NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM

Similar documents
STRUCTURAL EVALUATION AND BRIDGE MANAGEMENT CONSULTANT EVALUATION CRITERIA FOR COUNTY MINOR BRIDGE INSPECTION SYSTEM (COMBIS) I. SCHEDULE.

ERRATA SHEET RECORDING AND CODING GUIDE FOR THE STRUCTURE INVENTORY AND APPRAISAL OF THE NATION=S BRIDGES REPORT NO. FHWA-PD , DECEMBER 1995

INSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE

How to Review SI&A Data

Summary of Critical Findings Reviews for the National Bridge Inspection Program

SOUTHEAST TEXAS CONTINUING EDUCATION BRIDGE INSPECTION, MAINTENANCE AND REPAIR

NEW MEXICO LAND OF ENCHANTMENT

State-Aid Bridge News July 20, 2004

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

NJDOT Bridge Preservation and Asset Management Strategies. Gerald P. Oliveto, P.E. Roger Estivalletti

SIAMA. SIAMA Asset Management Technologies Level-2 Bridge Condition Inspection

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY

Guideline for Bridge Safety Management February 2012

Bridge Inspection Manual. Revised July 2002 by Texas Department of Transportation (512) all rights reserved

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

Inspection Frequency MiSIM Chapter 3

Inspection Form Completion

BRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION

Cochran Mill Road Bridge over Tuscarora Creek

Fhwa Field Manual For Timber Bridge Inspection

2012 Forum Bridge Inspection Clarifications GENERAL/MISCELLANEOUS

Baseline Document Change Announcement

Scott Neubauer. Bridge Maintenance and Inspection Engineer Office of Bridges and Structures Iowa DOT

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO COUNTY STATE AID HIGHWAY 10 OVER THE POMME DE TERRE RIVER DISTRICT 4 STEVENS COUNTY

Responses to questions received following I-526 Wando Bridge closure As of May 31, 2018

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

Load Rating Guidance Document Issue Date: 2018

MnDOT Contract No Exhibit A Scope of Work

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY

Wall Asset Management Implementation at Colorado Department of Transportation. Bryant Walters, Collins Engineers Mark Vessely, Shannon & Wilson

CHAPTER 13 MICHIGAN DESIGN MANUAL BRIDGE DESIGN RAILROAD CROSSINGS RAILROAD CROSSINGS IDENTIFICATION OF GRADE SEPARATIONS

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

US 278 East Bound and West Bound. MacKay Creek and Skull Creek. Cursory Above Water and Underwater Investigation Of. Over

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS

Austin Avenue Bridges Project Walking Tour Agenda

BURAUEN BRIDGES ASSESSMENT Typhoon Haiyan Emergency Response Philippines

SECTION 10 UTILITIES

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Road M3 Chisinau Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Draft Feasibility Study (December 2008)

LRFD Bridge Design Manual Changes

STRUCTURE AND BRIDGE DIVISION

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

VDOT s Experience with Reinforced Concrete and Metal Culverts

STRUCTURE AND BRIDGE DIVISION

ENGINEERING DIRECTIVES AND STANDARDS VOLUME I CHAPTER 1 SECTION 1 DIRECTIVE 8

HistoricBridges.org - National Bridge Inventory Data Sheet

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

BRIDGE DESIGN MEMORANDUM DM0115

Chapter 1. General Design Information. Section 1.03 Loads and Load Factors. Introduction. Load Modifying Factors

STRUCTURE AND BRIDGE DIVISION

Bridge Preservation Beyond the Short Term

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

BRIDGE INSPECTION REPORT

Designing Bridges for Inspectability

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY

Excavation Safety Program

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - WILKIN COUNTY

MnDOT Bridge Load Rating and Evaluation Manual TABLE OF CONTENTS

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

Pinellas Bayway Bridge Replacement

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

Exhibit A Mn/DOT Contract No

National Transportation Safety Board Washington, D.C

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 3 - MORRISON COUNTY

Cast in place concrete parapet and Ministry standard sidewalk railing.

