FLEXIBLE REACTIVE POWER EXCHANGE BETWEEN MEDIUM AND HIGH VOLTAGE NETWORKS: CASE STUDY

Similar documents
Improving the Reactive Power Balance between a German MV and HV Grid through Coordinated Reactive Power Provision by Wind Power Plants

ENERGY STORAGE IN DISTRIBUTION GRIDS - NEEDS FOR CROSS-VOLTAGE-LEVEL PLANNING AND OPTIMIZATION

DISTRIBUTION GRID PLANNING CONSIDERING SMART GRID TECHNOLOGIES

Joint DSO TSO reactive power management for an HV system considering MV systems support

GENERATION CURTAILMENT AS A MEANS TO INCREASE THE WIND POWER HOSTING CAPACITY OF A REAL REGIONAL DISTRIBUTION NETWORK

A JOINT DSO-TSO REACTIVE POWER MANAGEMENT FOR AN HV SYSTEM CONSIDERING MV SYSTEMS SUPPORT

WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY

Outcomes and recommendations GREDOR

Country Report Germany

Reactive Power Coordination Strategies with Distributed Generators in Distribution Networks

Daniel Feltes Phone: Fax:

Sensitivity of Low-Voltage Grid Impact Indicators to Modeling Assumptions and Boundary Conditions in Residential District Energy Modeling

ELECTRIC ARC FURNACE WITH STATIC VAR COMPENSATOR PLANNING AND OPERATIONAL EXPERIENCE

Innovating Photovoltaics: the way ahead Grid integration

IMPACT OF THREE-PHASE PSEUDO-MEASUREMENT GENERATION FROM SMART METER DATA ON DISTRIBUTION GRID STATE ESTIMATION

Determination of Smart Inverter Control Settings to Improve Distribution System Performance

CIRED Workshop - Helsinki June 2016 Paper ABSTRACT PROPOSED APPROACH INTRODUCTION. N. Natale, F. Pilo, G. Pisano, G. G.

Technical considerations for integration of distributed renewables on the grid

The Effect of the Volt/Var Control of Photovoltaic Systems on the Time-Series Steady-State Analysis of a Distribution Network

OPTIMAL RECLOSER DEPLOYMENT TO LEVERAGE SELF-HEALING: A TECHNO-ECONOMIC ROBUSTNESS ASSESSMENT

Gas Natural Fenosa s Experiences on Renewable Energy Integration

CASE STUDY : ASSESSMENT OF POWER QUALITY IN PRACTICE

Practise-oriented consideration of the dynamic fast fault current of power park modules in grid protection analysis

SMART GRID VENDÉE PROJECT: A DECISION-SUPPORT TOOL FOR THE MULTI- YEAR PLANNING OF ACTIVE DISTRIBUTION NETWORKS

PRICE. Distribution Grid State Estimation

Market Framework for Distributed Energy Resourcesbased

UNOFFICIAL TRANSLATION SUPPLY OF REACTIVE POWER AND MAINTENANCE OF REACTIVE POWER RESERVES

Enhanced Features of DFIG Wind Energy Converters regarding new Grid Code Requirements

New distributed energy resources Challenges and new roles for the distribution grid

Challenges with high PV penetrations in distribution grids

Testing of a Predictive Control Strategy for Balancing Renewable Sources in a Microgrid

VOLTS-VAR OPTIMISATION (VVO)

SCENARIOS FOR DG/RES DEVELOPMENT ON CASE STUDY, COUNTRY AND EUROPEAN LEVEL

Integration of Renewable Energy Sources in the Electricity System - Grid Issues -

Optimal Capacity and Placement of Battery Energy Storage Systems for Integrating Renewable Energy Sources in Distribution System

Analysis of Micro Generation Impacts in Distribution Networks

NORDAC 2014 Topic and no NORDAC 2014 http :// 3.1

Do It Locally: Local Voltage Support by Distributed Generation A Management Summary

Optimal Location of Star and Delta connected Capacitor Bank for Loss Minimization in a Five Bus Power System

Control of a Microgrid in Islanded Mode

Annex to the Accreditation Certificate D-ZE according to DIN EN ISO/IEC 17065:2013

Virtual Power Plants: Basic Requirements and Experience in Practice

How to keep the necessary stability and reliability in the energy system of the future?

