T-WALL Retaining Wall System

Similar documents
CONSTRUCTION MANUAL. T-WALL Retaining Wall System FOR RAILROAD PROJECTS. The T-WALL Solution...

CONSTRUCTION MANUAL 2.5 x 5 UNITS

CONSTRUCTION MANUAL 5-0 x 7-6 UNITS

CONSTRUCTION MANUAL for Railroad Projects

Reinforced Earth wall Construction Manual

Strengthened Soil Wall Construction Manual

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

T-WALL.

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

CHAPTER 13 - MECHANICALLY STABILIZED EARTH WALLS AND PATENTED EARTH RETAINING SYSTEMS

Uwall UNIVERSAL CONSTRUCTION MANUAL

REINFORCED EARTH. Construction and Quality Control Procedures Manual. Construction Manual: Rectangular Panels. Rectangular Panels

MagnumStone Specifications Gravity

T-WALL & STONE STRONG

LANDSCAPE RETAINING WALLS

REINFORCED EARTH. Construction and Quality Control Procedures Manual. Construction Manual: Cruciform Panels. Cruciform Panels

SPECIFICATION FOR REINFORCED SOIL WALL

SANDERS PRE-CAST CONCRETE SYSTEMS, INC. MSE WALL SYSTEM SUBMITTAL

GEOGRID CONNECTION DETAIL OLYMPIA RADIUS UNIT

StormPod Arch Installation Guide

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Gravity Wall. A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures

PERMEABLE INTERLOCKING PAVERS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SPECIFICATION FOR MAGNUMSTONE GEOGRID REINFORCED Mechanically Stabilized Earth (MSE) SYSTEM

SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM

INSTALLATION GUIDE A Unique Retaining Wall System That s Engineered to Last!

Construction Procedures

Notes for Erection of Evergreen Maxi Wall Retaining Walls

CONTENT. INTrOduCTION 3. units & CONNECTOrs 4. standard INsTallaTION PrOCEdurEs 5

Anchorplex retaining wall construction guide

SECTION UNCLASSIFIED EXCAVATION AND GRADING

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Building. Anchorplex. Retaining Wall Systems

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

TRICON TM RETAINED SOIL WALL SYSTEM

Design & Detail Installation Manual. LongSpan Bridge and Culvert Construction System

67665_MesaInstallationGuide_2 12/10/07 2:12 PM Page 1 E ID U G TION ALLA T INS

DETENTION, RETENTION AND RECHARGE STRUCTURES

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

DIVISION 4100 SITEWORK

Redi Rock Specification and Installation Manual

CHAPTER 11: WALLS.

Design Manual: Gravity Wall. Section 1

Handling and Installation Instructions

Site Preparation... 2

Five Stone System. Trench Depth Compactible Rock. Foundation. 57 lbs 41 lbs 31 lbs 47 lbs. Patent Pending. Approximate Weight

SEPA Environmental Checklist Mercer Island Center for the Arts. Attachment F Geotechnical Supplemental Memo

StormTech Construction Guide

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

GABIONS AND REVET MATTRESSES

Section ( ) SPECIFICATION FOR SEGMENTAL CONCRETE UNIT RETAINING WALL

ODOT Design & Construction Requirements for MSE Walls

Construction Procedures

Installation Guidelines

Best Practices for Design and Construction of MSE Walls

CONCRETE SEGMENTAL RETAINING WALLS

Section (02830) MODULAR CONCRETE RETAINING WALL

Retaining Wall Systems

G R A V I T Y / G E O G R I D

Premier Railroad Grade Crossing Installtion Guide PREMIER RAILROAD GRADE CROSSING INSTALLTION GUIDE GUIDE GROUNDED IN STRENGTH

SECTION SOILS REPORT

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

T R I C O N P R E C A S T L T D. TRICON RETAINED SOIL WALL SYSTEM CrimpLock Connection System CONSTRUCTION MANUAL

SECTION SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH

STANDARD DESIGN NOTES 1 / 2

Installation Handbook

installation section three: Installation

BIO-AQUIFER STORM SYSTEM

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

American Concrete Pipe Association. Precast Box Culvert Installation Procedures

VERSA-Green TM Plantable Retaining Wall System


STORMCAPTURE. Installation Manual

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

StormTech Construction Guide

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System

SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM

Verti-Block Design Manual Section 1 - Gravity Wall (Standard)

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

StormTech Construction Guide

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL FREESTANDING WALL SYSTEM

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

COUNTRY MANOR TM DIY RETAINING GUIDE

SECTION CHAIN LINK FENCES

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

StormTech Construction Guide

SECTION 503 TEMPORARY PAVEMENT RESTORATION

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

Table of Contents. 1 Introduction. 2 Description. 3 Tools and materials. 4 Footings or slabs. 5 Coursing placement. 6 Reinforcing steel

