Tank Truck Bottom Loading and Overflow Protection Systems

Similar documents
This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

SAFEWORK PRACTICES TRUCK LOADING CAT A-2, SOP #25

Whereas, on grounds of international standardization and of safety during the loading of ships, standards must be drawn up at International Maritime


Series Sump and Sewage Systems

Lockout / Tagout Policy

HEALTH & SAFETY CHECK LIST

ENVOY STATION FUEL SELF AUDIT CHECKLIST

English version. Electrostatics - Code of practice for the avoidance of hazards due to static electricity

TANKER LOADING SKIDS FOR OIL DISTRIBUTION DEPOTS

MATERIAL SPECIFICATION FOR UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR LED TRAFFIC SIGNALS

Part 12 General Safety Precautions

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems:

Recreational Craft Directive Compliance

Mar11 Rev C

Proposed LNG Pump Requirements for Regulation 110

Transport bulk gases by road

SECTION EARTHING AND EARTH FAULT PROTECTION

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES

Sump Pump System OEM INSTALLATION MANUAL

A complete LNG FUEling system

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

SPECIFICATIONS FOR SANBORN OILY WASTEWATER WASTE MINIMIZATION UNIT MODEL UFV750T

Service Equipment / Tank Components for the new ADR 2005 and OPS

HIGH EFFICIENCY SHOWERS WASTE WATER HEAT RECOVERY UNIT. Saved power 80kW. Showers waste water 9 C Power consumption 3,1kW. Showers waste water 31 C

VALE # MSPEC LAST REVISION. Name: Brian Koltun Position: Process Superintendent Department: Power Department, Ontario Operations

Table of Contents. Section Mass Flow Meters

Test Data Report for: Hot Water Dispensers, Household Storage Type, Electrical. Tested under ASSE Standard 1023 Issued: 1979

SOUTH AFRICAN NATIONAL STANDARD

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

CHAPTER 6 : GAS SAMPLING SYSTEMS

FreezeFree TM Automated Anti-Icing System GENERAL SPECIFICATIONS

SECTION ULTRASONIC TRANSIT TIME CLAMP-ON FLOW MEASURING SYSTEM

Eurobitume UK. Site Inspection for Delivery of Bitumen

1993 Specifications CSJ SPECIAL SPECIFICATION 4880 Bridge Equipment Cabinets

Guideline for In-Service Assessment of Ammonia Refrigeration Plants

ETSI EN V2.2.2 ( ) European Standard (Telecommunications series)

SECTION CHEMICAL FEED SYSTEM

April 14, 2015 Rev Rev

It is acceptable to place all required information in the main element (such as D5010) and delete the sub-elements provided in this template.

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS

DESCRIPTION. S-PAPI-1.3. Contractor shall be present and make adjustments as necessary during the FAA Flight Check. EQUIPMENT AND MATERIALS

LOCKOUT TAGOUT SAFETY PROGRAM

GASSO Skid Mounted Measuring Systems for Loading Terminals TECHNICAL SPECIFICATION

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

CRON HDI-920 Site Planning. Customer Responsibilities

About Us. In business since JC Carter designed the first cryogenic submerged motor pump in of 4 Large Test Facilities in the World

OMT Asphalt Plant Inspection Checklist

FAA APPROVED ROTORCRAFT FLIGHT MANUAL SUPPLEMENT STC SR01164SE

STATIC GROUNDING VERIFICATION SYSTEM

C.A.S.E. Air Carrier Section Policies and Procedures

XN24 for Package Production. Site Preparation Guide XN24

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS

LIFE+ PROJECT - SEKRET LIFE12 ENV/IT/ "Sediment ElectroKinetic REmediation Technology for heavy metal pollution removal"

Davenport Water Pollution Control Pretreatment Office Elements of a Slug/Spill Prevention, Control and Countermeasure Plan

DANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM

PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS

Mar11 Rev B

EI/JIG STANDARD 1530 Guidance for locations which currently operate to JIG 3 Standards

Chapter 13 WATER UTILITY

Installation & Calibration Manual

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

CHRYSLER ENGINEERING STANDARD No: CS Vehicle Engineering Office CHARACTERISTIC STANDARD Change: -

SOUTH AFRICAN NATIONAL STANDARD

SECTION BASIC ELECTRICAL REQUIREMENTS

Installation & Calibration

This document is a preview generated by EVS

ADJUSTABLE AIR HYDRAULIC SLIDING JACKBEAM 7000 lbs.

