Current and Future AZPDES General Permits: How will these Impact County Operations?

Similar documents
The Flow of Arizona s Stormwater Program. An AZPDES Update May 5, 2009

The Cumulus Stage of Arizona s Stormwater Program. An AZPDES Update May 11, 2010

Created by Pima Association of Governments and the Stormwater Management Working Group for the Tucson Region.

Reign Consulting Presents

Stormwater CGP. CGP Regulatory Overview. CGP Regulatory Overview

Stormwater Construction General Permit CGP-2013

Stormwater Management Program

Gary H. Baise. Olsson Frank Weeda Terman Bode Matz PC Washington, DC

from Pesticide Applications

DEPARTMENT OF HEALTH, CLEAN WATER BRANCH UPDATES TO HAR AND NPDES PERMITS NOVEMBER 2018

Mike Mitchell U.S. EPA Region 4

Stormwater Management - Basic Overview for Municipal Employees

EPA s NPDES Stormwater Permitting Program

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

Arizona Department of Environmental Quality Industrial Stormwater Program (Multi-Sector General Permit) Spencer J. York, Project Manager

MS4 Statewide Summit

Permitting Applicability and Renewal of the Phase II MS4 and Construction General Stormwater Permits

The Saga of Post Construction Stormwater Requirements in TN

ADOT s Statewide Individual Stormwater Permit

Wakefield Stormwater and Erosion Control Bylaw Final Draft

Greg Schaner U.S. EPA

2015 Environmental & Sustainability Summit

Idaho Stormwater MAXIMUM EXTENT PRACTICABLE ANALYSIS

Texas Pollutant Discharge Elimination System (TPDES) Stormwater Permitting Updates

EPA Region 1: NPDES Permitting Background and Update

Proposed Pesticide General Permit (PGP) Elise Doucette Minnesota Pollution Control Agency

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW

The Impact of National Pollutant Discharge Elimination System Permits on Pesticide Use

Water Is Not a Pollutant

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

Stormwater Practitioner s Meeting EPA Audits

The Solution to Pollution is Dilution

Introduction. SPDES General Permit for Stormwater Discharges from Construction Activity (GP ) October, 2017

Recent Changes in Phase II MS4 Permitting

Stormwater Regulatory Landscape at Construction Sites

Reclaimed Water Rules Revision: A Progress Report

Division of Surface Water Response to Comments

FACT SHEET. Public Comment Period Expiration Date: To be determined Contact: Raymond Bahr

FACT SHEET. Public Comment Period Expiration Date: March 30, 2017 Contact: Raymond Bahr

Sec NPDES Municipal Separate Storm Sewer System (MS4) Program. (Ord HR; )

Stormwater Management Practices and Design Manual. Clemson University

Water Quality Control Permits for Aquatic Herbicides

Kathleen Bertuch, Central New York Regional Planning and Development Board

FACT SHEET AND EXECUTIVE DIRECTOR=S PRELIMINARY DECISION

Massachusetts and New Hampshire MS4 General Permit Appeals

US Environmental Protection Agency

Storm Water Annual Report

Policy Resolution Water Quality in the West A. BACKGROUND

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

June 27, 2012 Holly Galavotti U.S. EPA

17 th Annual LRGV WQ Management & Planning Confernece South Padre Island, TX May 19, 2015

National Pollutant Discharge Elimination System (NPDES) Phase II Permit

AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM AND THE ARKANSAS WATER AND AIR POLLUTION CONTROL ACT

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

Liberty Star Uranium & Metals Corp. Environmental Mission Statement

STORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program

Fact Sheet OPDES Permit OKR04, Small MS4s Page 1

CHAPTER 3 THE NATURAL ENVIRONMENT

Updates on EPA Stormwater Program

City of Novato Integrated Pest Management Policy

California s New Construction General Permit

LANCASTER COUNTY Act 167 Frequently Asked Questions (FAQs)

ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL.

TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders

12-SW General Permit

Appendix O Example Industrial SWPPP Template

STATE OF OHIO. Storm Water Program. Chapter of the ADMINISTRATIVE CODE. Most Recent Revision:

(Total Maximum Daily Load) What Does the Federal Government Require for Storm Water Management Under Phase II?

Sarah Holcomb Environmental Scientist New Mexico Environment Department

Integrated Planning for Meeting Clean Water Act Requirements

Maine Stormwater Conference. Contractor s Regional Perspective on the Construction General Permit

Federal Update and National Stormwater Trends. Brenna Mannion, P.E. Director, Regulatory Affairs & Outreach

Innovative Storm Water Program Implementation

What is an illicit discharge?

208 Plan Amendment Process for New Wastewater Treatment Facilities. Pima Association of Governments

Raindrops Keep Falling on My Head Managing KY s MS4 Program Presentation by: Kentucky Division Of Water Surface Water Permits Branch Abigail Rains

STORM WATER TREATMENT PLAN REVIEW

Maryland Department of the Environment Water and Science Administration

Northern Cheyenne Tribe v. Montana Department of Environmental Quality

Regulatory Background & Determining if Industrial Permit Coverage is Needed

SUDAS Revision Submittal Form

STORMWATER MANAGEMENT PROGRAM. Table of Contents

Illinois EPA MS4/ILR10 permit overview & changes

STORM WATER TREATMENT PLAN REVIEW

ADOT s Stormwater Program

EPA s 1990 Phase I and 1999 Phase II Stormwater Regulations

NPDES PHASE II MS4 GENERAL PERMIT STORM WATER QUALITY MANAGEMENT PLAN PART C: PROGRAM IMPLEMENTATION UPDATE

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

Illinois EPA update to DuPage County Watershed Management Section Bureau of Water

Stormwater Management Program

Stormwater Quality & LID for Ephemeral Watersheds. Marie Light April 9th, Low Impact Development Workshop

Oklahoma Clean Lakes and Watersheds Association Meeting April 12, 2012

Maryland Department of the Environment. 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity

1. Pre-Construction Conference Information: Date of Pre-Construction Conference: Owner/Operator Name:

Nelly Smith Environmental Engineer EPA Region 6. Sarah Holcomb Environmental Scientist New Mexico Environment Department

2015 Chestnut Street, Camp Hill, PA Phone: ,

Federal Update and National Stormwater Trends. Brenna Mannion, P.E. Director, Regulatory Affairs & Outreach

Transcription:

Current and Future AZPDES General Permits: How will these Impact County Operations? AACE Annual Meeting January 28-29, 2010 Rancho de los Caballeros, Wickenburg, Arizona by: Ed Latimer, PhD, PE Manager, Water Resources Department Earth & Environmental Tempe, Arizona

Overview History of AZPDES Regulatory Program in Arizona Status of AZPDES General Permits Municipal Construction Industrial DeMinimus Future AZPDES General Permits Aquatic 2

History of AZPDES Regulatory Program in Arizona

What Federal Law Regulates NPDES? Clean Water Act Section 402: National Pollutant Discharge Elimination System CODE OF FEDEAL REGULATIONS Title 40 Protection of Environment Part 122 - EPA Permit Programs (40 CFR 122) 4

Water Quality Act (1987) Amended the CWA to make NPDES requirements applicable to stormwater discharges. Through Section 402(p), it creates a 2-phase stormwater pollution prevention program Also allowed States to assume authority of the NPDES program, either fully or partially. EPA remains ultimate enforcement authority 5

Phase I of Stormwater Regulations Go into effect with EPA as the lead agency. Discharge permit required for: Large and Medium Municipal Separate Storm Sewer Systems (MS4s) (Individual Permits) Select industrial facilities/activities (EPA Multi-Sector General Permit) Construction sites disturbing 5 or more acres (EPA Region IX Construction General Permit) 6

