THE NARMADA BACHAO ANDOLAN

Similar documents
THERE IS NO CASE FOR INCREASE IN HEIGHT OF THE SARDAR SAROVAR DAM

What is an Environmental Movement? sustainable management changes in public policy ecology, health and human rights

Luharia s Story Narmada Dam Project CBA.

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal.

Incidentally, here it should be noted that in response to RTI application, the dates of original commissioning. SSP: Mounting Costs, Minimal Benefits

A Balance Sheet of Performance of Large dams in India The case of irrigation and flood control

A VISIT REPORT ON SARDAR SAROVAR DAM. CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT

16 Management of Natural Resources

Water Resources. Ms. Sarika Karda

Department of Electrical Engineering. Industrial Visit Report. Sardar Sarovar Narmada Nigam Limited Hydro Electric Power Station

SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER)

D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD

A Report on Industrial Visit at

DRINKING WATER FROM SARDAR SAROVAR PROJECT NARMADA CONTROL AUTHORITY

Uprooting Forests, Planting Trees: Success of Compensatory Afforestation Measures Mitigating the Deforestation for the Sardar Sarovar Dam, India

Climate Change The International Journal

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.

Public Expenditures and Subsidies in Indian Surface Irrigation: Who Benefits?

10 th September 2017 CURRENT AFFAIRS

Economic Analysis of Tribal Farm in Gadchiroli District of Maharashtra, India

INITIATIVES OF THE MINISTRY UNDER MGNREGA FOR ADDRESSING THE DESERTIFICATION, LAND DEGRADATION & DROUGHT(DLDD) CHALLENGE

Overview of Water and Water Conflicts in NE India

Problems in Human Rights and Large Dams

COMPLIANCE REPORT ASSESSING APPLICATION OF ARTICLE 11 b (6) OF EMISSIONS TRADING DIRECTIVE TO HYDROELECTRIC PROJECT ACTIVITIES EXCEEDING 20 MW

Water: Some facts and figures

INDIAN SCHOOL MUSCAT SENIOR SECTION DEPARTMENT OF SOCIAL SCIENCE CLASS: IX TOPIC/CHAPTER: 1: The Story Of Palampur THE GREEN REVOLUTION IN PUNJAB

Dams and the World s Water

Climate Variability, Urbanization and Water in India

REPORT ON INDUSTRIAL VISIT OF SARDAR SAROVAR PROJECT

Regional Pattern of Agricultural Growth and Rural Employment in India: Have Small Farmers Benefitted?

Executive Summary of Bistan Lift IrrigationProject

SMALL HYDRO PROGRAMME IN INDIA

India s Water Minister: Linking of Rivers Is Top Priority

Soil and Water Conservation/ Watershed Management

Water Stewardship & Industries

Tata Trusts. Impacting quality of life of poor communities

T he amount of water pumped by farmers from India s aquifers is greatly exceeding

Water Energy Nexus and Need of Research

Downloaded from

Madhya Pradesh State Water Policy, 2003

Achieving self sufficiency in pulse production in India

Water and Climate Resilience Programme (WACREP) South Asia - India

Ex-ante Evaluation - 1 -

INDIA S TRYST WITH THE BIG DAMS

IMPO P RT R AN A C N E C E O F G RO R UN U D N W

PRE FEASIBILITY REPORT

Borlaug Dialogue 2008

Ch-2 SECTORS OF THE INDIAN ECONOMY

The Nam Theun 2 Resettlement Plan and Viability of Proposed Livelihood Options for Displaced Villagers

International Alert Series. The BIG Issues

Climate change and economic changes in India: The impacts on agriculture

NCERT Class 9th Social Science Economics Chapter 1: The Story of Village Palampur

Water and Energy Resource Potential of Ethiopia Status of Development and Investment Opportunities. Ethiopian Investment Forum 07 June, 2011

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

Foundation for Ecological Security, India Structure of the presentation

THE LAST DROP? A guide for media practitioners to the critical water issues facing India today

Integrated Water Resource Management: Water Security

Amita Shah. Gujarat Institute of Development Research Gota, Ahmedabad

Water and agriculture

& Watershed Management Practices. 4 Sustainable Watershed Management

Large Dams in the Americas: Is the Cure Worse than the Disease?

