Quality Assurance Project Plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

Similar documents
Quality Assurance Plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

Environmental Compliance Plan for the Y-12 Central Mercury Treatment System Project

Multimedia Superabrasive, Laser Cladding, and Waterjet. Technology Performance Support System. Federal Manufacturing & Technologies

RATE OF NO X EVOLUTION FROM SODIUM NITRITE/BORIC ACID SOLUTIONS (U)

AlliedSignal - AEROSPACE. GAS- 9 m3//9--/ Opportunity Assessments: A Tool for Waste Minimization and Pollution Prevention

OSTI NR % S. Calcuttawala DOE/MC/ /C0649. DOE/Allison Ceramic Vane Effort. Author: R. Wenglarz S. Ali W. Browning. P.

Epoxidation of Plant Oils. Federal Manufacturing & Technologies. J. W. Lula KCP Published June 2000

Alkaline Detergent Recycling Via Ultrafiltration

Imaging System for the Automated Determination of Microscopical Properties in Hardened Portland Concrete. Federal Manufacturing & Technologies

Preparing for a Successful EVMS Certification

4lliedSig nal - AEROSPACE. An Integrated, Subsurface Characterization System for Real-Time, In-Situ Field Analysis

CuInSe, and. CdTe Solar Ce1. Numerical Mod. Annual Subcont. Purdue University West Lafayette, Indiana. J. L. Gray, R. J. Schwartz, Y. J.

' L t 0-M QUALITY ASSURANCE PLAN FOR THE OBJECTIVE SUPPLY CAPABUITY ADAPTIVE REDESIGN (OSCAR) PROJECT. K. A. Stewart K. A. Rasch. R. W.

A-01 Metals in Stormwater Runoff Evaluation

Volumetric Radioactivity Viewed as Surface Radioactivity for Free Release Assessment Purposes

Three-Dimensional Silicon Photonic Lattice

Energy and Environmental Research Emphasizing Low-Rank Coal -- Task 1.7 Hot-Water Extraction of Nonpolar Organic Pollutants from Soils

Black Carbon Mitigation Projects:

SUPPORT SERVICES FOR CERAMIC FIBER-CERAMIC MATRIX COMPOSITES

ASTER. US.Department of Energy under contract DE-AC05-960R22464 GELCASTING OF SILICON CARBIDE CERAMICS APPROVED FOR PUBLIC RELEASE

L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

U.S. Department of Energy, Guidelines for Evaluating DOE Non-Reactor Nuclear Facility Training Programs, November 1985.

Conveyorized Photoresist Stripping Replacement for Flex Circuit Fabrication

Subtask Subcritical Water Extraction of Mercury From Soils and Sediments. Final Report November 12,1998. By: Steven B.

Y-I 2 MASTER DEC OAK RIDGE %I 2 PLANT YIAMT-269 WECEIV&===J. CRADA Final for CRADA Number Y

Integrated Disposal Facility Sagebrush Habitat Mitigation Project: FY2007 Compensation Area Monitoring Report

Environmentally Conscious Closed-Loop Aqueous and Semi-Aqueous Cleaning Systems for Defluxing and Degreasing

Chloride Content of Dissolver Solution from Rocky Flats Scrub Alloy Ninth and Tenth Campaigns Following Head End Treatment

I I. Best Management Practices Plan for the Chestnut Ridge-Filled Coal Ash Pond at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

This document was prepared in conjunction with work accomplished under Contract No. DE-AC09-96SR18500 with the U. S. Department of Energy.