EDF and Integration of Distributed Energy Resources

Effects of Renewable Distributed Generation on the Operational Characteristics of Meshed Power Distribution Systems

Maximum PV-penetration in low-voltage cable networks

The new role of DSO. David Trebolle Trebolle Manager, Active Networks and Network Analysis Applications Gas Natural Fenosa

Methods and Application Considerations for Hosting Capacity

TSOs, taking into account the following: Whereas

Mitigation of Voltage Fluctuations in Power System Using STATCOM

1 Workshop on Power System Testing

A New Connection Concept to Connect an Offshore Wind Park to an Onshore Grid

Study on the value of flexibility in the management and design basis of distribution networks in France

Germany s electricity networks outlook Today and tommorow

PG&E Demonstration A Dynamic Integration Capacity Revised Plan Overview

Power System Integration of Offshore Wind Farms:

The (future) role of the European DSOs - What can we expect? A German perspective

MEASUREMENTS AND SIMULATION FOR POWER QUALITY OF A WIND FARM

THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Asset Management & Regulation, ESB Networks

Technical and economical analysis of the wind turbines interconnection with the windfarm substation

SMART GRID SCENARIO. Marina Egea,

Microgrid impact on the development of electricity infrastructure

EVOLUTION OF THE QUALITY OF SUPPLY IN THE PORTUGUESE DISTRIBUTION SYSTEM

Copper versus Silicium Aspects of Smart Grid developments based on Experiences from on going demo projects

A NOVEL OF PRIMARY DISTRIBUTION NETWORKS WITH MULTIPLE DISTRIBUTED GENERATOR PLACEMENT FOR LOSS REDUCTION

Distributed Generation and Renewables in Electricity Markets

Economic assessment of distribution network planning: a practical approach

Wind Power Grid Integration - Grid Code Requirements & Compliance Schemes The German Case Lessons and Experiences

Presentation: Optimal Planning of Renewable Energy Sources Integration in Smart Distribution Networks. GCC-Cigre. By Sultan S. Alkaabi, 9 th May 2017

IMPACT OF WIND POWER PLANT OPERATION ON MV DISTRIBUTION GRIDS

Distributed Energy Resource Management System (DERMS)

Distributed Generation Penetration Impact on Distribution Networks Loss

ALL ISLAND GRID STUDY STUDY OVERVIEW. January 2008

Easy Grid Analysis Method for a central observing and controlling system in the low voltage grid for E-Mobility and Renewable Integration

Impact of commercial/industrial SSEG installations on MV networks

OPTIMAL PLACEMENT OF MULTIPLE TYPE DGs IN RADIAL DISTRIBUTION SYSTEM USING SENSITIVITY BASED APPROACH

BASIC CONCEPTS. Yahia Baghzouz Electrical & Computer Engineering Department

Electrical utility distribution network capital planning

Virtual power Plant Concept in Electrical Networks

CENTRE FOR WIND ENERGY TECHNOLOGY CHENNAI INDIAN WIND GRID CODE

Distribution Network Planning for Mumbai

Influence of Micro-Grid in Steady State Performance of Primary Distribution System

ESTABLISHMENT OF THE SECOND LIST OF UNION PROJECTS OF COMMON INTEREST

Integration of Large Offshore Wind Power into Energy Supply

Assessing the impacts of higher PV Penetration in the distribution network on the DSO (Distribution System Operator)

Terms of Reference AG 2017/01

INITIAL ASSESSMENT OF REACTIVE POWER EXCHANGES AT UK GRID SUPPLY POINTS

Steady State Power System Security Analysis with PowerWorld Simulator

Power sharing among multiple solar photovoltaic (PV) systems in a radial distribution feeder

MORE MICROGRIDS Contract No: PL019864

Interconnection of Distributed Generators and Their Influences on Power System

Hierarchical Frequency Control Scheme for Islanded Multi-Microgrids Operation

Electricity Grid Evolution in EU pre-access Countries: the Turkish case. Gaia Moretti

Power Quality Improvement in Distribution System Using Distribution Static Compensator

Distribution Information Exchange Code

Techno-economic Analysis of Reactive Power Provision in Decentralizing Energy Systems. Fabian Hinz.

