Barrier. Delimitation. Water drainage

Similar documents
Barrier. Delimitation. Water drainage

KLAUS Multiparking GmbH Hermann-Krum-Straße 2 D Aitrach Fon+49 (0) Fax +49 (0)

Three-sided barrier compliant to DIN EN ISO Depending on location, design also as wind protection. Clear height (DH) Three-sided barrier

PRODUCT DATA kg

Water drainage 11 G82-165/295 G82-165/310 G82-185/310. car height car height height. car height upper (L) G82-185/325 G82-195/315 G82-195/335

PRODUCT DATA kg / 2600 kg

Stack Parking Surface Mounted Stackers

PRODUCT DATA kg / 2600 kg

PRODUCT DATA kg / 2600 kg

PRODUCT DATA kg / 2600 kg

Tender specification KLAUS Multiparking MultiBase 2072 outdoor installation EB MultiBase 2072 outdoor installation DB

Product Data TrendVario

Available in 5 platform widths from 7'-7" to 8'-11" Available in 2 headroom heights: 5'-9" and 6'-11" Available in 4400 lbs or 5060 lbs load capacity

Tender specification KLAUS Multiparking MultiBase U1 EB / MultiBase U1 DB

PE/PH. Product Data Parking Pallet. longitudinally shifting. Parking Pallet PE/PH

Tender specification KLAUS Multiparking TrendVario 4300

QUADROPARKER SERIES QUADROPARKER N4904 THE IDEAL SOLUTION FOR THE EXTERIORS; ON 4 LEVELS CAR STACKERS

Data Sheet Wöhr Combilift 552-2,0

Data Sheet WÖHR COMBILIFT 552-2,6

Data Sheet Wöhr Combilift 552-2,6

PARKLINE SERIES UNIPARKER N5202 THE SEMI-AUTOMATIC PARKING SYSTEM WITH PIT AND WITHOUT COLUMNS AT THE ENTRY SEMI AUTOMATICS

Carlift Series PHP 222C

Cardok Carlift Data Sheet

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

Cardok Carlift with Rigid Chains Data Sheet

ELVORON LU/LA ELEVATOR

CARPARX Pit Construction Guide

Installation Plan. Washer-extractor PW 6088 EL LP. en - AU M.-Nr

LOADING DOCK SYSTEMS HIGH SPEED DOORS LIFT TABLES DOCK SHELTERS SECTIONAL DOORS COMPL. FOOD INDUSTRY L O A D I N G D O C K S Y S T E M S

Installation plan. Tumble dryer. PT 8807 EL (Electrically heated) en - US Mat. NR / 02

Introduction. Disclaimer. Table of contents

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

SECTION FIELD PANELS

LOADING DOCK EQUIPMENT. A. Section Concrete Forms and Accessories: Placement of anchors into concrete.

SECTION The specification section is organized by placing information in three standard parts:

ELVORON STELLA HOME ELEVATOR

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...

Pre-installation Manual. Plate Processor 68/85 Thermal

Installation plan. Washer-extractor PW 6107 EL. en - GB M.-Nr / 01

Elevators and Lifts

INSTRUCTION MANUAL Wardrobe lift 717

Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller

VPL-3300B Commercial Vertical Platform Lift Technical Specifications

Product Datasheet. Hydraulic Dock Leveller with Telescopic Lip (PT) Load capacity: 150 KN ANSI NORM. Contact:

Relevant issues of booth construction

TADANO AERIAL PLATFORM GENERAL DATA. MAXIMUM PLATFORM LOADING CAPACITY 450 kg or two (2) persons. 9.8 m m

PRODUCTION AND WAREHOUSE LOGISTICS

Installation recommendations. Washer-extractor PW 6080 EL AV/LP. en - GB Mat. no / 01

56-SDMS-01 REV. 01 SPECIFICATIONS FOR

DOCK LEVELLER USER MANUAL

TECHNICAL SPECIFICATION OF HORIZONTAL MILLING MACHINE

VPL-3200B Residential Vertical Platform Lift Technical Specifications

Power IT Compact Secondary Substations, CSS. Technical catalogue for sheet steel substations

PROPOSAL: Q July 9, 2018

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION

SECTION VEHICLE LIFTS. B. Section Basic Electrical Materials and Methods: Power and controls wiring.

Section 7: Specifications

TECHNICAL SPECIFICATION

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

Page 1 af 12 LRS 1402 QUADSAW. Hand book. 5. Edition Sep Spearhead Machinery Limited

Electric Service Standards

Introduction. Disclaimer. Table of contents

Stainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K

A-BEAM W Erection Manual 2

VPL-3300B Commercial Vertical Platform Lift Technical Specifications rev: (5) ILS-01100

RSA Series Dock Levellers Hinged Lip Suspended Frame. Technical Characteristics nr. 3258

Technical Description For MK-CTX Office Cabins

Hydraulic systems Quality without cutting corners

GENERAL MECHANICAL SYSTEM REQUIREMENTS

The functional requirements of safety devices define how the safety device must operate and does not relate to the reliability level.