ROLES AND EFFORTS OF THE IRRIGATION SECTOR IN MYANMAR AGRICULTURE PRACTICE

Note on Participatory Irrigation Management in Maharashtra

5. ENDEMIC POVERTY AND STARK INEQUALITIES

The Innovation: Water harvesting through bore-well recharge:

Fellowship Siddamma. ASHA Austin, TX. Oct 2017

International Innovations Awards CAPAM GUJARAT STATE ELECTRICITY CORPORATION LIMITED. A new direction to green,clean and inclusive

Pre- FEASIBILITY REPORT

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities

Water Stewardship. March 9, Mumbai

I J R T E R [ISSN:

IMPACT STUDY OF THE AGRI-ENTREPRENEURS PROGRAMME INDIA SUMMARY

NORDIC CLIMATE FACILITY (NCF) Promoting Renewable Energy Technologies for Enhanced Rural Livelihoods

Thai-Lao Hydro Projects Should Meet International Standards

Slow Sand Filtration Project

FOREST CONSERVATION ACT 1980: NEED TO STRIKE BALANCE BETWEEN CONSERVATION AND DEVELOPMENT L.P. Singh, IFS (1996) Bihar

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name

PROJECT PROPOSAL ON RURAL WATER

Coping to resilience - Indore and Surat, India. G. K. Bhat

WATER RESOURCES SHORT ANSWER TYPE QUESTIONS [3 MARKS]

WATER FROM THE CLOUDS

PRESENTATION ON RIVER BASIN MANAGEMENT

JICA s Support to India (Forestry Sector)

Human Impact on Water

STAKEHOLDERS, PARTICIPATION AND BENEFIT SHARING: APPROACH TO MIDDLE YEYWA

Exploratory study of Doha Model as a water harvesting structure

Content. Monsoon Report and Sowing Update. Highlights. Southwest Monsoon: A flashback of Southwest Monsoon A slow beginning

1/16/2008. Too little rain Too much rain. Major Diversion Routes. Modified from Dr. J. Rao, 2003

ROLE OF WATER USERS ASSOCIATION IN MANAGEMENT, OPERATION AND MAINTENANCE OF IRRIGATION SYSTEMS IN INDIA

A case study on the successful experience of the. Integrated Farming, Masine Handikhola. Makwanpur District

STATE WATER POLICY. 1. The Need for a State Water Policy

Dr. Sanjay Belsare, Executive Engineer Palkhed Irrigation Division, Water Resources Department, Government of Maharashtra, India

A REPORT ON VISIT AT SARDAR SROVAR DAM. Faculty : Asst. Prof. Bhargav V. Vadalia MECHANICAL ENGINEERING DEPARTMENT OM ENGINEERING COLLEGE, JUNAGADH.

NARMADA BACHAO ANDOLAN vs. UNION OF INDIA

REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICTION WRIT PETITION(C) NO.230 OF M.K.Balakrishnan & Others O R D E R

CARE s Emergency Response to the Flood Disaster in Bolivia

D. B. AGRO INDUSTRIES DODDANAVR TRADE CENTER, NEAR FORT, P. B. ROAD, BELGAUM KARNATAKA

Water in the Green Economy

An Assessment of Available Water for Livestock and Garden Irrigation in Dry Season for Subsistence Farmers in Zimba District

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

Transcription:

DAMS AND DISPLACEMENT THE NARMADA BACHAO ANDOLAN JMPCOC/EVS-II/DS/15-16 1

Narmada means ever delightful one of the holiest rivers in the country of India they say that even the site of the river will cleanse all of your sins JMPCOC/EVS-II/DS/15-16 2

Conceived in the mid 1960s under Nehru Building postponed due to disagreement between three states impacted by project: Madhya Pradesh Gujarat Maharashtra JMPCOC/EVS-II/DS/15-16 3

It is home to over a million people, mainly tribal people, Adivasi (original dwellers) whose grandparents lived on and farmed the land. Local farmers, wage labourers, crafts people and fishermen live along the river and rely on it for their livelihood. JMPCOC/EVS-II/DS/15-16 4

WHY THE NARMADA DAM? Currently in India: 1/5 of pop. (200 million people) are without safe drinking water 2/3 of pop. (600 million people) lack basic sanitation 2/5 of pop. (350 million people) live below the poverty line With rain being sporadic because of rainy seasons and variations between different parts of the country, the idea of storing river water in reservoirs behind dams seemed to be a great solution JMPCOC/EVS-II/DS/15-16 5

The first of the dams to be built is the Sardar Sarovar. It is considered to be one of the most important dams in the project and the biggest water development project in India According to the government, the Sardar Sarovar Dam will do the following: Provide safe drinking water to 30 million people Irrigate 4.8 million hectares of land Produce 550 megawatts of power Provide 1,300 cubic-meters of water per year for municipal and industrial purposes Provide a drainage system to carry away floodwaters It will also take the land of 320,000 people JMPCOC/EVS-II/DS/15-16 6

JMPCOC/EVS-II/DS/15-16 7

Initial Budget(1986-87) Rs 6,400 cr Investors are the World Bank until 1993 (when they withdrew), Govt.of Gujarat (state where the Sardar Sarovar dam is located) and S.Kumars (India s leading textile companies) Expenditure so far Rs 14,000 cr Projected Total cost Rs 24,000 cr Cost of main canal Rs 4,000 cr Villages submerged 14 Families displaced 4,600 Irrigation for 1.91 million hectares Drinking water for 8,200 villages, 135 JMPCOC/EVS-II/DS/15-16 towns 8