Earth Retaining Structures and Systems Submittal Checklist. Part One: Materials and Material Properties

Section ( ) MODULAR CONCRETE RETAINING WALL

SECTION LIMESTONE SEGMENTAL RETAINING WALLS

Transcription:

CONSTRUCTION MANUAL T-WALL Retaining Wall System The T-WALL Solution... THE NEEL COMPANY 8328 Traford Lane Springfield, VA 22152 Phone 703-913-7858 Fax 703-913-7859

T-WALL Retaining Wall System CONSTRUCTION MANUAL CONTENTS Part I EARTHWORK...1 THE STRUCTURE DEPENDS ON IT! Part II INTRODUCTION...2 General Overview...2 Equipment and Materials Supplied by The Neel Company and/or the Licensed Producer...2 Equipment, Materials and Tools Supplied by the Contractor...2 Part III HANDLING T-WALL UNITS...3 T-WALL Unit Delivery...3 Unloading the Units...3 Part IV CONSTRUCTION PROCEDURES... Site Preparation... Leveling Pad Construction... Layout on the Leveling Pad...5 Erection of the First Course... Constructing Subsequent Courses and Backfilling...7 Constructing Barriers...8 Constructing Corners...9 Constructing Large Pipe Penetrations...9 NOTE TO THE READER This manual has been prepared as a guide to building T-WALL Retaining Wall structures. Its contents should be thoroughly reviewed by the contractor and the superintendent responsible for construction prior to the delivery of the T-WALL units to the jobsite. The Neel Company and/or its Licensed Producers will provide jobsite technical assistance to help the contractor implement correct construction procedures. Compliance with this manual does not relieve the Contractor of the responsibility to adhere to contract plans and specifications. The T-WALL Retaining Wall System should never be built without drawings stamped by a Professional Engineer. 199 The Neel Company The T-WALL Retaining Wall System is Patented Revised /00

Part I EARTHWORK THE STRUCTURE DEPENDS ON IT! The concrete T-WALL units are only half of the structure; the earth is the other half. This combination makes the wall stand up. The following earthwork items are very important: FOUNDATION The foundation should be inspected and approved by the owner s engineer before the leveling pad is poured. If the foundation is soft, the wall will settle. SELECT BACKFILL GRADATION This is critical to the structure s stability. See the T-WALL shop drawings for project backfill gradation. It is important that gradation tests be performed to ensure that the backfill meets the specifications. The select backfill gradation effects the friction on the stems, drainage and settlement. COMPACTION Proper compaction of the backfill between and behind the stems is required to prevent settlement which will effect paving at the top of the wall. Specifications are printed on the T-WALL shop drawings, failure to meet the specifications of any of the above items will result in wall movement. STEM LENGTH VARIES " " 2'-" STEM LENGTH VARIES " " 5'-0" SINGLE UNIT STEM LENGTH (ft) 8 10 12 1 1 18 20 T-WALL UNIT WEIGHTS SINGLE UNIT WEIGHT(#) 100 1850 2100 2350 200 2900 3150 300 350 DOUBLE UNIT WEIGHT(#) 5'-0 1/2" 3200 3700 200 700 5200 5800 300 800 5'-0" 7300 DOUBLE UNIT 1

Part II INTRODUCTION GENERAL OVERVIEW: WORK TO BE PERFORMED BY THE CONTRACTOR: Site preparation, including excavation Forming and pouring the leveling pad Wall construction including backfilling Installation of fences, guardrails or other necessary items BASIC CONSTRUCTION PROCEDURES: Form and pour leveling pad Set first course of units Place and compact select backfill Place joint material and shear keys Set second course of units CREW SIZE AND PRODUCTION RATES: A typical wall erection crew includes: One operator for lifting equipment One working foreman to check alignment Two men for setting units and placing joint materials Construction rates for T-WALL depend entirely upon the rate at which select backfill can be delivered, placed and compacted. MATERIALS AND SERVICES SUPPLIED BY THE NEEL COMPANY AND/OR THE LICENSED PRODUCER: Sublicense to build the structure On-site technical assistance Engineering and design of the structure Delivery of the following wall materials to the site: Precast concrete T-WALL units Shear keys Horizontal joint material Vertical joint material Shear key wrap material Bolts for corner units EQUIPMENT, MATERIALS AND TOOLS SUPPLIED BY CONTRACTOR: T-WALL unit lifting equipment: backhoe or small crane. Equipment for hauling, dumping and spreading backfill: dump trucks, front-end loaders and dozers. Compaction equipment: small walk-behind vibratory roller. Tools: Lifting device Shims Pinch bar Four foot level Chalk line Level to check grade Duct tape (for shear keys and filter cloth) Power drill (10" x 3/" carbide bit for drilling bolt holes in corner units) 2

