BIM STATE of the ART Waves of Innovation Source: The Natural Edge Project, Australia http://www.naturaledgeproject.net/keynote.aspx
BIM STATE of the ART Towards a sustainable society Source: The Natural Edge Project, Australia http://www.naturaledgeproject.net/keynote.aspx
BIM STATE of the ART Towards a technological society Source: Larry Downes, The Laws of Disruption: Harnessing the New Forces that Govern Life and Business in the Digital Age (2009)
BIM STATE of the ART Evolution 2015 & IPD & VDC Source: Hannu Penttilä, Helsinki University of Technology, Finland
BIM STATE of the ART Shifting Management Cycle Some Clients already know of and are educated in BIM Geometry Information Design: Construction: O&M: D&D&D: % = % = % =???% =? Manage Oddslot Manage Design Hand over Build BIM Hand over Build Collate Collate Source: The state of BIM in EU Construction within the 4D BIM UK Conference at Birmingham City University-15/05/2014
BIM STATE of the ART Facts Industry: Beginning of extensive use of BIM technology Implementation and penetration following Project life s Cycle Education: Isolated use of BIM technology Implementation?? 7
BIM STATE of the ART Shifting Project Delivery Systems (PDS) 2D & 3D CAD Isolated Design - Bid - Build Owner Contractor Sub- Contractors Modelling Software Design Team Sub- Consultans Single Platform Interoperability BIM Source: CRC for Construction Innovation-Australia http://www.construction-innovation.info/images/pdfs/research_library/extension/national_bim_guidelines_july08_presentation.pdf
BIM STATE of the ART Shifting Project Work Flows Scope & Criteria P. Design Final Design CD Bid Construction Owner Architect Engineer Contractor FM O&M Owner FM Contractor Engineer Architect Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M
BIM STATE of the ART Shifting Project Work Flows Scope & Criteria P. Design Final Design CD Bid Construction RFI Construc tability Qty Contractor TraditionalProject Coordination O&M Tenderig Process Contract Procurement Scheduling Site Preparation Execution Cost Control Hand over
BIM STATE of the ART Shifting Project Work Flows Scope & Criteria P. Design Final Design CD Bid Construction Construc tability Contractor O&M RFI Qty Tenderig Process Contract Procurement Scheduling Site Preparation Saved Time Execution Cost Control Contractor Scope & Criteria P. Design Final Design CD Hand over Pre-construction Construction O&M
BIM STATE of the ART Shifting Project Work Flows Scope & Criteria P. Design Final Design CD Bid Construction Construc Constructability tability Contractor O&M Qty Quantity takeoff Contract Procurement Scheduling Saved Time Tenderig Process RFI Contractor Scope & Criteria P. Design Final Design Site Preparation Cost Control CD Execution Hand over Pre-construction Construction O&M
BIM STATE of the ART Shifting Project Work Flows Constructability Quantity takeoff Contract Procurement Scheduling Tenderig Process RFI FM Contractor Engineer Site Preparation Cost Control Execution Architect Hand over Owner Contractor Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M
BIM STATE of the ART Shifting Project Work Flows Constructability Quantity takeoff 3D BIM Coordination Contract Procurement Scheduling 4D BIM Site Preparation Execution Cost Control 5D BIM Tenderig Process RFI Owner FM Contractor Engineer Architect Hand over Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M
BIM STATE of the ART Shifting Project Work Flows Shifting Project Delivery Systems (PDS) Scope & Criteria P. Design Final Design CD Bid Construction Owner Architect Engineer Contractor FM O&M B Integrated Virtual I Project Design M Delivery Construction Owner FM Architect Contractor Engineer Hand over Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M Source: Mr. A.Lopez-Director of validation services-solibri Iberia Soft landing