EC Type-Approval Certificate

LOCKOUT TAGOUT STILL CRAZY AFTER ALL THESE YEARS?

CODE OF GOOD PRACTICE WITH BULK DELIVERIES OF LIQUID CHEMICALS

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Union Power Cooperative

Draft proposals for Test methods for close-coupled solar water heating systems - Reliability and safety

Mar11 Rev B

TECHNICAL SPECIFICATIONS

Certificate of EC type-examination of a measuring instrument Number: UK/0126/0060 Revision 1

Stack Parking Surface Mounted Stackers

Architect s Project Number of 5 Decentralized HVAC Equipment District Master Specs 2013 Edition

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

Cargo Tank Attendance:

CONTROL OF VOLATILE ORGANIC COMPOUND-VOC EMISSIONS (STORAGE AND DISTRIBUTION OF PETROL FROM TERMINALS TO SERVICE STATIONS) [S.L.504.

SECTION VEHICLE LIFTS. B. Section Basic Electrical Materials and Methods: Power and controls wiring.

Titles and Descriptions of Training Materials

The Notice of Drafting was published in the State Register on September 28, 2012.

II. Details of the Complex Machinery and Equipments Internal system designation

GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls.

SECTION PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS

COMPLIANCE TO AS FIXED FIRE PROTECTION INSTALLATIONS PUMPSET SYSTEMS

Conveyor Safe Operating Procedures

MAY-16 REV B2

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

2. Water Pressure Booster Systems. 3. Duplex Pedestal Type Sump Pumps.

Bid Opportunity PLUMBING SYSTEMS Section Installation of Boiler Heating Systems Page 1 of 7 Centennial Pool, 90 Sinclair

UNIFIED FACILITIES GUIDE SPECIFICATIONS

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

Closed Dispense Systems

Facility Interconnection Requirements

Transcription:

Fuels Safety Program Standard PTT 101 Ref. No.: Rev. No.: PTT 101 4 Date: Date: 1977 November 2017 Tank Truck Bottom Loading and Overflow Protection Systems Page 1

Foreword This document presents the Standard prepared for tank vehicle and island components of approved Bottom Loading Systems pursuant to the Liquid Fuels Handling Code. It was originally prepared as a consensus document by the Fuels Safety Branch and the Ontario Petroleum Association Task Force. This edition contains revisions intended to recognize rack control equipment designed for use with both Thermistor and Optic systems. Companies such as Scully, Dixon Bayco (under the name Flo Tech) and OPW (under the name Civacon) are three examples of companies who manufacture these systems. This Standard is under continuing review and suggestions for technical changes shall be recommended by the Liquid Fuels Risk Reduction Group and approved by the Director of the Fuels Safety Program. This 4th edition supersedes the 1981 edition. Page 2

Contents Foreword...2 SECTION 1 - Coupler/Adapter...4 SECTION 2 - Primary Shut-Off Loading Control...4 SECTION 3 - Automatic Overflow Protection...4 SECTION 4 Loading System...5 SECTION 5- Venting...5 SECTION 6 Grounding Circuit...5 SECTION 7 Dimensional Limitations...5 Page 3

