In the name of Allah - The most Beneficent & Merciful

Similar documents
In the name of Allah - The most Beneficent & Merciful

Indus Basin River System - Flooding and Flood Mitigation

FLOOD MANAGEMENT IN PAKISTAN

Managing Extreme Floods in Pakistan

Provincial Disaster Risk Management Planning Guidelines

LEAD Pakistan. Managing Reduction in Water Flows in the Indus River System The Emerging role of IRSA. Managing Shared Basins: October 19 th, 2017

Mr Hazrat Mir. Chief Meteorologist PMD

INDUS WATER TREATY 2.0 THE RATIONALE FOR THE INDUS WATER TREATY

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities

An Overview of Water Resources of Pakistan Dr. Muhammad Akram Kahlown Chairman Pakistan Council of Research in Water Resources (PCRWR)

Pakistan Engineering Congress

Upper Lower Riparian Issues and Options Group Discussions in the consultative Workshop

POLICY BRIEF ISSUES IN INSTITUTIONAL FRAMEWORK FOR DISASTER RISK MANAGEMENT IN PAKISTAN. Floods 2010

PMD ICHARM Japan UNESCO.

Joint ICTP-IAEA Workshop on Vulnerability of Energy Systems to Climate Change and Extreme Events April 2010

THE WATER ACCORD

Ramsar Advisory Mission Pakistan 29 October 5 November, 2012

ANNUAL FLOOD REPORT 2014

Pakistan s Climate Change Vulnerability & Remedial Policy Measures

9 3 GFAS(Global Flood Alert System)

Pakistan Development Forum. Presentation by

SOIL SURVEY IN PAKISTAN, HISTORY, ACHIEVEMENT AND IMPACT ON AGRICULTURE JARWAR ATTAR KHAN DIRECTOR SOIL SURVEY OF PUNJAB, PAKISTAN

Early Warning & DRM System of Pakistan Learning from Good Practices. South Asia Hyderomet Forum By M. Idrees Mahsud Member (DRR), NDMA

Thal Flood Canal Project Some Facts. M.H. Panhwar

INTEGRATED WATER RESOURCE MANAGEMENT IN PAKISTAN

SPATIAL TECHNOLOGIES FOR DATA IN TRANSBOUNDARY CATCHMENTS IMRAN IQBAL

Roadmap toward Effective Flood Hazard Map in Lampang Thailand. JICA region-focused training course on flood hazard mapping JFY 2005

EFFICIENT AND SUSTAINABLE IRRIGATION-MANAGEMENT IN PAKISTAN

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

Financing of Education in the Public Sector. GOVERNMENT OF PAKISTAN MINISTRY OF EDUCATION Policy & Planning Wing Islamabad.

Application of Satellite Rainfall Monitoring in Flood Management of Indus River

ACTION PLAN TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN CAMBODIA

M. Asif Khan, National Centre of Excellence in Geology University of Peshawar

WATERSHED MANAGEMENT AND LAND RECLAMATION IN NORTH WEST FRONTIER REGIONS OF PAKISTAN

INDUS BASIN IRRIGATION SYSTEM: WATER BUDGET AND ASSOCIATED PROBLEMS

MANGLA DAM KEY FACTS. 380 ft. (above riverbed) Gross Storage Capacity: Live Storage Capacity: Year of Completion: 1967

WATER RESOURCES OF PAKISTAN

Hydrological Aspects of Drought

Indus River System Model: A planning tool to explore Water-Energy-Food nexus for Pakistan

Climate Change Challenges faced by Agriculture in Punjab

PAKISTAN DEVELOPMENT FORUM (PDF) PLANNING FOR WATER RESOURCES

IN THE NAME OF ALLAH THE BENEFICENT, THE MERCIFUL

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

Flood Disaster Management Apparatus in Sindh

UN/Germany Expert Meeting on Space Technologies for Flood and Drought Risk Reduction June 2014, Bonn Germany

Pakistan Water Apportionment Accord: Water Entitlements and Key Issues National and Balochistan Perspectives. Dr. Shahid Ahmad 1

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

Technical Advisory Panel On Climate Change

Prospectives and Limits of Groundwater Use in Pakistan

Irrigation System, Arid Piedmont Plains of Southern Khyber-Paktunkhwa (NWFP), Pakistan; Issues & Solutions

India, District Chamba N.A. 6,318,745 Lahore, 2,232,992 Okara,1,843,194 Sahiwal 2,068,490 Khanewal, (Source 1998 Census Report)

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES

Climate Change, Climate variability and Water Management

Title: Roadmap towards Effective Flood Hazard Mapping in Cambodia. October 31~December 03, Name: PHENG SEANGMENG

Pakistan: Monsoon Floods

THE MANUAL OF CIVIL SERVICE LAWS IN PAKISTAN

PAKISTAN WATER SECTOR STRATEGY

Understanding the Laws of the Kabul River Basin. Ahmad Rafay Alam Saleem, Alam & Co.

