JASON COTE-WONG RESIDENTIAL SUBDIVISION AND STORMWATER PERMITTING EAST MONTPELIER, VERMONT JUNE 21, 2017 OWNER: JASON COTE-WONG

Similar documents
Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

GRASS-LINED CHANNEL (acre) CODE 840

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

SECTION 903 EROSION CONTROL

SECTION EROSION CONTROLS

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

Erosion and Sediment Control Plan for a Timber Harvesting Operation

SECTION 10 - SEEDING Related requirements specified in other Sections of the Specifications. A. Section 7 - General Construction Standards

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Index. outlet protection Rev. 12/93

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

STANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS SECTION 11

STANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS

Please print or type.

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

BMP 6.4.4: Infiltration Trench

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

RESTORATION SPECIFICATION

SECTION EROSION AND SEDIMENTATION CONTROL

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

[1] Level spreaders can release sheet flow down steep slopes, but the level spreader itself must be constructed across a level gradient.

IN T R A / M IN T R A M

Figure Inlet protection (Source: Minnesota DOT)

New Market Township. Driveway/Approach Permit

SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK

SECTION EROSION CONTROL DEVICES

WQ-08 ENHANCED DRY SWALE

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS

BMP No. 2 Vegetative Establishment of Silviculturally Disturbed Areas

SECTION SOIL EROSION, SEDIMENTATION CONTROL AND LANDSCAPING TABLE OF CONTENTS

Tips with Creation of your Erosion and Sediment Control Plan

Erosion Control Blankets

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

SECTION EROSION AND SEDIMENTATION CONTROLS

Section 1I-3 - Bioswales

APPENDIX C DURING CONSTRUCTION BMP TABLES

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

Appendix B.2. Construction Specifications for Infiltration Practices

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

ITEM 706 PIPE SLOPE DRAIN

Standard Erosion Control Plan

Erosion Control for Home Builders

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Suggested Stormwater Management Practices For Individual House Lots

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS

New Administration Building

Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage

SOIL TRACKING PREVENTION DEVICE TYPE A

Diversion Dikes. Fe=0.95

KANSAS CITY METROPOLITAN CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION

Common Construction-Site BMPs Quick Reference Guide

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Earth Dikes and Drainage Swales

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Construction Inspection Checklists

LAND DISTURBING ON SHORELAND AREAS

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

E & S Plan Approved. Not required but may be a municipal requirement** Not required but may be a. municipal. requirement** Not required but may be a

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Slash Water Bar Video

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

17 Seeding. Types of Seeding. Preparation. Application Rate of Fertilizer. Application of Seed. Seasonal Limitation. Mulching

The Construction General Permit and Erosion Prevention and Sedimentation Control

SECTION 10 - TRENCHING AND BACKFILLING

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Chapter 3 Dispersion BMPs

SECTION TRENCHING & BACKFILLING

INDEX BMP SUMMARY FOR CONSTRUCTION SITES

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

Submittal Requirements. Post Construction Verification Document Plan Requirements

EROSION AND SEDIMENTATION CONTROL

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

Degradation of the resource Fertility loss Organic matter Tilth degradation. Water quality Sediment Nutrients

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

SECTION EROSION AND SEDIMENTATION CONTROL

Grassed Waterway Improvement and Gully Restoration

Specifications for SEEDING FOR EROSION CONTROL

Berks County Conservation District EROSION CONTROL FOR TIMBER HARVEST ACTIVITIES

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

Appendix B Construction SWPPP Short Form

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

ROLLED EROSION CONTROL PRODUCTS (RECP)

APPENDIX I. Plan Reviewer Checklist

Maine s Land Use Regulations and Erosion Control Techniques

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

Transcription:

