Study on the Plan of Taipei Port

Similar documents
Port reform in Taiwan: new government opportunities or port competitiveness?

Organisation de Coopération et de Développement Economiques Organisation for Economic Co-operation and Development

Dalian the Nearest Port to the World in North China

MRMR Hambantota Port

Development strategy of the port industry of Ukraine on the horizon RaivisVeckagans, CEO of USPA

Alexandria port Eldekhiela port

House Select Committee on Strategic Transportation and Long Term Funding Solutions. November 6, 2017

INVESTMENT POTENTIAL INVEST IN PORT TERMINALS AT THE PORT OF WALVIS BAY NORTH PORT PROGRAM DATE: 29 AUGUST 2016 REVISION: 1

Ports to serve Indonesia

Opportunity for Private Investment Mauritius Island Container Terminal

Waterborne will Win. Waterborne Saves Energy

JLTOC Update. October 7, 2016

Suez Canal. The Suez Canal Zone represents a new chapter in the economic development of

Tanzania Ports Authority

Presentation on Initiatives to Improve Cargo Handling at the Port of Mombasa. Muhamad A. Jezan Resident Representative

LONE STAR HARBOR SAFETY COMMITTEE Roger Guenther Executive Director Port of Houston Authority

MOTC approves establishment of free port zone in Kaohsiung Port. Kaohsiung Harbor Intercontinental Container Center

Investments in Transport Infrastructure Projects

TEN THINGS YOU NEED TO KNOW ABOUT A FCSTT (Floating Container Storage & Transhipment Terminal)

COUNTRY REPORT. Phnom Penh. Autonomous Port. Main infrastructures consist of -Area of Sihanoukville Port 975,000m 2 -Length of port berth

Pham Huy Toan Branch of Viet Nam Maritime Administration in Ho Chi Minh City

1.Integration of City and Port is an innovative concept: President Chen

Port of Long Beach Port Master Plan Overview December 22, 2008

Multi countries consolidation in Commercial port Free Trade Zones for small and medium sized logistics service providers

THE LEGAL FRAMEWORK FOR SETTING UP A DEEP SEA PORT IN NIGERIA BY TOKUNBO ORIMOBI LP

Evaluating Container Developing Strategies for the Port of Kaohsiung: An Exploratory Analysis

Select U.S. Ports Prepare For Panama Canal Expansion

Review of Island & Reclamation Studies for Container Terminal Development on the Pacific Coast of Panama. Autoridad del Canal de Panamá

Industrial and Port Developments in East Port Said, Sokhna Port and the Surrounding area of the Suez Canal. East Port Said Port 3

SRIRACHA HARBOUR DEEP SEAPORT

The Sustainable Development and the Construction of Resourcesaving and Environmentally Friendly Port in Shanghai

Embassy of Denmark in Vietnam 2 / 10

1.Evergreen Opens Three New Berths in Kaohsiung Annual handling capacity expected to exceed 2 million 20-foot boxes

NEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT

SHORT-TERM DEVELOPMENT PLAN FOR TEMA PORT

1. To strengthen port integration: plan for overall international commercial port status and co-operation, and integration of port functions

The Operating Concept Peter Beamish, MA MICE Technical Director, Royal HaskoningDHV

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY. 1. Sector Performance, Problems, and Opportunities

China s WTO Commitments

PORT OF HOUSTON AUTHORITY

Development of port Infrastructure: Bangladesh Perspective FAHMIDA AKHTAR DEPUTY SECRETARY MINISTRY OF SHIPPING

Wan Hai Lines Q1 Update. Laura Su HSBC Taiwan Executive Forum May. 24, 2017

China Container Port Industry Report, July 2011

Click to edit Master title style. TNPA Port Consultative Committee Port of Port Elizabeth Port Performance Report July 2015

Growth In Container Volumes

The Enterprise and Land-Bridge Company LLC of 2005

House Appropriations Committee Overview of Virginia International Terminals (VIT) October 15, 2012

U. S. Port and Waterway Modernization Strategies: Environmental Impacts Section. Institute for Water Resources March 13, 2011

SYRIA CRISIS BEIRUT PORT ASSESSMENT (LEBANON) (29 AUG 2013)

1.Representatives of Hamburg Port Visits Kaohsiung to Exchange Ideas

Gateway Infrastructure Development Programs in Urban Centers on the west coast of North America