Latest Data on Water Pollution in Khyber Pakhtunkhwa Province of Pakistan

GOVERNMENT OF BIHAR WATER RESOURCES DEPARTMENT

3. Present Situation of Environmental Problems

Country (Policy) Dialogues (With Special Reference to Pakistan)

Use of Space-based Systems for Water Resources Management In India

International Workshop On. Connecting Emergency Preparedness and Response With Sustainable Development Through Reinforced Operational Capacities

AAU Rawapindi Irrigated area of Pakistan Production Constrains Land Utilization Agri. Potential in rain-fed areas Water management in Rain-fed area

Building National Resilience

NATURAL DISASTER INDIA

Impacts of Climate Change on the Water-Energy-Food Nexus in the Indus Basin of Pakistan

SARDAR MUHAMMAD TARIQ Chief Executive Officer Pakistan Water Partnership (PWP), Ex-Member (Water) WAPDA, Former Regional Chair, GWP-South Asia

Development of an Integrated Information System for Flood Control and Water Management in Western Province

PAKISTAN NATIONAL DRAINAGE PROGRAM PROJECT (CREDIT NO PK)

PAKISTAN S GROUNDWATER RESERVOIR AND ITS SUSTAINABILITY

Pakistan Earthquake Reconstruction & Rehabilitation Authority.

Holistic Approach to Disaster Reduction in Japan: Towards Total Disaster Risk Management Mr. Satoru Nishikawa

Presentation to the National Climate Change Country Team and Other Stakeholders. Suva, 29 March, John E. Hay (GOPA Team Leader)

PAKISTAN MARKET MONITORING BULLETIN

Briefing for the Minister of Civil Defence

Time Session Speaker Objectives Venue. Chairman Water Environment Forum, Pakistan.

IMPACT OF SUBSURFACE DRAINAGE ON SOIL SALINITY IN PAKISTAN ABSTRACT

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Ordinary Level

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Ordinary Level

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Ordinary Level

FLOOD Analysis And Development of Groundwater Recharge and Discharge Estimate Maps using GIS

COUNTRY REPORT ON WATER TRESOURCES OF PAKISTAN. Dr. Shahid Ahmad* Dr. Amir Mohammad** Sardar Tariq Khan***

CRS CROP BULLETIN CROPS SITUATION SEPTEMBER,2014 SUMMARY

RIVER BASIN PADMA [ BANGLADESH ]

GMS: Flood and Drought Risk Management and Mitigation Project

Asian Water Cycle Symposium 2016 (March 1-2, TOKYO) Flood Session NEPAL

PAKISTAN SPATE IRRIGATION NETWORK NEWS LETTER # 1 February 5, 2014

Hydropower Resources, Potential and Challenges in Pakistan

Consultative Workshop Upper and Lower Riparian s Issues and Options. Dr. Shahid Ahmad January th 2010

Extract from TAJIKISTAN SPCR October Building Climate Resilience in the Pyani River Basin. Title

Water Resources and conservation Strategy of Pakistan

Development of NATIONAL DISASTER MANAGEMENT PLAN OF VIETNAM

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

REVISED OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

Growing Wheat under Spate Irrigation In Dera Ismail Khan ( )

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name. Sindh Water Sector Improvement Project Region

CROP BULLETIN CONTENT

Development of NATIONAL DISASTER MANAGEMENT PLAN OF VIETNAM

Transcription:

In the name of Allah - The most Beneficent & Merciful

GOVERNMENT OF PAKISTAN INDUS RIVER SYSTEM AUTHORITY PRESENTATION ON WATER RELATED DISASTER AND ITS MANAGEMENT IN PAKISTAN

HISTORIC PERSPECTIVE After creation of Pakistan, a Central Engineering Authority was constituted under Chief Engineering Advisor to deal with the issues of water, power and allied engineering matters at National Level It was re-designated as Chief Engineering Advisor s Office after establishment of Water & Development Authority (WAPDA) in 1959 In 1977 Federal Flood Commission was established for the purpose of integrated flood management at National Level 1n 1982 a Federal Coordination Cell (now re-designated as FID Cell) was established to coordinate activities of the Provincial Irrigation Departments in particular in the drainage sector In 1987 Dam Safety Council was established to carry out inspections of existing dams and plans for new dams etc.

