Valuing Distressed Generation Assets

Similar documents
PJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper

Power Generation Asset Optimization: Optimal Generating Strategies in Volatile Markets (Case Study) Presented at POWER-GEN 2001 Las Vegas, Nevada

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report

Executive summary. Value of Smart Power Generation for utilities in Australia. A white paper by Wärtsilä and Roam Consulting

Marc de Croisset FBR CAPITAL MARKETS & CO. Coal-to-Gas Switching: Distilling the Issue

The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT. David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009

Net Revenue. Overview Net Revenue. Net Revenue. Conclusion

Net Revenue. Overview Net Revenue. Conclusion. Historical New Entrant CT and CC Revenue Adequacy

Impacts of High Variable Renewable Energy (VRE) Futures on Electric-Sector Decision Making

Summary of Integrated Capacity and Energy Revenue Modelling

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring

Beyond LCOE: The Value of CSP with Thermal Energy Storage

The Future of Electricity: A Market with Costs of Zero? Marginal

Net Revenue. Overview Net Revenue. Conclusion

Energy Uplift (Operating Reserves)

Energy Uplift (Operating Reserves)

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring

The Future of Electricity: A Market with Costs of Zero? Marginal

Overview of EAI Functional Requirements for Short-Term Generation Planning

PowerSimm for Applications of Resource Valuation

Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component

The Implications of Lower Natural Gas Prices for the Electric Generation Mix in the Southeast 1

2007 State of the Market Report Midwest ISO. Midwest ISO

PJM s Clean Power Plan Modeling Reference Model and Sensitivities

STATE OF THE MARKET REPORT 2005

Evolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017

Further Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market

Further Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market

Electricity System Operator Incentives BSUoS Seminar

From base to cycling operation - innovative concepts for thermal power plants

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012

Draft 2011 Long-term Transmission Plan. Stakeholder Session June 20, 2011

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

CO2, SO2 and NOX Emission Rates. March 15, 2018

SECTION 8. RISK MANAGEMENT AND MITIGATION

Dharam V. Punwani Avalon Consulting, Inc. Tom L. Pierson Turbine Air Systems, Ltd.

Overview. Net Revenue

Keeyask Generation Project. Public Involvement. Supporting Volume. Environmental Impact Statement

Review of Interconnection Assistance Reliability Benefits. May 12, NPCC CP-5 Working Group

Capacity Revenues for Existing, Base Load Generation in the PJM Interconnection

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

APRIL 23, Capacity Value of Wind Assumptions and Planning Reserve Margin

The consumer and societal benefits of wind energy in Texas

OVERVIEW OF DESERT SOUTHWEST POWER MARKET AND ECONOMIC ASSESSMENT OF THE NAVAJO GENERATING STATION

California ISO. Q Report on Market Issues and Performance. November 1, Department of Market Monitoring

Time Dependent Valuation of Energy

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES

August 22, 2014 FIRE ISLAND WIND

2001 Annual Report on the New York Electricity Markets

REPORT ON EXPORT PRICES AND REVENUES RELATING TO THE NEED FOR AND ALTERNATIVES To (NFAT) MANITOBA HYDRO S PREFERRED DEVELOPMENT PLAN

Transmission Expansion Advisory Committee

Analyst Presentation Managing Hydrology Risk

PowrSym4. A Presentation by. Operation Simulation Associates, Inc. February, 2012

Monte-Carlo Optimization Framework for Assessing Electricity Generation Portfolios

Electric Forward Market Report

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor

Congestion and Marginal Losses

Business Plan Workbook

The economic benefits of wind energy in the Southwest Power Pool

EIA Winter Fuels Outlook

PRODUCTION FORECAST AND METHODOLOGY NUCLEAR

Ancillary Service Markets

ISO-New England s Generating Unit Availability Study: Where s the Beef?