OWNER: 4028 U.S ROUTE 2 05651 (802) 223-7171 JUNE 21, 2017 ENGINEER: 34 SCHOOL STREET LITTLETON, NH 03561 (603) 444-4111 EAST MONTPELIER SURVEYOR: CHASE & CHASE SURVEYORS 301 NORTH MAIN ST., SUITE 1 BARRE, VERMONT 05641 (802) 479-9636 PROJECT LOCATION T:\ Wong Stormwater\DWGS\Final\HE_SITEPLAN_4.dwg, CoverVT24x36, 6/28/2017 8:17:20 AM, MBurnell VERMONT INDEX LOCATION PLAN SCALE: 1" = 2000' 1 2 3 4 5 6 7 8 COVER EXISTING CONDITIONS PROPOSED SITE PLAN OVERVIEW PLAN AND PROFILE STA 0+00-9+00 PLAN AND PROFILE STA 9+00-16+90 PRE DRAINAGE AREA MAP WITH SOIL COLOR DELINEATION POST DRAINAGE AREA MAP WITH SOIL COLOR DELINEATION STORMWATER DETAILS AND NOTES

LEGEND 2 FOOT CONTOURS 10 FOOT CONTOURS APPROX. PROPERTY LINE TREELINE FENCELINE WETLANDS BOUNDARY GRAVEL ROAD PAVEMENT HATCH GRAVEL HATCH WETLAND HATCH IRON ROD FOUND EXISTING CONDITIONS T:\ Wong Stormwater\DWGS\Final\HE_SITEPLAN_4.dwg, SH2-EX COND, 6/28/2017 8:17:30 AM, MBurnell 0 50 100 200 400 REVISION DESCRIPTION ENG DWG : PROJECT #: BDL H-5334 2 OF 8

LOT NUMBER ENVIRONMENTALLY SENSITIVE RURAL DEVELOPMENT (ESRD) CREDIT LOT IMPERVIOUS AREA (ACRES) LOT TOTAL AREA (ACRES) IMPERVIOUS PERCENTAGE (%) CONSERVATION LAND (ACRES) PERCENT IN CONSERVATION (%) 3-A1 1.04 33.83 3.07 13.21 39.04 3-A2 0.09 2.18 4.12 1.14 50.00 TOTAL 1.13 36.01 3.14 14.35 39.85 W FM LEGEND 2 FOOT CONTOURS 10 FOOT CONTOURS APPROX. PROPERTY LINE PROPOSED PROPERTY LINE TREELINE FENCELINE WETLANDS BOUNDARY GRAVEL ROAD PROPOSED GRAVEL ROAD PROPOSED SEWER FORCEMAIN PROPOSED WATERLINE PAVEMENT HATCH GRAVEL HATCH PROPOSED GRAVEL HATCH WETLAND HATCH ESRD CREDIT HATCH GRASSED SWALE HATCH STONE LINED DITCH HATCH IRON ROD FOUND T:\ Wong Stormwater\DWGS\Final\HE_SITEPLAN_4.dwg, SH3-PROPOSED COND, 6/28/2017 8:17:35 AM, MBurnell 0 50 100 200 400 PROPOSED SITE PLAN OVERVIEW REVISION DESCRIPTION : BDL ENG PROJECT #: H-5334 3 OF 8 DWG

0 20H 40H 80H 160H 0 2V 4V 8V 16V PLAN AND PROFILE STA 0+00-STA 9+00 T:\ Wong Stormwater\DWGS\Final\HE_SITEPLAN_4.dwg, SH4-P&P, 6/28/2017 8:17:40 AM, MBurnell REVISION DESCRIPTION ENG DWG : PROJECT #: BDL H-5334 4 OF 8

0 20H 40H 80H 160H 0 2V 4V 8V 16V PLAN AND PROFILE STA 9+00-STA 16+90 T:\ Wong Stormwater\DWGS\Final\HE_SITEPLAN_4.dwg, SH5-P&P, 6/28/2017 8:17:45 AM, MBurnell REVISION DESCRIPTION ENG DWG : PROJECT #: BDL H-5334 5 OF 8