Phase II of Stormwater Regulations Go into effect in March 2003. Discharge permit required for: Small MS4s (includes several counties in AZ) (ADEQ MS4 General Permit) Previously exempted municipally-owned industrial facilities, while providing a permit exemption to industrial sites with no exposure conditions. (EPA Multi-Sector General Permit) Construction sites disturbing between 1 and 5 acres. (ADEQ Construction General Permit) 7

Arizona s NPDES Primacy 2000 ADEQ completes several legal and administrative requirements, and begins to define the AZPDES program. December 2002 Official Program delegation to the state of Arizona (ADEQ). EPA Region IX retains permit authority for Indian country within the state. 8

9

21 federally recognized tribes Land areas ranging from 1 square mile to 18,000 square miles, making up over 25% of Arizona 10

Status of AZPDES General Permits

Facts of General Permits Entity seeking coverage submits a complete and accurate Notice of Intent (NOI) to the permit authority. Permit seeker must meet all of the terms of the general permit to remain in compliance. Good for a maximum period of five (5) years. Can be administratively continued by the permit authority when they expire. 12

Construction General Permit (CGP) 1 st AZPDES CGP was issued in February 2003, AZPDES Permit No. AZG2003-001. Replaced the previous construction general permit (for large construction sites) that was issued by EPA Region IX in 1998. 2 nd and current AZPDES CGP was issued on February 28, 2008, Permit No. AZG2008-001 Includes new administrative procedures and clarifies a few permit requirements. 13

Other Permits that Could Apply ADOT Projects Individual Permit No. AZS000018-2008, effective September 19, 2008. Covers all stormwater discharges associated with construction, industrial and municipal activities under ADOT s control throughout the state. Contractors must meet AZPDES CGP requirements, plus ADOT permit-specific requirements. 14

Other Permits that Could Apply Indian Lands Federal 2008 Construction General Permit. This permit was issued June 30, 2008, and it is effective only through June 30, 2011. The replacement Federal CGP is expected to have effluent limitation guidelines. 15

Multi-Sector General Permit (MSGP) One large permit divided into numerous industrial sectors (A thru AD), and it uses Standard Industrial Classification (SIC) codes and narrative descriptions to identify the regulated industrial activity. In addition to private industry, it applies to federal, state, and municipally-owned and operated facilities. 16

MSGP 2000 (Federal) When Arizona was delegated NPDES primacy in 2002, ADEQ opted instead to adopt the federal MSGP that had been issued on October 30, 2000. Expired, but has been administratively continued until a new permit is issued. New regulated industrial sites cannot obtain permit coverage, but expected to comply with all permit requirements. 17

MSGP 2008 (Federal) Issued on September 29, 2008 3 years after the MSGP 2000 expired. In Arizona, only applicable in Indian Lands. ADEQ intends to release a AZPDES MSGP in 2010 applicable for regulated industrial activities located outside of Indian Lands. 18

Status of the AZPDES MSGP A proposed draft AZPDES MSGP was released in April 2009 to seek public review and input. Numerous informal stakeholder meetings were held throughout the summer and fall of 2009. ADEQ anticipates the AZPDES MSGP 2010 to be public noticed (for official public comments) sometime in the first quarter of 2010. Based on typical statutory timelines, the AZPDES MSGP 2010 should be issued during second quarter of this year. 19

Municipal Stormwater Permits There are 8 municipalities in Arizona regulated as large MS4s under the Phase I Stormwater Rules of 1990: ADOT Glendale Mesa Phoenix Pima County Scottsdale Tempe Tucson 20

Small MS4 General Permit The AZPDES Small MS4 General Permit was issued on December 2002 and expired in December 2007. Regulatory Criteria Not an Medium or Large MS4 Located whole or in part within an "urbanized areas, as defined by the US Bureau of the Census. Overnight populations of over 1000 people 21

Small MS4 General Permit (cont.) A total of 41 Small MS4s are currently regulated, including cities/towns, universities, military bases, and counties. Regulated counties (5 total) include: Coconino, Maricopa, Pinal, Yavapai and Yuma Permit coverage has been administratively continued until a new permit is issued. 22

