USDA - RURAL DEVELOPMENT. Construction Bid, Contracts, Meetings, Change Orders, Closeout

Similar documents
A62 PRE-CONSTRUCTION MEETING AGENDA

A62 UT PRE-CONSTRUCTION MEETING AGENDA

Pre-Construction Conference Discussion Guide

REQUEST FOR QUALIFICATIONS

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built.

ATTACHMENT D SCOPE OF SERVICES

APPENDIX D CONSTRUCTION PHASE CRITERIA

Chapter 6, Construction

Interim Turnover Check List

G , Request for Proposal Land Survey

Construction Activity Descriptions April, 2018

SECTION 6.2: CONTRACT MANAGER

Rental Production Division: Architecture Department

CHAPTER 6: MARKER FOR UT CONSTRUCTION CHANGES

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018

EJCDC Contract Documents for America s Infrastructure Buy online at

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

Managing Construction Projects Part l.

Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards

Chapter HEALTH & WELLNESS CENTER TASK FORCE CHARTER

Construction Family of Documents

EXHIBIT A INDEX TO TECHNICAL SPECIFICATIONS DOCUMENT FOLLOWS

NC State University OESAD GUIDELINES Contract Year

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

SAN ANTONIO WATER SYSTEM PRE-CONSTRUCTION MINUTES

Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards

PROJECT CHECKLIST Links to Relevant Links to Relevant Responsible Suggested Red Folder

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center

EJCDC Contract Documents for America s Infrastructure Buy online at

Activation, Transition & Close Out Step 7. July 13, 2012

EXHIBIT A INDEX TO TECHNICAL SPECIFICATIONS DOCUMENT FOLLOWS

AUDITING INVOICES 101

Manage Deliverables - Construction Step 6 February 2015

PURCHASING BUT DIDN T KNOW TO ASK

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

Diocese of San Diego BUILDING AND RENOVATION GUIDELINES. Table of Contents. Building and Renovation Committee Bylaws 2

Construction Administration Process

CONSTRUCTION PHASE PROCEDURES

WORK FOR YOU MAKING YOUR FILES. File Management In Preparation For Compliance Reviews

Chapter 1, Introduction

Work Breakdown Structure Element Dictionary Construction

CONSTRUCTION MANAGEMENT

PROJECT ITEMS CHECK LIST Project No.

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program

EXHIBIT 6 Preconstruction Work

(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet

1/24/2014. Schedules Schedule of Values Submittals Payment Applications Requests for Information Change Order Requests Change Orders

SUBRECIPIENT MONITORING GUIDE

APPLICABILITY/ACCOUNTABILITY:

Chapter 3 Other Stakeholders Duties

The Home Depot U.S.A., Inc. Instructions to Bidders

Albany Unified School District Contractor Prequalification

CONSTRUCTION DOCUMENTS Part 1

CITY MANAGER MEMORANDUM. John Anderson Drive Roadway Improvements - Construction Engineering and Inspection Services

TABLE OF CONTENTS COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT

13. Contract Changes General Change Order Process

Owner s Representative SCOPE OF SERVICES

OSNI PONCA OFFICE REMODEL

Pre-Construction Meeting Minutes

AIA Contract Documents: Retail Price List

Document B252TM 2007

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

(TO) TASK ORDER AMENDMENT TO CSC AGREEMENT (PROFESSIONAL CCNA SERVICES) Clerk Tracking No. /f,p -ooo 7'K

APPENDIX C - PRECONSTRUCTION MEETING AGENDA

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

Texas Board of Professional Engineers Professional Practice Update / Ethics

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

AGENDA PRE-CONSTRUCTION MEETING

TRUMAN STATE UNIVERSITY SITE IMPROVEMENTS, KIRK BLDG, MISSOURI HALL & STUDENT REC CENTER LTD RENOVATIONS

SECTION PAYMENT PROCEDURES

1ARCHITECTURE TABLE OF CONTENTS

AIA Contract Documents Price List

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

CHAPTER 3: DESIGN. TN Higher Education Designers Manual October 2018 Page 1 of 12

ADMINISTRATIVE DIRECTIVE #CS-04

MARYLAND STADIUM AUTHORITY

County of Elko, Nevada Requirements, Specifications and Contract Documents. Mechanical System Upgrade, Project Manuel. Jackpot, Elko County, Nevada

CLEAN WATER SERVICES AND CAROLLO ENGINEERS, INC. RECITALS. 1. District and Consultant previously entered into the Master Contract.