Low Carbon Grid Study: Analysis of a 50% Emission Reduction in California

August 21, Electron Beam Welding of a Depleted Uranium Alloy to Niobium Using a Calibrated Electron Beam Power Density Distribution

Local Area Network Material Accounting System (LANMAS) Functions and Features Overview

Vitrification of Three Low-Activity Radioactive Waste Streams from Hanford

Page 1 / 11. Version 0 June 2014

IGR NOx/SOx Control Technology

Strain Limit Criteria to Predict Failure C0A^-^7l i $- ~. t%

BECHTEL JACOBS PAYROLL CREATION

HEALY CLEAN COAL PROJECT. QUARTERLY TECHNICAL PROGRESS REPORT No. 21 FOR THE PERIOD JANUARY 1, 1996 THROUGH MARCH 31, 1996

Preliminary Disposal Analysis for Selected Accelerator Production of Tritium Waste Streams

7 INTRODUCTION. Typically, reactive metals such as aluminum are welded using a thoriated tungsten welding

Sodium Carbonate Salt Transport System

HFIR COLD NEUTRON SOURCE MODERATOR VESSEL DESIGN ANALYSIS. S. J. Chang. Research Reactors Division Oak Ridge National Laboratory Oak Ridge, Tennessee

TER LIF'E CYCLE COST ESTIMATION AND SYSTEMS ANALYSIS OF WASTE MANAGEMENT FACILITIES

REGIONAL EVALUATION OF THE COMPLETE CCUS VALUE CHAIN

DOE/METC/C-96/7200. CRADA Opportunities in Pressurized Combustion Research. Authors: Daniel J. Maloney Thomas S. Norton Kent H.

Gunite and Associated Tanks Dry Well Conductivity Monitoring Report, Oak Ridge National Laboratory, Oak Ridge, Tennessee. February 1998-December 1998

Analysis of Volatile Organic Compounds in Groundwater Samples by Gas Chromatography-Mass Spectrometry

25 D.L. Martin Drive Mercersburg, PA (717)

INS QA Programme Requirements

F a i r f i e l d, Ohio and Dennis J. C a r r. Fernald Environmental R e s t o r a t i o n Management Corporation with

Oak Ridge Nationai Laboratory Oak Ridge, Tennessee MARTIN MARIETTA ENERGY SYSTEMS, INC. U. S. DEPARTMENT OF ENERGY under contract.

&i&lsc&s1 INTERNATIONAL ENERGY EFFICIENCY AND RENEWABLE ENERGY REX)URCES ON THE INTERNET ABSTRACT

LNG Safety Research: FEM3A Model Development. Quarterly Report to Prepared by:

Peak Reliability Synchrophasor Program (PRSP) NASPI Data Quality Workshop

This document was prepared in conjunction with work accomplished under Contract No. DE-AC09-96SR18500 with the U. S. Department of Energy.

R&CElVED DEC 1 0 m OSTI

MSTER GROUND WATER ELEVATION MONITORING AT THE URANIUM MILL TAILINGS REMEDIAL ACTION SALT LAKE CITY, UTAH, VITRO PROCESSING SITE

Managing the Distributed Solar Fleet: From Interconnection to Fleet Operations

DESIGN FACTOR GUIDELINES FOR HIGH PRESSURE COMPOSITE HYDROGEN TANKS STP/PT-005

Task 6.3/ Silicon Carbide Joining

Quarterly Technical Report. Lori Wrotenbery, Deputy Director Oil and Gas Division

Ic Application of the ARRMIS Risk and Reliability Software to the Nuclear Accident Progression

Upgrades for Truck Transportation of SNM in t cs/uf-c/

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

JUNE 14-16, 2016 SHERATON TYSONS CORNER TYSONS, VA. #CCUS

Indexing Contamination Surveys

Review of Proposed Subcontract for Outsourcing Information Technology

Energy Efficient Affordable Housing Final Report DE-FG44-93R410610

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

Development of A Comprehensive Software Suite for Stability Monitoring and Analysis Based on Synchrophasor Measurement (DOE-OE )

Investigating the Atomic Scale Superconducting Properties of Grain Boundaries in High-& Superconductors

Energy Division and Environmental Sciences Division

Dale R. Wahlquist. Submitted to the. American Glovebox Society 10th Annual Conference July 22-25, 1996 San Diego, California