BIM STATE of the ART Shifting Project Delivery Systems (PDS) 2D & 3D CAD Isolated Design - Bid - Build Owner Contractor Sub- Contractors Modelling Software Design Team Sub- Consultans Single Platform Collaborative Interoperability BIM. Design Build Integrated Owner Design-Build Entity Sub- Consultans Source: CRC for Construction Innovation-Australia http://www.construction-innovation.info/images/pdfs/research_library/extension/national_bim_guidelines_july08_presentation.pdf
BIM STATE of the ART Facts Industry: Beginning of extensive use of BIM technology Implementation and penetration following Project life s Cycle From traditional Coordination to 3D BIM Coordination (New role = job position) Education: Isolated use of BIM technology Implementation??? No education related to Project coordination 17
BIM STATE of the ART Model-Based Industries Source: Dassault Systems http://www.3ds.com/ Source: Autodesk http://www.autodesk.com/products/inventor/overview
BIM STATE of the ART Shifting Representation Formats Paper-Based vs. Model-Based (BIM / VDC) Source: Denis Neely, AIA http://www.aia.org/practicing/akr/aiab090847
BIM STATE of the ART Shifting Representation Formats Paper-Based vs. Model-Based (BIM / VDC) Cloud & Browse Solutions BIM Deliverables flows Electronic Documents Interoperability Information flows 2D + 3D Data transfer 2D Data transfer Processes flows Personnel+Computerization Personnel Paper Documents Single Platform Moelling Software 2D & 3D CAD
BIM STATE of the ART Cloud & Browse solutions Some available solutions Autodesk (Calculations and Collaboration) Graphisoft (Collaboration) Aconex (Document Management and Collaboration) 4Project (Document Management and Collaboration) RIB (Document Management and Collaboration) BIM Object (Content Management and Collaboration)..
BIM STATE of the ART Cloud & Browse solutions Content management solution Source: BIM Object http://info.bimobject.com/hercules
BIM for Construction Management
BIM for Construction Management Paper-Based vs. Model-Based (BIM / VDC) From 2D to 5D (BIM / VDC) REPRESENTATION VIRTUALIZATION Design phase Design 3D BIM model Static coordination Material Engineer disciplines Spaces Cost Control VIRTUAL CONSTRUCTION 3D BIM MATERIALIZATION Construction phase Construction 3D BIM model Dynamic coordination Labour-force Material Equipment Logistics 4D BIM Spaces Cost Control 5D BIM
BIM for Construction Management Paper-Based vs. Model-Based (BIM / VDC) From 2D to 5D (BIM / VDC) Level of Development LOD 000 LOD 050 LOD 100 LOD 200 LOD 300 LOD 350 LOD 400 LOD 450 LOD 500 LOD 550 LOD 600 Model Class M000 M100 M200 M300 M400 M500 M600 Buildings elements Building Building / with elements Constructio Fabrication Model Spatial No Model approximat with design n Model /Virtual Requirements /Room e dimensions (CD) Mock-up Massing dimensions (DD) As built (SD) Estimating Class C000 C100 C200 C300 C400 C500 C600 Estimating Requirements Average cost per m2 Average cost per element Cost per unique element, activity level Cost per unique element, resource level Cost per unique element, resource level Actual cost Scheduling Class S000 S100 S200 S300 S400 S500 S600 Scheduling Requirements Milestone Schedule Average production rate per element Source: VICO OFFICE http://www.vicosoftware.com/bim-execution-plan-vs-mps/tabid/299139/default.aspx Production rate per unique element/ Phase schedule based on resource hours estimates Production rate for resource hours/ Phase schedule based on subcontract or production commitmen ts Production rate for resource hours/ Weekly workplans Actual progressed schedule
BIM for Construction Management Paper-Based vs. Model-Based (BIM / VDC) From 2D to 5D (BIM / VDC) Scope & Criteria LOD 000 LOD 050 P. Design LOD 100 LOD 200 Final Design LOD 300 LOD 350 CD Bid LOD 400 LOD 450 Construction LOD 500 LOD 550 O&M LOD 600 M000 M000 M100 M200 M300 M300 M400 M400 M500 M500 M600 E100 E200 E200 E300 E300 E300 E400 E500 E500 E500 E600 S100 S200 S200 S300 S300 S300 S300 S400 S400 S500 S600 Generic solutions Specific solutions FM Contractor + Subcontractor+Supplier Engineer Architect Owner Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M Source: VICO OFFICE http://www.vicosoftware.com/bim-execution-plan-vs-mps/tabid/299139/default.aspx Virtual Construction