INVITATION FOR BID (IFB):

DEN Process: Project Closeout. David Mashburn, Director of Facility Services DENVER INTERNATIONAL AIRPORT February 8, 2017

Chapter 4 State Requirements for Educational Facilities Section 4.1

CONSTRUCTION PROCEDURES MANUAL PROJECT

Construction Contract Basics

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

CE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES

OCEAN COUNTY COLLEGE PURCHASING MANUAL

Internal Audit Report March 2016

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT BUSINESS PROCESSES

CONSTRUCTION MANAGEMENT SERVICES

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

Purchasing and Procurement Policy

PURCHASING POLICIES AND PROCEDURES MANUAL

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

UNIFIED FACILITIES GUIDE SPECIFICATIONS

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT

1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT)

Ge#ng Started. Application process:

Transcription:

USDA - RURAL DEVELOPMENT Construction Bid, Contracts, Meetings, Change Orders, Closeout

RURAL DEVELOPMENT REGULATIONS website http://www.rurdev.usda.gov/home.html

State Engineer s Role in Construction Management Agency s technical representative Approves and signs most paperwork Inspection (for RD purposes only) Makes sure documentation is done

State Engineer s Role in Construction Management Why do we even do it? Protect the interest of the taxpayer Protect the interest of the Owner / borrower Aren t we already paying someone for this?

Components Review bid and contracts Pre-construction meeting Monthly construction meetings Inspections: review RPR reports Change orders Payments to contractor and engineer Pre-final, final and warranty inspections

Post-Bid/Pre-Award Submittal Bid Tabulation Engineer s Recommendation for Award Contractor signed RD- Form 400-6, AD- 1048, and RD Instruction 1940-Q Exhibit A-1 As-bid Form E (budget form) RD MUST concur on bid BEFORE award

Post-Bid/Pre-Award Submittal Bid tab has all prices for all items for all contractors Look for unusual prices; do these impact project budget? Engineer s recommendation: after bid, defines which alternatives are being recommended, has total for each contract

Post-Bid/Pre-Award Submittal Are the 3 RD forms signed (not printed) RD 400-6 Are both sides provided Form E All as-bid prices agree with bids and recommendation Budget sufficient? Contingency reasonable?

Post-Bid/Pre-Award Submittal If everything is in order, RD will issue a letter to the Engineer concurring on bid and authorizing award of contract (copy Owner and Area Specialist)

Post-Award/Pre-Construction Submittal Owner s Board resolution of award Notice of Award Executed agreement for each contract Contractor s Certificate of Insurance Contractor s executed Performance and Payment Bonds EJCDC C-610 (2013) and EJCDC C-615 (2013)

Post-Award/Pre-Construction Submittal Certificate of Owner's Attorney Resident Construction Inspector s Resume Regulatory Agency Approval(s), Permits NYSDEC confirmation of SWPPP NOI RD State Engineer MUST concur on contract(s) prior to preconstruction meeting

Post-Award/Pre-Construction Submittal Board resolution dated ON/AFTER RD bid concurrence Notice of Award dated ON/AFTER resolution Contract dated ON/AFTER Notice of Award date Bonds dated ON/AFTER date of contract

Post-Award/Pre-Construction Submittal Bonds MUST be on 2013 forms All info completed Check contract dollar and word amounts Power of attorney complete / correct / date Original signatures Dates correct No modifications

Post-Award/Pre-Construction Submittal Read the RD Contract Document Review letter to find out what to submit One copy of most things to Area Specialist and one copy to State Engineer RD doesn t need all the copies of the contracts RD DOES need all copies of the GC-A

Post-Award/Pre-Construction Submittal RD will issue a letter to the Engineer, copy for Owner and Area Specialist and RD Construction Control Inspector (CCI), concurring on contract(s) and authorizing coordination with Area Specialist to schedule preconstruction meeting Area Specialist schedules Precon (checks all items of Letter of Conditions)

Pre-construction Meeting Led by Project Engineer Area Specialist and RD Inspector must attend Owner, Engineer, Contractor s Rep (with signing authority) must attend Recommend Regulatory Agency & Utility companies also attend Sign in sheet for all attendees to sign

Pre-construction Meeting Engineer prepares and distributes agenda to all attendees and interested parties RD s Guide B to be completed/read/discussed; may be merged with Engineer s agenda Clearly describe expectations for project timelines, payments, change orders, etc.