Ancillary Service for Transmission Systems By Tap Stagger Operation in Distribution Networks

THE PROBABILISTIC STUDY OF VOLTAGE PROBLEMS IN LIGHTLY LOADED MEDIUM VOLTAGE POWER SYSTEM CONNECTED WITH SMALL CHP GENERATORS

Measures to improve the flexibility of RWE s lignite power plants as a reliable partner of the energy transition

EFFECTS OF A HIGH PV PENETRATION ON THE DISTRIBUTION GRID

Transcription:

23rd International Conference on Electricity Distribution Lyon, 15-18 June 215 Paper 964 FLEXIBLE REACTIVE POWER EXCHANGE BETWEEN MEDIUM AND HIGH VOLTAGE NETWORKS: CASE STUDY Sebastian STEPANESCU Richard HUBER Netze BW GmbH s.stepanescu@netze-bw.com ABSTRACT This paper presents the results of a case study in which a concept to modify the power exchange between several MV-networks and the overlay HV-network is analysed. This concept is based on a remote control of the MVconnected generators power factors. The tap position of the HV/MV-transformers is also remotely regulated in order to minimise voltage deviations. An algorithm based on successive optimal reactive power dispatches is used for the assessment of the reactive power flexibility. The simulations are carried out for a period of one year. The aims of the study are to assess the maximum reactive power flexibility per hour, to find the reason for its limitation and to analyse the influence of the achieved flexibility on aspects of network operation like energy losses. INTRODUCTION Besides the reversal of active power flows, the penetration of Distributed Energy Resources (DER) in Distribution Networks (DNs) has also caused a high volatility of the reactive power flows between DN and Transmission Networks (TNs). In order to host the increasing dispersed generation without violating voltage limits, it is a common practise in that DER operate with inductive power factors during periods of high generation. This operation is in accordance with the technical guidelines both for MV- and for LV-connected generators and represents no additional costs for the Distribution System Operator (DSO) [1, 2]. The side effect of this practise is the increasing reactive power demand of DNs. When the penetration of DER is sufficiently high, the reactive power demand during high generation exceeds the reactive power demand during peak load. Measurements in a rural DN exemplifies, see Figure 1, this phenomenon. This figure also shows that one grid can have both a capacitive and an inductive behaviour during periods with the same active power reversal. In this paper, reactive power consumption will be considered positive when there is absorption of inductive reactive power from the DN. Negative reactive power CIRED 215 Hans ABELE Transnet BW GmbH H.Abele@transnetbw.de consumption will simply express inductive reactive power generation, like capacitors. Values of the DN s consumption are always at the HV-side of the HV/MV transformer. If this reactive power consumption of DNs is controlled, the reactive power flows between DNs and TNs can be adapted to cover the reactive power demand of the latter. In other words, DNs could operate like flexible reactive power plants and replace the conventional power plants which are being rapidly disconnected from the TN [3]. Consumption in p.u. Ignacio TALAVERA Peter FRANZ Sebastian WECK Jutta HANSON Technische Universität Darmstadt ignacio.talavera@e5.tu-darmstadt.de.1.5 -.5 -.1 -.3 -.2 -.1.1.2.3.4 Active Power Consumption in p.u. Figure 1: Hourly PQ-measurements over a year in a rural MVnetwork with high penetration of DER. Values referred to the rated power of the HV/MV-transformer and measured at the HV-side. In this paper, the maximum band for the flexible reactive power exchange between a group of MV-networks and the overlay HV-network is calculated for every hour over a year. The main goals are to calculate the maximum and minimum reactive power consumption, to find the reason for the limitations and to evaluate the influence on losses. The calculations are based on successive Optimal Dispatches (ORPD) controlled by an overlay algorithm. In the following section, the overlay algorithm and the assumptions used for the calculations are explained in detail. DESCRIPTION OF THE ALGORITHM AND ASSUMPTIONS FOR THE SIMULATIONS In order to calculate the maximum and minimum reactive power consumption of the MV-networks, the algorithm shown in Figure 2 has been used. The first step of the algorithm is to import the values of 1/5

