Terms and Conditions Form OL-668 Rev l

Similar documents
Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions

Requirements for Suppliers

Procedure Documentation

Supplier Quality Requirements (ASQR)

Procurement Quality Assurance Requirements

Apex Industries Inc. 100 Millennium Blvd. Moncton, New Brunswick, Canada E1E 2G8 Purchase Order Quality Assurance Clauses

SUPPLIER QUALITY REQUIREMENTS

Absolute Manufacturing. Supplier Quality Requirements

APPD DESCRIPTION OF CHANGE DATE. BY A NA 8/23/12 Updated to new format, re-sequenced clauses, added

Type : Quality Procedure: Q - 023CLR Titre / Title: Flow Down of Additional Requirements Revised Date: May

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

SHELTON INDUSTRIAL PATTERN INC.

Absolute Manufacturing. Supplier Quality Requirements

Procurement Quality Requirements

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

Supplier Quality Requirements

Supplier Quality Assurance Requirements Manual

TT Electronics Integrated Manufacturing Services Supplement to Purchase Order Quality Clauses TT Electronics Purchase Order

Quality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)

Supplier Quality Clauses

Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found on our website at

NUMET MACHINING TECHNIQUES, INC.

Supplier Quality Requirements

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

SUPPLIER QUALITY REQUIREMENTS (SQR S)

Supplier Quality Requirements (SQR)

Quality Management System

PURCHASE ORDER QUALITY CLAUSES

SUPPLIER QUALITY REQUIREMENTS (SQR S)

The Following Clauses are applicable only as noted on the Purchase Order, either by Quality Clause Code or Itemized Quality Clauses:

PURCHASE ORDER SUPPLEMENT

Review of Purchase Orders to Suppliers and Subcontractors APPENDIX 1 : QUALITY ASSURANCE CLAUSES

THE FOLLOWING GENERAL REQUIREMENTS APPLY ON ALL ORDERS

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

ALVA MANUFACTURING PURCHASE ORDER QUALITY CLAUSES

Supplier Quality Clauses

PURCHASING QUALITY CLAUSES

PURCHASE ORDER PROCUREMENT CLAUSES QA25 Rev N Date: 11/13/2016

QUALITY CONTROL INSTRUCTION

Purchase Order Quality Clauses

Meggitt Oregon Purchase Order Quality Notes

PROCUREMENT QUALITY PROVISIONS Revision G January 9, 2017

Quality Notes. PCX Aerostructures, LLC Supplier Quality Assurance Requirements - Quality Clauses Revision 14 - January 02, 2015

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

These requirements apply to all suppliers:

Supplier Quality Requirements(SQR s) SECTION 1

PCX Aerostructures, LLC Quality Notes Supplier Quality Assurance Requirements - Quality Clauses Revision 29 - March 30, 2017

Supplier Quality Requirements (Including Terms & Conditions)

MAGNETIC COMPONENT ENGINEERING, INC.

TERMS AND CONDITIONS. No charges are allowed for boxing, packing, crating, and insurance unless specifically provided for in the Purchase Order.

Operating Procedure 6-02 Supplier Quality Requirements

Quality Flow-Down Requirements to Suppliers

SQRs SUPPLIER QUALITY REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS

PP Quality Assurance Procurement Clauses for Suppliers

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

Intro Corporation Purchase Order General Terms and Conditions

Compliance with YFTFC001 Quality System for Manufacturers is required for this Purchase Order.

HM Dunn AeroSystems Purchase Order Quality Clauses

Purchase Order and Quality Clauses

Purchase Order Quality Notes, Terms & Conditions PFM Revision K (9/9/2014)

2.1. The Seller s Quality Management System shall ensure all relevant Purchase Order requirements are flowed down to their sub-tier sellers.

Special Purchase Order Clauses

QUALITY ASSURANCE PROCEDURE: SUPPLIER QUALITY REQUIREMENTS

Replaces: Not applicable.

CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

Quality Flow-Down Requirements to Suppliers

Supplier Quality Requirements Manual AEC-300

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Supplier Quality Requirements

Clauses applicable only when specified by Q-number on the purchase order.

