SAIL Rourkela BF No. 5 Building India s largest blast furnace

Similar documents
High Capacity Iron Making with Large, Modern Blast Furnaces

BLAST FURNACE SIZING CONSIDERATIONS - for Incredible India. Danieli Corus Jan 30, 2016 at Ranchi,India

MODERN MINI AND COMPACT BLAST FURNACES: OPERATIONS BASED DESIGN CONSIDERATIONS*

BLAST FURNACE OPERATIONAL SERVICES SPECIALIZED ASSISTANCE PACKAGES

Indian Experience in Construction of Kalugin Top Combustion Stoves

Coal Injection. Pulverised. in Blast Furnace. Blast furnace iron making continues. - N. M. Rao, Consultant (I&S) May 2016

FangYuan Group LTD. The World s Leader in Refractory Materials. Blast Furnace Lining Products

ADVANCED BLAST FURNACE BOSH AND STACK SYSTEMS R.J. van Laar and R.G. van Oudenallen Danieli Corus BV Rooswijkweg 291, Netherlands

Low-cost hot metal from a blast furnace (BF) can be

italian engineering, contracting and plant components suppliers

Peter Zonneveld, MD Danieli Corus. Innovative Technologies in Modern Sustainable Steel Making

Design Innovation and Practice of Laiwu. Steel 3 # 4,000 m³ Blast Furnace

SEVERSTAL L-BLAST FURNACE HEARTH REFRACTORIES FINDINGS AND REPAIR AT SPARROWS POINT

Technology and developing trends of nickel pig iron blast furnace. Speaker:Dong Xunxiang

Indian Blast Furnace Industry and Prospects of Indigenous Manufacturing of Its Equipment - Role of MECON

The modern blast furnace is a different animal to that

Practices and Design for Extending the Hearth life in the Mittal Steel Company Blast Furnaces

At Corus IJmuiden (formerly Hoogovens)

MODERN BLAST FURNACE EQUIPMENT OF NIPPON STEEL & SUMIKIN ENGINEERING

THE USE AND OPTIMISATION OF FERROUS FEED AT THE WHYALLA BLAST FURNACE

BLAST FURNACE TECHNOLOGY

IRONMAKING. solutions for processing direct-reduced iron (DRI) and by-products. Blast Furnace A, voestalpine Stahl GmbH, Austria

L Blast Furnace Hearth Refractories Findings and Repair at Severstal Sparrows Point

BLAST FURNACE BOSH DESIGN AND REPAIRS

SIMETAL CIS BF VAiron. Blast furnace automation at its best. Metals Technologies

Relining of Pohang No.3 Blast Furnace

Raw materials improvement in the steel industry

HOW A BLAST FURNACE WORKS

Development of EAF Dust Recycling and Melting Technology Using the Coal-based FASTMELT Process

Blast Furnace Cooling Stave Design

The HIsarna Ironmaking Process

ENHANCING OPERATIONAL SAFETY AND LOGISTICAL EFFICIENCY FOR TORPEDO LADLES

in iron-making industry

Developments of OJSC Scientific-Research Institute of Metallurgical Heat Engineering (VNIIMT)

Stahl-Zentrum. Influence of coke quality on BF hearth lifetime and operation results. Walter Hartig, Rongshan Lin * ) AG der Dillinger Huettenwerke

FEASIBILITY OF USING ULTRASONIC TECHNIQUE TO MEASURE THE BLAST FURNACE LINING THICKNESS

STUDIES ON INFLUENCE OF LIQUID LEVEL ON BLAST FURNACE PERFORMANCE AND MONITORING OF HEARTH DRAINAGE

RAW MATERIALS AND IRONMAKING. Raw materials improvement in the steel industry

NO TAPHOLE - NO FURNACE. C Coetzee 1 and P Sylven 2

INTRODUCTION OF CURRENT TECHNOLOGIES FOR COKE DRY QUENCHING SYSTEM BY KOTARO ITAKURA*

RATING OF THE STEEL SECTOR. How we did it

4 th EFFECT OF RAW MATERIAL ON BLAST FURNACE PERFORMANCE: THE USE OF AN EXPERIMENTAL BLAST FURNACE. Anna Dahlstedt * Mats Hallin* Jan-Olov Wikström **