BIM for Construction Management Paper-Based vs. Model-Based (BIM / VDC) From 2D to 5D (BIM / VDC) Scope & Criteria P. Design Final Design CD Bid Construction O&M LOD 000 LOD 050 LOD 100 LOD 200 LOD 300 LOD 350 LOD 400 LOD 450 LOD 500 LOD 550 LOD 600 Constructability Quantity takeoff 3D BIM BIM Coordination Contract Procurement Tenderig Process Scheduling Site Preparation Execution 4D BIM RFI Cost Control 5D BIM Hand over S100 S200 S200 S300 S300 S300 S300 S400 S400 S500 S600 Scope & Criteria P. Design Final Design CD E100 E200 E200 E300 E300 E300 E400 E500 E500 E500 E600 Pre-construction Construction O&M LOD 000 LOD 050 LOD 100 LOD 200 LOD 300 LOD 350 LOD 400 LOD 450 LOD 500 LOD 550 LOD 600 Virtual Construction Virtual Construction
BIM for Construction Management From 2D to 5D (BIM / VDC) BIM tools for Virtual Construction (VC) Scope & Criteria P. Design Final Design CD Bid Construction O&M Constructability Quantity takeoff 3D BIM BIM Coordination Autodesk Navisworks Manage Contract Procurement Tenderig Process Scheduling Site Preparation Execution 4D BIM Syncro Ltd. Synchro Pro RFI Cost Control 5D BIM Hand over Trimble VICO Office RIB itwo Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M Virtual Construction
BIM for Construction Management BIM tools for Virtual Construction (VC) Constructability Quantity takeoff Contract Static Clash Detection Model for Construction Packages(Sub.&Suppliers) Qty Check out Location breakdown Construction Layout Procurement Tenderig Process RFI Hand over Scheduling Site Preparation Cost Control Qty & Activities list Activities Sequence Execution Site logistics Site existing conditions H&S / Work areas Equip.& Machinery QC & QA Prod. C. Dynamic Clash Detection Milestones Interim certificates 3D scanners 3D scanners Milestones Workflows optim. Temporary works Resource Manag. Cash flow Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M
BIM for Construction Management BIM tools for Virtual Construction (VC) Contract Constructability Quantity takeoff Static Clash Detection Model for Construction Packages(Sub.&Suppliers) Qty Check out Location breakdown Construction Layout Procurement Tenderig Process RFI Hand over Autodesk Navisworks Manage Scheduling Site Preparation Cost Control Qty & Activities list Activities Sequence Execution Site logistics Site existing conditions H&S / Work areas Equip.& Machinery QC & QA Prod. C. Dynamic Clash Detection Milestones Interim certificates 3D scanners 3D scanners Milestones Workflows optim. Temporary works Resource Manag. Cash flow Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M
BIM for Construction Management BIM tools for Virtual Construction (VC) Contract Constructability Quantity takeoff Static Clash Detection Model for Construction Packages(Sub.&Suppliers) Qty Check out Location breakdown Construction Layout Procurement Tenderig Process RFI Hand over Synchro Ltd. Synchro Pro Scheduling Site Preparation Cost Control Qty & Activities list Activities Sequence Execution Site logistics Site existing conditions H&S / Work areas Equip.& Machinery QC & QA Prod. C. Dynamic Clash Detection Milestones Interim certificates 3D scanners 3D scanners Milestones Workflows optim. Temporary works Resource Manag. Cash flow Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M
