Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012

Similar documents
Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

PJM Wind Integration Initiatives

Leading Insights into Solar

The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT. David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009

CO2, SO2 and NOX Emission Rates. March 15, 2018

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring

FLEXIBILITY HOW TO CONTRIBUTE TO THE STABILITY OF THE GRID THANKS TO THE FLEXIBILITY OF YOUR PRODUCTION PROCESSES?

PJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

CO2, SO2 and NOX Emission Rates. August 21, 2015

PJM EIS Generation Attribute Tracking System (GATS)

Wind Generation and Grid Operations: Experience & Perspective

Evolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017

ATC Network Customer Meeting Planning Update

Pay for Performance Regulation Year 1 Design Changes. Draft Final Proposal

Klaus Wewering. ACER Workshop CBA 2.0. Improving the pan-european cost-benefit analysis methodology 10 May 2016

The Integration Challenge

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report

Flexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting

Pumped hydro Storage Plants

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

A Bulk Energy Storage Resource Case Study with 40% RPS in 2024

TECHNICAL AND ECONOMIC ANALYSIS OF THE EUROPEAN ELECTRICITY SYSTEM WITH 60% RES EDF R&D

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor

Renewable Grid Integration Assessment Overview of Thailand Case study

Mid-Continent Independent System Operator (MISO) Overview. INCMA February 15, 2017

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

August 22, 2014 FIRE ISLAND WIND

2016 ISO Flexible Capacity Needs Assessment: Study Methodology, Assumptions, and Preliminary Results

Renewables Curtailment in China is there light at the end of the tunnel? Liutong Zhang

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Solving Climate: The Need for Zero Carbon On-Demand Power

The Implications of Lower Natural Gas Prices for the Electric Generation Mix in the Southeast 1

Solar Integration into the PJM Grid

Review of Manitoba Hydro Export Price Forecast for Needs For and Alternatives To (NFAT)

Illinois State Institute for Regulatory Policy Studies Conference

2001 Annual Report on the New York Electricity Markets

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

Peter Randall Solar Kingdom Ltd

Assessing the Flexible Capacity Requirements for 2018 through 2020

Transmission Expansion Advisory Committee

Integrating Energy Efficiency and Demand Response

2011 RFP for All Generation Sources Proposal Conference

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

Congestion and Marginal Losses

1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017

California ISO. Q Report on Market Issues and Performance. August 21, Prepared by: Department of Market Monitoring

Renewable Integration Impact Assessment Finding integration inflection points of increasing renewable energy. NCEP Webinar Sept.

Ancillary Service Markets

Congestion and Marginal Losses

Wind Workshop. Technical Characterization: Dependable Capacity & Firm Energy 10:00-10:30am

APS Renewable Energy. Overall Commitment and Distributive Energy Program. Arvin Trujillo 4CPP-Government Relations

Operations Report. Stephanie Monzon Manager, Markets Coordination MC Webinar January 22, PJM 2018

Congestion and Marginal Losses

Operations Report. Stephanie Monzon Manager, Markets Coordination Operating Committee July 10, PJM 2018

California ISO. Q Report on Market Issues and Performance. November 1, Department of Market Monitoring

Joe McDonald.

Wyoming Pipeline Authority Happy Jack Wind Farm

System Needs: An Energy Planning Perspective. Randy Reimann

California ISO. Structural competitiveness of the energy imbalance market: Arizona Public Service Balancing Area. April 10, 2018

BRITISH INSTITUTE OF ENERGY ECONOMICS. RENEWABLES AND CCGTS: COMPETITORS OR COMPLEMENTARY? 11 October 2012 Andrew Morris

MEMORANDUM. January 6, Power Committee. Maury Galbraith. Draft Sixth Plan Electricity Price Forecasts

Integrating Renewables

Load Shift Working Group.