Partnerships in Capital Projects. AAPA Facilities Engineering Seminar and Expo

China Container Port Industry Report, 2010

Vietnamese ocean shipping: Potential, Orientation, and Application

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives

Effects of the Panama Canal Expansion on Texas Ports and Highway Corridors. executive summary

Port Services and Facilities

INTE-TRANSIT 3 rd Training Workshop Strategic Roadmap to 2020 for Piraeus Container Terminal

AAPA Marine Terminal Management Long Beach September 13, 2013

Waterways 1 Water Transportation History

Ports of Auckland Development Proposals MAY 2013

Japanese ODA loan. Ex-ante Evaluation

Eilat Port No Containers

POLISH MARITIME CLUSTER

Analysis of Existing Problems and Countermeasures of Multimodal Transport Development in Western Region Zhigao Liaoa and Qian Zhub

Once known as warehousing and distribution, the process

The global economy is based on an efficient transportation of goods among countries and continents, and today over 90% of the world's trade is

«Liepaja an effective industrial and regional transit center»

Climate Change Impacts and Adaptation: A Challenge for Global Ports

PORT OF NEWCASTLE CONTAINER TERMINAL PRESENTATION FEBRUARY 2018

Pasaia: A redefinition of city and port spaces

AAPA Harbors, Navigation and Environment Seminar Vancouver, B.C.

Port NOLA Forward: Strategic Master Plan FAQs

Regional Logistics Corridor. Georgian National Investment Agency (GNIA)

NAMIBIA: LOGISTICS HUB FOR SOUTHERN AFRICA CAPE TOWN, SOUTH AFRICA 17 NOVEMBER 14 (& BEYOND)

F5. Coastal Minor Port Zone

PIANC Commission Working Group Report Reviews

Process for Port Master Planning

TANJUNG BRUAS PORT CORPORATE INTRODUCTION

Assessment criteria for global logistics hub ports in Northeast Asia

Port of Vancouver USA Clark College Business Advisory Committee May 9, 2017

The Hong Kong Container Port a regional logistics hub

Port of Philadelphia Port Advisory Board

Issues for development with Inland Water Transportation in Myanmar

HUMAN GEOGRAPHY. By Brett Lucas

Ports & Maritime Organization. Two Proposed Investment Projects of PMO

Port Partnerships Strategic Opportunities for Gateway & Closer Market Ports to Work Together Presented by Rainer Lilienthal General Manager-Trade

THE PORT OF MARSEILLE FOS : Le FRENCH SMART PORT in Med

TRB - Annual Meeting

Facilitation of Landlocked Transit Cargo. IAPH Conference Abuja 18 th Sep, 2018

Maritime Components of the Canada-European Union Comprehensive Economic and Trade Agreement (CETA)

Illawarra Business Chamber/Illawarra First. Submission on NSW Draft Freight and Ports Plan

Port of Ngqura PCC CAPEX PROGRAM

Wharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet:

Introduction to Yangshan Bonded Pore Area and Yangshan Customs

Louisiana Ports: The Industry that Drives all Others. Presented By: Paul G. Aucoin Executive Director, Port of South Louisiana

Preparing for Post-Panamax Commodity Flows: Restructuring on Kentucky Waterways

The role of seaport system with social economic development in Vietnam

Transcription:

Third Chinese-German Joint Symposium on Coastal and Ocean Engineering National Cheng Kung University, Tainan November 8-16, 2006 Study on the Plan of Taipei Port Chi-Chi Chen UNION-TECH Engineering Consultants Co., Taipei utech@ms1.hinet.net Abstract Taipei port is a new port located at on the south bank of Dan-shui river mouth. It was a domestic harbour constructed for transporting aggregate from East Taiwan to North Taiwan originally. Due to the Keelung port can t satisfy the requirement of berthing mainline container ships, so a lot of import & export containers should be transported to Kaohsiung port that cause a heavy loading of inland road system. For solving this issue, Taipei port was expanded and promoted to an international auxiliary port of Keelung port in 1997. Taipei port is planned to have diversified functions, and it is operated as a landlord port, all the operation facilities is invested and operated by private sectors except infrastructures. The whole port area is reclaimed offshore by dredging material of port and discarded soil of Taipei metropolis, so the environmental impact can be reduced to minimum. Taipei port would keep the liberalization and privatization of operation conditions, and this port would be the biggest international port in North Taiwan in the future. 1 Introduction Taipei port locates on the south bank of Dan-shui river mouth in Ba-li of Taipei County, the location of Taipei port is shown in figure 1. It was a domestic harbour constructed for transporting aggregate from East Taiwan to North Taiwan originally. Based on the transportation demand of North Taiwan, Taipei Port was promoted to an international auxiliary port of Keelung harbour by Executive Yuan in 1997. Taipei port is close to the Taipei metropolis, which is the national political and economical centre and the main domestic cargo sources also. Taipei port neighbours upon Mainland China and East Asian economical rings, and locate on the shipping route of Far East to North America and Europe. Therefore, it is very suitable to be developed as an international container port for mainline ships and cross-strait transportation.