STP-NU-057 ASME CODE DEVELOPMENT ROADMAP FOR HDPE PIPE IN NUCLEAR SERVICE

FAX: Title of Presentation: Criticality Measurements for SNM Accountability

Furnace Injection of Alkaline Sorbents for Sulfuric Acid Control. Semi-Annual Technical Progress Report. October 1, 2002 March 31, 2003

Task Enhanced Mobility of Dense Nonaqueous-Phase Liquids (DNAPLs) Using Dissolved Humic Acids

QUALITY ASSURANCE / QUALITY CONTROL POLICY

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

UCRL-ID Lawrence Livermore National Laboratory Capabilities in Multiphase Dynamics ~~~~~~ Rose C. McCallen Sang-Wook Kang OSTO

Anthracite R&D Needs CRADA , Final Report. September James T. Bartis Arthur K. Inberman Eos Technologies, Inc.

ofwij/tl C/ORNL

Spray DryedBaghouse System Testing CRADA , Final Report. April 28,1992. Henry W. Pennline. U.S.Department of Energy

MS 3805 RELEASE ABSTRACT - PG

New Sesame Equation of State for Tantalum

October 3 1, Heechan Cho R.P. Killmeyer

Amy Cross-Smiecinski: Harry Reid Center for Environmental Studies

- Golden, Colorado [303] FAX: [303]

Status and Update of the National Ignition Facility Radiation Effects Testing Program

ORNL/TM-2014/133 Weatherization Assistance Program Technical Memorandum Background Data and Statistics On Low-Income Energy Use and Burdens

GENERAL REQUIREMENTS FOR ENGINEERING AND DESIGN

GUNNISON, COLORADO. February 1996 DOUAU DISCLAIMER _- - ~-

INDUSTRIAL PRODUCTION.

cd C0flF q - -3

ISO 9001:2008 Quality Management System QMS Manual

Argonne National Laboratory, Argonne, IL

SHELTON INDUSTRIAL PATTERN INC.

VERIFICATION OF ALLOWABLE STRESSES IN ASME SECTION III SUBSECTION NH FOR ALLOY 800H

STP-PT-026 GUARANTEED HIGHER STRENGTH PROPERTIES

Transcription:

f LOCKHEED Y/ER-270 Quality Assurance Project Plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee! This document has been approved by the for release to the ER ENERGGYSYSTEMS

This report has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Ofice of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; prices available from 423-576-8401 (fax 423-576-2865). Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22161.

DXSUAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

YER-270 Energy Systems Environmental Restoration Program Quality Assurance Project Plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee Date Issued-July 1996 ~~~~~~~~~~~~~~ Prepared for the U.S. Department of Energy Office of Environmental Management under budget and reporting code EW 20 Environmental Management Activities at the OAK RIDGE Y-12 PLANT Oak Ridge, Tennessee 3783 1-8169 managed by LOCKHEED MARTIN ENERGY SYSTEMS, INC. for the U.S.DEPARTMENT OF ENERGY under contract DE-AC05-840R2 1400 DISCLAIMER t This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specifc commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recornmendation, or favoring by the United States Government or any agency thereof. The Views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

QUALITY ASSURANCE PROJECT PLAN FOR THE CHESTNUT RIDGE FLY ASH POND STABILIZATION PROJECT JULY 1996 APPROVAL SHEET 4 Concurrence: 8 R. Meccia, Design Manager, Foster Wheeler Environmental Corporation Concurrence: ak Ridge Company

PREFACE This Quality Assurance Project Plan for Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, YER-270, was prepared in accordance with requirements under the Comprehensive Environmental Response, Compensation and Liability Act for reporting project quality assurance requirements. This work was performed under Work Breakdown Structure 1.4.12.1.1.01.42.01 (Activity Data Sheet 2301). This document provides the Environmental Restoration Program with quality assurance requirements for the project. ii