BIM for Construction Management BIM tools for Virtual Construction (VC) Contract Constructability Quantity takeoff Static Clash Detection Model for Construction Packages(Sub.&Suppliers) Qty Check out Location breakdown Construction Layout Procurement Tenderig Process RFI Hand over Trimble VICO Office Scheduling Site Preparation Cost Control Qty & Activities list Activities Sequence Execution Site logistics Site existing conditions H&S / Work areas Equip.& Machinery QC & QA Prod. C. Dynamic Clash Detection Milestones Interim certificates 3D scanners 3D scanners Milestones Workflows optim. Temporary works Resource Manag. Cash flow Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M
BIM STATE of the ART Facts Industry: Beginning of extensive use of BIM technology Implementation and penetration following Project life s Cycle From traditional Coordination to 3D BIM Coordination (New role = job position) Cloud & Browse solutions for calculation and collaboration New processes & workflows, towards Integrated Project Delivery (IPD) systems Education: Isolated use of BIM technology Implementation??? No education related to Project coordination No collaboration No clue or only academic knowledge of new processes & workflows, education still in silos 33
BIM for Construction Management BIM tools for Virtual Construction (VC) Interoperability Structural Engineer HVAC Engineer City The ability to manage and communicate electronic product and project data between Architect BIM Model Construction Manager collaborating firms and within individual companies design, construction, maintenance, and Civil Engineer Facilities Manager business process systems Building Owner Source: Building Smart Internacional http://www.buildingsmart.org/compliance/certified-software/ Source: National Institute of Standards and Technology (NIST) http://
BIM for Construction Management BIM tools for Virtual Construction (VC) Interoperability 2D 3D Data transfer & Information Schedule Architectural Design 3D BIM model Schedule Architectural Design 3D BIM model VICO Office Synchro Pro Navisworks Manage VICO Office Synchro Pro Navisworks Manage Schedule Update 3D Model Update Schedule Update 3D Model Update Quantities Take off 4D Visualization Dynamic (M.Views) Quantities Take off 4D Visualization Dynamic (M.Views) Gantt Charts 4D Visualization Gantt Charts 4D Visualization Line of Balance Charts 4D Scheduling Line of Balance Charts 4D Scheduling Resources Management & Histograms 3D Static clash detection Resources Management & Histograms 3D Static clash detection Montecarlo Simulation 3D Dynamic clash detection Montecarlo Simulation 3D Dynamic clash detection What if Simulations 3D database Equipment & Machinery What if Simulations 3D database Equipment & Machinery Cost Estimation Location-based Management Cost Estimation Location-based Management Cash Flow Charts 3D Model Edit Cash Flow Charts 3D Model Edit Monitor and Production control Tools 3D PDF Monitor and Production control Tools 3D PDF
BIM for Construction Management BIM tools for Virtual Construction (VC) Interoperability Schedule 2D 3D Data transfer & Information Architectural Design 3D BIM model Schedule Architectural Design 3D BIM model VICO Office Synchro Pro Navisworks Manage VICO Office Synchro Pro Navisworks Manage Schedule Update 3D Model Update Schedule Update 3D Model Update Quantities Take off 4D Visualization Dynamic (M.Views) Quantities Take off 4D Visualization Dynamic (M.Views) Gantt Charts 4D Visualization Gantt Charts 4D Visualization Line of Balance Charts 4D Scheduling Line of Balance Charts 4D Scheduling Resources Management & Histograms 3D Static clash detection Resources Management & Histograms 3D Static clash detection Montecarlo Simulation 3D Dynamic clash detection Montecarlo Simulation 3D Dynamic clash detection What if Simulations 3D database Equipment & Machinery What if Simulations 3D database Equipment & Machinery Cost Estimation Location-based Management Cost Estimation Location-based Management Cash Flow Charts 3D Model Edit Cash Flow Charts 3D Model Edit Monitor and Production control Tools 3D PDF Monitor and Production control Tools 3D PDF