Operations Report. Hong Chen Senior Lead Engineer, Markets Coordination Members Committee October 22, PJM 2018

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

Project Risk Management Bootcamp. Contents are subject to change. For the latest updates visit

California ISO 2009 Annual Report on Market Issues and Performance

New England s Energy Mix: Clean, Diverse, Responsive and Getting Even Better

Electric Sector Restructuring and Utility GHG Emissions: Trends and Opportunities in the US

The Future of Electricity: A Market with Costs of Zero? Marginal

Future Market Implementation

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

TECHNICAL AND ECONOMIC ANALYSIS OF THE EUROPEAN ELECTRICITY SYSTEM WITH 60% RES

Flexible Resource Adequacy Criteria and Must-Offer Obligation

Day Ahead Market Enhancements

Congestion and Marginal Losses

MISO PJM Cross-Border Planning

SECTION 6 - ANCILLARY SERVICE MARKETS

ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE

Final Flexible Capacity Needs Assessment for 2019

Demand Response. Overview. Recommendations

The Future of Electricity: A Market with Costs of Zero? Marginal

The Future From One RTO s Window The Institute for Regulatory Policy Studies. Dave Hadley VP, State Regulatory Relations Midwest ISO

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

Reliability Modeling: Demand, Outage, Intermittent Generation, & Import

Results of California s Renewable Energy Program and Agricultural Biomass to Energy Program (SB704)

MISO Energy Storage Study DRAFT Scope

Ancillary Service Markets

Congestion and Marginal Losses

Presentation for the Local Government Commission and the Community Environmental Council. July 13, 2007

Electric Forward Market Report

Virtual Workshop on PJM ARR and FTR Market 2017/2018

Eugene Water & Electric Board. The Future of Utilities in the Pacific Northwest

Executive summary. Value of Smart Power Generation for utilities in Australia. A white paper by Wärtsilä and Roam Consulting

The uncertainty of wind output how it declines during the day.

Overview Of PJM Demand Response and Energy Efficiency. Issues September 22, Susan Covino, Senior Consultant Market Strategy

LCOEs and Renewables Victor Niemeyer Program Manager, Energy and Environmental Policy Analysis and Company Strategy Program

Transcription:

Wind Update Renewable Energy Integration Lessons Learned March 28, 212

Contents Summary Review of Historical Wind Growth and Output Impact of Wind on Operations Wind Curtailments Dispatchable Intermittent Resources (DIRs) and their impact Future Wind Growth and Potential Impacts 2

Summary Wind capacity and output continues to grow and that trend is expected to continue. Congestion will continue as more wind is added. Multi-Value Projects will mitigate this congestion over time. Output variability is being mitigated by geographic diversity of the wind resources, which will influence our ability to manage it operationally. Processes and tools to reliably and efficiently manage wind output continue to be enhanced: Dispatchable Intermittent Resources have been successful to date and will continue to be used as a tool to manage wind output and its effects on market operations. Wind forecasting has improved and is expected to continue to improve. MISO does not currently anticipate significant operational management issues in the next several years. MISO continues to move forward with future analysis, tools, plans, and education to manage the increase of this important resource in the future. 3

MW MW Growth of Wind Registered wind capacity in the MISO footprint has increased consistently over the last several years, and is expected to continue on that trend. Iowa and Illinois were ranked 2 nd and 3 rd in the country respectively for the amount of wind capacity installed in 211. 6, 6, 5, 5, 4, 4, 3, 3, 2, 2, 1, 1, Dec-6 Dec-11 Dec-12 Dec-29 1 2 3 In Queue 1 Capacity projected to be added in MISO Footprint during 212 (3, MW). 2 Capacity estimated to be added in MISO Footprint by the end of 229, based on the amount of additional wind generation needed to meet current Renewable Portfolio Standards (RPS) in the MISO region (15, MW). 3 Interconnection Queue as of October 1 st, 211 (42,5 MW). 4