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 7 WATONWAN COUNTY

Inspector's Role and Responsibilities. Inspection Policies & Procedures. Requirements for Certification and Re Certification. Inspector's Skills

9D - BRIDGE INSPECTION

System Preservation in Louisiana

MEMORANDUM TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT SUBJECT: CONSIDERATION OF TRAFFIC WAY BRIDGE REPLACEMENT PROJECT PROGRAMMING

PIER PROTECTION (VEHICLE COLLISION) September 13, 2018

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CR 27 OVER THE RED LAKE RIVER DISTRICT 2 PENNINGTON COUNTY

STRUCTURE AND BRIDGE DIVISION

International Symposium Non-Destructive Testing in Civil Engineering (NDT-CE) September 15-17, 2015, Berlin, Germany

Construction Activity Descriptions April, 2018

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE

1 layer of untreated timber running planks, 254 mm x 89 mm.

CITY TREE REMOVAL POLICY AND PROCEDURES

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.

Element Level Bridge Inspection Data and Bridge Preservation. Derek Soden, P.E. FHWA Resource Center

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

MASH. When most people hear MASH, they think of the popular. Regulation CODES & STANDARDS

Chapter 4 Bridge Program Drawings

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES

RECOMMENDED PROCEDURES FOR RAILWAY CULVERT INSPECTION

Appendix - Guideline for Bridge Safety Management with Clarification Comments on Grey Background February 2012

STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY

Structural - Engineering Review Checklist

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD

SCOPE OF WORK. Consultant: An individual or firm, who is contracted to furnish services outlined in this scope of work.

San Joaquin Valley Unified Air Pollution Control District

Transcription:

NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM TO: FROM: All Engineering & Support Staff Structural Evaluation James Lane, Manager Structural Evaluation DATE: January 2, 2008 PHONE: 530-3572 SUBJECT: Priority Repair Procedure Revised January 2008 The attached Priority Repair Procedure has been revised in accordance with the current requirements. Please utilize this Procedure for all Priority Repairs effective immediately. If you have any questions regarding this, please do not hesitate to see me. JL: op C: Richard W. Dunne JL

SECTION 5.3 PRIORITY REPAIR SECTION 5.3.1 -- PROCEDURE 1. Once the need for a priority repair on a State or Orphan bridge has been identified in accordance with the attached Priority Repair Categories, a search of all current design projects will be made to determine if there are any ongoing projects whose construction would affect the design (or need) of the priority repairs. It will then be determined if a consultant, Structural Evaluation or Structural Design will be assigned the project. If the project is assigned to Structural Design, it is necessary to write a memorandum describing the condition and requesting that the appropriate action be taken. Typically, all repairs which would result in changes to the current configuration of the structure would be referred to Structural Design for completion. However, no further action is necessary by Structural Evaluation. If the project is assigned to Structural Evaluation, continue with Step #2. If the project is assigned to a consultant, skip to Step #3. 2. The project to design the priority repair will be assigned to a crew led by a Project Engineer. The crew will develop the necessary drawings, sketches, specifications and repair procedures required for Maintenance Engineering to effect the priority repair. The priority repair will be designed in accordance with the current AASHTO Design Manuals, NJDOT Design Manuals and NJDOT Standard Specifications. The repair shall also be designed using standard engineering practices with a consideration of the construction capabilities of Maintenance Engineering. The as-built plans for the bridge shall be obtained if required and the conditions shall be verified in the field as necessary to develop the priority repair design. In emergency repair situations, the need for interim repair measures shall be considered when the permanent repairs may not be constructible in a timely manner. Care shall be taken that the final repair design is functional and constructible. 3. After the priority repair is designed by the crew, a transmittal memo for the unit manager s signature to Maintenance Engineering shall be drafted and the entire package forwarded to the Supervising Engineer for the quality review. Skip to Step #5. 4. When the project is assigned to a consultant to design the priority repair, it could be extra work (meaning there is an additional fixed fee involved) or additional work (no additional fixed fee involved). In either case, if a significant effort is required by the consultant, the Project Engineer should request a cost proposal from the consultant based on the agreed scope-of-work for the repair design. 5.3-1