The Influence of Demand Resource Response Time in Balancing Wind and Load

Global Digital Advertising Report Adobe Digital Index Q4 2014

Hedging Coal Price Risk in a Deregulated Power Market

MATERIALS AND SUPPLIES INVENTORY

Integrated Resource Planning at Tacoma Power. Ahlmahz Negash EE 500E Energy & Environment Seminar University of Washington

CO2, SO2 and NOX Emission Rates. August 21, 2015

Capacity and Flexibility Needs under Higher Renewables

Northeast Energy Summit 1 Veterans Way, Suite 200 Carnegie, PA Steve Dean, ASA, P.E. Managing Principal (412)

The Optimisation of the supply-demand balance, the role of interconnections, and the impact of nuclear shutdown in Germany for EDF

Alberta Capacity Market

Ancillary Service Markets

A Bulk Energy Storage Resource Case Study with 40% RPS in 2024

Do We Need ICAP? Ensuring Adequate Capacity in a Competitive Electricity Market

I 5 Corridor Analysis Phase 1 Report

Alberta Capacity Market Information Session

Schedule 2 TECHNICAL INFORMATION

Session V Market Driven ES Existing Business Cases give an Insight to their Revenue Streams. Business Cases for large Capacity Storage Projects

Methodology to Perform Long Term Assessments

Managing Risk and Volatility in Gas-Fired Generation

ISO New England Inc. February /19 ICR Related Values 1

Load Shift Working Group.

APPENDIX I PLANNING RESERVE MARGIN STUDY

ACKNOWLEDGEMENT. The following staff members of the Department of Market Monitoring contributed to this report:

Managing Coal Burn Challenges of Yesterday, Today and Tomorrow

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

Crops Marketing and Management Update

Basic Generation Service Commercial and Industrial Energy Pricing Overview

Congestion and Marginal Losses

Background Figure 1: PEC s Location in ISO-NE 1

Energy Market. Highlights

This analysis was prepared by Matt Gurnham under the direction of Peter Harrison and Jeffrey Novak.

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring

Integrated Planning Model (IPM ) Overview

A Brief Analysis of the Benefits of Privatising Victoria s Electricity Industry

Transcription:

VALUING DISTRESSED GENERATION ASSETS Kevin M. Harper, & Stephen A. Stolze R.J. Rudden Associates, Inc. Douglas M. Logan, & Buck Feng Power Costs, Inc. Achieving an accurate valuation for distressed generation assets is of paramount importance. With most of the largest independent generation companies facing the need to restructure the debt that underlies their projects (or sell certain assets outright), less than rigorous valuation approaches could lead to a repeat of history on the debt side or a surrender of too much value on the equity side. In this environment, the need to apply more sophisticated analytical tools to the valuation of assets is essential. Failure to do so will likely lead to inappropriate valuations and less than optimal decisions. Despite the increased complexities facing energy project analysts, many still employ the same approach to asset valuation as they have for years. However, traditional methodologies for the valuation of assets exhibit a number of shortcomings, such as: High-level financial pro formas do not capture the effects that dynamic, physical asset limitations have on generation asset value (e.g., costs to achieve optionality); and, hence, they do not represent real asset value. The level of precision and functionality afforded by spreadsheet environments limit flexibility in the analysis of the physical characteristics of generation assets. Some financial models do not optimize in response to multiple project inputs and constraints. Generation plants have operational constraints that restrict their ability to respond to market changes; therefore, traditional Black-Scholes models, which more or less assume an instant on/off capability, are inappropriate tools. At Rudden, we believe that determining the true value of an asset, or portfolio of assets, requires a simulationbased analysis capable of capturing both the intrinsic and extrinsic (optional) values taking into account all operational constraints (Figure 1). In addition, the analysis should also include the use of a Monte Carlo-based tool to simulate a wide range of possible price trajectories and other variables. It will yield a distribution of profits, rather than a point estimate, that can be used to assess earnings at risk and calculate an appropriate asset or portfolio value under real world conditions. Traditional Approach Simulation-Based Approach Plants are physical assets that convert fuel into electricity Valuation inputs: Expected capacity factor Expected average cost of fuel Expected average market price of electricity Precedent sale price/kw for similar plants Many types of plants are more accurately viewed as call options on electricity whose exercise price is the price of fuel Traditional valuation inputs plus: Volatility of fuel, electricity pricing Correlation between fuel, electricity pricing Operational flexibility (ramp-up/down time, start-up costs) Figure 1: Simulation inputs capture plant and other constraints 1