Pre-construction Meeting Meeting minutes distributed by Engineer after the meeting and must document discussions and verbal agreements Notice to Proceed may not be issued until after pre-construction meeting and Area Specialist has all necessary paperwork

Monthly Progress Meetings Led by Engineer Attended by RD Inspector (CCI), Owner, Engineer, and Contractor Updated progress schedule from Contractor

Payment Estimates If any payment is being requested, the following MUST be submitted as one package: FORM E Budget Sheet Tabulation sheets for each section of Form E All administrative and technical invoices Contractor s partial pay application Engineer s monthly report or meeting minutes (submitted within 5 days after meeting)

Payment Estimates Recommend emailing draft to RD inspector prior to monthly meeting Submit no more frequently than monthly Submit six copies, all with original signatures First page must be on EJCDC C-620 (2013) Backup pages may be on Contractor s or Engineer s form as long as it s in the same format

Payment Estimates Everything on the pay estimate form MUST be filled out Change orders NOT yet approved by RD shall NOT be reflected on the pay estimate Stored materials must have paid invoices (or invoices first month, paid invoices second month) and stored in an approved location

Form E changes Administrative requires Owner Board resolution, subject to review/approval by LAS Technical services requires engineering amendment or other documentation, subject to review/approval by State Engineer Construction requires change order, subject to review/approval by CCI or State Engineer Direct expenditures requires documentation, subject to review/approval by State Engineer

Contract Change Orders Submit six copies, all with original signatures, to State Engineer or RD Construction Control Inspector (CCI) Provide a draft copy of the front sheet to the Area Specialist and State Engineer/CCI at the same time First page must be on EJCDC C-941 (2013) Fully complete Change Order Form

Change Orders Area Specialist Confirms availability of funds State Engineer or CCI Reviews technical aspects Adequate documentation Verifies within scope Approves / Disapproves

Contract Change Orders Include ALL supporting information (labor and equipment hours, quantities, invoices/quotes for material prices, drawings/maps) Include justification (if Regulatory requirement, provide copy of letter) Engineer is responsible to provide copies of pay estimates and change orders to fiscal advisors

Contract Change Orders Recommend sending an electronic copy to RD before the change order is finalized / signed to verify its eligibility, completeness, etc.

Contract Change Orders ALL CHANGE ORDERS MUST BE APPROVED BY RD STATE ENGINEER OR CCI BEFORE CHANGE ORDER WORK MAY START AND BEFORE CHANGE ORDER MAY BE REFLECTED ON THE PAY ESTIMATE. NO EXCEPTIONS.

Contract Change Orders Final over/under change order is to zero out all quantities, including previous change order work. Final quantities must equal actual quantities installed. Final contract amount must equal work to date.

Inspection Services RD approval of the inspector What to do/expect What not to do/expect

Roles of the Inspector Observe & report Know the contract Document Safety

Observe Inspector is there whenever the contractor is working (unless part-time inspection has been approved by the Owner AND RD) Inspector is aware of what is going on Inspector is knowledgeable in type of construction Testing of materials

Report Review report format with RD prior to use Daily logs Who, what, when, where, how many, time Distribute to all interested parties Who How often Signature (digital)

Safety The Contractor is responsible for site safety; check contract requirements Inspector should let appropriate people (Contractor and Owner) know immediately of safety concerns or violations

What RD Will Not Do Will not direct the contractor Will not act as Engineer Will not act as Owner

Common Problems to Avoid Inspector not on site Inspector and/or Owner directs contractor Inspector and/or Owner makes deals with contractor Owner / Engineer does not respond in a timely manner