5. The Project Engineer should write a memo to the Bureau of Programming (Robert McLaughlin) requesting Federal approval (if federal funds are involved) and the necessary additional funding based on the consultant s cost proposal. If additional work is involved, the Project Engineer can authorize the consultant to start the work. If extra work is involved, the consultant cannot start the work until the necessary contract modification is executed. Remember that if the cost proposal exceeds $50,000., it must be reviewed by Auditing. In either case, the Project engineer should negotiate the final design project costs with the consultant upon receipt of his cost proposal. Upon receipt of the consultant s final cost proposal, the Project Engineer will immediately begin the consultant contract modification process. The contract modification can be processed through the consultant signature phase, but if the FHWA s approval is required, it may not be routed for signatures through the Department until the FHWA s approval is received. Once the consultant contract modification has been fully executed, consultants performing extra work can be given notice to proceed with the design work. 6. When the priority repair design package is received from the consultant, the Project Engineer will ensure that the work produced by the consultant meets the requirements of the scope-of-work. If the design is not in conformance with the scope-of-work, a transmittal letter to the consultant shall be drafted noting the non-conformance for the signature of the unit manager. In some cases, this may be discussed with the consultant on the telephone to speed the resubmission process, but a letter should follow to the consultant. 7. If the design conforms to the requirements of the scope of work, the Project Engineer shall draft a memorandum for the signature of the unit manager to Maintenance Engineering and the entire package shall be forwarded to the Supervising Engineer for the quality review. 8. The Supervising Engineer shall review the priority repair design to ensure that the design conforms with the current design manuals and codes. He will also ensure that the design is functional, constructible and conforms with current engineering practice. He will verify that there are no ongoing design projects whose construction would affect the priority repair design. Additionally, he will verify that the priority repair package is complete in all respects and that the proper priority repair category has been specified. 9. If non-conformances are found, the package will be returned to the designer or consultant noting all non-conformances. 10. If the package is observed to be acceptable, the Supervising Engineer will initial a buck-slip and forward the entire package to the unit manager for his signature. 5.3-2

11. Upon verifying that the proper procedures have been followed and review conducted, the unit manager will sign the transmittal memo to Maintenance Engineering. The memo and photos will also be E-Mailed to the proper Regional Maintenance Engineer (Region North, Central or South) and the Bureau of Maintenance Engineering. In addition, for repairs that will have environmental impact on waterways or wetlands (such as installation of rip-rap), a copy of the memo and e-mail will be provided to the Director of Environmental Resources in order to obtain the necessary environmental permits. 12. A copy of the transmittal memo shall be provided for the Priority Repair Log file. Upon receipt of the memo, the necessary information shall be logged in and the memo filed. 13. If Maintenance Engineering encounters any problems with the execution of the priority repair, they will contact the Project Engineer who will make any corrections necessary for in-house designs or ask the consultant to make the revisions for consultant designs. These corrections can be handled verbally, but must be documented by the as-built information provided by Maintenance Engineering to Structural Evaluation upon completion of the project. 14. Upon receipt of an E-Mail notification from Maintenance Engineering specifying completion of the priority repair, the Priority Repair Log will be updated and the completed repair moved from the pending to completed portion of the Log. 15. A copy of the E-Mail notification from Maintenance Engineering indicating completion of the repair will then be forwarded to the Project Engineer for repair verification or information. Maintenance Engineering will provide digital photos of the work done in the E-Mail whenever possible. This repair completion notification E-Mail with photos of the repair will constitute the field verification for this office. The inspection crew that initiated the priority memo will field verify all Emergency repairs and any high Priority 1 repairs where the photos provided by Maintenance Engineering do not provide enough information or detail to verify the repair. Low Priority 1 and all Priority 2 repairs will not be field verified by Structural Evaluation. The SI&A/PONTIS data must be updated as needed. Also, an E-Mail notification must be sent to Ayodele Oshilaja (Project Engineer) with copy to Vicki Young indicating that the Priority E or high Priority 1 repair has been field verified. 5.3-3