Figure 1 2 Master Plan of Taipei Port The master plan of Taipei port is shown in figure 2. The considerations of this layout are based on the predictive throughput and other concerns, such as the actual demand of operation and the marketing demand. This port can strengthen the competitive ability and has reserved sufficient space for future development.

Figure 2 2-1 Development Orientations a. The auxiliary international port of Keelung harbour; b. The main container port for mainlines in North Taiwan; c. The major port for bulk import; d. A port with free trade zone. 2-2 Planning Tactics a. The development of Taipei port must consider the issue of the maintenance requirement of approach channel due to coastal sedimentation. b. All the port area will be obtained by reclamation offshore to prevent levying private land and reserve the coastal zone for public. All the dredging material of channel, turning basin, basin, berth, and water area maintenance would be used for land reclamation of port area. c. The landlord operation mode is proposed for Taipei port, the infrastructure as outer breakwater, road systems, and utilities would be invested by port authority, and the major operation facilities would be invested by private sectors. d. For decreasing the inland transportation of container between North and South Taiwan, modern container terminals would be planned in order to accommodate the mainline container ships. e. The functions of Taipei port would satisfy the import demand of bulk cargo and

break cargo in North Taiwan. f. For accommodating the discarded soil of Taipei metropolis, an offshore area would be planned in order to solve the environmental issues of dumping discarding soil and increase the port area for future development. g. For increasing the competitive ability, Taipei port would supply enough space for free trade zone. h. Diversified functions are expected for Taipei port. A lot of space will be reserve for marina, coastal recreation zone for public, power station, etc. 2-3 Predicted Throughputs Cargo bulk and break cargo container Unit: thousand ton, thousand TEU Year 2007 2011 2016 2021 2026 chemical liquid bulk 200 250 250 250 250 cement 900 1,730 1,680 1,610 1,540 coal 0 1,000 1,000 11,500 13,600 aggregate 7,200 7,400 8,200 9,000 9,900 fuel 3,000 3,000 3,000 3,000 3,000 General cargo 1,400 4,320 4,650 4,970 5,280 total 12,700 17,700 18,780 30,330 33,570 Import & export 0 710 1,390 2,140 2,400 transshipment 0 490 960 1,610 1,800 total 0 1,200 2,350 3,750 4,200 2-4 Maximum Size of Calling Ships The planned maximum size of calling ship was 8,000TEU for container ship and 80,000DWT for bulk carrier originally. For satisfying the trend of marine marketing development, strengthening the competitive ability, and to fulfil the demand for coal handling system of thermal power plant in Taipei port, the planned maximum size of calling ships is revised as shown in following table finally.

Cargo Ship Size Capacity Length Breadth (m) (m) Draft (m) Container Short-tern 10,000TEU 350 52.0 14.0 Long-tern 15,000TEU 400 69.0 15.0 Coal Short-tern 80000DWT 265 38.0 14.0 Long-tern 150,000DWT 300 45.0 17.0 Liquid Bulk Panamax 50,000DWT 230 32.0 12.0 General Handy-Size 30,000DWT 190 27.0 11.0 Automobile Post-Panama 65,000GT 215 35.5 11.5 2-5 Planning of Harbour Facilities a. The planned outer breakwaters of Taipei port are shown in figure 2, including the north outer breakwater which will be extended with a total length of 9,163m, and 1,550m south outer breakwater which is under construction. In addition, there will be a new south outer breakwater with a length of 1,250m in future, and one breakwater 528m long for protecting the basin of pleasure-craft. b. To accommodate the maximum size of ships and to increase the calmness of outer port, the width of entrance and approach channel will be 400~525m with a depth of CD.-19~-21m. The width of inner channel will be 300m with a depth of CD.-16~-17m. Three turning basins with diameter 720m, 900m, 900m are planned with a depth of CD.-16m, CD.-17m, CD.-19m respectively. 2-6 Planning of Wharfs 2-6-1 East Wharf Area (layout is shown in figure 3) a. Terminal No. 1 for General and Bulk Cargo (wharf E13 ~ E16) b. Four berths for general cargo and bulk cargo with a total length of 1,230m and an area of 4.9 Ha have been rented to a private company for a multi-function terminal to unloading and transiting aggregate, coal, and fuel mainly. c. Terminal No. 2 for General and Bulk Cargo (wharf E10 ~ E12) d. Three berths for general cargo and bulk cargo with a total length of 690m and an area of 10.0 Ha would be opened for private investor in the future. This terminal will be multi-function for handling aggregate, coal, cement, break cargo, etc. e. Terminal No. 3 for General and Bulk Cargo (wharf E01 ~ E03) f. Wharf E01 ~ E03 is operated for unloading aggregate currently. These three berths with a total length of 554m and an area of 13.1 Ha is proposed to rebuild by private sectors for multiple functions. It is expected and promoted that the whole area can be developed for free trade zone in order to increase the efficiency of overall operation.