Division 14 Conveying Systems

V1504 VERTICAL PLATFORM LIFT PLANNING GUIDE

Conergy SolarFamulus II

ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS

V1504 VERTICAL PLATFORM LIFT PLANNING GUIDE

Design, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at. CREST, Hosakote. Indian Institute of Astrophysics

Pre-installation Manual CONCEPT 301 D/401 D/501 D

CAMPISA COMPONENTS OFFERS INNOVATIVE SOLUTIONS FOR EASY INSTALLATION, USE AND MAINTENANCE, WITH SPECIAL FOCUS ON ENERGY EFFICIENCY AND SECURITY.

We store: high. wide. deep. safe. Cantilever racks. System K100 single-sided double-sided

A-BEAM S Erection Manual 2

(Previously Known as Mother Dairy, Gandhinagar) Request for Quotation (RFQ) Inquiry No: AFD: PUR: PKS: Dock leveller, Dated: 17 October, 2018

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

Mounting systems for solar technology

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

Swimspa and fitness pool installation Guide

SERVICES - SERVICE EQUIPMENT- PANELBOARDS

PART 1- General LULA Elevator Section 14200

LEADING IN WELDING SAFETY CATALOGUE 2014 CONSTRUCTION. Version 14/01

Standard program overview fire doors

GENERAL MECHANICAL SYSTEM REQUIREMENTS

CITY OF DANA POINT SITE ACCESSIBILITY AND PARKING B103 SITE INTRODUCTION

General Requirements for Mobile Homes

EMPLOYER S REQUIREMENTS FOR NEW LIFTS

4. POINTS ON SWITCH AND CIRCUIT BREAKER PLATFORM GROUNDING.

10. Transportation Facilities.

Transcription:

Car Cutting through Grounding 0 for vehicle up to.00 m = 1 long (0 for vehicle up to.0 m 1 long) KLAUS Multiparking GmbH Hermann-Krum-Straße D-1 Aitrach Fon + (0 ) 0-0 Fax + (0 ) 0- info@multiparking.com www.multiparking.com Water drainage 1-% 1-% 0 Barrier Delimitation see table PRODUCT DATA Outdoor All space requirements are minimum finished dimensions. Tolerances for space requirements + 0. in cm. (single platform) = vehicles (double platform) = vehicles Suitable for Standard passenger cars: Limousine, station wagon, SUV, van according to clearance and maximal surface load. width Clearance profile 1 0 10 Standard Special 10 cm 10 cm see page see page 00 (0) 1 0 0-1 0-0- 1 0-1 1 1 1 1 10 10 1 1 0-1 0-0 0-1 0-0 1 00 0 1 0 0 1 10 Standard type Special system: maximum load for extra charge. To follow the minimum finished dimensions, make sure to consider the tolerances according to VOB, part C (DIN 10 and 11) and the DIN 10. Car width for platform width 0 cm. If wider platforms are used it is also possible to park wider cars. For dividing walls: cutting through x cm. Potential equalization from foundation grounding connection to system (provided ). Slope with drainage channel and sump. With direct connection to the sewerage system. 00 0 To the extent that the conditions of the construction do not restrict the height, the car height on the upper parking slots is not restricted. Three-sided barrier compliant to DIN EN ISO. In compliance with DIN EN 10, cm wide yellow-black markings compliant to ISO must be applied to the edge of the pit in the entry area to mark the danger zone (see load plan page ). At the transition section between pit floor and walls no hollow mouldings/coves are possible. If hollow mouldings/coves are required, the systems must be designed smaller or the pits accordingly wider. For convenient use of your parking space and due to the fact that the cars keep becoming longer we recommend a pit length of 0 cm. MultiBase 0 Outdoor Code number.0. Version 0.0

Car MultiBase 0 Outdoor Code number.0. Version 0.0 of Width dimensions Single Platform () Double Platform () Single and Double Platform ( + ) Example 0 0 0 0 0 0 0 0 0 00 0 0 0 0 00 0 00 0 0 0 0 0 0 0 0 0 0 + 0 0 + 0 0 + 0 0 + 00 0 + 00 0 + 0 + 0 0 + 0 0 + 0 0 0 0 0 0 0 0 0 Carriageway in accordance with local regulations For parking boxes on the edges and boxes with intermediate walls we recommend our maximum platform width of 0 cm for single platforms and 0 for double platforms. Problems may occur if smaller platform widths are used (depending on car type, access and individual driving behaviour and capability). For larger limousines and SUV wider driveways are necessary (in particular on the boxes on the sides due to the missing manoeuvring radius). System B lifted System lowered u maximum descending slope % maximum ascending slope % The illustrated maximum approach angles must not be exceeded. Incorrect approach angles will cause serious maneouvring & positioning problems on the parking system for which the local agency of KLAUS Multiparking accepts no responsibility.