SECTION 5.3.2 -- PRIORITY REPAIR CATEGORIES Emergency (highest) Major defects in the superstructure or substructure which, if not repaired immediately, may require closing the bridge or a portion thereof and could lead to a total collapse of the structure. Included in this category are defects affecting the structural integrity of the bridge. In many instances it may be necessary to block off the affected area or close the bridge entirely until the repairs are made. Also, defects which, in the judgment of the engineer, require immediate attention in order to eliminate significant safety hazards to the traveling public. Generally, the superstructure (SI&A Item #59), substructure (SI&A Item #60) or culvert (SI&A Item #62) are found to be in critical condition and are coded 2 or less in the Structure Inventory and Appraisal Sheet. Repairs under the Emergency category must be done as soon as possible. When delays are unavoidable, the use of temporary repairs must be considered and utilized whenever possible. In all cases, the repairs must start no later than fourteen (14) days from the date of notification of Maintenance Engineering. However, most repairs should be started within three (3) days of notification. Examples 1. Crack in a non-redundant primary load carrying steel member. 2. Substantial (more than 50%) undermining of the bearing area of a non-redundant member. 3. Deterioration or other conditions which causes a main load carrying member to become unstable. 4. Loose sections of concrete encasements located above the traveled roadway or sidewalks. 5. Missing sections of bridge railings. 6. Localized failure of bridge deck or sidewalk. Procedure 1. Inspection crew (in-house or consultant) will immediately inform their respective project managers, usually utilizing a telephone in the field, regarding the situation. 5.3-4

2. Structural Evaluation will alert the Bureau of Maintenance Engineering by telephone and recommend immediate appropriate action needed, such as load or speed posting (reduction in load limit, if already posted), blocking a portion of or closing the bridge to vehicular traffic, etc. 3. Scope of work will be reviewed and checked to see if the proposed repairs can be done by the in-house maintenance forces or if it is beyond their capabilities. 4. Repairs beyond the capabilities of Maintenance Engineering should be brought to the attention of the Manager, Structural Engineering. 5. Follow up with a memorandum to Maintenance Engineering confirming the proposed action within one day. 6. Structural Evaluation shall prepare the repair sketches, plans and material list (if necessary) of the proposed repairs. Help could also be obtained from Structural Design or consultants by way of an existing state contract. 7. Bureau of Maintenance Engineering will inform Structural Evaluation when the repairs are completed by e-mail (with photos) and also make available as-built sketches/plans if possible. 8. A follow-up log of all priority repairs shall be maintained in Structural Evaluation to ensure the needed repairs have been made. A copy of the "Priority Repair Log" shall be sent to the Bureau of Maintenance Engineering every month to update their status of pending priority repairs. 9. Verification of the repairs by Structural Evaluation with an E-Mail notification (see section 5.3.1, item no 15). Priority #1 (high) Major defects in the superstructure or substructure which, if not repaired, may cause a significant load restriction or partial collapse of the structure. Included in this category are defects affecting the stability of the structure. In many instances, it may be necessary to post load or speed restrictions or to partially or completely block off the affected area to vehicular traffic until the repairs are made. Also, include defects which, in the judgment of the engineer, need immediate attention to maintain the level of service it served or to ensure the safety of the traveling public. Generally, superstructure (SI&A Item #59), or substructure (Item #60) or culvert (Item #62) are found to be in poor condition and coded 3 or less in the Structural Inventory and Appraisal Sheet. 5.3-5