g. Wharf E04 is planned for passenger terminal. h. Wharf E05 ~ E09 is planned for berthing tugs and small crafts. i. Temporary Petroleum Unloading Wharfs To fulfil the fuel import demand of North Taiwan, four berths is planned for unloading fuel and liquid chemical temporarily, these wharfs include wharf E03 ~ E05, and E15. All of these wharfs will be relocated to outer port to assure the safety of harbour centre area and the resident area adjacent to Taipei port. j. Logistics Park for the Components of CarThe whole area has been rented to private companies to invest a special automobile logistics park jointly, which is also the first successful case of the operation for the free trade zone in Taiwan. k. Port Administration Area l. Special Zone for Coast Guard Figure 3 2-6-2 North Wharf Area (layout is shown in figure 4) a. Wharf N01~N02 Two berths with a total length of 602m are planned for handling general cargo. b. Container Terminal No. 1 (wharf N03 ~ N09) Container terminal No. 1 includes seven deep berths with a total length of

2,368m and an area of 113 ha. The development of this terminal was tendered as a BOT project, and this terminal is under construction. Considering the limited area for container yard, the storage area of N4-2~ N9-2 will be rented to the operator of Container Terminal No.1 after the completion of the reclamation work. c. Offshore Logistics Park The development area for logistics park is located in the water area outside the existing north breakwater from 1k+710 to 5k+263, the existing depth of this area is CD.-10m ~ CD.-20m. The area of this park will be 348.3 Ha, and the volume of required reclamation material is 71.72 million m3. The discarded soil come from Taipei metropolis will be used for filling. Except the windbreak area with a width of 200m inside the outer breakwater, there should be 17 areas for business usage, and 2 areas reserved for administration usage. The road system inside this park will be smoothly, the width of roads will be 25m~40m. The schedule of the availability of filling materials can not be totally controlled at this moment. Furthermore, a huge quantity of filling materials is required due to the considerable water depth in this reclamation area, so it would take a very long time to complete the reclamation works. Therefore, it is difficult to plan the usage of this area at this moment; this area is classified as the future development area. Figure 4

d. Future Development Area There are still eight berths with a total length of 2,668m in north wharf area. The usage of these berths will be adjusted by the actual demand in the future. Basically, the area behind apron will be planned as free trade zone or container stacking yard in priority. However, the actual usage of these berths will be finalized stage by stage according to the marketing demand in the future. 2-6-3 South Wharf Area (layout is shown in figure 5) a. Container Terminal No. 2 (wharf S01 ~ S08) There are eight berths with a total length of 2,630m is planned for container terminal in south wharf area. The width of this area is 800m, and the area is 114.0 Ha. Wharf S01~S03 is planned as feeder berths, and the container ship of mainline will berth at wharf S04~S08. This terminal would be invested and operated by private companies in the future. b. Special Zone for Military A preliminary planning for special zone for military is considered, but a feasibility study should be carried out in the future. c. Power Plant Special Zone Figure 5 Due to the power demand in North Taiwan and installed infrastructure of Taipei port, a thermal power station is proposed in Taipei port. This project is under negotiating