Analyzing Revenue and Cost Streams There are a number of revenue and cost streams that must be fully analyzed to develop an accurate generation asset valuation. Some of the more obvious include: Market prices Fuel costs Capacity factor Operations and maintenance (O&M) expenses Capital amortization Less obvious, and more difficult to analyze, considerations such as revenue and cost streams associated with optionality include: Price volatility Unit flexibility Ancillary services such as spinning reserve, non-spinning reserve, regulation up, and regulation down Ramp-up, run time and ramp down Congestion costs/transmission credits The cornerstone of Rudden s valuation is the development of an integrated revenue and cost model for the project that incorporates all of the impacts of optionality in addition to the economics of the sales contracts, supply contracts and market forecasts associated with the project (Figure 2). This type of analysis requires in-depth industry knowledge covering a broad array of factors, the most important of which include: Understanding sector and plant economics and their interrelation with sector and market regulations Assessing the alternatives at the project level and how they might positively or negatively impact the revenues that feed into the company Reviewing the engineering performance criteria (e.g., heat rates and forced outage rates) and output flexibility for a variety of electric generation assets Determining the plant s optionality (the ability to respond to market dynamics) Analyzing electric power, reserve and ancillary services markets, contracts, and uncertainties Evaluating fuel supply contracts and associated alternatives Developing correlations between power costs and fuel prices Identifying the location and extent of physical (e.g., transmission) constraints Integrating environmental restrictions 2

The Rudden Methodology The Rudden methodology involves two stages: (1) a deterministic analysis stage, and (2) a financial analysis stage. In the deterministic analysis stage, the present values of the revenue and income streams are appraised using predicted values of the market for electrical energy and ancillary services. Fuel and production costs are also evaluated, using a production cost program based on an optimization simulation algorithm. Stage one is commonly referred to as an engineering analysis. The result of this stage is the intrinsic value of the asset. In the financial analysis stage, market uncertainty, together with a model of the generator s optionality (which, in this case, refers to the ability of the unit to respond to market conditions), is considered and the expected extrinsic value, together with a measure of value-at-risk, is developed. This stage uses a Monte Carlo-based sampling and simulation model that combines the physical constraints of the plants with the volatilities associated with the power and fuel markets. Based on this simulation, a distribution of profits over the time horizon, for which expected profit and comprehensive risk measures are generated, is provided. The result of stage two is the extrinsic value of the asset. When combined, the intrinsic and extrinsic values are equal to the total value of the generation asset. Inputs and Outputs for Rudden s Two Stage Analysis Inputs Technology configuration Technology constraints Forward price curves (fuel and energy) Market constraints Contract structures (forward, options fuel and energy) Transmission constraints Emission constraints Market volatilities and correlations Other constraints as appropriate Outputs Generation plan Bidding strategy Commodity arbitrage Unit commitment Optimal transaction portfolio Constrained fuel coordination Transaction evaluation Profit and loss distributions Operational statistics (e.g., MWh produced, starts, and MBTU used) Total value: intrinsic plus extrinsic value Figure 2: Simulation based analysis requires in depth industry knowledge covering a broad array of factors 3