23 rd International Conference on Electricity Distribution Lyon, 15-18 June 215 Paper 964 demand and generation from given profiles into a power system analysis software. In this case study, the profiles are based on measured values of wind generation, PVgeneration and power demand in the region where the analysed MV-networks are located. The total power of other types of DER like biomass-fired power stations is small compared with the installed power of PV- and wind generators. For the simulations, its generation has been assumed to be constant. Once the values are imported, two processes are executed in parallel: a standard load flow and the calculation of the reactive power band of each active power generator at this point in time. The reactive power band used for this case study is based on the German guideline for the generators connected to the MV-network [1]. According to these guideline, MV-generators have to be able to operate within a range of power factors from,95 inductive to,95 capacitive. This range is independent of the operating point of the generator. In our case study, only the wind and PV-generators connected to the MVnetwork are considered active generators. The Overall Available of the Active Generators (OARPAG) is the sum of the maximum calculated reactive power absorption, or generation, of each active generator. For the standard load flow, the power factors of the MVgenerators are assumed to be 1. On the contrary, the generators connected to the LV-networks, most of them PV-generators, follow cos φ(p)-curves like the curve presented in [4]. These curves are common practise in and are based on the application guideline of the German Association for Electrical, Electronic and Information Technologies [2]. One of the results of the load flow is the reactive power demand of the MVnetwork. This value is used as the reference reactive power for the ORPD. Once the two first steps are executed, the first iteration of the algorithm starts. Its cornerstone is the execution of ORPD whose control variables are the reactive power provision of each active generator. Initially, the tap position of the HV/MV-transformer is set to the position calculated in the standard load flow and, therefore, represents no control variable for the ORPD. The algorithm used to find a solution to the optimisation problem is described in [5]. The objective function for the optimization is always the minimisation of power losses. In addition, the solution has to fulfil all the following constraints: Thermal capacity of each transformer, cable and overhead line. Voltage limits of each MV- and LV-node. Reactive power band of each active generator. The thermal capacity of lines and transformers is considered to be 1% of its rated current. The maximum voltage deviation of all the MV- and the underlay LVnodes is set to be ±1% of its nominal voltage, as set out in the European Standard EN 516 [6]. The upper and lower limit of the reactive power absorption/generation of the active generators has been calculated in the previous step using the limits of the power factors and actual active power generation. Moreover, a constraint for the reactive power exchange with the HV-network is used. For the first ORPD, this reactive power exchange is limited to a narrow band around the value calculated with the standard load flow. This reference value is modified in every iteration by adding a sufficiently small portion of the OARPAG to the reference reactive power. By means of this constraint, the reactive power consumption of the DN can be modified. The maximum reactive power absorption from the MVnetwork is considered to be the value of the reference reactive power of the last iteration where the ORPD has converged. From t=t Init Start Until t=t End 1 2 3 4 Set fixed constraints,9 U n U 1,1 U n I I r Import active power values from profiles for t i Calculate reactive power band per active generator,95 ind < cos φ <,95 cap 5 No 7 Execute Optimal Dispatch Converged? Q ref Yes Execute load flow Q ref Figure 2: Simplified flow chart of the developed algorithm. If the last convergent ORPD does not make full use of OARPAG, it means that either the voltage or the thermal limits of the MV-network are violated to reach the targeted reactive power consumption. In this case, it is checked if there is the possibility to solve the thermal or voltage problems by changing the tap position of the HV/MV-transformer. If so, the tap position is modified and the iteration process is restarted with the last reference value. This outer loop is repeated until at least one of the following two requisites is fulfilled: The OARPAG is completely used. No modification of the tap position can increase the reactive power consumption. 3 End 2 Set variable constraint Q ref - δ < Q < Q ref + δ 6 Modify reactive power reference Q ref = Q ref ef CIRED 215 2/5