Repairs under the Priority #1 category must be done as soon as possible. All repairs should start no later than thirty (30) days from the notification to Maintenance Engineering. Examples 1. Longitudinal crack in a primary load carrying steel member. 2. Substantial (more than 50 percent) undermining of bearing area of a major load carrying member. 3. Substantial section loss or collision damage to the main load carrying member requiring a major highway to be load posted. 4. Pier cap of a column bent in distress. 5. Major section loss on adjacent piles of a pile bent pier. 6. Major scour problem with undermining of footings not on piles (bridge is scour critical). Procedure 1. Inspection crew (in-house or consultant) will immediately inform their respective project managers regarding the situation. 2. Structural Evaluation will alert the Bureau of Maintenance Engineering and recommend immediate appropriate action needed, such as posting of load or speed restrictions, blocking a portion of the bridge to vehicular traffic, etc. 3. Scope of Work will be reviewed and checked to see if the proposed repairs can be done by the in-house maintenance forces or if it is beyond their capabilities. 4. Repairs beyond the capabilities of Maintenance Engineering should be brought to the attention of the Manager, Structural Engineering. 5. Follow up with a memorandum to Maintenance Engineering confirming the proposed action. 6. Structural Evaluation shall prepare the repair sketches, plans and material list (if necessary) of the proposed repairs. Help could also be obtained from Structural Design or consultants with a present state contract. 7. Bureau of Maintenance Engineering will inform Structural Evaluation when the repairs are completed by e-mail (with photos) and also make available as-built sketches/plans if possible. 5.3-6

8. A follow up log of all priority repairs shall be maintained in Structural Evaluation to ensure the needed repairs have been made. A copy of the "Priority Repair Log" shall be sent to the Bureau of Maintenance Engineering every month, to update the status of pending priority repairs. 9. Verification of the repairs by Structural Evaluation with an E-Mail notification (see section 5.3.1, item no 15) for repairs designated as High Priority 1 only. Routine Priority 1 repairs do not require field verification beyond the receipt of an e-mail from Maintenance Engineering. Priority #2 (medium) Major imminent defect in the superstructure, substructure or deck which, if not repaired in the near future (within +3 months), may cause a load restriction or partial collapse of the structure. Generally, one of the major components is in "Poor" condition and at least one of the Structural Inventory and Appraisal items 58, 59, 60 or 62 is coded "4" or less. Any defects that would risk the safety of the traveling public in the near future should also be included here. The engineer's judgment will be required to evaluate the overall situation to properly categorize the recommendations. Following are some of the examples in this category: Examples 1. Short crack in a primary load carrying steel member in a redundant structure. 2. Substantial undermining of bearing area of a redundant load carrying member. 3. Major section loss or collision damage. 4. Major problems with the bridge railing. 5. Major scour problems with footings on piles (bridge is not scour critical). Procedure 1. Inspection crew (in-house or consultant) will convey the situation to their respective project engineer by a memorandum to file/letter. 2. Structural Evaluation will prepare repair recommendations, including sketches and plans, etc. as necessary, and forward them to the Bureau of Maintenance Engineering under Priority 2 repairs. Help may be obtained from Structural Design or consultant with a present state contract. 5.3-7

3. Bureau of Maintenance Engineering will inform Structural Evaluation when the repairs are completed by e-mail (with photos) and, also, make available as built sketches/plans if possible. 4. A follow-up log of all priority repairs shall be maintained in Structural Evaluation to ensure the needed repairs have been made. A copy of the "Priority Repair Log" shall be sent to the Bureau of Maintenance Engineering every month, to update their status of pending priority repairs. 5. Field verification of Priority # 2 repairs are not required. Priority #3 (low) All other repair recommendations not falling in the previous three categories, including maintenance items, shall be under this category. As per the current reporting requirements, these repairs are not required to be included in routine bridge survey reports. Procedure Necessary repairs will be recommended in the Bridge Inspection Report and a copy will be sent to the Bureau of Maintenance Engineering. 5.3-8