CONTENTS PREFACE... ABBREVIATIONS... 1. INTRODUCTION 2. PROGRAM...... 3. PERSONNEL TRAINING AND QUALIFICATION.. 11 iv 1 1... 2... 3... 3... 4 7. DESIGN... 4 8. PROCUREMENT... 4 9. INSPECTION AND ACCEPTANCE TESTING... 4 10. MANAGEMENT ASSESSMENT... 5 11. INDEPENDENT ASSESSMENT... 5... A-1 4. QUALITY IMPROVEMENT 5. DOCUMENTS AND RECORDS 6. WORK PROCESSES Appendix: MATRIX OF IMPLEMENTING PROCEDURES... 111

ABBREVIATIONS CRFAPS DOE Energy Systems FWENC MK-F QA QAPP Chestnut Ridge Fly Ash Pond Stabilization U.S. Department of Energy Lockheed Martin Energy Systems, Inc. Foster Wheeler Environmental Corporation MK-Ferguson of Oak Ridge Company quality assurance quality assurance project plan iv

1. INTRODUCTION The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-f3-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are listed below. Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title ID field support, environmental oversight, and quality assurance (QA) oversight of the project. Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title III support. MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the U.S. Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participants QA programs that are necessary for this project. This QAPP has been prepared by Energy Systems and is approved for use by the project manager after concurrence by the construction manager and the design manager. The elements of this QAPP, based upon the criteria of DOE Order 570O.6Cyare described below. Inasmuch as the existing, approved programs of the participants adequately address the requirements of DOE Order 5700.6C, the description of the elements in the QAPP is designed to identify the responsibilitiesof the participants relative to the implementation of the requirements. Implementing procedures for each of the elements, which are applicable to this project, are identified in Appendix A. 2. PROGRAM This program will be managed and staffed by an integrated team comprised of Energy Systems, FWENC, and MK-F personnel. Although individual organizations have been assigned specific responsibilities,the activities performed under the auspices of these organizations may be performed by employees of any of the organizations. The technical, administrative, and QA policies and procedures governing the activities within the responsible organization will be applicable to all personnel performing such activities. 1

2 The project activities, which are fully defined in the CRFAPS project plan, are summarked as follows. 0 Project Management-Energy Systems will perform overall project management and provide project integration services. The project manager will have overall responsibility for ensuring that this project accomplishes its mission and objectives. The project manager reports to the Environmental Restoration Program remedial manager and to the Executive Oversight Group, consisting of the FWENC Environmental Restoration Waste Management program director, the president and general manager of MK-F, and the Energy Systems vice president for Environmental Restoration Waste Management programs. Project Integration- ost, schedule, and progress reporting; project documentation; and maintenance of the construction cost estimates will be the responsibility of the business manager. Technical Support-Energy Systems will integrate the various contractors technical efforts in support of project execution, including technical interface with all project team members of site preparation activities. This activity will be the responsibility of the technical manager. 0 0 Environmental Support-Energy Systems will be responsible for overseeing environmental compliance of the project, including preparing environmental compliance documentation, developing and implementing an environmental compliance strategy and a compliance oversight plan, and serving as primary team contact for the regulators. This activity will be the responsibility of the environmental manager. Design-FWENC is primarily responsible for the remedial design packages to adequately describe the construction activities of the remediation subcontractor and will provide Title Dl home office engineering support. This activity will be the responsibility of the design manager. Construction-MK-F will procure services of a subcontractor to perform construction activities and will be responsible for all construction activities, which include procuring construction subcontracts, administeringconstruction subcontracts, and conducting oversight of construction field activities to ensure compliance with project requirements. This activity will be the responsibility of the construction manager. The project organization chart is depicted in Fig. 1. 3. PERSONNEL TRAINING AND QUALIFICATION Since personnel may be matrixed between organizations, interorganizational training will be conducted for those personnel. Personnel performing activities on this project will complete appropriate indoctrination, orientation, and/or training and qualification related to the activities to be performed in accordance with the requirements of the organization responsible for the activity.