between Port Authority and Taiwan Power Company (TPC). A preliminary study had been completed for this project. The maximum coal carriers will be 150,000 DWT, and the annual unloading volume of coal will be 12.6 million ton for six coal-fired generating sets with 800,000 KW capacity each. Based on the estimated development schedule, the commencement of operation of Taipei Power Station will be year 2018. For accommodating 150,000 DWT coal carriers, a calm water area with sufficient space is required, and a huge reclamation works should be carried out for the required land of power plant. Therefore, TPC proposes to invest and construct the extension portion of north outer breakwater (sta. 5k+263~9k+163) and new south outer breakwater by them self in advance. Two berths for coal unloading, revetment with a length of 5,076m for land reclamation, land reclamation works for power station, dredging for outer channel and outer turning basin, and breakwater for pleasure-craft basin would be also carried out by TPC. d. Coastal Recreation Zone To reserve right of the coastal zone for public use, an isolation channel is planned between existing coast and port area in order to maintain a near-shore recreation zone. Keelung Harbour Bureau will carry out a beautifying work for coast area between the old south breakwater and new south breakwater. Taipei County Government will handle the planning and developing works between the area outside the port district and West Coastal Highway. e. Pleasure-Craft Basin (Marina) A pleasure-craft basin in the southern area is planned for investing and operating a yacht harbour by private sectors. The western S16-3 area with an area of 12.39Ha can be installed yacht club, parking area, yacht parking area, maintenance shop, etc. 2-6-4 Boundary of Port District The boundary of Taipei port district is shown in figure 2, the total area for Taipei port is 3,102 ha approximately. 2-6-5 Connecting Traffic System (route is shown in figure 6) The existing connecting road of Taipei port is Provincial Road No.15 via the 50m-wide Zhong-hua Road. The related construction plans of connecting road system are as follows: a. The completion date of Phase II connecting road construction will be May 2007. b. The estimated completion date of the widening work of West Coastal Highway from Ba-li to Lin-kou (12k~19k) will be in June 2008. c. The estimated completion date of East-West Expressway from Ba-li to Wu-gu will be in March 2008.

d. The estimated completion date of the improvement work of Wu-gu interchange system of national free way will be in March 2009. Figure 6

3. Phase Development Plan and Operation & Management Mode 3-1 Phase Development Plan Phase development plan of Taipei port is shown in figure 7. The different phases are defined by different colour. The phase development schedule is shown in following table. Figure 7 Stage Period Time Completed Jan. 1993 Dec. 2006 14 years Phase 1 Jan. 2007 Dec. 2011 5 years Phase 2 Jan. 2012 Dec. 2016 5 years Phase 3 After Jan. 2017 3-2 Operation and Management Model The most important strategies of developing an efficient and beneficial port are how to bring non-governmental capital and management vitality of private sectors. The landlord operation mode and privatization would be the key to strengthen the capability of competition. Nowadays, the world first 10 container ports management system is always conducted by separating port management from port operation.

After being promoted to international commercial port, the management mode of Taipei port is operated as landlord port, and most of operation facilities is privatized in practice. Not only stevedoring, storage, wharf affairs have already been open to private corporation, but also the investment and operation of General and Bulk Cargo Terminals & container terminals would be open to private sectors by areas. Keelung Harbour Bureau will not intervene in management and strictly play the role of a port manager only. Consequently, Taipei port has caught on the steps of operation and management of modern ports, and satisfies the expectation and need of ships or cargos owners. However, the development goal of Taipei port is to conduct the mode of landlord port, and to keep the liberalization and privatization of operation conditions. 4. Existing Conditions of Taipei Port 4-1 Existing Port Facilities Present development situations of Taipei port are shown in figure 2. 4-1-1 Existing Harbour Facilities a. The total length of north outer breakwater is 5,263.2m; north inner breakwater is 463.77m long, south outer breakwater is 1,050m long and south inner breakwater is 290m long. b. The existing approach channel is 200m wide, and -12m deep; the diameter and depth of existing turning basin is 500m and -12m. c. Three tug boats with 1,600HP, 2,800HP and 3,200HP had been rented out to non-government enterprise for commerce. Otherwise, one pilot boat and one multipurpose ship is managed by Keelung Harbour Bureau now. 4-1-2 Existing Wharf Facilities a. There are East Wharf Area and North Wharf Area currently, which are invested and operated by private companies in principle. b. Wharf E01~E03 is public wharf for unloading aggregate currently, but it would be removed to general and bulk cargo terminal No.1 in the future. c. Wharf E04~E05 is liquid chemical terminal currently. d. Wharf E05 is a public wharf for passenger terminal. e. Wharf E06~E09 is occupied by tug boats, small crafts, construction boats currently. f. The investment projects of government and private sectors are listed as follows: (a) B.O.T. Project of Container Terminal No. 1