NRCS SOILS INFORMATION (WASHINGTON COUNTY SOIL SURVEY) (USED WITHIN NRCS MAPPING LIMITS) MAPPING MAPPING UNIT SYMBOL SOIL MAPPING UNIT NAME HSG 26A,26B,26C,26D,S6E ADAMS LOAMY FINE SAND A 41E BUXTON SILT LOAM D 43B,43D SALMON VERY FINE SANDY LOAM B 44B LAMOINE SILT LOAM C 45A SCANTIC SILT LOAM D 91C, DUMMERSTON FINE SANDY LOAM B 93D BUCKLAND LOAM C/D W WATER -- INDICATES SOIL NAME INDICATES SLOPE OF LAND A = 0 TO 3 PERCENT SLOPE B = 3 TO 8 PERRECENT SLOPE C = 8 TO 15 PERCENT SLOPE D = 15 TO 25 PERCENT SLOPE E = STEEP F = VERY STEEP T:\ Wong Stormwater\DWGS\Final\HE_SITEPLAN_4.dwg, SH6-PREDEV COLOR MAP, 6/28/2017 8:17:50 AM, MBurnell 0 50 100 200 400 PRE-DRAINAGE AREA MAP WITH SOIL COLOR DELINEATION REVISION DESCRIPTION : BDL ENG PROJECT #: H-5334 6 OF 8 DWG

NRCS SOILS INFORMATION (WASHINGTON COUNTY SOIL SURVEY) (USED WITHIN NRCS MAPPING LIMITS) MAPPING MAPPING UNIT SYMBOL SOIL MAPPING UNIT NAME HSG 26A,26B,26C,26D,S6E ADAMS LOAMY FINE SAND A 41E BUXTON SILT LOAM D 43B,43D SALMON VERY FINE SANDY LOAM B 44B LAMOINE SILT LOAM C 45A SCANTIC SILT LOAM D 91C, DUMMERSTON FINE SANDY LOAM B 93D BUCKLAND LOAM C/D W WATER -- INDICATES SOIL NAME INDICATES SLOPE OF LAND A = 0 TO 3 PERCENT SLOPE B = 3 TO 8 PERRECENT SLOPE C = 8 TO 15 PERCENT SLOPE D = 15 TO 25 PERCENT SLOPE E = STEEP F = VERY STEEP T:\ Wong Stormwater\DWGS\Final\HE_SITEPLAN_4.dwg, SH7-POSTDEV COLOR MAP, 6/28/2017 8:17:55 AM, MBurnell 0 50 100 200 400 POST-DRAINAGE AREA MAP WITH SOIL COLOR DELINEATION REVISION DESCRIPTION : BDL ENG PROJECT #: H-5334 7 OF 8 DWG