It will displace 180,000 people more than projected and affect 700,000 livelihoods. 3,200 dams to be built along 1,200km Narmada river. Gujarat, Madhya Pradesh, Maharashtra and Rajasthan were likely to benefit from this project. Opponents says the DAM will displace 200,000 people and damage ecology. It is estimated that the project would be fully complete by 2025. JMPCOC/EVS-II/DS/15-16 9

Indian Government supports the building of dams. The World Bank supported the Sardar Sarovar Dam Project and loaned India $450 million. They withdrew from the project after an independent review confirmed social and environmental impacts were increasing. Supreme court gave stay order & directed the states to complete rehabilitation process. In 2000, Supreme court gave the final verdict of completion of construction according to its original scale. JMPCOC/EVS-II/DS/15-16 10

Dalits and Adivasi (indigenous people). In accordance to their caste system they are often referred to as untouchables. Many of these people are uneducated and very few can read and write. Narmada Bachao Andolan (NBA),Save the Narmada Movement. The movement started in 1986 when the World Bank lent India $450 million for the Sardar project. It was started by a social worker named Medha Patkar. She is the representative for the NBA movement. Baba Amte ; a social worker whose work with leprosy has earned him much respect in the country among thetribal people and government officials. Arundhati Roy ; Booker Prize-winning author supporter of the Save the Narmada Movement JMPCOC/EVS-II/DS/15-16 11

Non fulfillment of basic environmental conditions Insufficient plans & studies Local inhabitants not being taken into confidence Insufficient compensation JMPCOC/EVS-II/DS/15-16 12

JMPCOC/EVS-II/DS/15-16 13

Has increased at various points during the period b/w 1970s through now Consists of a complex project to build 3000 dams, including 3 major dams, along with a network of canals Is justified on the grounds of eliminating water scarcity in Gujarat and Maharashtra Madhya Pradesh most likely to face costs of submergence In theory, all three states will benefit from clean hydroelectric project JMPCOC/EVS-II/DS/15-16 14

Medha Patekar, NBA activist The NBA or Narmada Bachao Andolan (Save the Narmada Movement) has become the primary organization resisting the Dam Strategies include legal challenges, demonstration, civil disobedience and other non violent tactics Prominent help from wellknown figures such as Arunadhiti Roy JMPCOC/EVS-II/DS/15-16 15

Will displace 3 million peasants and adivasis whose villages and farms will be submerged Will not fix water scarcity in Gujarat only a small portion of drought impacted lands would benefit No just compensation has been offered to people already displaced by project, those who will be displaced as project continues will face similar issues Cultural impact of re settlement is a form of supression of adivasi cultural practices Government disputes these figures JMPCOC/EVS-II/DS/15-16 16

Govt. relies of figures gathered in 1979 that showed 6,147 families would be displaced By 2001 this number had grown to 41,000 families (roughly 205,000 people) Neither set of figures includes people who would be displaced by canals (157,000) or whose livelihoods would be permanently altered by 3000 dams fishermen, peasants, tribals who earn a living from forest produce, etc No attempt to keep numbers current as legal challenges drag on JMPCOC/EVS-II/DS/15-16 17

India has freshwater reserves but two caveats important to remember Only Northern river systems are perennial, rest are rainfed These data include groundwater that is disappearing in agricultural areas 32.5% of renewable freshwater is being used annually, this percentage continues to grow year by year Agricultural sector is the primary user 92% Domestic usage is only 5%, while Industry uses 3% of water sources JMPCOC/EVS-II/DS/15-16 18

By the 1990s the NBA won a series of important victories The World Bank which had funded $450 million for the SS project agreed to investigate the NBA and Govt. claims In 1992 the Morse report commissioned by the WB indicted the Indian Govt. for a poorly conceived resettlement strategy and concluded that the NBA claims about the permanent negative impact of resettlement were valid The World bank pulled out of the project and in 1995 work on the major dam was suspended JMPCOC/EVS-II/DS/15-16 19

The Indian Government found other sources of funding and re started the project The height of the main reservoir was now raised by 80 85 m. NBA challenged the govt. again leading to a court battle in the Supreme Court 2001 judgment was a stunning blow to NBA JMPCOC/EVS-II/DS/15-16 20

The recent decision of the Supreme Court to allow the construction of the Sardar Sarovar dam, even as thousands of families are yet to be rehabilitated and 35000 more face displacement. The Supreme Court and Government of India have turned a blind eye to this grave injustice JMPCOC/EVS-II/DS/15-16 21