In an increasingly competitive market, steelmakers face a

Ironmaking, Energy and the Environment

Water-cooled tap-hole blocks

CHARGING PRACTICE OF BLAST FURNACE OPERATED WITH 100% ACID PELLETS

Transition of blast furnace revamping technology, and challenge to a supershort term revamping technology

The final two decades of the 20th century saw the birth

Current Refractory Technology and Practices in the Steel Industry

BLAST FURNACE IRDNMAKING

Stahl-Zentrum. Coke quality parameters versus blast furnace process and hearth performance. Gerard Tijhuis, Luc Bol, Bart van der Velden, Huub Schulte

MANUFACTURE OF IRON OR STEEL (preliminary treatment of ferrous ores or scrap C22B 1/00; electric heating H05B)

Environment furnaces. The Twelfth International Ferroalloys Congress Sustainable Future. June 6 9, 2010 Helsinki, Finland

The generic requirements from blast furnace refractories are summarised below:

Energy and Resource Efficiency

COMPLETE SOLUTIONS FOR THE FERRO ALLOY INDUSTRY

Mechanical Strength of Reduced Iron Ore Pellets Sampled from the LKAB Experimental Blast Furnace

BlueScope s Port Kembla Steelworks (PKSW)

Two integrated steel plants (Phase 1 and 2), both

INBA System. Slag Granulation with Continuous Dewatering and Pollution Control. Ironmaking

COMPUTATIONAL MODELING OF BLAST FURNACE COOLING STAVE BASED ON HEAT TRANSFER ANALYSIS

Increase the Cooling Efficiency of Casting Furnace Stave Cooler with Use of Experimental and Analytical Analysis

Development of the Oxy-BF for CO 2 Capture Application in Ironmaking

Lecture 19: Emerging Steelmaking Technologies

The steel plant of today is exposed to an ever-growing

Overall considerations/benefits of metallic silos

Hot Rolled Products Analyst Site Visit Port Kembla

Session II: DRI in focus. DRI in use: How can DRI (HBI) be utilized in the Blast Furnace and BOF? by Ralph Smailer, Director/Owner Metserv

FangYuan Group LTD. Refractory Materials for Electric Smelting Furnaces. The World s Leader in Refractory Materials. Edition 2007

View of Promac s Engineering Works, Bangalore, India

FINEX - AN OLD VISION OF THE IRON AND STEEL INDUSTRY BECOMES REALITY*

Environmentally Friendly Process Technology at Hirohata Works

IRONMAKING FEATURING 12

Sustainable development in Steel Industry. Together we make the difference

Technical and economic aspects of production and use of DRI in integrated steel works

BURN DOWN, EXCAVATION AND RELINING ENS /2014

Structural Steel. Production and Applications. GWP Engineering Limited

CaCO 3 CaO + CO 2 MgCO 3 MgO + CO 2 CaCO 3 MgCO 3 CaO MgO + 2 CO 2 FeCO 3 FeO + CO 2 FeO + CO Fe +CO 2

Wet granulation of blast furnace slag has been

Realizing a state of the art All Indian Pellet plant by MECON. MECON LIMITED A House of Engineering Excellence

Chuan Wang 1, Johan Sandberg 2, Mikael Larsson 1

STEEL INDUSTRY OVERVIEW

Basic Environment,Health & Safety Guidelines for Foundries

Hisarna, an Opportunity for Reducing CO2 Emissions from Steel Industry

Reduction in Charge Requirements of Hismeltiron-Making Process in Indian Context

In conjunction with MJAC Midland Joint Advisory Council for Environmental Protection. Present. Advanced Module IV