SEEDING RECOMMENDATIONS LEVEL LIP SPREADER INSTALLATION 1. GRADING AND SHAPING A. SLOPES SHALL NOT BE STEEPER THAN 2:1; 3:1 SLOPES OR FLATTER ARE PREFERRED. WHERE MOWING WILL BE DONE, 3:1 SLOPES OR FLATTER ARE RECOMMENDED. 1. CONSTRUCT THE LEVEL SPREADER LIP ON A ZERO PERCENT GRADE TO INSURE UNIFORM SPREADING OF RUNOFF. 4" LOAM, MULCH AND SEED 2. SEEDBED PREPARATION A. SURFACE AND SEEPAGE WATER SHOULD BE DRAINED OR DIVERTED FROM THE SITE TO PREVENT DROWNING OR WINTER KILLING OF THE PLANTS. B. STONES LARGER THAN 4 INCHES AND TRASH SHOULD BE REMOVED BECAUSE THEY INTERFERE WITH SEEDING AND FUTURE MAINTENANCE OF THE AREA. WHERE FEASIBLE, THE SOIL SHOULD BE TILLED TO A DEPTH OF ABOUT 4 INCHES TO PREPARE A SEEDBED AND MIX FERTILIZER AND LIME THOROUGHLY INTO THE SOIL. THE SEEDBED SHOULD BE LEFT IN A REASONABLY FIRM AND SMOOTH CONDITION. THE LAST TILLAGE OPERATION SHOULD BE PERFORMED ACROSS THE SLOPE WHEREVER PRACTICAL. 3. ESTABLISHING VEGETATION A. LIME AND FERTILIZER SHOULD BE APPLIED PRIOR TO OR AT THE TIME OF SEEDING AND INCORPORATED INTO THE SOIL. KINDS AND AMOUNTS OF LIME AND FERTILIZER SHOULD BE BASED ON AN EVALUATION OF SOIL TESTS. WHEN A SOIL TEST IS NOT AVAILABLE, THE FOLLOWING MINIMUM AMOUNTS SHOULD BE APPLIED: -AGRICULTURAL LIMESTONE, 2 TONS PER ACRE OR 100 LBS. PER 1,000 SQ. FT. -NITROGEN (N), 50 LBS., PER ACRE OR 1.1 LBS. PER 1,000 SQ. FT. -PHOSPHATE (P 2O 5), 100 LBS. PER ACRE OR 2.2 LBS. PER 1,000 SQ. FT. -POTASH (K 0), 100 LBS. PER ACRE OR 2.2 LBS. PER 1,000 SQ. FT. 2 (NOTE: THIS IS THE EQUIVALENT OF 500 LBS. PER ACRE OF 10-20-20 FERTILIZER OR 1,000 LBS. PER ACRE OF 5-10-10). B. SEED SHOULD BE SPREAD UNIFORMLY BY THE METHOD MOST APPROPRIATE FOR THE SITE. METHODS INCLUDE BROADCASTING, DRILLING, AND HYDROSEEDING. WHERE BROADCASTING IS USED, COVER SEED WITH.25 INCH OF SOIL OR LESS, BY CULTIPACKING OR RAKING. 2. LEVEL SPREADER SHALL BE CONSTRUCTED ON UNDISTURBED SOIL AND NOT ON FILL. 3. AN EROSION STOP SHALL BE PLACED VERTICALLY A MINIMUM OF SIX INCHES DEEP IN A SLIT TRENCH ONE FOOT BACK OF THE LEVEL LIP AND PARALLEL TO THE LIP. THE EROSION STOP SHALL EXTEND THE ENTIRE LENGTH OF THE LEVEL LIP. 4. THE ENTIRE LEVEL LIP AREA SHALL BE PROTECTED BY PLACING TWO STRIPS OF JUTE OR EXCELSIOR MATTING ALONG THE LIP. EACH STRIP SHALL OVERLAP THE EROSION STOP BY AT LEAST SIX INCHES. 5. THE ENTRANCE CHANNEL TO THE LEVEL SPREADER SHALL NOT EXCEED A 1 PERCENT GRADE FOR AT LEAST 50 FEET BEFORE ENTERING INTO THE SPREADER. 6. THE FLOW FROM THE LEVEL SPREADER SHALL OUTLET ONTO STABILIZED AREAS. WATER SHOULD NOT RE-CONCENTRATE IMMEDIATELY BELOW THE SPREADER. 7. PERIODIC INSPECTION AND REQUIRED MAINTENANCE SHALL BE PERFORMED. 