ADDENDUM 3 TO INVITATION FOR BID 5300-FG. Interior Renovations for UNLV Quality Assurance Lab (QAL) and UNLV Monitoring Systems Lab (MSL)

Similar documents
ADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION

MECHANICAL M-1 LEGEND AND DETAILS M-2 FLOOR PLAN - DUCTWORK M-3 FLOOR PLAN - PIPING

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

Addendum No. 3: EAST HIGH SCHOOL AUDITORIUM RENOVATIONS

Bid Package# 500 Org. 046 Fred Florence Middle School Org. 164 Anson Jones Elementary School

TENDER ADDENDUM NO. TWO (2)

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS

ADDENDUM NO. 1. Kapuskasing District High School Interior Upgrades. ADDENDUM NO. 1 November 9, 2018

The following shall be incorporated into the Contract Documents dated 26 MAR 2018.

Refer to Sheet A-203 and modify Floor Plan Demolition Keynote #23 as follows:

SOLICITATION ADDENDUM

Addendum #3 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

ADDENDUM NO. 1. PROJECT: Lowell High School DATE: January 28, Eucalyptus Drive, SF, CA 94132

ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED.

September 23, 2016 ADDENDUM #2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

Division 09 FINISHES TABLE OF CONTENTS

STANDARD PLAN RELEASE SUMMARY(SPR) Facilities Management Department

Arlington Public Schools Purchasing Office

INVITATION TO TENDER ITT NO. PS CONSTRUCTION SERVICES FOR INTERIOR OFFICE RENOVATIONS AT 236 E CORDOVA STREET QUESTIONS AND ANSWERS NO.

CLARION UNIVERSITY OF PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION ISSUE DATE: September 4, 2014

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Questions and Answers Construction of New Amenities At Folly Beach County Park

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

ADDENDUM 1 August 28, Construction & Facility Management Office 1636 Gold Star Drive Raleigh, NC 27607

MSA MOORE & SPENCE ARCHITECTS, P.A.

Addendum No. 5 Tender Call No Closing: 12:00 NOON (LOCAL TIME), February 17, 2017

ALUMNI CENTER RENOVATIONS - UNIVERSITY COMMUNICATIONS

REBECCA LG BOSTICK, ARCHITECTS, INC

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

ADDENDUM NO. 3. IFB J Emergency Communication Center Renovation and Addition Project

Addendum #2 3875Q Request for Quote Renovation of Old RCMP and Change Room at South Arm Community Centre

Proposal. Lexington, MA. Price Work Description

ADDENDUM #9 DATE: 1/12/17 TO:

ADDENDUM 1. Bid Date March 8, 2017 at 2 pm CST. March 2, 2017

ADDENDUM NO. 3, February 8, Renovations to the Existing Shelby County Center Architect s job no. 2598/BN

1. Baptist Hospital has added Construction Zone as an approved General Contractor to bid this project (409)

RFP /ME - ADDENDUM 2

QUESTIONS & ANSWERS FOR B SOUTHWEST SERVICE CENTER BOOKING REMODEL 02/20/2019

ADDENDUM NO. TWO TO THE REQUEST FOR PROPOSAL (RFP) DOCUMENTS April 25, 2016

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications)

The addendum consists of six (6) pages of 8½ x 11 text and three (3) 30 x 42 drawings*. End of Addendum 1

SECTION TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS. ADD the following sections: Commissioning Requirements...

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT

METROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) # M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO.

Kitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo

3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes.

CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services - Purchasing Division Telephone:

Bucknell University. Lewisburg, Pennsylvania HUNT HALL IMPROVEMENTS 2017 PROJECT LOCATION MAP CS-1 DRAWING TITLE: PROJECT:

A1.01 SITE PLAN 394 W OLENTANGY ST POWELL, OH BUILDING TO BE RENOVATED SITE PLAN. P F www. archa ll.

Addendum 4 RFI Questions and Answers

See attached answers to questions and requests for clarification received.