Innovative and Safe Copper Launder Design

Essar Steel (I) Ltd. Hazira

Ironmaking Technologies Contributing to the Steel Industry in the 21 st Century

The Importance of Process Integration in the Iron and Steel industry

ATP Oil Shale Plant in China

DESIGN OF INNER HOOD OF BELL ANNEALING FURNACE FOR BETTER HEATING EFFICIENCY

2005 Energy Intensity (Basic oxygen furnace Steel; Iron and Steel Sector)

Prima PRO process mass spectrometer

Manufacture of Pig Iron Concentration Calcination Smelting Blast furnace Chemistry of reactions in Blast furnace. 15CY101: Chemistry SRM University 2

THE CIRCLE OF FLEXIBILITY CIRCULAR PELLETIZING TECHNOLOGY

Study of the Compressive Strength of Concrete with Various Proportions of Steel Mill Scale as Fine Aggregate

Willow Creek Mine - Project Update. April 2006

Recent progress of hot stage processing for steelmaking slags in China considering stability and heat recovery. Guangqiang Li, Hongwei Ni

GE Power. Smarter. Cleaner. Industry. Iron & Steel 2017 STEAM POWER SYSTEMS INDUSTRY PRODUCT CATALOG

Transcription:

SAIL Rourkela BF No. 5 Building India s largest blast furnace RSP s BF No. 5, commissioned in 2013, is the largest in India. It was built on an existing steelworks site on a very tight plot and integrated with pre-existing facilities. The new furnace is the key element of an expansion program that doubles the plant s capacity. Authors: J Bak and Edo Engel Danieli Corus BACKGROUND Rourkela Steel Plant (RSP), operated by the Steel Authority of India Limited (SAIL), was inaugurated in 1959 and was the first integrated steel plant in the public sector in India. The plant s initial capacity was around 1Mt/yr, which, over the following decades, grew towards 2Mt/yr with four blast furnaces and two BOF plants. India s high economic growth of 9% a year from 2001 to 2012, has increased the country s steel consumption from 28.5 to 73.6Mt/yr, but with the country s per capita consumption at around 25% of the global average and at around only 12.5% of that of China, there is substantial growth potential for the near future. SAIL decided on an expansion plan in 2006, with the objective of doubling the company s total capacity. Table 1 presents key figures for this ambitious expansion plan with respect to the integrated steel plants operated by SAIL. The company set out on an expansion programme towards 4.5Mt/yr for the RSP site and also began further modernisation to reduce the environmental emissions of the coke batteries and sinter plants. Before expansion, hot metal was produced by four blast furnaces, three with an inner volume of 995m³ and one with an inner volume of 1448m. All are a 1960s design of German origin. For the expansion, RSP decided on a fifth furnace of substantially larger inner volume, designed with best available technology principles. The new furnace was built as a turnkey project by a consortium consisting of Danieli Corus and Tata Projects Ltd (TPL) and is based entirely on the technology and knowhow of Danieli Corus. The new furnace is the key element in an expansion programme that doubles the plant s capacity. With much of the existing ironmaking capacity reaching the end of its technical and economic lifespan, the new furnace enables RSP to meet existing as well as future demand for its products. BLAST FURNACE NO. 5 The new blast furnace has a 4,060m 3 ³ inner volume for an average production of 8,000thm/d. The pulverised coal injection (PCI) system is rated at 150kg/thm, with provision for 200kg/thm. Hot blast is provided by three hot blast stoves with internal combustion chambers operating at a 1,425 C dome temperature. The furnace has four tapholes, operated in two cast houses. Key details are given in Table 2. The furnace lining design is based on the Hoogovens high conductivity integrated cooling and lining concept a Metric Imperial Inner volume 4,060m 3 ³ 143,378ft 3 Working volume 3,470m 3 ³ 122,542ft 3 Hearth diameter 13.2m 43.3ft Production (avg.) 8,000thm/d 8,840thm/d Production (peak) 8,320thm/d 9,193thm/d PCI rate (target) 150kg/thm 300lbs/thm PCI rate (design provision) 200kg/thm 400lbs/thm Hot blast stove dome temp. 1,425 C 2,600 F r Table 2 BF No. 5 key numbers Plant Production 2011/12 After expansion % Increase Bhilai 5.1 7.5 47 Durgapur 2.1 2.5 19 Rourkela 2.3 4.5 96 Bokaro 4.0 5.8 45 Burnpur 0.5 2.9 480 Total 14.0 23.2 66 r Table1 Expansion plan for SAIL integrated plants (hot metal production figures in Mt/yr) 21