Car MultiBase 0 Outdoor Code number.0. Version 0.0 of parking space For countries where snow loads are a crucial factor For countries where snow loads is no relevant factor MultiBase 0,0 to. ( + ) MultiBase 0,0 to. ( + ) 1 kg MultiBase 0, to. ( + ) for extra charge MultiBase 0, to. ( + ) for extra charge MultiBase 0,0 to. (only ) for extra charge MultiBase 0,0 to. (only ) for extra charge kg 000 kg 0 kg 000 kg 0 kg 000 kg 0 kg Applies to a snow depth of 0 cm; in case of larger snow depths the snow must be removed. 0 0 (0) Type 1 0,0 to. () + +1 ±1 ±1, 0,0 to. () +1, +0 ±1, ± 0, to. () +, +1 ±1, ±,1 0, to. () + + ±, ±, 1 1 0,0 to. () +, +1 ±1, ±, Units are dowelled to the floor. Drilling depth: approx. 1 cm. Floor and walls below the drive-in level are to be made of concrete (quality minimum C0/)! The dimensions for the points of support are rounded values. If the exact position is required, please contact KLAUS Multiparking. 1 1 Dimension see page compliant to ISO (colors used in this illustration are not ISO compliant) All forces in kn

Car MultiBase 0 Outdoor Code number.0. Version 0.0 of Installation diagram 1 1 to the next system Stand for operating device 10 1 0,00 (to be performed ) No. Qunatity Position Frequency 1 1 Electricity meter in the supply line 1 Main fuse: x fuse 1 A (slow) in the supply 1 per or circuit breaker x 1 A line,0 kw (trigger characteristic K or C) unit x fuse 0 A (slow) in the supply 1 per or circuit breaker x 0 A line, kw (trigger characteristic K or C) unit 1 Supply line x. mm to main switch 1 per unit ( PH + N + PE) with marked wire and protective conductor 1 Lockable main switch defined at the 1 per unit plan evaluation 1 Supply line x. mm from main 1 per unit ( PH + N + PE) with marked wire switch to unit and protective conductor every Foundation earth connector corner pit floor m 1 Equipotential bonding in accordance 1 per with DIN EN 00 from foundation system earth connector to the system (included in delivery of KLAUS Multiparking) No. Terminal box Control line x 0. mm (PH + N + PE) Control line x 1. mm with marked wire and protective conductor Operating device 1 Control line x 1. mm with marked wire and protective conductor Hydraulic unit,0 kw/, kw, three-phase current, 0/00 V / 0 Hz 1 Control line x 1. mm with marked wire and protective conductor Field of application By default, the system can only be used for a fixed number of users. If different users use the system only on the upper parking spaces (e.g. short-time parkers in office buildings or hotels) the Multiparking system needs to be adjusted. If required, would you please contact us. Units Low-noise power units mounted to rubber-bonded-to metal mountings are installed. Nevertheless we recommend that parking system s garage be built separately from the dwelling. If it is not possible to install the hydraulic power units with the solenoid valves in adjacent buildings or spaces, the power unit and the solenoid valves must be housed in a cabinet (at an extra charge). Available documents wall recess plans maintenance offer/contract declaration of conformity test sheet on airborne and slid-borne sound Building application documents According to LBO and GaVo (garage regulations) the Multiparking systems are subject to approval. We will provide the required building application documents. Corrosion protection See separate sheet regarding corrosion protection. Care To avoid damages resulting from corrosion, make sure to follow our cleaning and care instructions and to provide good ventilation of your garage. Gap covers Any existing gaps between the systems or the platforms and the walls of the pit must be reduced to approx. cm by installing sheet-metal covers (at an extra charge). Environmental conditions Environmental conditions for the area of multiparking systems: Temperature range to +0 C. Relative humidity 0% at a maximum outside temperature of +0 C. If lifting or lowering times are specified, they refer to an environmental temperature of + C and with the system set up directly next to the hydraulic unit. At lower temperatures or with longer hydraulic lines, these times increase. CE Certification The systems offered correspond to DIN EN 10 and the EC Machinery Directive 00//EG. Operating device The home and off position of the system must always be in the lowered position. Special controls with key interlock are required that ensure that the key can only be removed when the system has been lowered to its lowest position. Depending on the conditions of the construction project, a stand may be necessary for the control elements (at an extra charge). Sound insulation According to DIN (Sound insulation in buildings), para., annotation, KLAUS Multiparkers are part of the building services (garage systems). Normal sound insulation: DIN, para., Sound insulation against noises from building services. Table in para..1 contains the permissible sound level values emitted from building services for personal living and working areas. According to line the maximum sound level in personal living andworking areas must not exceed 0 db (A). Noises created by users are not subject to the requirements (see table, DIN ). The following measures are to be taken to comply with this value: Sound protection package according to offer/order (KLAUS Multiparking GmbH) Minimum sound insulation of building R w = db (to be provided by ) Increased sound insulation (special agreement): Draft DIN -, Information on planning and execution, proposals for increased sound insulation. Agreement: Maximum sound level in personal living and working areas db (A). Noises created by users are not subject to the requirements (see table, DIN ). The following measures are to be taken to comply with this value: Sound protection package according to offer/order (KLAUS Multiparking GmbH) Minimum sound insulation of building R w = db (to be provided by ) Note: User noises are noises created by individual users in our Multiparking systems. These can be noises from accessing the platforms, slamming of vehicle doors, motor and brake noises.