Wind Generation Consistent with registered wind capacity, the contribution of wind to total MISO energy has also trended upward over the last 3 years. Also note the seasonal nature of the wind output. 7% 6% 5% 4% 3% 2% 1% % Wind Energy as a Percent of Total MISO Energy 5

Wind Generation The capacity factor of wind also has followed a consistent seasonal pattern over that same period, and has declined slightly overall. The decline is expected since more of the new wind resources are in less windy areas of the footprint. 45% 4% 35% 3% 25% 2% 15% 1% 5% % Capacity Factor Linear (Capacity Factor) 6

% of Intervals on Margin Registered Capacity - MW Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 MWh Registered Capacity - MW Dispatchable Intermittent Resource Impacts Since Dispatchable Intermittent Resources went into effect on June 1, 211, economic curtailments (dispatch of these resources below their forecast maximum output) have become a larger share of total wind curtailments... 16, 25 14, 12, 1, 8, 6, 2 15 1 providing more precise and timely congestion relief than the manual curtailments that they replace 4, 5 2, 5 45 25 4 2 Estimated Wind Energy Manually Curtailed Registered Capacity Wind Energy Economically Curtailed (DIRs) 35 3 15 25 and resulting in Dispatchable Intermittent Resources setting price more frequently through energy offer-based economic dispatch. 2 15 1 5 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 1 5 Off-Peak On-Peak Total Registered Capacity 7

MW % of Total Wind Capacity Wind Output at Time of Peak Load Wind output at the time of the annual peak load has not been consistent nor do we expect it to be. 5, 4,5 4, 6.% 5.% 3,5 3, 2,5 2, 1,5 1, 5 26 27 28 29 21 211 4.% 3.% 2.% 1.%.% Wind % of Total Wind Capacity Such variation in output creates a challenge for determining capacity credits. 8

Looking Forward - Continued Wind Growth Wind growth is expected to increase to support Renewable Portfolio Standards (RPS). Production tax credit extension is contentious and uncertain. Dispatchable Intermittent Resources will become the primary wind resource type. This resource type was developed to improve reliability and market efficiency: Through economic dispatch. With more accurate price signals. With more cost-effective congestion management. With expected lower levels of manual wind curtailments. With expected mitigation of minimum generation conditions. Operational challenges associated with wind: Output variability. Lack of correlation between wind output and load. Use of System Ramp. 9

MW Impacts of Growth Mitigated by Locational Diversity In the near to mid-term, significant operational impacts from wind s continued expansion will be influenced by increasing geographical dispersion 14, 12, 1, 8, 6, 4, 2, IA IL IN MI MN MO MT ND OH SD WI Wind in Queue 1

Operational Considerations Operations response to increases in wind output: Rapid increases in wind output mitigated by Dispatchable Intermittent Resources, which can be dispatched down. Operations response to decreases in wind output: Rapid decreases in wind output managed through: Wind forecasts which lead to unit commitments. 5 minute Energy Dispatch if possible. Note that operating reserve shortages will tend to increase if ramp is insufficient. Use of fast-start units to manage forecast error if no on-line capacity available or insufficient ramp. Operating reserve deployment when necessary. Growth in the magnitude of average changes in wind output has been mitigated by Increased geographical diversity and dispatchable intermittent implementation (less price chasing). To date, wind has not been a significant contributor to operating reserve deployments. Wind has had a small impact on regulation reserves. Contingency reserves have never been deployed due to a drop in wind output. Such deployments would be an indicator of need for further market products. 11