The Rudden methodology uses the Power Costs, Inc. (PCI) two-stage GENTRADER simulation model to capture the operation of the portfolio and the uncertainty in prices, quantity of full-service contracts and generation availability. GENTRADER optimizes the hourly exercise of the associated physical and financial options to maximize profit for a number of deterministic scenarios. The optimization process uses hourly market price curves for energy, ancillary services, and fuel. It commits and dispatches generation units, and exercises long and short positions in forward and option contracts. The optimization is accomplished under fuel emission and transmission constraints (Figure 3). Inputs to GENTRADER Technology specifications Performance parameters Forward price curves Fuel supply terms Ancillary services Operating constraints Functionality Constraint analysis Stress test based on various market conditions Scenario analysis Cost-of-service analysis Gross margin analysis Mark-to-market values for each generation asset and financial contract Pro Forma Analysis Project and portfolio valuation EBITDA and free cash flows Intrinsic and extrinsic value analysis Figure 3: The Rudden methodology uses the Power Costs, Inc. (PCI) two-stage GENTRADER simulation model These simulations cover all possible outcomes as determined by volatilities of prices, time between the present and the time of operation, variance of the contract quantities and availability rates the sample space. From the results of the first stage, the partial derivatives, or deltas of the profit portfolio the rate of change of profit when only one of the risk drivers is changed with respect to each of the risk drivers is estimated at a number of locations within the sample space. The deltas are then used to form a describing function that represents profit over the simulation horizon as a function of the uncertain, or stochastic variables. Finally, Monte Carlo simulation is used to estimate the distribution of profit. Case Study To demonstrate our methodology, we evaluated three different types of generating plants: (1) a MW natural gas steam turbine, (2) a 50 MW natural gas combustion turbine, and (3) a 600 MW natural gas combined cycle plant featuring two combustion turbines, one steam turbine, and duct firing. The characteristics of these three generating plants are shown in Figure 4. 4

Case Study Generating Plants MW Gas 50 MW CT 600 MW CC Type Steam turbine Combustion turbine Combined cycle Fuel Natural gas Natural gas Natural gas Capacity (MW) 50 575 Average Heat Rate (Btu/kWh) 10,800 13,300 7,400 Figure 4: Case study portfolio The simulation model output provides detailed and accurate hourly unit commitment and dispatch (Figure 5). The example uses simulated hourly operation of the three plants over one week in January 6 (Monday through Sunday) based on forecast prices for that period ($3.91 for Natural Gas and $42.63 for Energy) and an hourly price profile based on historical patterns in a specific region. 900 800 700 600 Output MW 500 400 300 100 0 1/2/06 1/3/06 1/4/06 1/5/06 1/6/06 1/7/06 1/8/06 600 MW CC MW Gas 50 MW CT Figure 5: Hourly unit commitment and dispatch for the base case portfolio The number of hours each unit is dispatched is related to its heat rate and operating constraints. The 600 MW combined cycle plant, containing units with the lowest heat rate, is dispatched every day. The other two plants are dispatched only on the first two days, when hourly prices are the highest. The 50 MW combustion turbine unit with the highest heat rate runs for the smallest number of hours. As a reminder, the combined cycle plant is configured as two combustion turbines, one steam turbine, and duct firing. Figure 5 shows that in this plant the first combustion turbine unit will operate continuously from Monday morning through Friday evening. It is also economic to operate the steam turbine whenever either of the combustion turbines is running. The output from one combustion turbine, plus the capacity that can be obtained from the steam turbine, can range between 150 MW and 240 MW. In our case study, the generator prices dip below the level required to maintain profitable operation of the plant in the off-peak hours of Wednesday, Thursday, and Friday mornings, yet the first unit remains on at or near minimum capacity in those hours rather than shutting down because of operational constraints captured by the model. The second unit, for which the operating constraints are less restrictive, shuts down completely for those hours. Both units shut down in the early hours of Saturday and Sunday. The plant operates both units at maximum through Tuesday morning, because prices remain high enough. Duct firing operates for a few peak hours each weekday. 5

