Copyright Materials. Learning Objectives

Similar documents
Copyright Materials 11/8/2012. Learning Objectives

Modular Wood Framing Goes Vertical

Copyright Materials INTRODUCTION TO SIPATO AN EMPLOYEE OWNED COMPANY. This presentation is protected by US and

Implementing Budget Solutions for Schools: Construction Cost and Scheduling Benefits of Using Wood

Learning Objectives. Copyright Materials. Timber over non-combustible Podium Structures. High Performance and Low Cost.

Detailing For Wood Shrinkage

DISTRICT 03: EASTERN CANADA'S FIRST 6- STOREY CLT BUILDING DAVID MIZRAHI, ENG. (ENSTIB, M.S.) DESIGN ENGINEER, NORDIC. Copyright Materials

Copyright Materials. Learning Objectives. Design is in the Details: Solutions to Common to Mid Rise Design. Challenges

Design Professionals. Acoustics

All-wood Podiums in Mid-rise Construction

2008 Questions & Solutions Engineering, Inc.

structural design of mass timber framing systems

Massive but Lean: How Design + Construction Efficiency Led One Mass Timber Project to Success

WORKSHOP Progressive Multi- Family Design: New Opportunities for Light Frame Mid-Rise Structures

Meeting Residential Energy. Construction. Copyright Materials. Loren Ross, P.E. Manager, Engineering Research American Wood Council

Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings

Section 5 Crew Requirements

Urban Acoustics HORBURN ASSOCIATES ACOUSTICAL, TECHNOLOGY, AND LIGHTING DESIGN. Steve(n) Thorburn, PE, LEED AP, CTS-I, CTS-D

CLT in the U.S. Manufacturing and Applications

Energy-Efficient Facilities: Building Envelope Design. Wall Systems. Copyright Materials. Course Description

Learning Objectives. Copyright Materials

Hindsight is 20/20: Lessons Learned in Courthouse Construction

Progressive Multi-Family Design: New Opportunities for Light Frame Mid-Rise Structures. Workshop

The Role of Control Layers in Building Enclosure Design

Architectural Panels. Architectural Panels to meet design expectations. Copyright Materials. National Sponsors

Slide 1. Slide 2. Slide 3. Lumber Standards and Specifications. Learning Objectives. Frank Stewart Western Wood Products Association

The Role of Control Layers in Building Enclosure Design

structural design of mass timber framing systems

Wood Solutions Fair, 2014, Toronto

Fast + Epp structural engineers Tanya Luthi, P.E.

BUILDING ENCLOSURE AIR TIGHTNESS TESTING Course Number: BCLUNA018-01P

Learning Objectives. Eden Project The Core Cornwall, England

Fire Safety of Tall Wood Buildings: A Research Review. Copyright Materials. Course Description. This presentation is protected by US and

Building Enclosure Details and Assemblies for Wood-Frame Buildings

Copyright Materials TIMBER TOWER RESEARCH PROJECT BY SOM. Learning Objectives

WOODWORKS WEBINAR - JUNE 14, 2012

A 21st Century Iconic Glulam Structure: Cathedral of Christ the Light

WELCOME! Copyright Materials. Credit Information. Welcome! We will begin in a few minutes. by the sign in table for today s drawing.

Exposed Wood in Fire Resistive Applications

STRUCTURAL SOLUTIONS

Wood Frame STUDENT HOUSING

From View Calculation to Fabrication A Manhattan Residential Project

Building Enclosure Design Fundamentals, Components, and Assemblies

Cross-Laminated Timber (CLT) in California:

Light Steel Framing ~ From Concept to Completion

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort

Design Professionals. Urban Acoustics. Acoustics. Lighting Design Fixture Layout Fixture Specification Controls Daylighting

MEETING FIRE CODE WITH ORIENTED STRAND BOARD

Introducing the Design Guide for Nail-Laminated Timber Architectural Considerations SUBTITLE

Project Estimate Summary

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

Building Enclosure Detailing for Balconies

Building for Energy Efficiency Part 2 Advanced Framing Workshop. Objectives for this presentation...

Integrated Air & Water Barrier Systems

Elevation "L" ASTOR II DESIGN CRITERIA: 2012 International Residential Code with Georgia Amendments

BUILDING ENCLOSURE COMMISSIONING EDUCATION

Measuring the Impact of BIM in Design-Bid-Build

Elevation "L" CHELSEA II DESIGN CRITERIA: 2012 International Residential Code with Georgia Amendments

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings

SECTION FABRICATED WALL PANEL ASSEMBLIES. A. American Institute of Steel Construction (A.I.S.C.) "Manual of Steel Construction.

