New Residential & Commercial Development

Similar documents
CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives

The Three C s of Urban Transportation Planning

This page was intentionally left blank

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

12 Evaluation of Alternatives

Indirect and Cumulative Effects

9. TRAVEL FORECAST MODEL DEVELOPMENT

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

NYMTC September 11 th Memorial Program Internship in NYCDOT

2017 TRANSPORTATION POLICY STATEMENT

EIGHT PLANNING FACTORS

LARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013

Updated Traffic Impact Analysis Regulations Administrative Guidelines

NEW YORK TRANSPORTATION FACTS ECONOMIC IMPACTS

11 Joint Development Regulatory Context and Methodology

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

SUSTAINABLE COMMUNITIES STRATEGY

City of Kingston. Public Information Centre #2. Population, Housing and Employment Projections Study. December 3, 2018

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL

Technical Assistance for Sustainable Communities: Building Blocks

Chapter 4: Transportation and Land Use

CHAPTER 1. A New Transportation Plan

1.0 Introduction to Transportation Planning

APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

APPENDIX TRAVEL DEMAND MODELING OVERVIEW MAJOR FEATURES OF THE MODEL

TRANSIT SYSTEM SUMMARY REPORT

Updated Traffic Impact Analysis Regulations Administrative Guidelines

Appendix C Presentation Slides with Script

COMPREHENSIVE PLAN Executive Summary C ITY OF ENNIS, TEXAS

Appendix C: Scenarios and Future Drivers Impacting Transportation

Nashville Southeast Corridor High-Performance Transit Alternatives Study. Final Report

If you have any questions about the request for proposal, please contact me by at

Revenues and expenditures increase based on the tax district increase due to increases in real estate assessments in CY 2016 compared to CY 2015.

South Fulton Parkway Transit Feasibility Study Stakeholder Committee Meeting #2

EMU: BN/UP ALTERNATIVE ARVADA RIDGE STATION OPTION A

WELCOME. Opportunity Corridor Committee Meeting #1. May 19, May 19, 2005

Corridor Planning Standards + Potential Performance Measures

Frequently Asked Questions Connecting Palo Alto

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

and Unmet Need: Methodology and Results

CHAPTER 2: KEY TRENDS AND ISSUES

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

3. STATION SPACING AND SITING GUIDELINES

Honorable Mayor and Members of the City Council. Submitted by: Dan Marks, Director, Planning and Development

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner

Highway and Freight Current Investment Direction and Plan. TAB September 20, 2017

City of Medford Fire Rescue Oregon. Emergency Service Master Plan SW Parkway Ave. Suite 3 Wilsonville Oregon

WINGRA CREEK MARKET STUDY AND REDEVELOPMENT STUDY Scope of Services

Cumulative and Secondary Impacts

Coney Island/Gravesend Sustainable Development Transportation Study

RURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES

New York Metropolitan Transportation Council. Plan Regional Transportation Plan A Shared Vision for a Sustainable Region

FUNCTIONAL CLASSIFICATION PROCESS

CHAPTER 4 GROWING THE FUTURE. Regional Growth

I-90/Irene Road Interchange Economic Impact Analysis. FINAL REPORT June 2, For Boone County, IL

MOBILITICS. Scenario Planning and Modeling Connected & Automated Vehicles. June 12, 2018

Chapter 5 Transportation Draft

LANDSIDE FACILITIES AIRLINE TERMINAL FACILITIES INVENTORY 5.0 INTRODUCTION C H A P T E R 1 CHAPTER 5

Vehicle Miles Traveled Trends and Implications for the US Interstate Highway System

Traffic generated by future approved, planned or potential development activity.

Fairmount Line Feasibility Study

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

Ballard-Interbay MIC Summary Statistics

Caltrain Rapid Rail Plan

2. Goals and Objectives

Rivers Edge Alternative Urban Areawide Review (AUAR) Traffic Study

Once known as warehousing and distribution, the process

VII. FREIGHT MANAGEMENT

Sustainability. Sustainability Principles. 1. Framework. Spokane Transit s definition of Sustainability is:

SCS Scenario Planning

Chapter Six Future Transportation and Land Use

City of Palo Alto (ID # 7047) City Council Staff Report

Policy Research CENTER

An Overview of Transportation Issues in the NY Metro Area July 26, 2010

Riverview Corridor Pre-Project Development Study

Performance Measures Workshop, May 18, 2017

Will County Community Friendly Freight Mobility Plan: Executive Committee Update

NEW OPPORTUNITY FOR MIDDLESEX COUNTY

2040 LAND USE WORKBOOK February 2017

ONE NEVADA TRANSPORTATION PLAN The Nevada Department of Transportation s Long-Range Transportation Plan