8. PROTECTIVE MATERIAL AND EROSION STOP SHALL BE NORTH AMERICAN GREEN C125 EROSION CONTROL BLANKET OR APPROVED EQUAL. MIRAFI FILTERWEAVE FW 700 GEOTEXTILE FABRIC, OR EQUAL EXTEND TO GROUND SURFACE D* 24" (TYP.) 2'-0" (TYP) 10'-0" (TYP) 3 (TYP.) 1 STONE LINED DITCH DETAIL STONE FILL, SIZE PER PLAN * STONE SIZE MIN. D EROSION STONE 12" 1 3 UNLESS OTHERWISE SPECIFIED 14'-0" MINIMUM 2'-0" GRASSED SWALE DETAIL PROVIDE NORTH AMERICAN GREEN DS 150 NETTING (OR EQUAL) OVER LOAM AND SEED IN BOTTOM OF DITCH, EXTEND MINIMUM 1 FT UP SIDE SLOPES CL C. SEEDING GUIDE: USE STEEP CUTS AND FILLS, BORROW AND DISPOSAL AREAS WATERWAYS, EMERGENCY SPILL- WAYS, AND OTHER CHANNELS WITH FLOWING WATER SEEDING MIXTURE (SEE 3D) A B C A DROUGHTY POOR SOIL TYPE WELL DRAINED EXCELLENT MOD. WELL DRAINED EXCELLENT POORLY DRAINED POOR FIRST STRIP OF PROTECTIVE MATERIAL LEVEL LIP OF SPREADER 1' OVERLAP BOTH STRIPS OF PROTECTIVE MATERIAL OVER EROSION STOP A MINIMUM OF 6 INCHES EROSION STOP SECOND STRIP OF PROTECTIVE MATERIAL EXISTING GRADE 6" MIN. FINISH GRADE 3 3 1 1 2'-0" WIDTH VARIES 4% TRAVEL LANE 6" CRUSHED GRAVEL WIDTH VARIES TRAVEL LANE 4% 2'-0" 6'-0" 3 2'-0" 1 1 3 LIGHTLY USED PARKING LOTS, ODD AREAS, UNUSED LANDS, AND LOW INTENSITY USE RECREATION SITES D. SEEDING RATES: MIXTURE A B POUNDS PER ACRE POUNDS PER 1,000 SQ. FT. POOR 6' MINIMUM LEVEL SPREADER DETAIL NO SCALE 12" BANK RUN GRAVEL SELECT FILL OR EXISTING GRADE STONE LINED DITCH OR GRASS SWALE (SEE DETAIL) A TALL RESCUE CREEPING RED FESCUE REDTOP TOTAL: 20 20 2 42 0.45 0.45 0.05 0.95 TYPICAL ROAD CROSS SECTION B TALL FESCUE CREEPING RED FESCUE CROWN VETCH OR FLATPEA TOTAL: 15 10 15 OR 30 40 OR 55 0.35 0.25 0.35 OR 0.75 0.95 OR 1.35 C TALL FESCUE FLATPEA TOTAL: 20 30 50 0.45 0.75 1.20 E. WHEN SEEDED AREAS ARE MULCHED, PLANTINGS MAY BE MADE FROM EARLY SPRING TO SEPTEMBER 15. WHEN SEEDED AREAS ARE NOT MULCHED, PLANTINGS SHOULD BE MADE FROM EARLY SPRING TO MAY 20 OR FROM AUGUST 10 TO SEPTEMBER 1. F. TEMPORARY SEEDING RATES: 4' 2' SPECIES WINTER RYE POUNDS PER ACRE 112 POUNDS PER 1,000 SQ. FT. 2.5 REMARKS BEST FOR FALL SEEDING. SEED FROM AUGUST TO SEPTEMBER 5TH FOR BEST COVER. SEED TO A DEPTH OF 1 INCH. 18" OATS ANNUAL RYEGRASS PERENNIAL RYEGRASS 80 40 30 2.0 1.0 0.7 BEST FOR SPRING SEEDING. SEED NO LATER THAN MAY 15TH FOR SUMMER PROTECTION. SEED TO A DEPTH OF 1 INCH. GROWS QUICKLY, BUT IS OF SHORT DURATION. USE WHERE APPEARANCES ARE IMPORTANT. SEED EARLY SPRING AND/OR BETWEEN AUGUST 15TH AND SEPTEMBER 15TH. COVER SEED WITH NO MORE THAN 0.25 INCH OF SOIL. COVER WHICH IS LONGER LASTING THAN ANNUAL RYEGRASS. SEED BETWEEN APRIL 1ST AND JUNE 1ST AND/OR BETWEEN AUGUST 15TH AND SEPTEMBER 15TH. MULCHING WILL ALLOW SEEDING THROUGHOUT THE GROWING SEASON. SEED TO A DEPTH OF APPROXIMATELY 0.5 INCH. 3/4" - 1 1/2" CRUSHED WASHED STONE 40% VOID SPACE GEOTEXTILE FABRIC (MIRAFI FW 700 OR EQUAL) 4. MULCH A. HAY, STRAW, OR OTHER MULCH, WHEN NEEDED, SHOULD BE APPLIED IMMEDIATELY AFTER SEEDING. B. MULCH WILL BE HELD IN PLACE USING APPROPRIATE TECHNIQUES FROM THE BEST MANAGEMENT PRACTICE FOR MULCHING. 