Substantial Completion Work is completed and can be used by Owner. Reduction of retainage MAY be allowed Any uncompleted work is not paid for until that work is completed Must retain twice the value of the work remaining, if not more

Certificate of Substantial Completion Certificate of Substantial Completion (CSC) MUST be submitted within a reasonable time from date of substantial completion. CSC is effective on date shown, regardless of when signed. Area Specialist needs a copy with original signatures; State Engineer / CCI can receive it electronically

Certificate of Substantial Completion Form EJCDC C-925 for CSC Punch list MUST be attached to CSC Owner, Engineer, and Contractor must sign Time to complete punch list items is to be shown on the CSC

Certificate of Substantial Completion Critical date 1 year warranty period starts Liquidated damages start if work isn t complete by date of substantial completion Date by which CSC must be achieved is given in the Notice to Proceed, extended by change orders if applicable

Substantial Completion Any building should be ready for the Owner to occupy and use Need to have a Certificate of Occupancy (C of O), copy e-mailed to Area Specialist, CCI, and State Engineer Electrical inspection may be needed to obtain the C of O up to local Code Enforcement Officer

Inspections Substantial Completion Critical players Owner Consulting Engineer/Resident Inspector Contractor Funding agencies Regulatory agencies Discuss all conditions of construction and project closeout

Punch List Complete all punch list items before final payment What if the contractor won t do the work - Engineer and Owner deals with - proper notification per attorney and contract - contact bonding company Final inspection needs to be attended by the Owner, the Engineer, the Resident Inspector; RD CCI or State Engineer only if there were major punch list issues.

Components of Closeout 1. Substantial completion 2. Punch list work 3. Final contractor over/under change order 4. Contractor closeout documents 5. Other closeout documents 6. Engineer closeout documents 7. Use of remaining funds 8. 11 month warranty inspection

Contract Closeout Documents Certificate of Substantial Completion Prefinal / final inspections with Owner, Engineer, Contractor, and RD Final over/under change order Contractor Release of Liens (AIA G706 and G706A Contractor Consent of Surety (AIA G707)

Contract Closeout Documents Engineer s certification to Regulatory Agency Regulatory Agency s Approval Letter (no longer issued?) Engineer s certification that construction is compliant with all NYS codes (via contract documents) Warranty information (copy of transmittal these sent to the Owner)

Contract Closeout Documents Owner s Board s resolution accepting project as complete and authorizing final payment Contractor s final payment application Final Form E

Inspections Final Complete all project closeout items before acceptance If contractor not responsive, after giving notice owner should complete work with funds retained and send any remaining moneys to contractor Critical players Owner, Engineer/Resident Inspector, Contractor, Rural Development State Engineer or CCI

Use of Remaining Funds Once all construction contracts are done (or nearly so), Owner/Engineer may submit a request for using remaining funds (if any). Eligible items - necessary for operating, maintaining, and protecting the facilities. Within SCOPE identified in approved PER RD State Engineer must approve request for eligibility. Typically a Direct Expense.

Use of Remaining Funds Direct expenditures not approved by RD State Engineer or State Architect are not to be reflected on the Form E-Project Budget Once approved, Owner/Engineer obtains min. three quotes for each item Quotes and final cost estimate must be submitted & approved by RD

Warranty Inspection 11 months after substantial completion Owner, Engineer, and Contractor should attend RD CCI/State Engineer must attend Good idea to talk to operator Any concerns are to be addressed in writing to the contractor

Liquidated Damages Part of Agreement; Not a penalty To be enforced; change in Contract Times documented in Change Order Carefully consider amounts Interest Engineering/Inspection Administrative costs Other costs

Contractor Default Follow contract terms & notice requirements Check state laws that may apply Allow surety reasonable time to respond Notify state licensing agency and Treasury Department if surety is unresponsive Keep Owner s attorney informed and verify that proper procedures are followed

Construction Administration/Inspection Costs Approved in Engineering Agreement RD approval of amendments for additional time; justification Contractor exceeds Completion dates: additional engineering/inspection costs to be covered by Liquidated Damages

Questions?