As noted earlier, GENTRADER s simulation-based analysis allows for full representation of plant operating constraints. To illustrate the impact of these constraints on valuation, a second case (the Unconstrained Case ) was analyzed, in which the constraints in the original case were relaxed in the same manner as in a tradition Black-Scholes approach (Figure 6). Combined Cycle Operating Parameters Parameter Constrained Unconstrained Maximum Ramp Rate 4.5 MW / min 15 MW / min Minimum Up Time 4 hours 1 hour Minimum Down time 4 hours 1 hour Start-Up Profile Requires 3 hours to reach 135 MW Can start up immediately Figure 6 Figure 7 looks only at the 600 MW combined cycle plant and shows the dispatch variance for these two cases. The green shaded area represents the original, combined cycle plant simulation under constrained conditions. This profile is identical to the one displayed in Figure 5. The blue diamonds show the dispatch of the combined cycle plant using a Black-Scholes unconstrained approach. In most hours, the two units operate at the same output level. However, in some off-peak hours the dispatch is very different. This is most obvious in the mornings of Wednesday, Thursday, and Friday. During these times, the entire plant shuts down under unconstrained conditions, while the one unit is kept running under constrained conditions. 700 600 500 Output MW 400 300 100 0 1/2/06 1/3/06 1/4/06 1/5/06 1/6/06 1/7/06 1/8/06 Constrained Unconstrained Figure 7: Dispatch variance for constrained versus unconstrained cases The reason for the dispatch variance is the 3-hour start-up requirement identified earlier (Figure 6), or in other words, the constrained unit must be left running in order to be available for all in the money hours. The financial consequences of this dispatch variance is that the costs for operating the constrained units during the off peak intervals are lost in the unconstrained case. Figure 8 lists the results covering our one-week time horizon. In addition, it should be noted that units represented as being immediately available in the unconstrained case are not due to ramp rates, and thus revenues are overstated as well. 6

Constrained Unconstrained Energy (MWh) 65,930 63,625 Revenue ($) 2,596,661 2,541,843 Fuel Cost ($) 1,887,294 1,809,247 O&M Cost ($) 125,926 121,524 StartUp/ Shutdown Cost ($) 22,555 30,067 Gross Margin ($) 560,886 581,005 Average Revenue ($/MWh) 39.39 39.95 Average Cost ($/MWh) 30.88 30.82 Average Gross Margin ($/MWh) 8.51 9.13 Figure 8: Financial results covering a one-week time horizon It is through the careful representation of operating constraints that the Rudden Methodology featuring GENTRADER software provides accurate modeling of unit commitment, dispatch, and financial results. Returning to our case study, we can examine the portfolio s performance. Figure 9 shows the projected long-term monthly results for each of the three generating plants for one year (6). The monthly results show the seasonal variation in plant operations. Notice that, although the combined cycle plant operates every month, the steam turbine and combustion turbine units are each idle for a few months in the spring and fall. All three plants have their highest utilization in the summer, when higher electricity demand pushes market prices higher. 600,000 Monthly Generation MWh 500,000 400,000 300,000,000 100,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 600 MW CC MW Gas 50 MW CT Figure 9: Long-term monthly results for each of the three generating plants for one year (6). For the longer-term view, we input fuel prices as shown and long-term annual operational results were developed (Figure 10); these annual results show the impact of evolving market conditions. In base case region for the first two years, the market is working down a projected surplus. Starting in 5, the market is forecast to be in balance. Other regions may take longer to reach that balance. 7

Annual Generation MWH 5,000,000 4,500,000 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 3 4 5 6 7 8 9 2010 2011 2012 2013 Natural Gas Energy ($/mmbtu) ($/MWh) 3 3.49 31.88 4 3.47 34.33 5 3.61 40.07 6 3.91 42.63 7 4.18 45.38 8 4.12 45.32 9 4.09 45.89 2010 4.27 48.15 2011 4.55 50.48 2012 4.59 51.09 2013 4.66 52.06 Figure 10: Long-term annual operational results 600 MW CC MW Gas 50 MW CT The impact of evolving market conditions on plant operations is magnified in the financial results, as shown in Figure 11. Although total energy output for the three units increases 35% from 3 to 2013, gross margin increases by nearly % for the combined cycle plant and more than 700% for the combustion turbine plant. The financial results shown are based on base case forecast assumptions, including a balanced market after the surplus is worked down. It is quite possible that further boom/bust cycles will occur within the forecast horizon, as well as strong fluctuation in natural gas prices. Annual Gross Margin $ 600 MW CC MW Gas 50 MW CT 3 25,807,360 1,730,046 211,133 4 35,617,230 3,495,369 416,094 5 57,162,260 9,874,885 1,442,652 6 59,620,350 9,887,447 1,446,736 7 63,626,910 10,391,320 1,541,389 8 64,388,320 10,239,590 1,468,661 9 67,361,280 11,231,300 1,668,753 2010 70,859,970 11,304,730 1,623,165 2011 73,108,620 11,516,910 1,641,785 2012 75,545,930 12,108,000 1,760,773 2013 76,371,070 12,210,890 1,752,286 Figure 11: Long-term base case financial results To capture the impact of real-world uncertainties in the operational and resulting financial results of the portfolio, we analyzed four stress testing cases in additional to the base case. The combined set of five cases is the following: (1) base case, (2) higher power costs than in the base case, (3) lower power costs, (4) lower natural gas fuel costs than in the base case, and (5) lower natural gas prices. The alternative power price scenarios represent the impact of regional generation supply, demand balances and natural gas prices (Figure 12). 8