23 rd International Conference on Electricity Distribution Lyon, 15-18 June 215 Paper 964 All this process has to be executed twice per point in time: the first one by increasing the reference value of the reactive power in order to calculate the maximum reactive power consumption and the second one by decreasing the reference value in order to calculate the minimum reactive power consumption. This minimum reactive power consumption has to be understood as the maximisation of the capacitive behaviour of the DN. Furthermore, the results of the algorithm are only valid at a specific point in time t i. Therefore, the algorithm has to be executed several times in order to get sufficient points within a defined period of time t Init -t End. In this case study, the algorithm has been executed for a whole year every hour. In addition, it is recommendable to use this algorithm for each grid independently. The reason is that the simulation time increases rapidly with the network size, whereas the convergence of the ORPD worsens [5, 7]. Despite this precaution, the high number of necessary ORPD makes this algorithm very timeconsuming from a computational point of view. For this case study, it has been assumed that the DSO has 1% observability of both the MV-network and the underlay LV-networks. Moreover, another assumption is the remote controllability of all the active generators, in our case the MV-connected wind and PV-generators. This algorithm can also be used for lower degrees of observability and controllability. In case of lower degrees of observability, only the voltage and thermal limits of the monitored equipment would be considered for the ORPD by means of fixed constraints. Similarly, the portfolio of active generators can be adapted in order to consider the reactive power of only those generators that can be remotely controlled by the DSO. Furthermore, the reactive power band per generator can be individually calculated to determine, with a better accuracy, the actual reactive power capability in case the legal framework do not oblige each MV-connected generator to operate within the same predefined range of power factors. Consequently, this algorithm has a high degree of flexibility and can be adapted to the specific legal framework and the different degrees of observability and controllability of each DN. CHARACTERISTICS AND MODEL OF THE NETWORK The results presented in this paper are based on simulations of eight MV-networks located in southern. These networks are connected to the same overlay, meshed 11-kV-network. The electric distances among the MV-networks are small. For this case study, the effects of the enhanced Flexibility (RPF) on the 11-kV-network are neglected and all the MV-networks are considered to be connected to the same HV-substation. The results of the simulations are the sum of the results of the eight simulated MV-networks. Further works will focus on the effect of the flexible reactive power flows in the overlay network. The analysed MV-networks have a typical rural character with long feeders, low energy densities and the existence of overhead lines. The nominal voltage of all the analysed MV-networks is 2 kv. For the simulations, a detailed electrical model of the MV-networks has been used. The standard voltage regulation for both the MV- and the underlay LV-networks is carried out by the on-load tap changer of the HV/MV-transformers. The reference voltage for this regulation is 1,3 p.u. and the dead band around the reference voltage is ±,2 p.u. Each MVnetwork consists of several MV-feeders and has a radial character. Optimisation of the switching status during the simulations is set out the scope of this paper. LV-networks connected to the MV-networks are modelled in order to simulate the real voltage deviations along the MV/LV-transformer and LV-feeders. The modelling of the LV-networks has been made in a simplified manner by using common types of equipment and typical lengths of LV-feeders [8]. During the last years, a high amount of DER has been connected to the networks. The approximate power capacity installed in the eight networks is shown in Table 1. Wind generation accounts for around two thirds of the total installed power and it is exclusively connected to the MV-level. Around one quarter of the installed capacity is based on PV-generators. Almost 7% of the overall PV power capacity is connected to the LV-networks. This reduces the maximum controllable reactive power from active PV-generators. Table 1: Installed power capacity of DER in the analysed networks. Installed Power Capacity (MW) LV-network MV-network Total Wind 232 232 PV 64 3 94 Other types 24 1 25 Total 88 263 351 The DN s active power consumption during peak load and no generation is around 13 MW and is well below the installed capacity of the wind power generators. That causes a reversal of the active power flow during windy situations that is especially high when the demand is simultaneously low. RESULTS AND ANALYSIS Figure 3 presents the consumption of active and reactive power of the eight MV-networks over the analysed year simulated through a standard load flow. The group of networks reaches its most capacitive behaviour at points in time where both the generation and demand are low. CIRED 215 3/5