BIM for Construction Management BIM tools for Virtual Construction (VC) Interoperability Capabilities CONCEPT Navisworks Manage VICO Office Synchro Pro Yes No Yes No Yes No Import Capabilities BIM model and files format X X X Schedule tools and files formats X X X IFC X X X BIM model and files format X X X Export Capabilities IFC X X X Movie format X X X PDF* / PDF 3D** X X* X** Reduce file size X???? Bi-directional data exchange ***Only with P6 X X X***
BIM for Construction Management BIM tools for Virtual Construction (VC) Interoperability Structural Engineer HVAC Engineer City Architect BIM Model Construction Manager Construction the missing link Civil Engineer Building Owner Facilities Manager Source: Building Smart Internacional http://www.buildingsmart.org/compliance/certified-software/
BIM for Construction Management BIM tools for Virtual Construction (VC) 4D BIM What it is 4D scheduling? Information Process Deliverables Which process prevail? 3D Data BIM model 4D Schedule 3D BIM model over the schedule or 2D Data Schedule Schedule over the 3D BIM model
BIM for Construction Management BIM tools for Virtual Construction (VC) 4D BIM 4D Simulation vs. 4D Scheduling vs. 4D Visualiztion 4D SIMULATION: Provide different scenarios of animated construction sequences 4D SCHEDULING: Ability to perform a schedule and an animated construction sequence associated with a 3D BIM model 4D Visualization: Ability to perform an animated construction sequence of 3D BIM model
BIM for Construction Management BIM tools for Virtual Construction (VC) Importance of 4D BIM Contract Constructability Quantity takeoff Static Clash Detection Model for Construction Packages(Sub.&Suppliers) Qty Check out Location breakdown Construction Layout Procurement Tenderig Process RFI Hand over 4D BIM Scheduling Site Preparation Cost Control Qty & Activities list Activities Sequence Execution Site logistics Site existing conditions H&S / Work areas Equip.& Machinery QC & QA Prod. C. Dynamic Clash Detection Milestones Interim certificates 3D scanners 3D scanners Milestones Workflows optim. Temporary works Resource Manag. Cash flow Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M Virtual Construction
BIM for Construction Management BIM tools for Virtual Construction (VC) Importance of 4D BIM Scope & Criteria P. Design Final Design CD Bid Construction Rework & Delay Reaction Rework : consequence of a special issue At any Change Delays: consequence missing something Scheduling At any Change Scheduling Reaction Adjust 4D model Scope & Criteria P. Design Final Design CD Pre-construction Construction O&M
BIM for Construction Management BIM tools for Virtual Construction (VC) Importance of 4D BIM Functional Capabilities CONCEPT Navisworks Manage VICO Office Synchro Pro Yes No Yes No Yes No 4D Visualization X X X 4D Dynamic visualization X X X 4D Scheduling X X X 4D Dynamic scheduling X X X 3D Static Model coordination X X X 3D Dynamic clash detection Xcond. X X 3D Equipment and Machinery Database X X X 3D Model edit tool X X X
BIM for Construction Management BIM tools for Virtual Construction (VC) Importance of 4D BIM Types of construction waste Material Loss: 1. (M1) Material waste 2. (M2) Non-optimal use of material (Unnecessary amount used in the product) 3. (M3) Non-optimal use of machinery, energy or labour (Unnecessary amount used in the production process) Source: Bølviken, Rooke, Koskela (2014) Proceedings IGLC22
BIM for Construction Management BIM tools for Virtual Construction (VC) Importance of 4D BIM Types of construction waste Time Loss: In the workflow 1. (T1) Unnecessary movement (of people) 2. (T2) Unnecessary work 3. (T3) Inefficient work 4. (T4) Waiting Source: Bølviken, Rooke, Koskela (2014) Proceedings IGLC22