MAJOR SECTIONS OF THE OFFICE OF CEA/CFFC 1. Civil Engineering Advisory Cell 2. Federal Irrigation & Drainage Cell (FIDC) 3. Flood Cell ( For Federal Flood Commission) 4. Dam Safety Council Secretariat 5. PANCID/PANCOLD Secretariat 6. Power Engineering Cell 7. Management & Administration Cell

Functions of Engineering Advisory Cell i) Scrutiny of feasibility reports, PC-Is, Conceptual / Inception/Interim Reports, etc., prepared by WAPDA, Provincial Governments and other agencies ii) Watch daily operations of major reservoirs (Tarbela, Mangla & Chashma) iii) Exchange of technical data and general liaison with international organizations, namely, International Commission on Large Dams (ICOLD), International Commission on Irrigation and Drainage (ICID), IIMI, IPTRID, FAO, WMO, UNEP, UNDP, UNESCO etc.

Federal Irrigation & Drainage Cell (FIDC) i) Act as Secretariat for Federal Programme Steering Committee for National Drainage Programme (NDP) headed by Secretary Water & Power ii) Inter-Provincial conflict resolution relating to NDP iii) To evolve National Water Policy iv) To oversee and monitor NDP

Federal Cell ( For Federal Flood Commission) i) To implement the functions of Federal Flood Commission (FFC) ii) iii) iv) To run Flood Communication Cell during Flood Season for effective dissemination of river flow and weather related information to President s and Prime Minisrter s Secretariat besides Ministry of Water & Power To implement structural and non-structural flood control measures under different programmes as envisaged in the National Flood Protection Plan (NFPP) To monitor the implementation of flood protection works under different progrmmes as envisaged in NFPP (Detailed presentation to follow after brief introduction of sections)

Functions of Dam Safety Council i) To carry out periodic inspections of dams and advise WAPDA regarding repairs and maintenance of dams and reservoirs ii) To review the plans of new dams and monitor the implementation of such projects iii) To review the plans and specifications for enlargement, modifications, major repairs, revival or abandoning of dams/reservoirs iv) To supply technical data and general liaison with World Bank and U.N. Organizations v) To keep close liaison with International Commission on Large Dams (ICOLD)

PANCID/PANCOLD Secretariat i) Exchange of technical data and general liaison with International Organizations, namely International Commission on Large Dams (ICOLD) and International Commission on Irrigation and Drainage (ICID) ii) To arrange seminars, symposiums and workshops in collaboration with ICOLD/ICID iii) To act as the Secretariat of Pakistan National Committee on ICOLD and ICID

Functions of Power Cell i) To scrutinize power projects prepared by WAPDA and KESC and render expert advice to the Ministry ii) To monitor and evaluate performance of WAPDA and KESC and suggest improvements in operational procedures iii) To coordinate hydel power development activities between GTZ, federal and provincial governments iv) Exchange and technical data and general liaison with international and national bodies on Power Engineering, namely, World Engineering Council (WEC), Energy Working Groups of Asia Pacific Economic Cooperation (APEC), etc.

Management & Administration Cell i) Administrative coordination of trainings (both local as well as foreign) ii) General services management iii) Annual budgeting of office and development projects, utilization, control and audit iv) Maintenance of project accounts, processing of consultancy services bills, internal inspection of accounts and financial monitoring of development projects

(a subsidiary of ARCADIS EUROCONSULT FEDERAL FLOOD COMMISSION

Establishment of Federal Flood Commission Prior to 1976, the Provincial Governments were responsible for the planning and execution of flood protection works Disastrous floods of 1973 and 1976 resulted in heavy losses indicating that existing flood protection facilities and planning were inadequate to provide effective protective measures for the country Consequently in January 1977 it was decided to establish Federal Flood Commission for integrated flood management on country-wide basis