Prescriptive Residential Wood Deck Construction Guide with Commentary DCA IRC Version (BCD 306)

Off-Site Wood Construction:

Special Inspections for Wood Construction BCD710 Michelle Kam-Biron, PE, SE, SECB Senior Director, Education American Wood Council

XHBN.FF-D Joint Systems. Joint Systems. System No. FF-D-3008

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Framing Techniques for Builders: Lessons Learned and Best Practices

Learning Objectives. Copyright Materials. This presentation is protected by US and International Copyright laws. Reproduction,

Thermal Bridging Solutions. Improving Building Envelope Performance

Ultra-Thin Prestressed Precast Panel Technology

SENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING

Shear Wall Design Examples per 2015 WFCM and 2015 SDPWS

Report on Commercial and Residential Carpentry and Steel Framing

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings

Greening Your Building With Wood

ENERGY STAR Homes version 3 Designing and Building to Meet the 2011 Changes. Thursday, February 24, 2011

SECTION TIMBER FLOATS

4400 North Point Pkwy., Suite 295 Alpharetta, GA Office

Impact of NFPA 285 on Air Barrier Specification and Design

Project Address: Name of Person Completing Form:

Audio Presentation. Session 3 DESIGN. Project Delivery Education Program. Construction Document Technology (CDT) Preparatory Course

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings. John Buddy Showalter, PE VP, Technology Transfer American Wood Council

Codes and Standards for Mid-rise Construction An All Wood Solution

BUILDING TRADES II ALTERNATIVE FRAMING TECHNIQUES TEACHER S GUIDE

WoodWorks National Sponsors

Continuous Insulation: Code Compliance and the NFPA 285 in Commercial Wall Assemblies. Hunter Panels Provider No. K169 Course Number HP 105

Energy Code Compliance:

SPEED FRAMING: FRAMER AND COMPONENT MANUFACTURER TEAM UP WITH TECHNOLOGY. A case study by MiTek

A-ONE Insulated Forms Installation Manual

229 Rehoboth Avenue Telephone P.O. Box 1163 Fax

NSC North Star Contracting, l.l.c

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

HMMA hmm08b Installation and Storage of Hollow Metal Doors and Frames. An American Institute of Architects (AIA) Continuing Education Program

T A B L E O F C O N T E N T S

Air Barrier Considerations for Roof/Wall Intersections. Presented by Laverne Dalgleish Air Barrier Association of America

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

Transcription:

Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited. The Wood Products Council 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-aia members are available upon request. This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation. Learning Objectives At the end of this program, participants will be able to: 1. Participants will be able to understand what is wall panelizing. 2. Participants will be able to understand the benefits to utilizing wall panelizing. 3. Participants will be able to understand how BIM modeling plays a key role in the use of wall panelizing. 4. Participants will be able to understand how wall panelizing can be used on future projects.

About Larrabure Framing Founded by Brian Larrabure in 1989 Larrabure Framing is a member of the NAHB, the BIA, and is a Simpson Strong Tie certified company. Comprised of separate multi-family and single family housing divisions, our company performs work for national home builders, REIT s, general contractors and high end ownerbuilders. Multi-Family Division This division has completed over 10,000 units of 5 story Type III construction, establishing our company as the most experienced Type III framer in the state. We have also completed a multitude of 2 to 4 story type V projects including tight inner city infill projects that require intense coordination with the builder and suppliers. Over 6000 units have been panelized. Housing Division Our Housing division has built thousands of homes throughout Southern California. From entry level to high end customs. Since 2005 Over 50% have been panelized. Pre Fabricated Wall Panels aka Panelization History of Panelization. A highly developed system using a BIM (Building Information Modeling) environment to model and coordinate rough framing issues such as: architectural requirements vs. structural, plumbing, HVAC, and electrical. Using BIM up to 95% of the framing issues can be resolved after which then you can build the major structural framing components at off site Facility.

Some Benefits of Panelizing Consistent layout and framing unit to unit and floor to floor. Reduction in on site man power needs by 30% a major benefit in these times of labor shortages. Reduced demand to site utilities, toilets, parking and refuse generated by employees. Reduction in on site injuries.

Why Panelize To save time on critical path and schedule by as much as 50%. Greatly reduce field driven Change Orders. Reduces on site material waste by 50 to 70%, Contributes up to 4 Leed Points*. By panelizing builder can meet current Cal Green waste reduction requirements*. Save Thousands $$ on waste removal. What do we look for? ADA issues. Thickness of wall finishes, shear panel, layers of drywall, stucco, wall heights etc. Non stacking point loads and structural steel. Window / door sizing vs. structural requirements. Concrete slab or podium dimensions vs. superstructure.

H-C Blocking

Site layout includes locations of wall panels as shown in project design book.

Two man teams can erect several units per day

Lumber components are laser etched and cut to size in one operation. Tolerances are +- 1/16, this makes for consistent units and walls throughout the project. Layout for studs posts etc are all laser etched in to the plates

The stacking/shipping report assures efficient loading and site placement of panels. Structural components are organized and assembled on flat tables. This allows for squaring of the walls, clean tight joints and assemblies. Each crew is working off of the wall books to insure that the correct grades are in place or fire treated materials are being used only where required. Each table has a QC supervisor monitoring the work. If the wood is defective or has white mold it is culled prior to assembly and never contaminates the site.

Lumber as delivered has high moisture content By the time the walls are delivered to the site the moisture content drops in to the single digit range Company Trucks & Outside Haulers

LESS SITE CONGESTION CLEANER & GREENER

Your upcoming projects Cost, Same as a stick framed project Project size, 50 units and up Lead time is the key, at least 3 to 4 months prior to pre deck Select the team, Not all have a proven track record