EXIT CONTROL 108 SIM LAB 105 SIM LAB 106 BUSINESS 2465 SF 100 GROSS 25 OCCUPANTS CLASSROOM 104 DATA / COMM 103 SCOPE OF WORK

Pine Cove Corporate Office Alterations CD RFI Response: September 22, 2017 by Orchestrate + Daedalus comments noted red submitted

DIW Office and Lab Improvements - Phase 2, Project ID Date Issued: November 5, 2014

1 data PIC location (with 2 ports) typically asf for multiple staff members

TRUCKEE HIGH SCHOOL POOL RENOVATIONS TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT

Communications Page 1 of 9

ADDENDUM B - IFB 5236-BC. UNLV White Hall Animal Care Facility. University of Nevada, Las Vegas. Purchasing Department Maryland Parkway

1. Adequate framing details, sizing, spacing and technical information shall be indicated on the documents.

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

This Addendum modifies the Project Manual, Specifications, and Drawings as follows:

ADDENDUM. ADDENDUM # 1 DATE: October 27, 2017

Addendum No. 3 pg. 1. Project: Prolift Project No.: Subject: Addendum No. 3 Date: Monday, July 18, 2016

INVITATION TO TENDER ITT No. PS RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16

ADDENDUM TO REQUEST FOR IFB 5234-BC. UNLV Wright Hall Build Out. University of Nevada, Las Vegas. Purchasing Department Maryland Parkway

VILLAGE OF MARATHON CITY MARATHON COUNTY WISCONSIN

SECTION ALTERATION PROJECT PROCEDURES

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

C o u n t y o f F a i r f a x, V i r g i n i a

SECTION MULTICOLOR INTERIOR FINISHING

EMBASSY SUITES PARK EAST DRIVE BEACHWOOD, OH INTERIOR AND EXTERIOR RENOVATION Owner NF II Beachwood, LLC

RFP P1319, Cobb Career Academy Questions and Answers

AMENDMENT TO SPECIFICATIONS

NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

ADDENDUM NO. 03 TO SPECIFICATIONS AND CONTRACT DOCUMENTS FOR JAXPORT CRUISE TERMINAL VIP ROOM RENOVATIONS JPA CONTRACT NO.

Inquiries: Vicki McNamara, Senior Buyer , Ext End of Addendum #2. Attachment: Part D Drawings

AMENDMENT OF SOLICITATION

Bid Addendum B Issued: 04/27/16

ADDENDUM NO. 2 - OUTLINE AND SUMMARY INFORMATION

EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES/RFQ #14-Q-009-KR BY AND BETWEEN

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018

ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018

Façade Improvement Specifications: 200 S. Lafayette, Greenville, MI SEE ARCHITECTUAL RENDERINGS ATTACHED. General Section:

PROJECT DATA USE GROUP M M TYPE OF CONSTRUCTION IIB NUMBER OF STORIES 1 HIGH RISE BUILDING COVER MALL IS BUILDING FULLY SPRINKLERED

ADDENDUM NO. A. April 18, 2017 BIDDING AND CONTRACT DOCUMENTS FOR

TARRANT COUNTY PURCHASING DEPARTMENT

ADDENDUM A CONSTRUCTION SPECIFICATIONS

MSA MOORE & SPENCE ARCHITECTS, P.A.

ADDENDUM # 1 To: File RFP for: New Affordable Home Construction Services

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP Christopher Christopher Repair

A R C V I S I O N S T U D I O S P C

ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio

Transcription:

ADDENDUM 3 TO INVITATION FOR BID 5300-FG Interior Renovations for UNLV Quality Assurance Lab (QAL) and UNLV Monitoring Systems Lab (MSL) University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702) 895-3521 Date of Release: December 22, 2017 Date and Hour of Opening: January 10, 2018 at 2:00pm PST THE FOLLOWING ADDITIONS, DELETIONS, CLARIFICATIONS AND/OR CHANGES SHALL BE MADE AND INCORPORATED IN THE SUBJECT RFP: The bid opening has changed to Wednesday January 10, 2018 at 2:00 PM PST. Questions: Question 1: Would you know who performed the last roofing layer on QAL building? Answer 1: The last contractor to perform the last roofing repair was MAC Roofing Services. Question 2: UNLV specs say If Applicable for the following. Please verify if contractor coverage is required. Pollution $5M occ/agg Builder s Risk Professional Liability Answer 2: Builder s Risk is required. Question 3: AD1.01, A1.01, ID1.01 UPPER ROOMS (IN LEFT HAND CORNER) ARE NOT LABELED THE SAME. MD1.01 #3a Is "EEW" the eye wash station? Panel Board:NA on E6.01 doesn't match the condensing units on M1.01 Answer 3: The question is very vague. However, the following is a clarification: The overall existing spaces of the QAL/MSL Buildings were named and numbered by EPA for their own function/convenience while they used the buildings and or portions of them. These