Case 1 2 3 4 5 Base Power -30% Power +30% Gas -30% Gas +30% Energy Generation (MWh) 600 MW Combined Cycle 65,930 14,990 83,915 86,015 28,750 MW Gas Steam Turbine 4,000 0 26,413 31,555 0 50 MW Combustion Turbine 400 0 2,250 3,100 0 Figure 12: Stress tested operational results for the portfolio The impact of market conditions on unit start-up, dispatch, fuel use, net operating revenue, and many other results can be examined using the simulation model. This is illustrated in Figure 13 for the 600 MW combined cycle plant. Gross margin range between about $39,000 and $1.4 million over the five scenarios. Case 1 2 3 4 5 Base Power -30% Power +30% Gas -30% Gas +30% Gross Margin ($) 560,886 37,932 1,435,229 1,238,016 171,947 Energy (MWh) 65,930 14,990 83,915 86,015 28,750 Fuel (mmbtu) 481,453 110,718 628,399 654,899 208,735 Total Hours On-Line 153 47 168 168 73 Total Number of Start-Ups 14 8 13 11 10 Capacity Factor 65.4% 14.9% 83.3% 85.3% 28.5% Average Cost ($/MWh) 30.88 32.2 31.32 22.88 39.76 Average Heat Rate (Btu/kWh) 7,303 7,386 7,489 7,614 7,260 Figure 13: Stress tested financial results for the combined cycle plant To reach an accurate portfolio valuation, Rudden s methodology uses a Monte Carlo simulation of plant operation under thousands of market conditions. This enables an analysis of the risk inherent in a generating asset taking into account the relative likelihood of the range of outcomes. Figure 14 shows the Monte Carlo analysis for the 6 forecast year. 600 MW CC MW GAS 50 MW CT1 Gross Margin ($) Mean 89,023,064 24,988,896 4,952,267 Std Deviation 35,445,912 11,778,185 2,713,403 Intrinsic 59,620,352 9,688,478 1,441,370 Energy (MWh) Mean 2,827,588 833,403 160,520 Std Deviation 553,104 213,631 49,798 Figure 14: Monte Carlo analysis for the 6 forecast year In this year, the intrinsic gross margin ($59.6 million for the 600 MW combined cycle plant) is the value obtained from the base case for 6. The expected or mean value of gross margin ($89.0 million) is significantly higher, due to the asset s operating flexibility and market volatility. The difference between the mean and intrinsic values, approximately $29.4 million, is the extrinsic, or optionality, value of the asset. From a risk management 9