23 rd International Conference on Electricity Distribution Lyon, 15-18 June 215 Paper 964 This is mainly due to the strong capacitive behaviour of weak-loaded MV-cables. If either the generation or the demand increases, the networks begin to behave more inductive. There are three reasons for this behaviour: Higher loading of equipment and the corresponding rise of its inductive losses. power factor of the loads. Reactive power absorption of LV-connected generators to limit voltage rises. The maximum reactive power consumption occurs when both demand and PV-generation, mainly located in the LV-networks, are simultaneously very high. The reason is the combination of the reactive power absorption of the underexcited LV-connected generators and of the loads. Consumption in MVar 3 15-15 -3-25 -15-5 5 15 Active Power Consumption in MW Figure 3: PQ-Diagram without reactive power control. Results of hourly standard load flows over an analysed year. Figure 4 shows the RPF band over a sunny and not very windy day. In case thermal and voltage limits of the networks are not violated and the variation of reactive losses is negligible, the bandwidth is proportional to the active power generation. This generation is very volatile and therefore the RPF band has the same nature. Since the German guidelines for MV-connected generators do not consider reactive power provision during times without active power generation [1], the RPF band accounts for zero in those situations. The simulation over the analysed year shows that these situations are common: more than 3% of the time the RPF is less than 1 MVAr. Active Power in MW Consumption in MVar 2 1-1 5 PV Network Wind Load -5 2: 7: 12: 17: 22: Time Figure 4: Active power demand and generation versus RPF band during a sunny day. During situations of high active power generation, the RPF band can reach values up to 16 MVAr. In Figure 5, the RPF bandwidth versus the number of hours in year is plotted. This figure shows that the period of time where the bandwidth accounts for values higher than 5 MVAr is relatively small but increases rapidly for lower bandwidths. Flexibility Bandwidth in MVar 2 15 1 5 2 4 6 8 Time over a year in h Figure 5: Bandwidth of RPF versus time. Figure 6 presents the percentage of time in which each of the three types of restrictions hinders higher RPF. Voltage and thermal limits are only considered to act as restriction when less than 95% of the OARPAG is used. The results show that the restrictions of the RPF due to voltage and/or thermal problems do not occur often. In the rest of the time, over 99%, the RPF is restricted by the German guideline for MV-connected generators [1]. The low influence of the voltage limit on the RPF can be explained by the combination of Wide Area Voltage Control of the HV/MV-transformer and ORPD. The voltage regulation by both methods is extremely effective when the voltage homogeneity of the networks is sufficiently high [4]. Percentage of time 1% 99% 98% 2% 1% % Maximum Reactive Power Consumption Minimum Reactive Power Consumption Figure 6: Reasons for the restriction of RPF in percentage of time over an analysed year. The high potential for RPF during times of high active power generation suggests that DNs could be able to follow reactive power targets when the active power CIRED 215 4/5

