CUP APPLICATION WIND ENERGY CONVERSION SYSTEMS (WECS) Commercial or Non-Commercial

Similar documents
MURRAY COUNTY WIND ENERGY ORDINANCE

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

SECTION 25: WIND ENERGY CONVERSION SYSTEMS (WECS)

ORDINANCE NO. Commercial WECS: A WECS of equal to or greater than 15 kw in total name plate generating capacity.

Nance County Zoning Regulations for Wind Energy Conversion Systems

Humboldt County Ordinance #68 Commercial/Utility Grade Wind Energy Conversion Systems (WECS) PURPOSE DEFINITIONS

Clustering: The grouping of wind turbines positioned or occurring closely together around a particular dwelling.

Zoning Regulations for Large and Small Wind that are Working

Commercial WECS: A WECS of equal to or greater than [100/40] kw in name plate generating capacity. Wind Energy Conversion System Ordinance

Article 18 Wind Energy Conversion System Regulations

Wind Energy Conversion System Ordinance of Otter Tail County Effective February 15, 2011

SECTION 25: RENEWABLE ENERGY ORDINANCE

SECTION SPECIAL REQUIREMENTS FOR WIND ENERGY CONVERSION SYSTEM

SECTION 12 WINDPOWER MANAGEMENT ADOPTED: FEBRUARY 15, 2005 TABLE OF CONTENTS SUBDIVISIONS... PAGE

Minnesota Energy Facility Permitting

MINNESOTA LOCAL GOVERNMENT WIND TOOLKIT

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND

Minnesota State Permitting Process for Large Wind Energy Conversion Systems

Article II Definitions Section 200 Interpretation II Definitions II-1

8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

Wind Energy ARTICLE XL - WIND ENERGY AN ORDINANCE REGULATING THE DEVELOPMENT OF WIND ENERGY SYSTEMS

CITY OF TONKA BAY COUNTY OF HENNEPIN STATE OF MINNESOTA ORDINANCE NO

CARLTON COUNTY RENEWABLE ENERGY ORDINANCE #32

2.04 Applicability. This ordinance applies to all unincorporated lands within the boundaries of Henry County.

List of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview...

Cheshire, MA SMALL WIND ENERGY SYSTEMS 12.0 SMALL WIND ENERGY SYSTEMS

WIND ENERGY CONVERSION SYSTEMS

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

SECTION ENERGY SYSTEMS (WIND AND SOLAR)

Section 2202 Applicability. This regulation applies to all lands within the boundaries of Austintown Township, Mahoning County, State of Ohio.

BEFORE THE OHIO POWER SITING BOARD

Section 11.01: Zoning Ordinance Subdivision 9.4: Utility and Communication Uses. 96 Chapter 11: Planning and Development

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS)

INTRODUCTION. Understand Your Goals. Large WECS, Small WECS. Model Wind Energy Standards. Model Wind Energy Ordinance

ORDINANCE NO. THE LENT TOWNSHIP BOARD OF SUPERVISORS ORDAINS: The following language is hereby added to the Lent Township Zoning Ordinance:

C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6

Contents I. Introduction... 1 A. Overview... 1 B. Compliance with Poweshiek County Zoning Ordinance... 3 C. Poweshiek County CUP Application

Wind Turbine Zoning for CERTs

WINTHROP, MAINE SMALL WIND ENERGY SYSTEMS ORDINANCE

Article 57 WIND GENERATION AND WIRELESS COMMUNICATION TOWERS

CHAPTER 725. Solar Farms.

CITY OF DELANO COUNTY OF WRIGHT STATE OF MINNESOTA ORDINANCE NO.

Ohio Power Siting Board. Staff Investigation Report and Recommendation

Cassadaga Wind Project Exhibit 6. Wind Power Facilities

WIND ENERGY CONVERSION SYSTEMS (Section Added by Ordinance 52-M, Effective ) (As Amended by Ordinance 52-P, Adopted )

ORDINANCE BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF NORTH MYRTLE BEACH, SOUTH CAROLINA, IN COUNCIL DULY ASSEMBLED, THAT:

EXCERPT FROM EMMET COUNTY ZONING ORDINANCE. A. Definitions For purposes of this section, the following definitions shall apply:

HEIGHT, TOTAL SYSTEM: The height above grade of the system, including the generating unit and the highest vertical extension of any blades or rotors.

Proposed UNION COUNTY ORDINANCE # 73

SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form

Chapter COMMERCIAL WIND ENERGY FACILITIES

SECTION 11. ACCESSORY USES. Accessory uses are permitted in any zoning district in connection with any principal use, which is permitted.

Sample Zoning for Wind Energy Systems April 16, 2008

BILL NO. B ORDINANCE NO TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

SMALL WIND ENERGY FACILITIES ORDINANCE. Ordinance No

Box Elder County Land Use Management & Development Code WIND ORDINANCE

SEWRPC Model Zoning Ordinance ZONING REGULATIONS FOR WIND ENERGY SYSTEMS

NaturEner Wild Rose 1 Energy Inc.