BIM for Construction Management BIM tools for Virtual Construction (VC) Importance of 4D BIM Types of construction waste Time Loss: In the product flow 5. (T5) Space not being worked in 6. (T6) Materials not being processed 7. (T7) Unnecessary transportation (of material) Source: Bølviken, Rooke, Koskela (2014) Proceedings IGLC22
BIM for Construction Management BIM tools for Virtual Construction (VC) Importance of 4D BIM Types of construction waste Associated Builders and Contractors, Inc. USA Rework (M1, T3) Request for Information Change orders Inadequate Resources (M3) Inefficient workflow (T3) Work around (T3) Multiple handling of material (T7) Excess material (M1) Waiting on supplies (T4) Waiting on another trade (T4) Safety losses Improper sequencing of work (T3) Source: Associated Builders and Contractors, Inc. USA http://www.abc.org/portals/1/webinars/documents/lean%20nov%202013.pdf
BIM for Construction Management BIM tools for Virtual Construction (VC) Importance of 4D BIM Typical types of construction waste CONCEPT Detect (D) Mitigate Impact (M) 3D CAPABILITIES Navisworks Manage VICO Office Synchro Pro Navisworks Manage 4D CAPABILITIES VICO Office Synchro Pro Request for Information D M D M D M Change orders D M D M D M Safety losses D M D M D M Excess material (M1) D M Rework (M1, T3) D D D Inadequate Resources (M3) D M D M Inefficient workflow (T3) D M Work around (T3) D D D Improper sequencing of work D D M D M (T3) Waiting on supplies (T4) D D M D Waiting on another trade (T4) D D M D
BIM STATE of the ART Facts New Job Positions Design Phase BIM MANAGER BIM COORDINATOR BIM SPECIALIST QUANTITY SURVEYOR WITH BIM COMPETENCES Construction Phase BIM MANAGER BIM COORDINATOR BIM SPECIALIST 4D BIM PLANNER 4D BIM Const. MODELER
BIM STATE of the ART Facts Industry: Beginning of extensive use of BIM technology Implementation and penetration following Project life s Cycle From traditional Coordination to 3D BIM Coordination (New role = job position) Cloud & Browse solutions for calculation and collaboration New processes & workflows, towards Integrated Project Delivery (IPD) systems Education: Isolated use of BIM technology Implementation??? No education related to Project coordination No collaboration No clue or only academic knowledge of new processes & workflows, education still in silos 50
BIM STATE of the ART Facts Challenges for the Educational Institutions 1. Understand new workflows and processes in BIM 2. Education in BIM technology that manage the new workflows and processes 3. Understanding and knowledge of the capabilities and limitations of BIM tools 4. Moving towards an integrated and collaborative education Problem Based Learning education 5. Harmonization of professional and academic BIM competences at European level 51
BIM in Europe Building Smart International Source: Building Smart International
BIM in Europe EU Public Procurement Directive 2014 FACTS and DATES Document published on 28-03-2014 Document came in force on 17-04-2014 Document must to transpose by State Members in their national legislations on 17-04-2016 Use e-procurement, Information and Communication on 17-10-2018 Source: EU directive http://eur-lex.europa.eu/legal-content/en/txt/pdf/?uri=oj:l:2014:094:full&from=en
BIM in Europe EU Public Procurement Directive 2014 Targets Sustainable Procurement aligned with Europe 2020, a strategy for smart, sustainable and inclusive growth 1. EFFICIENCY IN PUBLIC SPENDING 2. NON-DISCRIMINATION BETWEEN SUPPLIERS 3. SME s INTEGRATION 4. ENSURE LEGAL CERTAINTY 5. SPUR INNOVATION 6. BEST VALUE FOR PUBLIC MONEY 7. FACILITATE A QUALITATIVE IMPROVEMENT IN THE USE OF PUBLIC PROCUREMENT Source: EU directive http://eur-lex.europa.eu/legal-content/en/txt/pdf/?uri=oj:l:2014:094:full&from=en
BIM in Europe EU Public Procurement Directive 2014 Targets Sustainable Procurement aligned with Europe 2020, a strategy for smart, sustainable and inclusive growth 8. E-PROCUREMENT: Information and Communication 9. SME s PARTICIPATION 10. DIVIDE LARGE CONTRACTS IN LOTS 11. MOST ECONOMICALLY ADVANTAGEOUS TENDER (MEAT) NEW AWARDING CRITERIA 12. BEST PRICE-QUALITY RATIO 13. ELIMINATION OF PRICE ONLY AS AWARDING CRITERIA Source: EU directive http://eur-lex.europa.eu/legal-content/en/txt/pdf/?uri=oj:l:2014:094:full&from=en