drawing as-builts received from them, inclusive of the names and numbers were kept for the demolition documents to maintain the continuity of the as-built history. The floor plans (A1.01 and ID1.01) of this current renovation (for both, the QAL and MSL Buildings) used the same numbers and names assigned by EPA for the most part. However, there were spaces where was making more sense to rename and re-number the spaces as currently shown per the Plans A1.01 and the Floor Finish Plans ID1.01 (for each project). Independent of the rename and renumber of the spaces: 3A.1 The demolition plan is showing clearly the scope of work regardless of the names and numbers assigned for this scope. 3A.2 The floor plan and finish plan are clearly showing the scope of work regardless of the names and numbers assigned for this scope. Q3B: MD1.01 #3a Is EEW the eye wash station? Response: Yes. Q3C: Panel Board: NA on E6.01 doesn t match the condensing units on M1.01 Response: Refer to E2.21 for all circuiting. Circuit NA-1,3 is for CU-1, NA-21,23 is for FC-4, circuit NA-38,40 is for FC-1, BB2-25,27 is for FC-1, BB3-25,27 is for FC-1, BB3-29,31 is for FC-4 and BB3-36,38.

Question 4: Alternates listed on the plans do not match alternates listed on the bid form. Please clarify. Answer 4: See adjustments made to Sheet G0.01 - List of Alternates per Addendum No. 03 for each project (MSL and QAL). Question 5: Plans call out for the melamine to match Nevmar S6054 T Wrought Iron. We have been unable to locate a melamine that matches this dark gray color. Please specify an actual Melamine color or palette. We recommend KML Black #U002, KML Folkstone Grey #U601, or KML Silver Frost #K610. Answer 5: The use of KML Folkstone Grey #U601 would be acceptable. Question 6: Note 8.06 at door 21 calls for installation of a relocated door assembly. There are no door assemblies shown to be salvaged on the demo sheets. Please designate which door assembly should be used for this purpose or schedule door 21 to be a new door and frame.

Answer 6: This question is for QAL Building: See adjustments made to Sheets A1.01, A1.56 and A2.02 per Addendum No. 03 for this project. Question 7: Specification 09 84 00 Sound Absorbing Ceiling Units does not appear to be used. Please confirm. Answer 7: The sound absorbing ceiling units are used at the MSL project only. Please refer to MSL Sheet A3.01, Rigging Space denoted with the legend PB over the panels. Legend for PB Panels is included in this sheet. Question 8: There is no information on the plans, or in the specs, showing locations, sizes, or quantities of window shades specified in Spec Section 12 21 24 Manual Roller Shades. Please clarify. Answer 8: Incorrect. The documents are showing and containing the required information. The manual roller shades are used at the MSL project. Please refer to MSL Sheet A1.50 locating new window 1 at the wall separating Research Lab 15 from Research Lab 50 (new wall). The size, material, profile and installation height of Window 1 is determined by Sheet A2.02, details 3 & 4. Question 9: Key note 23.06 on QAL drawing A1.01 refers to 7/S2.01 shown below. Are the studs existing and the only added support the plate or are we to add the studs?

Answer 9: The studs where these mechanical units mounting plates need to be installed are existing studs for most of the cases; At the MSL Building there are few rooms where the existing studs are being extended above the existing ceiling for noise control, and in some of those walls a new HVAC is being installed: Refer to Lab 13, Lab 14 and Storage 27. In addition, not all the studs may be metal studs as shown per the structural detail 7/S2.01; some may be wood studs/ or similar as-built from the original building construction, but the installation of the plates follows the same criteria. Question 10: Per QAL Spec Section 3.6D ceilings that are to be painted are to have a roller smooth finish. Is it the Architect s intent to have the subcontractor of this division putty coat existing ceilings to this texture. Please clarify. 3.6 TEXTURE FINISH A. Apply Gypsum Board Primer prior to installing texture finishes materials in accordance with manufacturer s instructions. B. Spray apply texture finish materials. C. Provide light orange peel finish on all gypsum board walls scheduled for paint finish. D. Provide roller smooth finish on all ceilings and soffits scheduled for paint finish. Answer 10: This texture requirement is applicable to new gypsum board ceilings. This new texture is applicable to few spaces where the HVAC work is requiring cutting at least half of the existing gypsum ceiling of the space. For these cases, the new gypsum board and old gypsum board ceilings while joining together must have a uniform texture for both surfaces: existing and new; The new texture finish must be applied to all the gypsum board on the space, over the new and the old gypsum board. The old texture needs to be refinished; this will have to be done re-sanding the old surface to receive the new finishes as indicated by the documents. For elsewhere, the existing gypsum board ceiling textures are to remain as they are; when patching small areas within an existing gypsum board ceiling, the existing texture is to be matched. Question 11: The cross hatch below is not given in the legend on this set of plans and shows up on both the demolition reflected ceiling and reflected ceiling plans in Corridor 9.2 and Cust 2 in addition to the 2 rooms shown here. Please clarify what is being shown here. Answer 11: This question pertains to the MSL Building. The hatch has been incorporated into the MSL construction documents as indicated by the Addendum No. 03 for this project.