23rd International Conference on Electricity Distribution Lyon, 15-18 June 215 reverses. This would have notable effects on the planning and operation of the TN. Another strategy enabled by the enhanced RPF is the minimisation of reactive power exchange between the group of MV-networks and the overlay HV-network. The results are presented in Figure 7. Following this strategy, the maximum reactive power consumption falls from 29 MVAr to 12 MVAr. Moreover, the overall reactive energy exchange over the analysed year drops from 98 GVArh to 57 GVArh. Despite the fact that the maximal negative reactive power consumption cannot be reduced due to the lack of active power generation at this point in time, the number of hours when the reactive power consumption is under the limit of -2 MVAr is notably reduced. From a qualitative point of view, another positive effect of this strategy is the reduction of power losses since power losses normally reach a minimum close to the operating point where the reactive power exchange is reduced to zero [9]. Nevertheless, the simulations show that the reduction of energy losses in the simulated year is around 1% and, therefore, quantitatively insignificant. The reasons for the low improvement are the following: No control of reactive power flows in either MV/LV-transformers or the LV-feeders. Long periods of time without controllable reactive power due to absence of active generation. Considerable number of MV-feeders without any MV-connected generator which makes any type of reactive power optimisation impossible. management of the overall power system. Consumption in MVar Paper 964 This work has been carried out within the ongoing esea ch p og am Netwo k2 promoted by Netze BW GmbH. 3 Load Flow Minimized Reactive Energy Exchange 2 CONCLUSION The algorithm based on ORPD is an effective method to calculate the RPF band that can be provided by a portfolio of generators connected to distribution networks. The disadvantage of this method is the great number of necessary ORPD which makes this algorithm very slow. The results of the simulations of eight, real MV-networks show that, despite its high maximum value, the RPF bandwidth has a volatile nature due to its correlation with the dispersed generation. The problem could be notably reduced if the generators were able to increase the power factor range at partial load and to provide reactive power at no load. However, these two requirements are not reflected in the current German guideline [1]. Therefore, this guideline is the exclusive restriction to the RPF in more than 99% of the time in the year. Despite the abovementioned weak point, the potential of this concept to reduce both the reactive energy exchange over a year and the maximum reactive power consumption is notable. Moreover, distribution networks can follow reactive power reference values during times of high generation. This can have a high influence on the TN planning and operation. Moreover, the effect of RPF on energy losses over a year has been proven to be negligible. Acknowledgements 1 REFERENCES [1] -1 [2] -2-3 -25-2 -15-1 -5 5 1 Active Power Consumption in MW Figure 7: PQ-Diagram minimising reactive power exchange. 15 This low influence on power losses becomes an advantage when the goal of the RPF is to provide high amounts of reactive power to the overlay networks. The difference in power losses between the scenario of minimum reactive power consumption and standard load flow is roughly 1,5%. The difference between the scenario of maximum reactive power consumption and standard load flow is even smaller. The simulations of these eight MV-networks confirm the idea that the power losses will not surge in the MV voltage level if these networks actively participate in the reactive power CIRED 215 [3] [4] [5] [6] [7] [8] [9] BDEW Technical guidelines: Generating Plants Connected to the Medium-Voltage Network, Bundesverband der Energie- und Wasserwirtschaft, 28. VDE-AR-N 415:211-8 Power generation systems connected to the low-voltage distribution network - Technical minimum requirements for the connection to and parallel operation with low-voltage distribution networks, Verband der Elektrotechnik, Elektronik und Informationstechnik, 211. Bundesnetzagentur.de, Bundesnetzagentur - List of closure notifications. [online] Available at: http://www.bundesnetzagentur.de/cln_1431/en/areas/energy/companies/s pecialtopics/list_of_closure_notifications/list_of_closure_notifications_n ode.html [Accessed 12 Jan. 215]. I. Talavera, P. Franz, T. Theisen, J. Hanson, Voltage Regulation through Wide A ea Voltage Cont ol of HV/MV T ansfo me s and Inve te s Reactive Powe Suppo t, Proceedings of ICREPQ, 214. H.W. Dommel, W.F. Tinney, Optimal Powe Flow Solutions, IEEE Transactions on Power Apparatus and Systems, 1968. Eu opean Standa d EN 516: Voltage cha acte istics of elect icity supplied by public dist ibution netwo ks, 211. W.F. Tinney, C.E. Ha t, Powe Flow Solutions by Newton s Method, IEEE Transactions on Power Apparatus and Systems, 1967. Ke be, G, Aufnahmefa higkeit von Niede spannungsve teil-netzen fu die Einspeisung aus Photovoltaikkleinanlagen, 211. P. Schäfer, S. Krahl, H. Vennegeerts, A. Moser, Analysis of Reactive Power Control Strategies on Power Distribution and Transmission Netwo ks, Internationaler ETG-Kongress, 213. 5/5