BIM in Europe EU Public Procurement Directive 2014 TITLE I: Scope, Definitions and General Principles Chapter II: General rules Article 22: Rules applicable to Communication USE OF BIM USE OF OPEN ICT PRODUCTS Source: EU directive http://eur-lex.europa.eu/legal-content/en/txt/pdf/?uri=oj:l:2014:094:full&from=en
BIM in Europe EU Call for proposals Source: EU directive http://ec.europa.eu/growth/tools-databases/newsroom/cf/itemdetail.cfm?item_id=8284&lang=en&tpa_id=0&title=call-for-proposals:-support-of-acommon-european-network-aiming-at-aligning-the-use-of-building-information-modelling-in-public-works
BIM Lab VIA University College Go morgen og velkommen Breakfast Club Fredag, den 26. sep. 2014 BIM Lab opened 11. Jun 2014 >>>> BIM Lab Video
BIM Lab VIA University College Press Releases: http://vbipark.dk/aabning-af-bim-lab-3/ http://www.viauc.dk/pressesite/artikler/sider/vias-bim-lab-giver-genlyd-i-byggeverdenen.aspx http://bips.dk/nyhed/bim-lab-p%c3%a5-horsens http://www.viauc.dk/pressesite/artikler/sider/digital-oprustning-paa-vias-byggeuddannelser.aspx http://www.building-supply.dk/article/view/135704/nyt_bimlab_til_bygningskonstruktorer?ref=rss#.vbadzrectiu http://www.byggeri.dk/nyheder/view_news_bygtek.php?id=29423 http://www.ue.dk/byggeri/30198/digital-oprustning-paa-vias-byggeuddannelser http://www.building-supply.dk/article/view/135704/nyt_bimlab_til_bygningskonstruktorer#.u_nj5rkctcs
BIM Lab VIA University College What is VIA BIM Lab? Lab facilities to research and development with companies and students Equipment Total Station for surveying Equipment for Laser Scanning How Laser Scanning Works >>> http://youtu.be/_nxcfykpybi Equipment for Terrestrial photogrammetry Equipment for recordings - streaming - video conferencing Openvia: www.openvia.dk Cloud scan (punktsky eksempel) >>>>> http://youtu.be/4jkb-ukk5jm >>>>>VIA visualisering Energypark
BIM Lab VIA University College BIM focus areas BIM Processes: BIM Project Execution Planning Guide BIM Classification: Cuneco Classification System - CCS BIM Tools: Revit Arch MEP STRUC Robot Solibri Vico Navis Works Sigma
BIM Lab VIA University College Examples Students works: Laserscanning Claushol Castle https://youtu.be/ypttgtwhhsk KLT 4. sem: Lecturer workshop: OpenVIA search BIM Lectures on YouTube:
Higher education in BIM Spain- On Campus & Blended 1. UNIVERSIDAD POLITÉCNICA DE CATALUÑA 2. UNIVERSIDAD DE SEVILLA. 3. UNIVERSIDAD DE VALLADOLID. 4. UNIVERSIDAD DE A CORUÑA 5. UNIVERSIDAD POLITÉCNICA DE VALENCIA 6. UNIVERSIDAD DE EXTREMADURA 7. UNIVERSIDAD POLITÉCNICA DE MADRID 8. UNIVERSIDAD EUROPEA DE MADRID. 9. UNIVERSIDAD INTERNACIONAL DE CATALUÑA 10. CICE 11. IDESIE 12. ESCUELA DE EDIFICACIÓN (COAAM) Source: Felipe Choclán Gámez ETSAM-UPM
Higher education in BIM Spain- On line 1. UNED 2. e-zigurat & BIMFreelance:. Source: Felipe Choclán Gámez ETSAM-UPM 1 st edition-spanish: 102 students (Spain, Portugal, Mexico, Brazil, Colombia, Peru, Bolivia, Libia, Uzbekistan, Luxemburg and Norway) 2 nd edition-spanish: 80 students 3 rd edition-spanish: starts in September 1 st edition-portuguese BIM platforms: Autodesk-Revit and Navisworks / Bentley-AECOsim Graphisoft-Archicad / Nemetschek-Allplan Cype-MEP and Structures / DDS-CAD Solibri / Tekla / VICO (under negotiation) Source: e-zigurat & BIM Freelance
Higher education in BIM Denmark 1. Technical University of Denmark 2. The Royal Danish Academy of Fine Arts Schools of Architecture, Design and Conservation 3. Aarhus School of Architecture 4. Aarhus University 5. Aalborg University 6. University Of Southern Denmark 7. VIA University College 8. Copenhagen School of Design and Technology 9. University College Lillebælt