Jan-9 Mar-9 May-9 Jul-9 Sep-9 Nov-9 Jan-1 Mar-1 May-1 Jul-1 Sep-1 Nov-1 Jan-11 Mar-11 May-11 Jul-11 Sep-11 Nov-11 Mean Absolute Percentage Error Jan-9 Mar-9 May-9 Jul-9 Sep-9 Nov-9 Jan-1 Mar-1 May-1 Jul-1 Sep-1 Nov-1 Jan-11 Mar-11 May-11 Jul-11 Sep-11 Nov-11 Mean Absolute Percentage Error Mitigating Near-Term Impacts Improvements in wind forecast accuracy should continue to be realized and allow for more effective, proactive management of output variability. 14% 12% Day-Ahead Wind Forecast Error 1% 8% 6% 4% 2% % Average - All Hours Linear (Average - All Hours) 1% 9% 8% 7% 6% 5% 4% 3% 2% 1% % 4 Hour Ahead Wind Forecast Error Average - All Hours Linear (Average - All Hours) 12

Addressing Increasing Wind Capacity (Initiatives and Process Improvements) Completed wind integration initiatives: Wind forecasting enhancements. Addition of Dispatchable Intermittent Resources as a market resource (June 211). Continuing wind forecasting improvements: Process and data improvements. Work to improve forecasts during icing conditions. Expand use of additional wind speed prediction data. Continuing work on potential ramp management products: Preparing to hold another ramp management workshop in 212. Continuing to monitor both 5 minute operating reserve shortages and contingency reserve deployments. Continuing work to study intermittent resource variability and its operational impact. 13

Addressing Increasing Wind Capacity Portfolio changes (Other Factors) MISO resource portfolio may also mitigate effects of growth. EPA rule changes Coal unit retirements replaced by more gas unit capacity will likely increase system ramp ability. Gas units tend to have faster ramp and shorter start-up times. May be restricted by other environmental impacts. Evaluate lessons learned from systems with similar or larger wind portfolios: National Grid (UK). Red Electrica (Spain). 14

Summary Significant operational issues are not expected in the next several years given: Operational experience gained over time. Geographic (locational) diversity effects. Completed and continuing efforts to improve tools. Market incentives. Experience from other system operators that have faced similar challenges. Transmission improvements. 15

APPENDIX 16

Jan-9 Mar-9 May-9 Jul-9 Sep-9 Nov-9 Jan-1 Mar-1 May-1 Jul-1 Sep-1 Nov-1 Jan-11 Mar-11 May-11 Jul-11 Sep-11 Nov-11 MWh % of Wind Energy Manual Wind Curtailments As wind output has increased, its impact on local congestion has driven the need for varying levels of manual curtailments to manage transmission constraints. 18, 2% 16, 14, 12, 1, 8, 6, 4, 2, 18% 16% 14% 12% 1% 8% 6% 4% 2% % Estimated Wind Energy Curtailed Curtailments as % of Wind Energy Dispatchable Intermittent Resources were developed by MISO to: Improve reliability and market efficiency Through economic dispatch With more accurate price signals With more cost effective congestion management With expected lower levels of manual wind curtailments 17

(MW) Historical Wind Changes 1,8 1,6 1,4 1,2 1, 8 6 4 2 Average of 5 Largest Wind Drops Pre-DIRs Post-DIRs The magnitude of average changes in wind output over 1 and 6 minutes spans has been influenced by: Increased geographical diversity DIR implementation (less price chasing) Sep 9 - Nov 9 Dec 9 - Feb 1 Mar 1 - May 1 Jun 1 - Aug 1 Sep 1 - Nov 1 Dec 1 - Feb 11 Mar 11 - May 11 Jun 11 - Aug 11 1 Minute span 6 Minute Span Sep 11 - Dec 11 Jan-12 Average of 5 Largest Wind Drops as a % of Registered Capacity 18% 16% Pre-DIRs Post-DIRs trends which will also contribute to our ability to effectively manage the variable nature of wind output for the next several years. 14% 12% 1% 8% 6% 4% 2% % Sep 9 - Nov 9 Dec 9 - Feb 1 Mar 1 - May 1 Jun 1 - Aug 1 Sep 1 - Nov 1 Dec 1 - Feb 11 Mar 11 - May 11 Jun 11 - Aug 11 Sep 11 - Dec 11 Jan-12 1 Minute span 6 Minute Span 18