ORDINANCE NO. BEAVER TOWNSHIP, BAY COUNTY, MICHIGAN, ORDAINS:

Wind Energy Ordinances

WIND ENERGY CONVERSION SYSTEMS APPLICATION

Chapter 750 WIND POWER GENERATION FACILITIES

Procedure for NEPA for County or City Projects

6.6 RESIDENTIALLY-SCALED, LAND-BASED WIND ENERGY CONVERSION FACILITIES

CHIPPEWA COUNTY LAND AND RELATED RESOURCE MANAGEMENT ORDINANCE SECTION 16 SOLAR POWER MANAGEMENT TABLE OF CONTENTS SUBDIVISION 1.

TOWNSHIP OF WEYMOUTH ATLANTIC COUNTY NEW JERSEY ORDINANCE NO

5.6- LAND-BASED WIND ENERGY CONVERSION FACILITIES


Summit Repower Siting Process August 23, 2016

CHAPTER 1292: WIND ENERGY TURBINES

Town of Rensselaerville LOCAL LAW NO. 2 OF THE YEAR 2009

Town of Allegany Wind Energy Regulations. Proposed Amendments to the Town s Zoning Ordinance Draft: February 13, 2007

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

Wind Power: An Exploration of Regulations and Litigation

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE ST. HELENS, OREGON PHONE (503) CODE SUMMARY REQUIREMENTS

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10

SOLAR ENERGY FARMS AND SOLAR ENERGY SYSTEMS

The breach of any condition shall be cause for the Planning Commission to revoke Special Approval Use Permit.

ARTICLE 16 CITY OF EUDORA ZONING REGULATIONS

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

TOWAMENCIN TOWNSHIP GRADING PERMIT PROCEDURES. A grading permit is required for all earthwork of 100 cubic yards or more.

September 16, EQB Board Members. George Edwin Johnson EQB Staff

17. Commercial WECS S P X X X X X X X X B C

TOWNSHIP OF LOWER, COUNTY OF CAPE MAY, STATE OF NEW JERSEY ORDINANCE NO

Abandonment means to discontinue use with no intentions of rehabilitation of use or reinstating use within the next 18 months.

ADOLFO CARRIÓN, JR. PRESIDENT, BOROUGH OF THE BRONX 851 GRAND CONCOURSE BRONX, NEW YORK 10451

SEPA Environmental Checklist

CITY OF ORONO HENNEPIN COUNTY, MINNESOTA

1.0 INTRODUCTION 1.1 SUMMARY OF SEQRA PROCESS

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

DIVISION 15. TELECOMMUNICATIONS

A LOCAL LAW # 2 FOR THE YEAR 2006 AMENDING THE ZONING LAW OF THE TOWN OF COHOCTON, NEW YORK TO REGULATE WINDMILLS AND WINDMILL FACILITIES

Addition to Section 4 - Special Use Regulations

Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red.

Wind Energy Facility Siting and Permitting in South Dakota

NORTH EAST TOWNSHIP ORDINANCE NO.2013-

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

MEETING DATE: ADOPTED ON EARTH DAY: APRIL 22, 2008 AGENDA ITEM COMMENTARY

Demolition Permit Requirements

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

Transcription:

Application Fee $ 500.00 Dodge County Environmental Services Recorder Fee $46.00 721 Main St N, Dept. 123 Date Received Mantorville, MN 55955 Received by Phone 507-635-6272 www.co.dodge.mn.us CUP APPLICATION WIND ENERGY CONVERSION SYSTEMS (WECS) Commercial or Non-Commercial Applicant Name: Address City State & Zip Code Phone E-mail Address (if available) Name of Authorized Agent/ Project Manager Address City State & Zip Code Phone Project Name: Web site (if available) Site location(s): Township Section 1/4: of 1/4 Township Section 1/4 of 1/4 Parcel ID Number(s) (if applicable) Part A: Application Requirements: An application to the County for a permit under Chapter 16.16.51 is not complete unless it contains the following: i. The name, address, telephone number and signature of the project applicant, or authorized representative/agent of the applicant. ii. The role of the permit applicant in the construction and operation of the WECS. 1