Question 12: The project currently includes two styles of cabinets, this may cause issues when we try to blend them in the same room. In addition to the 2 different existing cabinet styles, the plans are proposing new cabinets and infill- this may cause additional conflicts in areas where 3 different styles of cabinets are being installed. The existing countertops need some attention when remodeling is taking place. Is the existing installation to be corrected? The notes say to repair/replace broken hardware since handles and locks on the older sets are not available. Older doors need to be modified if they are to receive new hardware. Please clarify this scope. Drawer slides are burned out in many of the cabinets scheduled to be reinstalled. Are new drawer slides to be provided? Answer 12: This question belongs to the QAL Building: Yes, the project includes more than one style of cabinets; the cabinet re-use is for the most part related to upper cabinets. These upper cabinets are either relocated independent from other existing cabinets in the room and/or using the same style of cabinets when combined for the most part; notice that few rooms are using existing upper cabinets relocated from other room(s) in combination with new upper cabinets, but these new cabinets are separated within the rooms per zones. The relocation of base cabinets is coming from rooms where the same style is used. The exception to this would be for Bio-Bank 21. However, the heights of these cabinets are very close to each other and this shall not represent a major issue, just appropriate coordination and installation efforts in the field. Q12C. The existing countertops need some attention when the remodeling is taking place. Is the existing installation to be corrected? Response: This question belongs to the QAL Building: Yes, some of the existing countertops are to be repaired/ changed. Refer to demolition plans and elevations indicating which counters are to be removed and disposed appropriately. Refer to floor plan A1.01 and enlarged plans of the laboratories A1.50 through A1.59, other documents of the set of drawings as referenced and the specifications for the new countertops and existing countertops requirements. The existing countertops need to be cleaned and polish to match new as a minimum. Q12D. The notes say to repair/replace broken hardware since handles and locks on the older sets are not available. Older doors need to be modified if they are to receive new hardware. Please clarify this scope. Response: This question belongs to the QAL Building: Refer to Specification Section 12 35 53 METAL LABORATORY CASEWORK, 3.1, G. If new hardware is required, please provide.

Q12E. Drawer slides are burned out in many of the cabinets scheduled to be reinstalled. Are new drawer slides to be provided? Response: This question belongs to the QAL Building: Refer to Specification Section 12 35 53 METAL LABORATORY CASEWORK, 3.1, G. If new hardware is required, please provide. Question 13: Since the suitability of the existing cabinets is not readily quantifiable, suggest an allowance be established to adapt and repair or replace existing as the Owner determines. To eliminate hidden contingencies, base bid would be based on existing cabinets not needing repair, rework, or adaption unless specifically called out on the plans. Answer 13: This question belongs to the QAL Building: The construction documents are clearly defining the existing cabinets that are being reused, where they are currently located and their new destination space as shown per Sheet A8.00. Notice that each piece of millwork has been identified in size and type. In addition, the specifications are also indicating the extent and coverage required to adapt the existing cabinetry, inclusive of hardware. Please use this documentation to price adequately the required repairs, re-work, adaptation of the existing cabinetry. Please ensure complete cost coverage. Question 14: Regarding Exhibit B2 MSL Sheet E5.01: Please clarify if the bold single lines other than the bubbled section are existing or if they are to be new. If they are to be new, please provide conduit and wire sizes. Answer 14: The Bold Single lines are existing, clouded (bubbled) sections are proposed new. Question 15: Print LV3.01 shows locations for card readers and door contacts. Please confirm that this is for the installation of conduit only. Answer 15: Yes, conduit only. UNLV has already selected a preferred manufacturer, and installer for these devices. Question 16: Print LV3.01 shows locations for card readers and door contacts. Please confirm whether we are required to provide devices and cabling. If so, please provide specifications and a scope of work. Answer 16: Yes, conduit only. UNLV has already selected a preferred manufacturer, and installer for these devices. Question 17: On the keynote legend for the base and upper cabinets its calls for "Existing Relocated/New Upper Cabinets". Are these new cabinets or just a relocated existing? Where does it show what is existing base/uppers cabinets V.S. what we have to provide as new in the QAL Building? Reference Sheet A1.56 note 12.09 for example.