5. MAINTENANCE TO ESTABLISH A STAND A. PLANTED AREAS SHOULD BE PROTECTED FROM DAMAGE BY FIRE, GRAZING, TRAFFIC, AND DENSE WEED GROWTH. B. FERTILIZATION NEEDS SHOULD BE DETERMINED BY ON SITE INSPECTIONS. SUPPLEMENTAL FERTILIZER IS USUALLY THE KEY TO FULLY COMPLETE THE ESTABLISHMENT OF THE STAND BECAUSE MOST PERENNIALS TAKE 2 TO 3 YEARS TO BECOME ESTABLISHED. 4" FOUNDATION DRAIN STONE DRIP EDGE DETAIL LOAM AREA PAVED AREA C. IN WATERWAYS, CHANNELS, OR SWALES WHERE UNIFORM FLOW CONDITIONS ARE ANTICIPATED, OCCASIONAL MOWING MAY BE NECESSARY TO CONTROL GROWTH OF WOODY VEGETATION. 2"-3" STONE, TYP. NOTES 4" COMPACTED LOAM AND SEEDED 6" FOLDED UNDER TOP (& BOTTOM) OF SLOPE 3" OVERLAP WHEN LAPPING ROLLS STAPLE ALL EDGES ON 12" CENTERS 6" 24",TYP. 1. CONSTRUCT ROCK CHECK DAMS WHERE INDICATED ON THE PLANS OR AS NECESSARY. 2. CONSTRUCT SPILLWAY IN CENTER OF ROCK CHECK DAM 6" BELOW TOP OF CHANNEL. 3. THE MAXIMUM SPACING BETWEEN THE CHECK DAMS SHOULD BE SUCH THAT THE TOE OF THE UPSTREAM CHECK DAM IS AT THE SAME ELEVATION AS THE SPILLWAY ELEVATION OF THE DOWNSTREAM CHECK DAM, THIS WILL VARY DEPENDING ON THE SLOPE OF THE CHANNEL. SUITABLE BACKFILL 6" CRUSHED GRAVEL 12" GRAVEL ROADWAY BACKFILL SHALL CONFORM TO TOWN REQUIREMENTS T:\ Wong Stormwater\DWGS\Final\HE_SITEPLAN_4.dwg, SHT8-DETAILS, 6/28/2017 8:17:59 AM, MBurnell STAPLES ARE 12" APART ON INSIDE EDGES 6" FOLDED UNDER BOTTOM (& TOP) OF SLOPE 24" MAX. 24" MAX. MULCH NETTING DETAIL NO SCALE STAPLE ALL EDGES ON 12" CENTERS 6" OVERLAP WHEN JOINING ROLLS SOURCE: USDA SOIL CONSERVATION SERVICE NO STAPLES ARE TO BE OVER 24" APART (CENTER TO CENTER) ALL STAPLES TO BE 6 INCH STAPLES CHANNEL TOP OF BANK 24" SECTION VIEW 2 (TYP.) 1 4. ROCK CHECK DAMS SHALL CONSIST OF A WELL GRADED MIXTURE OF 2" - 3" STONE. 5. REMOVE ROCK CHECK DAMS AND ANY ACCUMULATED SILT IN CHANNEL ONCE PERMANENT CHANNEL LININGS HAVE BEEN ESTABLISHED AND STABILIZED. DISTANCE VARIES DEPENDING ON CHANNEL SLOPE PROFILE VIEW ROCK CHECK DAM DETAIL NO SCALE SEE NOTE 3 UNDISTURBED SOIL D 3'-0" MIN. OR D+2 (WHICHEVER IS GREATER) TYPICAL CULVERT TRENCH DETAIL 3/4" CRUSHED STONE BEDDING FOR FULL WIDTH OF THE TRENCH UP TO SPRING LINE OF PIPE 6" BELOW PIPE IN EARTH 12" BELOW PIPE IN LEDGE ROCK C 2017 STORMWATER DETAILS AND NOTES REVISION DESCRIPTION : BDL ENG PROJECT #: H-5334 8 OF 8 DWG