iii. iv. The operator of the WECS, if different from the applicant or owner. The name(s), address(es), telephone number(s) and signature(s) of the project owner(s). For C-BED projects, information must be provided regarding the percent of ownership for each of the project owners. v. List of all contractor s performing work on the project and the duties they are responsible for completing. vi. vii. viii. ix. Name and contact information for local on-site project manager/general contractor responsible for daily project oversight and complaint resolution. The legal description and address of the project (if applicable). A description of the project (and all phases of the project, if applicable) including: number, type, model, model information, total name plate generating capacity, tower height, rotor diameter, total height of all wind turbines, and means of interconnecting with the electrical grid Site layout, including the location of all property lines, project area boundaries, land and wind right boundaries, property lines, roads, wind turbines, electrical wires (existing and proposed), interconnection points with the electrical grid, roads, access road/driveways (existing and proposed) drainage tile/systems, and all related accessory structures. The site layout shall include distances and be drawn to scale. x. Documentation of land ownership or legal control of the property and current land use on the site and surrounding area. xi. The latitude and longitude and GPS coordinate of individual turbine(s). xii. Noise modeling to verify project will comply with Minnesota Rules Chapter 7030 governing noise, as amended. Project must meet Minnesota Noise Standard, Minnesota Rules Chapter 7030 as amended. Specifically, residential noise standard NAC1, L50 50dBA during overnight hours. xiii. xiv. xv. xvi. Micro-WECS and Non-Commercial WECS must provide documentation that the power will be utilized on-site. A United States Geological Survey (USGS) topographical map, or map with similar data, of the property and surrounding area, including any other WECS within 10 rotor diameters of the proposed WECS. Location of wetlands, scenic, and natural areas including bluffs within 1,320 feet of the proposed WECS. Location of all known communications towers within five (5) miles of the proposed WECS. Documentation that the applicant notified all communication 2

tower operators shall be required. No WECS shall be constructed so as to interfere with County of Minnesota Department of Transportation microwave transmissions. The burden of proof shall be placed on the applicant to document that the proposed WECS will not interfere with the line of sight of other towers. xvii. xviii. xix. Location of all known public or private airports or heliports within five (5) miles of the proposed WECS. All projects located within five (5) miles of licensed public and private airports/heliports shall provide verification that these facilities have been notified and that no conflicts exist with the proposed projects. Identification of haul routes to be utilized for material transportation and construction activities: state, federal, county and/or township roads. The permittee must provide written documentation that all haul routes have been approved by each of the road authorities with jurisdiction. Copies of all relevant applications, permits and/or documentation that indicates compliance with all other local, state and federal regulatory standards, including but not limited to: a. Federal Aviation Administration (FAA) approvals/standards b. Minnesota Pollution Control Agency (MPCA) Rules, as amended. This includes, but is not limited to stormwater, solid and hazardous waste and noise. c. Environmental Protection Agency (EPA) regulations, as amended. d. MNDOT approvals Roads, ROWs and Microwave Beam Path Corridors e. Dodge County Highway Department approvals f. Township Road Authority approvals g. Federal Communication Commission (FCC) approvals h. Minnesota Department of Natural Resources (MNDNR) i. Minnesota State Historic Preservation Office (MNSHPO) j. Office of the State Archeologist (OSA), completed by County k. U.S. Fish and Wildlife Service (USFWS) xx. Locations and site plans for all temporary, non-residential construction sites and staging areas. Applications for Commercial WECS shall also include: i. Detailed Decommissioning and Restoration Plan compliant with Section 16.51.7 ii. iii. Description of potential impacts on nearby WECS and wind resources on adjacent properties. A Wake Loss Study may be required if the county determines the proposed project may have a significant impact on nearby WECS. Modeling and a description of potential impacts from shadow/flicker, including the number of properties impacted by flicker and the hours of day each property will be subject to shadow/flicker. If no shadow/flicker is predicted to impact the property, the applicant shall provide a statement of no impact. 3

iv. Signed copy of the Power Purchase Agreement (PPA). v. Other WECS located in Minnesota in which the applicant/owner has an ownership of financial interest. Part B: If your wind project has: 1) turbines from more than one manufacturer; 2) turbines whose characteristics are different from one another; and 3) turbines in the project with different in-service or start dates, you will need to fill out Part B for each turbine project or set of turbines whose characteristics are different. B.1 Turbine Manufacturer: B.2 Turbine Model: B.3 Turbine Rating (Nameplate Capacity): Kilowatts Megawatts B.4 Blade Length in Feet: Meters: B.5 Rotor Diameter in Feet: Meters: B.6 Rotor Swept Area in Feet: Meters: B.7 Tower Height in Feet: Meters: B.8 Hub Height in Feet: Meters: B.9 Project Capacity (Nameplate): Kilowatts Megawatts B.10 Number of Permanent Met Towers: None 1 2 3 4 B.11 Permanent Met Tower Height in Feet: 1 2 3 4 B.12 Transmission Network Interconnection Voltage (Kilovolts): < 25 (specify below) 115 138 25 161 34.5 230 41.6 345 69 other (specify) B.13 Beginning Date of Commercial Operation: Month Day Year B.14 Power Purchase Agreement With: B.15 Power Purchase Agreement Expiration Date: Month Day Year B.16 Comments (As needed for any clarification or explanation): 4

Signature Page for CUP Application: Wind Energy Conversion Systems (WESC), Commercial or Non-Commercial Signature of Applicant Date Signature of Authorized Agent/ Project Manager Date For Office Use Only: Date Rcvd 15 business days 60 days 120 days 5