point of view, it is extremely important to assess the range of financial outcomes and their probabilities. The probability distribution of gross margin (Figure 15) illustrates the entire spectrum of possibilities. From the distribution one can derive earnings-at-risk estimates. For example, there is a 5% chance that the gross margin of the combined cycle unit will fall below $39.7 million. Using Rudden s simulation methodology featuring GENTRADER, the total plant value (intrinsic + extrinsic) would be $ 89.0 million in the year shown. If the traditional Black-Scholes methodology were used and depending on the plant constraints, the plant value could have been overstated by as much as 10% to 30%. 8% 7% 6% Probability 5% 4% 3% 2% 1% 0% 0 20 40 60 80 100 120 140 160 180 220 240 260 Figure 15: Gross margin histogram for 600 MW CC Gr oss M a rg in - M illio n $ Conclusion The Need for More Sophisticated Valuation Analyses The distressed market has put a large number of projects at risk; there is a lot of money at stake. S&P reported in November 2 that energy companies have $90 billion in medium-term debt that will need to be refinanced between 3 and 6; 30 percent of this amount is currently in or near default. Power companies have been hard hit and, according to a recent survey of 25 energy executives conducted by the Bauer College, nearly twothirds of the executives do not expect the industry to emerge from its credit rating crisis before the second half of 4. As shown in Figures 16, long-range forecasts predict that generation project financials will be squeezed even tighter than they are today because the rate of rise in natural gas prices is expected to outpace the rate of rise in generator prices for many years. This asynchronous relationship is driven by increased natural gas usage in areas unrelated to gas-fired generation coupled with slow electricity load growth forecasts impacted by market saturation of high-use appliances such as air conditioners, power efficiency gains in electric power usage generally, and more effective demand management processes. Spark spread narrowing will follow this trend (Figure 17). Figure 18 shows the competitive position of the 600 MW gas-fired plant versus coal and nuclear plants. 10

Generator Price and Natural Gas Cost 4.30 4.10 Generator Price, USA Average, 1 $ / MWh (right scale) 50.00 45.00 3.90 3.70 3.50 3.30 3.10 2.90 40.00 35.00 30.00 25.00 20.00 15.00 10.00 2.70 2.50 0 1 2 3 5.00 Natural Gas Cost, USA Average, 1 $ /mcf (left scale) 0.00 4 5 6 7 201 201 8 9 0 1 201 2 Figure 16: The rate of rise in natural gas prices is expected to outpace the rate of price rise in generator prices. Source: EIA Annual Energy Outlook, January 3 $50 $40 Generator Price $30 $20 Spread for 600 MW CC w/ HR 7,400 $10 $0 Spread for MW Gas w/ HR 10,800 ($10) Spread for 50 MW CT w/ HR 13,300 ($20) 0 1 2 3 4 5 6 7 8 9 2010 2011 2012 Figure 17: Spark spreads are expected to narrow. Source: EIA Annual Energy Outlook, January 3 11

$50 $45 $40 Generator Price $35 $30 Spread for Nuclear at 85% capacity factor $25 $20 Spread for Coal at 30% efficiency $15 $10 $5 Spread for 600 MW CC w/ HR 7,400 $0 0 1 2 3 4 5 6 7 8 9 2010 2011 2012 Figure 18: Natural Gas will be less competitive than Coal or Nuclear. Source: EIA Annual Energy Outlook, January 3 In response to these changing market dynamics, energy companies are now mothballing some plants, stopping early construction, putting development plans on hold, and hanging the For Sale signs on existing assets. Additionally, many project owners are being forced to restructure their financing, either on a project-specific basis or at a corporate level. Refinancing will occur at higher costs, putting additional pressure on energy companies already experiencing financial problems. Understandably, these companies do not want to give up too much as part of the restructuring. At the same time, financial companies want to ensure that they receive fair value for their contributions. To fairly achieve both objectives, accurate asset and portfolio valuation is required. The changing regulatory environment (e.g., the Federal Energy Regulatory Commission s proposed Standard Market Design) and other uncertainties facing the industry make it imperative that a more sophisticated approach to asset valuation be undertaken. Traditional approaches are simply no longer appropriate. R.J. Rudden Associates, Inc. is among the world s premier strategic, economic and management consulting firms specializing in energy matters. Additional information is available on Rudden s web site at www.rjrudden.com. Power Costs, Inc. provides asset optimization solutions to many of the leading generation and trading companies in the world. PCI s GENTRADER TM enables energy companies to get the most out of their generation assets. Additional information is available at www.powercosts.com. 12

CONTACT INFORMATION For additional information, please contact: NEW YORK Stephen A. Stolze Tel: 631.348.4090, ext: 204 Fax: 631.348.4097 sstolze@rjrudden.com 13