3 8280A-960108/ JS.----T z i Project Manager I John Vanderlan I Representatives.--------I I - Quality Assurance Hugh Newsom Environmental Construction John Stiner John Vanderlan Gary Powers Fig. 1. Project organization chart. 4. QUALITY IMPROVEMENT Identification, control, and correction of items and processes that do not meet established requirements will be performed in accordance with the policies and procedures of the organization responsible for the affected activities. Energy Systems will have control over all nonconforming items. All nonconformanceswill be reviewed by the Environmental Restoration Program, regardless of whether the nonconformances are generated by Environmental Restoration Program personnel, other prime contractors, or subcontractorpersonnel. 5. DOCUMENTS AND RECORDS Documents and records specific to a particular activity will be generated, processed, and controlled by the respective participants under their own programs until such documents and records are required to be included in the official project file. At that time they will be submitted to the Environmental Restoration records management and Document Control Center manager located at the Oak Ridge K-25 Site in accordance with the records management plan for the Oak Ridge Y-12 Plant CRFAPS Project. Energy Systems will be responsible for overall project records management. r.

4 6. WORK PROCESSES Work processes will be controlled by each participant under its own program. Specific processes to be controlled are dependent upon activities performed. All construction-related activities will be performed in accordance with MK-F program requirements and procedures. Title III field activities will be performed by Energy Systems, with FWENC performing home office Title III support. 7. DESIGN Design-related activities for this project will be the responsibility of FWENC. Therefore, all design activities will be performed in accordance with FWENC program requirements and procedures. FWENC is responsible during Titles I and 11 design for identifying and listing critical design components whose failure would result in an impact to health, safety, environment, production cost overruns, or schedules. 8. PROCUREMENT Procurement of all construction materials and services will be performed in accordance with MK-F program requirements and procedures. Procurement of Services by FWENC or Energy Systems for performance of activities under their responsibility will be performed in accordance with their respective program requirements and procedures. Procurement of system components designated as critical components in the design phase will be purchased from manufacturers or vendors experienced in the production of such components. 9. INSPECTION AND ACCEPTANCE TESTING Inspection and acceptance of construction features and services will be performed in accordance with technical requirements contained in the project specifications. In its technical support and Title Ill role, Energy Systems will be responsible for inspection and acceptance of site preparation activities. The Energy Systems program requirements and procedures will govern activities for which it is the responsible organization. Acceptance of services procured by MK-F or Energy Systems will be performed in accordance with their respective policies and procedures. *

5 The owner of the measuring and test equipment used for inspection and acceptance testing will be responsible for its calibration and maintenance. Users of specific measuring and test equipment items will be responsible for compliance with calibration and maintenance requirements. 10. MANAGEMENT ASSESSMENT Each participant will be responsible for assessing the adequacy and effectiveness of QA program implementation within the areas of their responsibility in accordance with the requirements of their respective programs. The project manager will conduct management assessments as necessary to evaluate the overall adequacy of the quality programs and to identify any management barriers that would preclude successful completion of the project. 11. INDEPENDENT ASSESSMENT Based upon the review of project activities, the project manager, QA manager, or Executive Oversight Group may initiate an independent assessment of specific project activities. The results of any such assessment will be provided to the project manager and Executive Oversight Group for appropriate action.