Answer 17: The existing cabinets being dismounted and re-located are indicated by the charts included in the QAL Sheet A8.00. All other cabinets not listed as re-located per this sheet need to be considered new. AD3-G1 Sheet G0.01 QAL CHANGES TO DRAWINGS: 1. Sheet Index: 1.1 Modify Sheet Index to incorporate the following new sheets: 1.1.1 G2.01 PHOTOGRAPHIC ROOF INFORMATION 1.1.2 A4.01 ROOF PLAN 2. List of Alternates: 2.1 Modify the List of Alternates to read: Alternate A: Incremental Cost for adding QAL LED Lamp Retrofit as specified elsewhere in these documents. Alternate B: Incremental Cost for adding Natural Gas-Powered Generator for QAL as specified elsewhere in these documents. 3. Window Revisions: 3.1 Under No: Add delta 2. 3.2 Under Date: Add 12-22-17. 3.3 Under Description: Add Addendum No. 3 AD3-G2 Sheet G2.01 1. Incorporate this sheet to the construction documents. Cloud the sheet number; add delta 2 to the cloud of this adjustment. 2. Sheet G2.01 contains available current photos of existing roof conditions for reference and sheet notes as shown per the attached sheet. 3. Window Revisions: 3.1 Under No: Add delta 2. 3.2 Under Date: Add 12-22-17.

3.3 Under Description: Add Addendum No. 3 AD3-A1 Sheet AD1.01 1. Drawing 1: 1.1 Keynote door located at the intersection of gridlines 8 and 3 with keynote 08.07. Cloud this adjustment; add delta 2 to the cloud of this adjustment. 1.2 Delete dash line located along gridline 1 west side between Corridor 16.1 south side and gridline 5. Cloud this adjustment; add delta 2 to the cloud of this adjustment. 2. Keynote Legend 2.1 Modify keynote 08.07 to read: Remove door assembly and dispose appropriately. Patch substrate behind to match adjacent surfaces and finishes, inclusive of colors, materials and textures. See finish schedule for additional information. Cloud this adjustment; add delta 2 to the cloud of this adjustment. 3. Window Revisions: 3.1 Under No: Add delta 2. 3.2 Under Date: Add 12-22-17. 3.3 Under Description: Add Addendum No. 3 AD3-A2 Sheet A1.01 1. Drawing 1: 1.1 Door 21: Delete keynote 08.06 assigned to this door and replace with keynote 08.03. Cloud this adjustment; add delta 2 to the cloud of this adjustment. 2. Window Revisions: 2.1 Under No: Add delta 2. 2.2 Under Date: Add 12-22-17. 2.3 Under Description: Add Addendum No. 3 AD3-A3 Sheet A1.56 1. Drawing 1:

1.1 Door 21: Delete keynote 08.06 assigned to this door and replace with keynote 08.03. Cloud this adjustment; add delta 2 to the cloud of this adjustment. 2. Keynote Legend: 2.1 Add keynote 08.03 to read: Create opening in walls to suite door assembly shown on floor plan and described per door schedule. Patch and refinish adjacent surfaces as required. Cloud this adjustment; add delta 2 to the cloud of this adjustment. 3. Window Revisions: 3.1 Under No: Add delta 2. 3.2 Under Date: Add 12-22-17. 3.3 Under Description: Add Addendum No. 3 AD3-A4 Sheet A2.01 1. Room Finish Schedule: 1.1 Lobby 1: Add to Ceiling Material 1 (MATL 1) paint finish PT-1. 1.2 Corridors 5, 6, 13, 17 & 36: Add to Ceiling Material 1 (MATL 1) paint finish PT-1. 2. Window Revisions: 2.1 Under No: Add delta 2. 2.2 Under Date: Add 12-22-17. 2.3 Under Description: Add Addendum No. 3 AD3-A5 Sheet A2.02 1. Door Schedule: 1.1 Door 21: Delete the comments indicated for this door. 2. Window Revisions: 2.1 Under No: Add delta 2. 2.2 Under Date: Add 12-22-17. 2.3 Under Description: Add Addendum No. 3 AD3-A6 Sheet A4.01