Highest Priority Performance Measures for the TPP

Resources: Industrial Corridors. 20 Chicago Sustainable Industries

6 CHARTING PERFORMANCE

ENVIRONMENTAL JUSTICE ASSESSMENT

Commercial Zoning Update

Chapter #9 TRAVEL DEMAND MODEL

FACT SHEETS SAN BERNARDINO COUNTY

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

A Presentation to: Project Advisory Group Meeting #7

IMPLEMENTING THE PLAN

Real Estate Development Reuse Discussion for the USF-CEDR Basic Economic Development Course. City of St. Petersburg Economic Development Department

CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA

Land Use INTRODUCTION

Technical and Physical Feasibility Fact Sheet Alternative 28: Infill/Density

A more detailed description of Transportation, and its programs and initiatives can be found at

Mobility and System Reliability Goal

Transcription:

FUTURE TRENDS Part of the process to understand the future trends facing the City of New Rochelle is to interview the officials in the City Development Department to obtain information regarding future residential and commercial developments underway or proposed within the City. New Residential & Commercial Development New Rochelle is a nearly built-out city, therefore, new development is limited to existing properties rather than open space. There is potential development in vacant buildings in the downtown area. The City is in process of developing a new comprehensive plan to guide the community into the future, but currently the development is based on transit oriented development near the transportation corridor of the commuter rail and interstate 95, especially in the West End neighborhood. It is reported that there is still a need for low and moderate income housing in the City. This West End neighborhood area is expected to be rezoned to allow higher density residential hoping to also attract more commercial business to the residents and hotel space. The four recent high-rise buildings (Trump, Loft, and the two Avalons) are all residential and not yet completely filled. An additional high-rise (20 floors) is planned for the existing Church-Division Street parking garage space. This is hoped to become a mixed-use development whereby residential floors exist above a ground floor retail and office spaces. A planned development near Echo Bay on the existing City Yard property is planned for a four-story, 260 unit rental, mixed-use complex. Open space and preservation of the old Armory for reuse is also being planned. Many plans in the past for redevelopment of David s Island have come and gone. David s Island could be redeveloped, but the question of access (bridge, ferry) and the cost of bridge construction may be too costly for any projected plans at this time. NRFD should be consulted should any particular plan gain traction. The potential for a satellite station and the capabilities of nearby fire boats should be reviewed. All potential developments increase responsibilities on NRFD. As stated previously and demonstrated with incident-demand density mapping, the higher density of population is directly correlated with increased calls for service. While this new construction will be built under the most modern fire prevention codes and will be fully sprinkler equipped, 121

high-rise firefighting is different than residential or single-story commercial firefighting. This type of firefighting is one that NRFD has embraced and will continue to do so as the City develops further as a commuter center and perhaps a destination for nearby residents. Transportation Improvements No major new routes are being planned in New Rochelle that would significantly affect fire department travel. A current plan to improve the North Avenue overpass of I-95 is one of note but, again, it is not going to affect fire apparatus in the long term, expect potential delays during construction. While New Rochelle has a large traffic circle, these favor emergency services to traverse through areas. No other traffic circles are planned, but considerations of speed humps and other traffic calming devices on certain streets will have the effect of a poor at-grade crossing of a railroad crossing and will cause delay in the speed of emergency response. NRFD should be consulted before the implementtation of traffic humps. While no existing medians are being planned for removal, three streets may change directional travel according to the Development Office. Memorial Highway may have two-way traffic in the future. These will not significantly impact fire apparatus travel except Lawton is narrower than the others so this may cause delays for negotiating through with opposing traffic. Population Projections As indicated earlier in this chapter, the population of the City of New Rochelle has increased modestly over the past several decades. It is anticipated that additional population growth will continue into the future as the high-rise developments are filled and new ones are constructed. One method to project population growth is based on several decades of Census experience. For the City of New Rochelle, we used the decennial Census figures from 1990 through 2010 to extrapolate figures through the year 2030. This method, however, can fail to account for expected trends in the growth rate of an area. These changes often result from redevelopment, changes in employment capacity, or other socio-economic factors not taken into consideration in a linear projection from historic rates. Because of this, local population projections from agencies with differing methodology are also reviewed. 122

For New Rochelle, information available from the City Sustainability Plan indicates an expected population of 82,000 residents and 32,000 households by 2030. The Program on Applied Demographics at Cornell University has developed projections upon the County level. These projections were proportioned to New Rochelle based upon historic Census level and projected forward to 2030. In addition, The New York Metropolitan Transportation Council (NYMTC) 12 of the Metropolitan Planning Organization has also forecasted County population levels and similar methodology to reflect the growth in New Rochelle was utilized. The resulting population forecasts appear in Figure 4.41 13. Figure 4.41 POPULATION PROJECTIONS The locally produced population forecasts are more conservative than the Census-based population forecast primarily due to local and regional issues that are expected to persist in restraining population growth for the City, such as the lack of residential units for lowand moderate-income persons. As far as age composition, the County is expected to increase its over-65 age cohort from 17% to 22%, while all other age groups remain 12 http://www.nymtc.org/project/forecasting/sed_products/2030%20forecasts/tm%204.1.3b.pdf 13 http://pad.human.cornell.edu/counties/projections.cfm 123