Part III HANDLING T-WALL UNITS T-WALL UNIT DELIVERY: Prior to the start of construction, the Contractor and the Licensed Producer should develop a schedule for material deliveries. This timetable will allow the producer to match unit production with the construction schedule. Unloading units from truck UNLOADING THE UNITS: Under normal circumstances, a two hour unloading time is allowed for each delivery. During this period of time, the units may be unloaded and stacked on the ground using the lifting device. If the time allows, the units may be placed directly into the wall structure. Care must be exercised during handling to protect the units and joint materials from damage. Do not stack units more than two high. Dunnage and plastic edge guards are the property of the Licensed Producer and must be collected and returned as soon as possible. Lifting a 10' unit at the balance point The Contractor will be loaned one lifting device for the duration of the project. At the conclusion of wall construction, the lifting device will be returned to the Licensed Producer in good working order. If the device is lost, damaged or stolen the Contractor will be responsible for the cost of the device. The replacement cost is $1,000. Lifting device 3

Part IV CONSTRUCTION PROCEDURES SITE PREPARATION: Excavate the site to the elevation shown on the contract plans for the entire footprint of the T-WALL structure (including the area covered by the select backfill between the stems). Under special conditions, the excavation may be done in increments to minimize the amount of open cut. All unsuitable materials below subgrade must be removed and replaced with select, compacted backfill at the direction of the Engineer. Preparing the site Compact the subgrade to 95% standard proctor and proof roll the foundation in accordance with the project specifications. Excavate for the leveling pad. Any underdrains, drainage piping or drainage blankets should be installed at this time. LEVELING PAD CONSTRUCTION: The leveling pad is usually 12 inches wide and a minimum of inches deep. Leveling pad construction Form the leveling pad similar to forming a sidewalk. The edge forms are the screed rail. They must be checked with a level to assure proper elevation and tolerance. Finish surface tolerance is 1/ inch in any 10 foot length. Check for alignment. The front edge of the pad should be 3" outside the front face line of the wall. The leveling pad is for construction alignment only; the concrete may be low strength, 2,500 psi and there is no rebar in the leveling pad. Stepped leveling pad Pour the leveling pad. The concrete surface finish must be smooth and flat. Check the leveling pad for line, grade and tolerance with a level. If the leveling pad is out of tolerance, make corrections at this time.

LEVELING PAD CONSTRUCTION (Continued): 2'- 1/2" TOP UNIT (HEIGHT VARIES) Front face of units on stepped leveling pad 2'-" STD UNIT 1/2" HORIZ JOINT (TYP) H 8 ;;;;; LEVELING PAD FINISH GRADE (FRONT FACE) ELEV OFFSET 5'-0 3/8" FINISH GRADE (REAR FACE) ;;; SELECT BACKFILL BETWEEN STEMS Typical Vertical T-WALL Section BATTER 1h:v 1h:v 2'- 1/8" 2'-5 5/8" 5" 7 3/8" 8 SHEAR KEY STEM LENGTH 10 CONCRETE LEVELING PAD ELEV. v h ;; ;; ;;; START UPPER PAD - 8" FROM LOWER UNIT PAD CAN RUN PAST LOWER UNIT UNCLASSIFIED BACKFILL BEHIND STEMS OFFSET Battered T-WALL Section - Stepped leveling pad v h Steps in the Leveling Pad - Construct the lower leveling pad. Leave a to 8" gap before constructing the higher pad. This gap will assure that the higher pad does not interfere with the placement of the units on the lower pad. For a vertical wall, the typical step (change in elevation) is 2'- 1/2". Precast Leveling Pad - In areas where the wall steps up and the leveling pad is only a few units wide, precast leveling pads may be used. Compaction and grading under precast leveling pads is extremely important because any settlement or tilting will result in an unacceptable joint pattern or spalling of the concrete units. LAYOUT ON THE LEVELING PAD: To establish wall alignment, snap a chalk line on the surface of the leveling pad about 3" back from the front of the pad. This will be the front face of the wall and will center the unit on the leveling pad. Begin at 2'-" from the start of the wall and mark the leveling pad at 5'-0 3/8" increments. The T-WALL unit is 5' long with a vertical joint opening of 3/8". These marks indicate the center of the unit and where the stems of the units will rest on the subgrade. Grade the subgrade material at these marks level with the pad to the full depth of the stems so that the front face of the units will be plumb. After a unit is set, it is much easier to shim the stem up than to excavate down; therefore it is better to be low than high in this operation. For a battered wall, the pad and the material behind it should be graded on the appropriate slope as shown on the project drawings (usually horizontal to 1 vertical or horizontal to 1 vertical). 5