Appendix MATRIX OF IMPLEMENTING PROCEDURES

A-2 The table below lists the implementing documents of each of the participant organizations that may be applicable to the respective elements of this QA plan. A procedure index follows the table. Energy Systems Element FWENC MK-F ~~ m P m 1 ES-QA-1.O SPP-5402 EWC-PI 6 10 2 ESS-QA-10.0 E-87-OR 2A-2.2 QA-15.1 ESS-QA-15.0 QA-15.1 ESP-QA-16.3 OP-30 1 QA-3 12 E-69-OR E-72-OR 2A-15.1 2A-16.1 7A-3.3 1A-9.0 4 EWC-P 1104R1 EWC-P1113/R1 EWC-PI 110 E-1 1-OR E-1 03-0r 1A-1.2 1A-1.3 1A-6.0 5 ESS-QA-12.0 Personnel Training and Qualifications 3 Quality Improvement Documents and Records i Work Processes OR-2 E- 11-OR E-2 1-OR E-30-0r E-68-OR E-69-OR E-1 03-0r OR-16 9 ' 6 Design 7 PC-164 PC-165 8 ESS-QA-10.0 ESS-QA-12.0 Procurement Inspection & AcceptanCe 1A-1.2 2A-12.1 E-1 04-0r 2A-4.1 5A-1.O QAI-0 10 QAI-011 2A-18.1 Testing 9 ERN-I1704 ERN-I1 600 10 ERN-I1600 Management Assessment Independent Assessment

A-3 PROCEDURE INDEX Energy Systems E m - I 1 704 Management Assessmentsfor Conduct of Operations EWC-P 1104R1 Technical Review of ER Program Documents EWC-PI 610 ConductingProject Readiness Review EWC-PI 110 Receiving, Processing, and Maintaining Environmental Restoration Program Records EWC-PI 113/R1 ER Controlled Document Management ER/Y-I-I600 Conducting Project or Activity Assessments ES-QA-I.O Qualig Policy QA-3 12 Issues Management Program ESP-QA-16.3 Lessons Learned and Alerts Program ESS-QA-10.0 Inspections ESS-QA-12.0 Control of Measuring and Test Equipment ESS-QA-15.0 Control of Nonconforming Items (and Services) QA-15.1 Preparation of a Nonconformance Report (NCR) PC-I 64 Service Subcontract Safety and Health PC-165 Division Technical Review of Procurement Documents OP-3 0 1 Occurrence Notification and Reporting SPP-5402 Stop WorkAuthority FWENC E-11-OR As-Built Drawings E-2 1-OR Preparation, Review, and Approval of Equipment Specifications and Data Sheets E-30-OR Preparation, Review, and Approval of Calculations E-68-OR Division of ResponsibilitiesAmong Disciplines E-69-OR ConstructionInteface Documents (CIDs), Design Change Notifications (DCNs) and Project Document Control Lists (PDCLS) E-72-OR Nonconformance Reports (NCRs,) E-87-OR Training in Engineering and Related Procedures E- 103-OR Preparation, Review, and Specifications E- 104-OR Review of Vendor Documents and Approval of Design Drawings

I A-4 OR-2 Assignment of Design Classijkations OR-169 Title III Engineering Services QAI-01 0 General Surveillance Instruction QAI-011 Preparing, Conducting,Documenting, and Logging of Audits MK-F 1 A- 1.2/2 Construction Management Services Manual Document Management 1A-1.310 Document Control Program 1A-6.011 Records Management Program 1A-9.012 Occurrence Reporting 2A-2.20 Personnel QualiJicationand Training 2A-4.113 Procurement Document Control 2A- 12.1/1 Control of Measuring and Test Equipment 2A- 15.1/2 Control of Nonconformances 2A-16.111 CorrectiveActions 2A-18.1/2 Construction OversightAssessment 5A-1.OlO Control of Procurement Process 7A-3.315 Construction Inter$ace Document

Y/ER-270 DISTRIBUTION 1. L. V. Asplund 2-3. A. K. LeeDOE-OSTI (2) 4. D. M.Matteo 5. H. C. Newsom 6. P. T. Owen 7. J. H. Vanderlan 8. ER Central Doc. M a t. Center-RC 9. R. Meccia, Foster Wheeler Environmental Corp., 1 1 Union Valley Road, Oak Ridge, TN 37830 10. J. Stiner, h4k-ferguson of Oak Ridge Company, P.O. Box 2000, Oak Ridge, TN 3783 1