Supplier Quality Requirements

General Purchase Order Requirements

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS

Report number A0436 PRODUCT REQUIREMENTS FOR SELLERS OF BOEING DESIGNED DETAIL PARTS AND NON-FUNCTIONAL MINOR ASSEMBLIES

SUPPLIER QUALITY ASSURANCE REQUIREMENTS - EMEA

STRAN Technologies Quality Notes

Supplier Quality Procurement Requirements (SQPR) DATED: 01/31/2018

TABLE OF CONTENTS. Page 1 of 10

TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

PCX Aerostructures, LLC Quality Notes Supplier Quality Assurance Requirements - Quality Clauses Revision 37 SEPTEMBER 19, 2018

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

STANDARD QUALITY REQUIREMENTS FOR SUPPLIERS F05-QP008 Rev A Dated 08/12/2010

FORM Rexnord Industries, LLC Aerospace Division. Subject: Supplier Quality Assurance Requirements

Orbel Corporation AS9100D Supplier Flow Down Requirements

Supplier Quality Clauses

QUALITY TERMS & CONDITIONS FOR PROCUREMENT Rev A

ALTA Precision Inc. Quality Procedure

PURCHASE ORDER TERMS & CONDITIONS

PURCHASE ORDER TERMS & CONDITIONS

SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING

SUPPLIER QUALITY CODES

QUALITY ASSURANCE TERMS & CONDITIONS FOR PROCUREMENT Rev E

Customer Specific Requirements. Last Update 23July2015

Altech Machining, Inc. Terms and Conditions

Aerojet Rocketdyne Quality Note

Transcription:

1. The Purchase Order will specify all quantities and delivery date requirements and any other applicable documents necessary to fulfill the Purchase Order requirements 2. The current Manufacturing Sketch supplied with any Purchase Order, when applicable, will provide any special instructions, dimensional requirements, process requirements, and any other relevant technical data and/or requirements. 3. Seller must use only the approved and accepted requirements indicated on the Purchase Order 4. Quality Management System is as stated on the supplier s survey document 5. Certification and/or Certificate of Compliance requirements are specified on the Purchase Order 6. When the purchase order requires a certificate of compliance, the C of C must be signed by the suppliers authorized representative, ( name and title printed), and state that the product meets all applicable specification and purchase order requirements and all records will be made available to Olympic Tool upon request. The C of C shall provide traceability to all raw material and special processes utilized, when applicable. 7. Standard hardware suppliers, (MS, NAS, AN, etc) shall supply Olympic Tool with a certificate of compliance indicating the original hardware manufacturer and list the lot / batch number. When required by the specification the original hardware manufacturer shall be listed in the QPL and / or procurement section of the specification. 8. The supplied certifications shall provide the complete chain of ownership and shall not have customer names removed or redacted Page 1 of 7

9. All products shall be furnished in accordance with the latest drawing and / or specification unless otherwise specified on the Purchase Order. All certifications must indicate all applicable revisions. When the Purchase Order or drawing lists a specification that has been superseded or canceled the supplier must contact Olympic Tool for authorization to use any superseding and/or substitute specification. 10. Serial Numbers are required on certifications when listed on the Purchase Order. 11. Class A and Class B critical parts require the Mill Heat Number and the Original ingot Identifier. 12. Calibration System requirement for Sub Contracted Calibration is ANSI/NCSL Z 540-1 13. All Non Conforming Product or Non Conforming processed material will be Identified with red color and tagged. Packing slips shall identify that the shipment contains Non Conforming Product or Non Conforming processed material and the quantity of Non Conforming Product or Non Conforming processed material contained in the shipment. 14. Olympic Tool & Machine will be notified of any defective product prior to shipping. 15. Notify Olympic Tool & Machine of any changes in product and/or process, changes of suppliers, changes of the manufacturing facility location and when required obtain approval from Olympic Tool & Machine. 16. Flow down to the supply chain the applicable requirements including Olympic Tool & Machine requirements. 17. Supplier flow down to sub tier suppliers shall include (but is not limited to) The Purchase order requirements (if applicable) Any Key Characteristics (if applicable) DFARS requirements (if applicable) Flight Safety information (if applicable) Page 2 of 7