Functions of Federal Flood Commission i) Preparation of National Flood Protection Plans ii) Approval of Flood Control Schemes prepared by Provincial Governments and concerned federal agencies iii) Review of flood damages to public sector infrastructure and review of plans for restoration and reconstruction works iv) Measures for improvements in Flood Forecasting and Warning System v) Standardization of designs and specifications for Flood Protection Works vi) Evaluation and monitoring relating to progress of implementation of the National Flood Protection Plan(NFPP) vii) Preparation of a research program for Flood Control and Protection viii) Recommendations regarding principles of regulation of reservoirs for flood control Note: Responsibility of implementation rest with the Provinces

Composition of Federal Flood Commission Chief Engineering Adviser/Chairman Chairman Federal Flood Commission Chief (Water), P & D Division Member Joint Secretary (Roads) Member M/O Communications Member (Water) WAPDA Member Director General Member Pakistan Meteorological Department Member (Civil) Engineering Member Pakistan Railways Four Provincial Irrigation Secretaries Members Note: The Commission can co-opt additional members as it may deem necessary

Historical Flood Damages Year Damages (in US million$ at 2002 Price level) Human Lives Lost Villages affected 1950 207 2,190 10,000 1956 135 160 11,609 1957 128 83 4,498 1973 2176 474 9,719 1976 1476 425 18,390 1978 944 393 9,199 1988 470 508 1,000 1992 1276 1008 13,208 1995 160 591 6,852 2001 50 219 50 Total: 7,022 6,051

Causes of Floods in Pakistan Floods in rivers are caused by heavy concentrated monsoon rains Sometimes augmented by snowmelt flows Monsoon depressions originating in the Bay of Bengal often result in heavy downpour Additional contribution by weather systems from Arabian Sea Seasonal Low), and Mediterranean Sea (Westerly Wave) producing destructive floods in one or more of the main rivers of the Indus System Temporary natural dams as a result of landslide or glacier movement also sometimes cause floods

Flood Management - Objectives Flood Management in Pakistan is aimed at the following main objectives: Reduction of floods and flood damages Protection of cities, vital infrastructural installations, prioritized economic areas and other areas in that order Exploring more effective use of existing flood control facilities Improvements in Watershed and River Management Practices Improvement in Flood Forecasting & Advance Warning System

Flood Management Agencies Involved i) Federal Flood Commission (FFC) ii) National Flood Forecasting Division (NFFD/PMD) iii) Pakistan Army iv) Provincial Irrigation and Power Departments (PIDs/PIDAs) v) Water &Power Development Authority of Pakistan (WAPDA) vi) Emergency Relief Cell, Cabinet Division, Islamabad vii) Provincial Flood Relief Departments viii) Pakistan Commissioner For Indus Waters ix) Police x) Pakistan Forest Department xi) Pakistan Railways xii) Information Department xiii) Provincial Communication Departments xiv) District Administrations

Flood Management Strategies Structural Measures Construction Of Embankments Construction Of Spurs/Battery Of Spurs Construction Of Dikes/Gabion Walls/Flood Walls Construction Of Dispersion/Diversion Structures Channelization Of Flood Waters Construction Of Delay Action Dams Construction Of Bypass Structures

Flood Management Strategies Non-Structural Measures Improved Flood Forecasting System through : Effective Data Collection and Dissemination System Real Time Rain-Fall and River Flow Data Collection Weather Radar Prediction Modern System of Transmission of Flood Forecasts Improved Early Flood Warning System : Based on effective Flood Forecasts, early Flood Warning is issued Reliable interaction between all related Flood Control and Relief Agencies In-time warning and evacuation arrangements by Provincial Relief Departments, District Administrations & Pakistan Army

Irrigation Network of Pakistan The Irrigation System of Pakistan is the largest integrated irrigation network in the world, serving 34.5 million acres of contiguous cultivated land. The system is fed by the waters of the Indus River and its tributaries. Salient Features of Irrigation Network Structure No. Major Storage Reservoirs 3 Barrages 19 Inter-River Link Canals 12 Independent Irrigation Canal Commands 43

Investment on Flood Protection Works (1977- June 2002) Name of Province/Federal Line Agency Investment (Rs million) Percentage of Total Investment Punjab 4,076 44.34% Sindh 3,308 35.99% NWFP 940 10.23% Balochistan 678 7.38% FATA 95 1.03% Northern Areas 73 0.80% AJ & Kashmir 22 0.23% Total: 9,192 100%