generally static. New Rochelle will likely buck the trend of an increasingly aged population for several reasons. One is the cost of living in the area; empty nesters may move away or from single-family homes toward the rental towers in the City, if they can afford it. The other is the many colleges and the orientation to under age 25 students for retail and nightlife. Finally, New Rochelle s location along major transit corridors appeals to commuting workers, whose incomes drive the market for homes and apartments in the area. However, this may not occur if additional senior citizen oriented housing and care centers continue to find New Rochelle desirable. While these projections are not the definitive authority of future population within the City, they provide a way to base recommendations for future fire protection and emergency medical needs with expected service demand. Workload Projections In evaluating the deployment of facilities, resources, and staffing, it is imperative that potential changes in workload that could directly affect such deployment be examined in order to maintain acceptable levels of performance. For purposes of this study, population projections extrapolated from the Cornell University County Demographic Forecast for New Rochelle was multiplied to an average of the forecasted incident rate calculated from a five-year history of incidents per capita and the actual average incident rate per capita to estimate workload through the year 2040. The result of the analysis is shown in Figure 4.42. 124

Figure 4.42 ESTIMATED FUTURE WORKLOAD Actual fire incidents are expected to decline, but this is reflective of national trends due to improvements in building codes and public fire education. EMS and other types of fire calls are expected to continue to rise because of the increased population. RESOURCE DEPLOYMENT SCENARIOS With available apparatus, 95% of historic service demand can be reached within NFPA 1710 time parameters of a fire station. It has also been shown that all demand and roadways can be reached within eight minutes of a fire station. More importantly, nearly 86% of the reported structure fires can be reached by the first-alarm assembly travel time limits. The question remains then if the workload for units and the level of call concurrency (EMS calls being the most concurrent) inhibits NRFD from responding to calls with appropriate resources. The mutual aid resources into New Rochelle are rather low, indicating that NRFD is adequately handling the volume of calls with current resources. 125

The scope of work for this study was not whether the City should be seeking additions to the fire department resources, but rather where it could reduce assets at the stations, single apparatus, or staffing while still maintaining the ability of NRFD to deliver services within established industry benchmarks. This section examines these considerations and the impact, if any, upon the City of New Rochelle. Apparatus Reduction The reduction of an apparatus has the corresponding effect of staffing reduction. New Rochelle currently staffs five engines and three trucks utilizing three firefighters per apparatus. To eliminate an apparatus, the most likely choice would be a Ladder type since an Engine is an initial attack vehicle. Also, two of the five stations in New Rochelle only have a staffed Engine apparatus, so the closure of an engine would equate to a station closure. Four firefighters per apparatus is the recommended staffing level according to the NFPA. Figure 4.43 illustrates the staffing levels for scenarios that include eliminating one or more apparatus without regard to which station it affects. Figure 4.43 APPARATUS REDUCTION TABLE While it is evident that even a reduction of three apparatus is still sufficient for a firstalarm assembly force, actual fires often require multiple alarms, additional resources that would have to come from elsewhere and leave the City bare of emergency resources for another incident. This is not a recommended strategy. 126

Additionally, the reduction of Ladder units may affect the ISO coverage of the area of the City with the highest structural risk and highest population densities. This would potentially increase insurance premiums to the property owners. In addition, since a firstalarm assembly for a fire incident calls for two ladders, the city would have to rely upon mutual aid. The remaining ladders would have increased usage with corresponding maintenance costs, and the ability to send one ladder for training at the county facility would be hampered. To examine the effect of a Ladder closure incrementally from its host station (see Figure 4.12), we begin with the Ladder in Station 1. Station 1 Ladder It can be seen in Figure 4.44 that the effect of shutting down the Ladder at Station 1 has minimal impact upon the ISO distance coverage and the coverage of higher risk structures downtown. Recall, it does take away an available resource for multiple alarm structure fire incidents and concurrent call events. The loss of the Ladder in Station 1 also minimally impacts the first-alarm coverage area based upon the current NRFD policy of 3 Engines, 2 Trucks, and the Deputy Chief (Figure 4.45). It should be noted that the tower ladder in Station 1 does not fit in any of the other stations due to its size necessary for the structures nearby. Station 2 Ladder For the loss of a Ladder company in Station 2 14, Figure 4.46 illustrates a similar minimal impact upon ISO Distance and the higher risk property coverage downtown. Again, Figure 4.47 shows minimal consequence upon the first-alarm assembly coverage area when the Ladder is removed from Station 2. 14 According to Capt. Nechis, this truck was purchased with funds using a Federal Community Development Block Grant (CDBG) to be assigned to Station 2. The grant totaled $820,000. 127