18. The Record retention requirement for all Purchase Orders issued by Olympic Tool and Machine is a minimum of 7 years unless otherwise stated. These records must be available for review by Olympic Tool and/or their customers if requested. All Flight Safety and/or Critical designated Purchase Orders require retention of all records, including but not limited to all shop travelers, test records and calibration records and approvals for 50 years. These records must be available for review by Olympic Tool and/or their customers if requested. 19. All material, special processing and subcontracted services are subject to approval by Olympic Tool & Machine Receiving Inspection. 20. All procedures, processes and equipment shall be approved by Olympic Tool & Machine and /or its customer when required by the purchase order, drawing or associated specifications. 21. Right of Access shall be granted to Olympic Tool & Machine their customer and regulatory authorities to the applicable areas of all facilities, at any level of the supply chain, involved in the order and to all applicable records. 22. For any special tools, fixtures and gages that are supplied by Olympic Tool & Machine, a visual check of the provided tooling must be performed by the user prior to each use. Note: Each use is defined as being prior to any tool or gage being used on any individual part. 23. Olympic Tool requires sellers to have the necessary competence to perform all requested work on the purchase order. By accepting the purchase order. the seller certifies that the required competence is available at the sellers company. 24. Shipping requirements are the responsibility of the supplier unless otherwise specified on the Purchase Order. The product shall be adequately packaged to prevent damage during shipment. Bare surfaces which are subject to corrosion shall be protected with a corrosion inhibitor. Page 3 of 7

25. When required, Government Source Inspection requirements will be specified on the Purchase Order as follows; Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the government representative who normally services your plant so that appropriate planning for government inspection can be accomplished. 26. Critical Characteristics for government Prime contracts will be identified with the statement, THIS IS THE CRITICAL CHARACTERISTIC 27. Government Prime contracts for Critical Safety Items will comply with QE-STD-1. 28. Suppliers performing operations containing Critical Characteristics on Government Prime contracts will have Form OL-493 SUPPLIER SELF AUDIT accompany the purchase order to the supplier. The completed form will be returned to Olympic Tool & Machine with the completed product. 29. Unless prohibited in the Olympic purchase order, suppliers may choose to offload, but shall ensure the capability of all offload sub-tiers and the quality of all products meet Olympic purchase order requirements. 30. The supplier shall perform only those special processes for which the supplier is approved by Olympic Tool s customers to perform. In the event that the supplier chooses to outsource a special process, the supplier shall only use sub-tier suppliers that are approved by Olympic Tool s customer for the specific special process. The Olympic purchase order shall reference who the customer is. Specific approvals include, but are not limited to, the requirements of the following; D1-4426 The Boeing Company QPS-101 Bell Helicopter Document 200 Goodrich In the event of any uncertainty when choosing a supplier for an outside process contact Olympic Tool for direction. 31. All Olympic Tool supplied material that is rejected during manufacturing shall be returned to Olympic Tool. The rejected material shall be tagged. The tag shall indicate the defect, root cause, root cause corrective action, root cause corrective action verification plan, and the verification plan results. Page 4 of 7