Existing Flood Management Facilities (Structural) Province Embankments (Kilometers) Spurs (In number) Punjab 2,276 365 Sindh 2,106 36 NWFP 82.50 176 Balochistan 129 Nil Total: 4,593.50 577

Existing Flood Management Facilities (Non-Structural) National Flood Forecasting Division (NFFD), Lahore 10-CM QPM Weather Radar System at Lahore, 5.36-CM Weather Radar at Sialkot, 5 CM Weather Radars at Karachi, Rahim Yar Khan, D.I.Khan and Islamabad 69-HF Radio Communication sets for effective data transmission Provision of Meteoroburst Telecommunication System for improved gauging & telemetry. Mapping of flood prone areas along the Indus River and its major tributaries using GPS techniques and related development of a Digital Terrain Model (DTM) Development of Indus Basin Flood Forecasting System (FFS) through Rainfall-Runoff Computer modelling

Existing & Proposed Weather Radar Network

National Flood Protection Plan (I & II) Since its establishment in 1977 Federal Flood Commission has prepared & implemented two 10 years National Flood Protection Plans. Details are depicted in the succeeding two slides

National Flood Protection Plan-I (1978-87) Normal Annual Development Program Cost Rs 1,730 million No. of Projects 350 (in all the four Provinces) Funding Agency 100% by GOP

National Flood Protection Plan-II (1988-98) Normal Annual Development Program Cost Rs 2,541 million No. of Schemes Completed 170 Funding Agency 100% by GOP Flood Protection Sector Project-I (FPSP-I) Cost Rs 4,860 million No. of schemes completed 257 Foreign funding (ADB) US $ 131.07 million (80% ADB, 20 % GOP)

National Flood Protection Plan-III (1998-2012) Component Projects Name Cost (Rs in million) Completion Second Flood Protection 4,614 2004 Sector Project (Phase-I, 2002-2004) Second Flood Protection 3,386 2008 Sector Project (Phase-II) Third Flood Protection 6,000 2012 Sector Project Emergent Flood Control 2,400 On going Program since 1977 Hill Torrents Flood 8,600 2012 Management (Phase-I) (Details of on-going projects to follow)

On-going Protects Normal Annual Development Programme Second Flood Protection Sector Project

Normal Annual Development Programme

NORMAL ANNUAL DEVELOPMENT PROGRAMME ALLOCATIONS DURING THE LAST FIVE (5) YEARS (Rs in million) S. No. Year Allocation 1. 1998-1999 392.00 2. 1999-2000 300.00 3. 2000-2001 250.00 4. 2001-2002 78.00 5. 2002-2003 75.00

PROVINCE/. AGENCY NORMAL ANNUAL DEVELOPMENT PROGRAMME PROVINCE-WISE BREAKUP OF ALLOCATIONS DURING THE LAST FIVE (5) YEARS (Rs in million) 1998-1999 1999-2000 2000-2001 2001-2002 2002-2003 TOTAL Punjab 176.400 135.000 90.000 35.000 30.100 466.800 Sindh 121.520 93.000 62.000 23.535 19.380 319.435 NWFP 43.120 33.000 22.000 8.315 10.780 117.215 Balochistan 31.360 24.000 16.000 5.650 7.840 84.850 FATA 11.760 9.000 6.000 2.8000 2.940 32.500 Northern Areas 3.920 3.000 52.000 51.200 0.980 111.100 AJ & K 3.920 3.000 2.000 1.200 0.980 11.100 TOTAL: 392.000 300.000 250.000 128.000 73.000

Normal Annual Development Programme RELEASE CRITERIA Since July 2000 under the new system of Financial Control & Budgeting introduced by M/O Finance, releases are made in three (3) installments as under: (i) 45% for Ist six months uptil December 31. (ii) 25% upto March 31. (iii) 30% upto June 30. All releases are approved by M/O Finance subject to furnishing of utilization accounts of previous releases

Percentage Budget Allocations Province/Agency % age Punjab 45% Sindh 31% NWFP 11% Balochistan 08% FATA 03% Northern Areas 01% AJ & K 01% ------- Total: 100%