Taipei Port Container Terminal Corporation consists of Evergreen group, Wan-Hai group, and Yang-Ming line. This terminal is invested in the way of BOT. The main investment items include dredging and reclamation, construction of wharf N02 for general cargo, construction wharf N03~N09 and container yard, installation of container handling equipment. The total area is 110Ha approximately. The total investment is estimated up to 20.36 billion NTD, and the concession period is 50 years. The perspective drawing of the Container Terminal No. 1 is shown in figure 9. This terminal is under construction. If the connecting road system can be completed on time, the commencement date will be estimated before March 2008. (b) General and Bulk Cargo Terminal No.1 An investment Contract had been signed for renting existing wharf E13~E15 and investing wharf E16 for general and bulk cargo. Airtight storage facilities in the storage yard also contain in the Contract. The annual handling throughput of aggregate and coal should be no less than 3.6 million ton and 1.0 million ton respectively. (c) General and Bulk Cargo Terminal 2 The investment items of the terminal include construction of wharf E10~E12, reclamation of new land for the terminal, installation of automatic ship unloaders and airtight storage facilities, etc. The berths and cargo stevedoring and storing affairs are open to any company. Under the agreement of Ministry Transportation and Communication, this project will be conducted based on BOT procedure. Keelung Harbour Bureau is executing invitation of public tender at present. (d) Coast Guard plans to build a base in Taipei port, and it is approved by Governmnet. The base is located in the area of wharf E17~E20. 4-2 Achievement Records of Operation The throughput in year 2005 is up to 9.73 million ton, and consists of 6.88 million ton of aggregate, 2.45 million ton of liquid cargo, and 0.4 million ton of general cargo containing 6,240 cars. The throughput and the calling number of ships in 2000~2005 are shown in following table; average growing rate is 34%. Furthermore, the throughput in January ~ July 2006 is 7.69 million ton.

million ton 12 10 8 6 4 2 - Throughput Calling Number of Ships 2000 2001 2002 2003 2004 2005 num 1,800 1,600 1,400 1,200 1,000 800 600 400 200 - The business revenue of Taipei port is 4.03 hundred million NTD in year 2005; it is consisted of operational income (54%) and realty rent (46%). The operation income and rent in 1999~2005 are shown in following table. U : 1,000 NTD 450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 Operational Income Rental Income 1999 2000 2001 2002 2003 2004 2005 5 Conclusions The advantages and opportunities of future development of Taipei port are evaluated as follows: 5-1 Advantages a. Taipei port is located in the central of administrative and financial region of Taiwan, and its hinterland has the biggest market of Import and export

containers. The geographic location is beneficial to obtain the transhipment container from the southeast region of China. b. The port facilities can accommodate 10,000~15,000TEU Container Ships safely in future, so the mainline container ship can be attracted to use Taipei port. c. Taipei port is the first landlord port in Taiwan, the port complies with the trend of modern operation and the market s expectation, and so the port has the superiority of competition. d. Container Terminal No.1 is invested by three big shipping companies. The design capacity of handling container will be 4.0 million TEU, and excellent business capability and shipping route dispatch of operator can obtain a stable cargo source. Based on the successful operation of import and export container, this terminal can attract more shipping company s interest, so that it is beneficial to gain more business of transhipment containers. 6-2 Opportunities a. Taipei port is an artificial port, so that there is no restriction on boundary condition. The water area can be deepened according to the demand of shipping marketing. It has potential and full of opportunities to be a world-class container port. b. If the project of thermal power station in Taipei port is approved by Government, the infrastructure of final stage can be accomplished in advance. It is beneficial to enhance the potential of long-tern business. c. The increase of throughput and revenue is very stable in the past years. The container terminal No.1 is under construction and it would start to operate by the end of 2008. Based on virtuous circle of port operation, the business of Taipei port would be promoted by clustering effect and economic growth in future. d. If the urban planning of special zone for Taipei port can be executed in future, it will assist the development of Taipei port and the industries development in special zone. 7 References Institute of Transportation MOTC. Integral Development Plan of Taiwan s Commercial Ports, 2006. Keelung Harbour Bureau. Master Plan and Future Development Plan of Taipei Port (2007~2011), 2006. Taipei Port Container Terminal Corporation. BOT Investment Plan of Taipei Port Container Terminal, 2002. Keelung Harbour Bureau. Environmental Impact Assessment of Taipei Port

Offshore Logistic Park s Land Reclamation Project, 2004. Keelung Harbour Bureau. Environmental Impact Assessment of Phase II Revised Development Plan of Taipei Port, 2005.