32. For shelf life materials, Olympic Tool reserves the right to refuse any material that does not have at least 80% of the shelf life remaining 33. Digital Product Definition (DPD) requirements If a supplier receives, downloads, or uses DPD geometry in any format, supplied by Olympic Tool, the supplier SHALL: o Conform to Boeing Document D6-51991 Quality Assurance Standard for Digital Product Definition at Boeing suppliers. o Obtain both Boeing and Olympic Tool approvals as a DPDcapable supplier. If the supplier uses any sub-contractors and provides DPD geometry in any format to these sub-contractors, the supplier shall: o Impose Boeing Document D6-51991. The supplier is responsible for their own sub-contractors conformance. o Comply with all applicable export laws. A copy of D6-51991 and associated documents are available through Olympic Tool. 34. Any communication between the buyer and seller which alters the purchase order and associated engineering requirements shall require a purchase order amendment. The seller shall not deviate from the purchase order and associated engineering requirements based upon verbal communications or emails. Any deviation must be documented on the purchase order. 35. Suppliers are required to establish and maintain a FOD prevention program. The supplier s FOD program shall be based upon Boeing document D6-85622. If the supplier does not have access to the Boeing document the supplier shall base their FOD program upon AIA NAS412, Foreign Object Damage/Foreign Object Debris (FOD) Prevention. This document may be obtained from Aerospace Industries Association of America at 1000 Wilson Boulevard, Arlington, VA 22209 or http://www.aia-aerospace.org. Additional help in developing a FOD program can be found as follows; IAQG/SCMH Section 3.4 is published through the International Aerospace Quality Group (IAQG). Copies of this handbook are available through the IAQG web-site: http://www.sae.org/iaqg/handbook/scmhtermsofuse.htm Page 5 of 7

36. Raw material suppliers and fabricators utilizing their own material shall supply OLYMPIC TOOL AND MACHINE with the original mill certifications. 37. All raw material supplied or used to fabricate product, including standard hardware, shall comply with DFARS 252.225-7014-DOMESTIC PREFERRED. Mercury or mercury compounds shall not be intentionally added or come in direct contact with material or product. The supplier shall state compliance on certifications and / or C of C. This requirement shall be flowed to the supplier s sub-contractors. 38. Suppliers providing raw material or product manufactured from raw material that was not supplied by Olympic shall meet the following requirements; Plate (>0.187) Sheet (Up to 0.187) Bars (Round) Bars (Square and Rectangular) Forged Block You can cut the length and width but the raw material order must be the same gage thickness as specified on the Olympic purchase order or drawings referenced by the purchase order. You can cut the length and width but the raw material order must be the same gage thickness as specified on the Olympic purchase order or drawings referenced by the purchase order as specified on the Olympic purchase order or drawings referenced by the purchase order. The length may be cut but the raw material ordered must be the same diameter as specified on the Olympic purchase order or drawings reference by the purchase order. If it is tubing it must also have the same wall thickness. The length may be cut but the raw material ordered must be the same width and thickness as specified on the Olympic purchase order or drawings referenced by the purchase order. The length can be cut but the raw material ordered must be the same width and thickness as specified on the Olympic purchase order or drawings referenced by the purchase order.. Page 6 of 7

Any deviations from the above requirements must be approved by Olympic through an amended purchase order. 39. The seller shall implement a counterfeit material avoidance and detection system consistent with AS5553 and AS6174 as applicable. Material is defines as; raw material, parts, and electronics 40. Once approved the sellers ability to remain on the Olympic approved supplier list is based upon the seller maintaining an acceptable quality and delivery metric. Quality shall be a minimum of 98.8% acceptable and delivery shall be 92.5% minimum on time. The supplier may obtain their current rating by contact the Olympic purchasing agent noted on their purchase order. 41. The seller acknowledges that the articles, materials, or services provided under the Olympic purchase order are being purchase for installation or use on an aviation product. 42. The seller shall provide for timely notification to the buyer of known nonconformance escapements. 43. Olympic Tool wants our suppliers to be aware of their contribution to our product and services conformity, to be aware of their contribution to product safety and ensure that all our suppliers conduct their business for Olympic Tool in an ethical manner. 44. WARNING Information Subject to Export Control Laws The purchase order and its accompanying documents may contain information subject to the International Traffic in Arms Regulation (ITAR) or the Export Administration Regulation (EAR) of 1979. This information may not be exported, released, or disclosed to Foreign Nationals outside the United States without first complying with the export license requirements of the ITAR and/or the EAR. A violation of the ITAR or EAR may be subject to a penalty of up to 10 years imprisonment and a fine of $100,000 under 22 USC 2778 or section 2410 of the Export Administration Act of 1979. Include this notice with any reproduced portion of this document Page 7 of 7