NORMAL ANNUAL DEVELOPMENT PROGRAMME PROVINCE-WISE POSITION OF RELEASES DURING THE LAST FIVE (5) YEARS (Rs in million) PROVINCE/ AGENCY 1998-1999 1999-2000 2000-2001 2001-2002 2002-2003 TOTAL Punjab 132.400 125.820 22.500 24.710 13.545 318.975 Sindh 111.060 93.000 15.500 23.535 8.721 251.816 NWFP 32.340 33.000 5.500 5.820 4.851 81.511 Balochistan 23.52 24.000 4.000 Nil - 51.520 FATA 10.260 9.000 1.500 1.960-22.720 Northern Areas 3.420 3.000 50.500 50.000-106.920 AJ & K 3.420 3.000 0.500 Nil 0.441 7.361 Total: 316.420 290.820 100.000 106.025 27.558 840.823

NORMAL ANNUAL DEVELOPMENT PROGRAMME STATUS OF ALLOCATION VS RELEASES FOR 2002-2003 (Rs in million) PROVINCE/ AGENCY ALLOCATION RELEASES OF IST HALF of 2002-2003 (45%) REMARKS Punjab 30.100 13.545 45% of total allocation upto 31-12-2002 Sindh 19.380 8.721 45% of total allocation upto 31-12-2002 NWFP 10.780 4.851 45% of total allocation upto 31-12-2002 Balochistan 7.840 --- Case for release of Rs 3.530 million is under process with M/O Water & Power FATA 2.940 --- Utilization Account awaited for previous year releases Northern Areas 0.980 --- Case for release of funds for Rs 0.441 million is under process AJ & K 0.980 0.441 Utilization Account is awaited for Rs 0.441 million is awaited FFC 2.000 0.466 -

NORMAL ANNUAL DEVELOPMENT PROGRAMME PRIORITY WORKS BEING EXECUTED PRESENTLY PROVINCE & SCHEME TITLE ESTIMATED COST (Rs Million) REMARKS Punjab Protection of C-J Link outfall structure and Village Shergarh from erosion of river Jhelum Sindh Constructing T-Head Spur at S.M.Bund mile 135/7 and 3 No. studs at S.M. Bund mile 136/1, 136/2 and136/3 (Bhanote Site) NWFP 1. Protection of agricultural lands, Adazai bridge from flood action of Adezai river at Mamu Banda 2. Flood embankment for protection of village Matora from Lora nullah floods in District Lakki Marwat 3. Flood protection works for village Tipra, District Haripur 4. Flood protection work for village Palosai Mughdarzai against 78.000 85.209 4.900 3.000 2.100 1.560 On-going scheme from last year. Punjab Govt. intends to utilize its share on this scheme On-going scheme from last year. Sindh Govt. intends to utilize its share on this scheme On-going from last year Under process of approval Under process of approval Under process of approval

NORMAL ANNUAL DEVELOPMENT PROGRAMME PRIORITY WORKS BEING EXECUTED PRESENTLY PROVINCE & SCHEME TITLE ESTIMATED COST (Rs Million) REMARKS Balochistan 1. Flood protection of agricultural lan/abadies along the banks of Nikoi and Purshakai Mandas in Tarkha Badini areas in District Killa Saifullah 2. Flood protection of agricultural land/abadie in Killi Kari Wari Rude Jogezai area in District Killa Saifullah 3. Flood protection of Ghazni Viala, District Zhob 4. Flood protection of agricultural lans/abadies of Karezai and Urgus village in Muslim Bagh area of Killa Saifullah 5. Flood protection of Machi Kho village, District, Sibi 6. Flood protection of Dera Bugti Town, District Dera Bugti 0.440 1.300 1.000 2.000 0.967 0.791 Under process for approval Under process for approval Under process for approval Under process for approval Under process for approval Under process for

NORMAL ANNUAL DEVELOPMENT PROGRAMME PRIORITY WORKS BEING EXECUTED PRESENTLY PROVINCE & SCHEME TITLE ESTIMATED COST (Rs Million) REMARKS FATA Reclamation of land and flood protection of land and village abadies in different areas of FATA 5.900 On-going from last year Northern Areas 1. Construction of flood protective bund at Surmo 4.380 On-going from last year 2. Construction of flood protective bund at Mamochunmo Shigar Skardu (Phase-I) 2.000 On-going from last year AJ & K 1. Flood protection of agricultural land, playground & Boys Degree College Trarkal due to erosion of Tarakhel Nullah 0.726 Under process for approval