MultiBase 0 Outdoor Code number.0. Version 0.0 of Page 1 Car Safety fences Constraints according to DIN EN ISO must be put in place on three sides (all except the entrance side), unless buildings border the pit. Numbering of Consecutive numbering of. Building services Any required lighting, ventilation, fire extinguishing and fire alarm systems as well as clarification and compliance with the relevant regulatory requirements. Drainage For the front area of the pit we recommend a drainage channel, which you connect to a floor drain system or sump (0 x 0 x 0 cm). The drainage channel may be inclined to the side, however not the pit floor itself (longitudinal incline is available). For reasons of environmental protection we recommend to paint the pit floor, and to provide oil and petrol separators in the connections to the public sewage network. Strip footings If due to structural conditions strip footings must be effected, the shall provide an accessible platform reaching to the top of the said strip footings to enable and facilitate the mounting work. According to DIN EN 10, a warning that identifies this danger area must be placed in the entrance area that conforms to ISO. This must be done according to EN //EWG for systems with a pit (platforms within the pit) cm from the edge of the pit. Wall cuttings Any necessary wall cuttings according to page 1. supply to the main switch / Foundation earth connector Suitable electrical supply to the main switch and the control wire line must be provided during. The functionality can be monitored on site by our fitters together with the electrician. If this cannot be done during for some reason for which the is responsible, the must commission an electrician at their own expense and risk. In accordance with DIN EN 00 (Safety of Machinery. Equipment), grounding of the steel structure is necessary, provided (distance between grounding max. m). If the following are not included in the quotation, they will also have to be provided / paid for : Mounting of contactor and terminal box to the wall valve, complete wiring of all elements in accordance with the circuit diagram Costs for final technical approval by an authorized body Main switch Control line from main switch to hydraulic unit Single platform () and Double platform () General description Multiparking system providing independent for cars (), x cars (), one on top of the other each. are in accordance with the underlying dimensions of parking pit, height and width. The parking bays are accessed horizontally ( deviation ± 1% for correct drainage of platforms). Due to the special lifting and bearing construction lifting of the doors is not restricted. Vehicles are positioned on each parking space using wheel stops on the right side (adjust according to operating instructions). Operation via operating device with hold-to-run-device using master keys. Operating instructions are attached to each operator's stand. Multiparking system consisting of: steel pillars (mounted on the floor) sliding platforms (mounted to the steel pillars with sliding bearings) platforms 1 mechanic synchronization control system (to ensure synchronous operation of the hydraulic cylinders while lowering and lifting the platform) hydraulic cylinders rigid supports (connect the platforms) chains and pocket wheels 1 automatic hydraulic safety valve (prevents accidental lowering of the platform while accessing the platform) Dowels, screws, connecting elements, bolts, etc. The platforms and are end-to-end accessible for parking! Hydraulic system consisting of: Hydraulic cylinder Solenoid valve Safety valve Hydraulic conduits Screwed joints High-pressure hoses Installation material Electric system consisting of: Operating device (Emergency Stop, lock, 1 master key per parking space) Terminal box at wall valve Hydraulic unit consisting of: Hydraulic power unit (low-noise, installed onto a console with a rubber-bonded-to-metal mounting) Hydraulic oil reservoir Oil filling Internal geared wheel pump Pump holder Clutch -phase-ac-motor Contactor (with thermal overcurrent relay and control fuse) Test manometer Pressure relief valve Hydraulic hoses (which reduce noise transmission onto the hydraulic pipe Platforms consisting of: Platform base sections Adjustable wheel stops Canted access plates Side members Central side member [only ] Cross members [ long and short cross members] Safety railings along the upper and lower platform (if required) Screws, nuts, washers, distance tubes, etc.v We reserve the right to change this specification without further notice KLAUS Multiparking reserves the right in the course of technical progress to use newer or other technologies, systems, processes, procedures or standards in the fulfillment of their obligations other than those originally offered provided the derives no disadvantage from their so doing.