ERECTION OF THE FIRST COURSE: Always begin erection at a fixed point such as a corner, step, or tie-in to an existing structure. If there is no fixed point, simply start on the lowest leveling pad. Joint material is not required between the leveling pad and the precast units. Set the first units on the leveling pad, using the chalkline and marks as a guide for centering the stems and aligning the front face. First course of units on leveling pad Adjust the elevation of the back of the stem to plumb the front face of the unit. After alignment, check the top of the front face for level and height with relation to the other units in this course. If the top of the unit is irregular, place the level on the line where the top of the front face is chamfered. Shim as necessary. Rechecking alignment, level and plumb to make sure that you have not disturbed one while adjusting the other. Finally, step back and sight down the tops of the units. This visual check will allow you to fine tune the alignment. Second course / joint material Every effort should be made to ensure that the first course of units is properly aligned and level. Construct the wall in horizontal lifts. WALLS HAVE A TENDENCY TO GROW OR SHRINK IN LENGTH DEPENDING ON THE AMOUNT OF CARE TAKEN TO PROPERLY LAYOUT AND ALIGN THE FIRST COURSE! Putting units into position

CONSTRUCTING SUBSEQUENT COURSES AND BACKFILLING: Prior to initial backfilling, the 12" wide filter fabric should be cut into lengths equal to the height of the wall at each vertical joint. Center these strips across the 3/8" vertical joints between the units at the rear face. This procedure prevents the migration of the backfill material through the joint. Throw the excess filter fabric over the top of the units during backfilling and pull it back on the backfill during setting operations. Filter fabric covering vertical joints on back face 1'-0" ;;;;;;;;; ;;;;;;;;; 3/8" VERT JNT Filter fabric placement REAR FACE OF T-WALL 1/2" HORZ JNT MATERIAL FILTER FABRIC Horizontal joint material is placed in the horizontal joints between the units at the front face. This material acts as a cushion to prevent concrete-toconcrete contact and as a gasket to prevent backfill material leakage. Position the horizontal joint material so that it is flush with the rear face of the unit. Shear keys, wrapped with 1/" joint material, should be placed in the space between teeth where the top and bottom stems come together. The number of keys required per unit should be shown on the project drawings. Typically, one key is used per feet of length or fraction thereof. Shear keys should be spaced equally beginning at the rear most opening in the shorter unit. The purpose of the shear keys is to: provide an alignment guide prevent movement of the unit during backfill and compaction provide additional pullout resistance at the top of the wall. It may be necessary to plumb the units using shims on top of the shear keys. Shear keys wrapped in joint material On battered walls it will be necessary to snug the shear keys to prevent the units from sliding downhill during compaction. 7

CONSTRUCTING SUBSEQUENT COURSES AND BACKFILLING (Continued): If you encounter a unit that is out of square it is best to use the stem as a guide to alignment. Keep in mind that this is purely an aesthetic concern, not a structural problem. Dump the select granular backfill material directly on top of the stems. This procedure will fill both sides equally and prevent lateral movement of the unit. Placing the backfill Do not stack the units more than one unit high without backfilling. It is unlikely that the subgrade will support the point load of the stem and the front face of the wall will be out of plumb by the time the backfill is placed. Backfill and compact each course of units completely before starting the next course. The loose lifts of backfill should not exceed 12 inches before compaction. Each lift must be thoroughly compacted before more fill is placed. Failure to adequately compact the backfill can jeopardize the stability of the wall. Compacting the backfill Backfill and compact the fill in front of the wall as soon as possible. This procedure must be accomplished before the wall is 10 feet high. CONSTRUCTING BARRIERS: TOP OF BARRIER PRECAST OR C.I.P. BARRIER GUTTER LINE ROADWAY C.I.P. GRAVITY SLAB 8

CONSTRUCTING CORNERS: SHORT STEM CORNER UNIT BOLTED CONNECTION (2 REQ'D FOR EACH CORNER UNIT) A A LONG STEM STANDARD UNIT Stem arrangement at corner CORNER UNIT STEM OF STANDARD UNIT 3/" x 12 1/2" FIELD- DRILLED HOLE 9 1/2"± 9 1/2"± 3/" x 12" EXPANSION ANCHOR (GALVANIZED STEEL) WITH NUT & WASHER (GALVANIZED STEEL) SECTION A-A Detail of bolt connection at corner CONSTRUCTING LARGE PIPE PENETRATIONS: 9