SECTION 1 - Coupler/Adapter The coupler/adapter configuration shall satisfy the following requirements: a) The coupler can only be opened manually after connection to the adapter and the adapter valve shall be mechanically opened by the action of the coupler and shall automatically close when disconnected. b) The tank vehicle adapter shall conform to the applicable dimensional, pressure and test requirements of the latest edition of API 1004, for mating with loading couplers, including paragraph 5.12 (g) thereof. c) A dust cover with a liquid tight seal shall be provided. d) The coupler/adapter shall be capable of operation with all Class I, II and III petroleum products at their individual loading temperatures. Note - If the user requires provision of a break feature to fail when a highway tank is accidentally moved while the coupler or unloading hose is connected, it shall be included in the coupler not the adapter. The design shall provide for automatic closing of the coupler and adapter valves prior to breakaway and shall fail safe with a minimum spillage of product. SECTION 2 - Primary Shut-Off Loading Control The primary shut-off loading shall be by means of loading island controls. SECTION 3 - Automatic Overflow Protection An automatic overflow protection system shall satisfy the following requirements: a) The system shall be electrically energized, self-checking, intrinsically safe, and the total system shall fail safe in both truck and island installations. b) Systems shall not be capable of being by-passed under normal operation. However, should there be the necessity for providing a manual override to compensate for system failure, such override shall be activated only by a lock controlled switch requiring supervisory authorization. c) The sensing level of the probe shall be installed 25 mm above the top-most calibration marker in each compartment. d) Where two systems are not compatible, there shall be design provisions to ensure that the connectors of incompatible systems cannot be interconnected. e) Compartment ullage above the probe sensing level shall provide for a maximum system shutdown time of 4 seconds without overflow from the compartment. f) The individual compartment overflow sensing devices shall have a maximum signal to island control system transmission time of ½ a second. g) The system shall provide loading rack shutdown. Overflow in any one compartment shall shut down the total system until the overflow condition is corrected. h) The system shall be capable of handling petroleum products at their loading temperatures and operate properly in the temperature range -40 o C to +82 o C. i) Connections in the system shall be to the manufacturers specification and intrinsically safe. j) Electrical components shall conform to the requirements of the Ontario Electrical Safety Code and shall be certified. Page 4

k) A non-replaceable, sealed fuse shall be included in the mounting assembly of each sensing probe where necessary to protect against accidental extraneous voltages or currents. l) The equipment mounted on islands dispensing Class I and II product up to +70 o C product temperature shall monitor through a single connector any combination of compartments and /or vehicle configuration. Connections from the island controls to the overflow protection system installed in the vehicle shall be by means of connectors complying with the specific Annex for each system. m) The equipment mounted on islands dispensing Class III product (in excess of +70 o C product temperature) may comply with (l), or if individual compartment connectors are installed on the vehicle, the mating connector component of the island system must be so restricted that it can only be mated with that connector appropriate to the compartment to which the loading arm is coupled. Connections from the island controls to the overflow protection system shall be by means of connectors complying with the specific Annex for each system. SECTION 4 Loading System The piping and couplings shall be a minimum of 100mm I.D. with a maximum flow rate of 45 L/s for each loading assembly and a maximum system shutdown time of 4 seconds. SECTION 5- Venting The individual compartment vents shall satisfy the following requirements: a) Vents shall open automatically with emergency valve operation or by other means that will prevent start of loading until the vent is open. b) Vents shall comply with recognized vent standards. c) When the vent is open, it shall be able to pass the full liquid loading rate without allowing the tank to exceed its design working pressure. d) Vent vapour and liquid discharging capacities expressed in loading rate shall be clearly marked on the vent. SECTION 6 Grounding Circuit The grounding circuit shall satisfy the following requirements: a) The grounding circuit shall provide a closed circuit from the truck to ground with a resistance of less than 10,000 ohms for the dissipation of static charges. b) Loading cannot begin or continue unless the grounding circuit is completed. c) The grounding circuit shall not be by-passed. SECTION 7 Dimensional Limitations The installation shall be on the curbside of the vehicle with a maximum dimension of 9.15 m to outside centres of any combination of adapters. The face of the adapter must be on a vertical plane located at a maximum of 150 mm inside of the maximum width of the vehicle. a) Vehicles loading Class I and II products, 1000 mm + 300 mm vertical height. b) Vehicles loading Class III product, 1200 mm + 300 mm vertical height with a minimum of 1500 mm + 300 mm horizontally between adapter centres. Page 5