National Municipal Stormwater Program Being Re-evaluated In 2006 EPA commissioned the National Resource Council (NRC) to study EPA s stormwater program In October 2008 NRC released Urban Stormwater Management in the United States The report showed that current scope of stormwater regulations is insufficient: Many developed and rapidly developing areas are regulated differently, or even excluded from regulation Regulatory provisions for controlling discharges are weak, leaving a great deal of discretion to discharges Poor accountability and uncertain effectiveness 23

National Municipal Stormwater Program Being Re-evaluated (cont.) Runoff flow and related parameters like impervious cover should be considered for use as proxies for stormwater pollutant loading. Stormwater control measures that harvest, infiltrate, and evapotranspirate stormwater are critical to reducing the volume and pollutant loading of storms. Possible re-evaluation outcomes: National volume based control program Elimination of the Phase I and II terminology and creating a single municipal permitting program 24

EPA Stormwater Rulemaking Jan-Feb 2010 EPA holding Public Input and Listening Sessions for Stormwater Rulemaking Spring-Summer 2010 Distribute questionnaires to states and MS4s (large and small). The draft (for public comment) of a new stormwater rule expected out late 2011. Late 2012 Final Action/Rule Expected Will a new AZPDES Small MS4 General Permit be issued prior to the new rulemaking likely not! 25

AZPDES De Minimus General Permit Addresses non-stormwater discharges that have potential to enter a water of the U.S., including: potable and reclaimed water systems subterranean dewatering well development aquifer testing hydrostatic testing of pipelines charitable car washes building and street washing dechlorinated swimming pool water 26

Status of the AZPDES DMGP The 1 st AZPDES DMGP, No. AZG2004-001, was issued on March 17, 2004, and expired five years later (2009). During fall 2009, ADEQ released a draft of a new DMGP for public review and comments. This input period ended September 30, 2009. The AZPDES DMGP 2009 was not release in 2009, now expected to be issued sometime in March or April 2010 (AZPDES DMGP 2010). 27

Future AZPDES General Permits

Historical Regulation of Pesticides EPA regulates aquatic pesticides under the authority of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA). As a product-licensing statute, FIFRA requires that pesticide products obtain EPA s review and label registration before being manufactured. EPA did not require a NPDES permit for the application of aquatic pesticides as long as these applications would be consistent with the product label. 29

Legal Background Does the Clean Water Act (NPDES Program) apply to FIFRA regulated pesticides? Headwaters, Inc. v. Talent irrigation Dist. (2001) League of Wilderness Defenders v. Forsgren (2002) Altman v. Town of Amerhest (2002) Fairhurst v. Haganer (2005) EPA Final Rule 71 Fed Reg 68483 (Nov 2006) National Cotton Council of America v. EPA (Jan 2009) 30

Application of Aquatic Pesticides Now Regulated under NPDES The 6th Circuit Court of Appeals issued an opinion overturning the EPA rule that exempts from the NPDES permitting program FIFRAcompliant pesticide applications directly to and near/over waters of the U.S. Thus, now NPDES permits will be required for pesticides applied directly to water to control pests and/or applied to control pests that are present in, near or over waters of the US. 31

General Permit Timeline On June 8, 2009, the 6th Circuit Court of Appeals granted EPA a two-year stay of the mandate in National Cotton Council et al v. EPA in response to their motion to stay request of April 9, 2009. By April 2011, it is anticipated that EPA will have issued a final pesticides NPDES general permit. ADEQ anticipates preparing a general permit to provide AZPDES coverage, but little is known about its timeline. 32

Thank You! I appreciate the Opportunity to Present to You Contact Info: Ed Latimer, PhD, PE, CPSWQ 1405 West Auto Drive, Tempe, AZ 85294 480/940-2320 (office) 602/818-2931 (cell) ed.latimer@amec.com