1. Incorporate this sheet to the construction documents. Cloud the sheet number; add delta 2 to the cloud of this adjustment. 2. Sheet A4.01 contains available aerial photographic information of existing roof conditions for reference, roof plan with intended slopes for repairs of the existing foam roof, and sheet notes as shown per the attached sheet. 3. Window Revisions: 3.1 Under No: Add delta 2. 3.2 Under Date: Add 12-22-17. 3.3 Under Description: Add Addendum No. 3 AD3-G1 Sheet G0.01 MSL CHANGES TO DRAWINGS: 4. Sheet Index: 4.1 Modify Sheet Index to incorporate the following new sheets: 1.1.1 G2.01 PHOTOGRAPHIC ROOF INFORMATION 1.1.2 A4.01 ROOF PLAN 5. List of Alternates: 5.1 Modify the List of Alternates to read: Alternate A: Incremental Cost for adding MSL LED Lamp Retrofit as specified elsewhere in these documents. 6. Window Revisions: 6.1 Under No: Add delta 2. 6.2 Under Date: Add 12-22-17. 6.3 Under Description: Add Addendum No. 3 AD3-G2 Sheet G2.01 4. Incorporate this sheet to the construction documents. Cloud the sheet number; add delta 2 to the cloud of this adjustment. 5. Sheet G2.01 contains available current photos of existing roof conditions for reference and sheet notes as shown per the attached sheet. 6. Window Revisions: 3.4 Under No: Add delta 2.

3.5 Under Date: Add 12-22-17. 3.6 Under Description: Add Addendum No. 3 AD3-A1 Sheet AD3.01 3. Ceiling Legend: 3.1 Add ceiling legend for hatch shown at Vestibule 1, Lobby 9.1, Custodial 2, Corridor 9.2 indicating as follows: Existing Textured Ceiling to Remain. Paint per New Finishes. Cloud this adjustment; add delta 2 to the cloud of this adjustment. 2. Window Revisions: 2.1 Under No: Add delta 2. 2.2 Under Date: Add 12-22-17. 2.3 Under Description: Add Addendum No. 3 AD3-A2 Sheet A2.01 2. Room Finish Schedule: 2.1 Modify Room Finish Schedule as shown per the attached revised sheet. Cloud this adjustment; add delta 2 to the cloud of this adjustment. 3. Finish Material List: 3.1 Add to the Finish Material List the Mecho Shades information as follows: Under Description: Mecho Shade Under Manufacturer: Mecho Shade Under Model: Soho Collection 1100 Series 1% open Under Size: Fit Window opening; refer to 4/A2.02 Under Color: 1113 Mercer 4. Window Revisions: 4.1 Under No: Add delta 2. 4.2 Under Date: Add 12-22-17. 4.3 Under Description: Add Addendum No. 3 AD3-A3 Sheet A3.01 1. Ceiling Legend: 1.1 Add ceiling legend for hatch shown at Vestibule 1, Lobby 9.1, Custodial 2, Corridor 9.2 indicating as follows: Existing Textured

Ceiling to Remain. Paint per New Finishes. Cloud this adjustment; add delta 2 to the cloud of this adjustment. 2. Window Revisions: 2.1 Under No: Add delta 2. 2.2 Under Date: Add 12-22-17. 2.3 Under Description: Add Addendum No. 3 AD3-A4 Sheet A4.01 3. Incorporate this sheet to the construction documents. Cloud the sheet number; add delta 2 to the cloud of this adjustment. 4. Sheet A4.01 contains available aerial photographic information of existing roof conditions for reference, roof plan with intended slopes for repairs of the existing foam roof, and sheet notes as shown per the attached sheet. 4. Window Revisions: 4.1 Under No: Add delta 2. 4.2 Under Date: Add 12-22-17. 4.3 Under Description: Add Addendum No. 3 CHANGES TO SPECIFICATIONS: AD3-GR1 Table of Contents: 1. Delete Table of Contents in its entirety and replace with the attached revised Table of Contents. AD3-SA1 New Section 07 57 00: 1. Add Section 07 57 00 SPRAYED FOAM ROOF SYSTEM RE-COAT/ RENEWAL to the project manual per the attached. END OF ADDENDUM 3 ALL OTHER TERMS, CONDITIONS AND SPECIFICATIONS OF THIS INVITATION TO BID REMAIN THE SAME.