p Fig 1 BF general arrangement r Fig 2 Bosh and belly design with copper cooling plates and graphite refractory. This modern lining design minimises sliding effects in the bosh, and the equilibrium lining profi le enables the creation of a stable accretion, which protects against erosion. The belly and lower stack include a combination of graphite and silicon carbide refractory and machined copper plate coolers, which enables the creation of an accretion, but also provides suffi cient erosion resistance if the accretion may not be present. A total of 25 year campaign lives can be achieved at high PCI and productivity levels and/or when operating on lower or varying quality raw materials. Figure 1 illustrates the general arrangement of the furnace, and Figure 2 the design of the bosh and belly. The gas cleaning system is based on the Danieli Corus cyclone dust catcher with a single tangential inlet and an annular gap scrubber (see Figure 3). The main advantage of this type of dust catcher, as opposed to traditional, gravitybased ones, is that the characteristics are such that virtually all of the low zinc fraction of dust is separated here (that is, 85%), leaving the smallest possible zinc-contaminated fraction for the scrubber. With gravity dust catchers, 50% of the dust is separated, the other 50% still made up of zincrich dust, too much to be recycled to the sinter plant and/or significantly increased additional costs for processing. The plant is equipped with a slag granulation system based on a de-watering wheel, a Top Gas Recovery Turbine (TRT), and raw materials, which are belt-charged to the bell-less top. A schematic overview is shown in Figure 4. THE PROJECT On 2 October 2008 (M K Gandhi s birthday), RSP signed a contract with a consortium consisting of Danieli Corus and TPL for the turnkey supply of the new furnace. Danieli Corus was responsible for the engineering and supply of technological items as well as erection supervision, operational assistance and training. TPL was responsible for the engineering and supply of the balance of the scope (eg, civil) as well as erection. In projects of this magnitude, project management is pivotal in coordinating all processes pertaining to areas such as engineering, procurement, inspection, logistics and erection. This particular project was executed under conditions that called for specifi c measures. CLIENT S ENGINEER Mecon, an organisation operated by the Government of India and based in Ranchi, acted as the Client s Engineer on behalf of SAIL. Mecon has specifi c knowhow about the various packages, leading to many interesting discussions on technology. In those, the various parties challenged each other s views to get the best result for the project. This established a solid technical base between the parties and prevented lack of clarity during the construction phase. 22

r Fig 3 Tangential cyclone: paths of 5µ, 15µ and 30µ particles CO-OPERATION WITHIN THE CONSORTIUM Since the majority of the scope was with TPL, this party acted as Consortium Leader, taking care of all communication with the client on behalf of the Consortium. Extensive document control systems were set up within all parties (TPL, Danieli Corus, Mecon and RSP) as well as between them. Numbering systems were established for engineering documents, but also for email messages and letters. Furthermore, much attention was paid to tracking of documents and issues to be solved. This has paid off, since not a single document was missed and not one issue left unfi nished. Finally, the contractual planning was detailed into a Level 4 Planning, in which the schedules of the consortium members and their subcontractors were merged. Monthly meetings were organised by RSP s Project Department, which kept tight control. r Fig 4 3D overview of BF plant LOGISTICS A total of 950 containers and various break bulk transports with foreign supplies were at Kolkata, to be trucked to Rourkela. The haul from the Kolkata Dock System (KDS) to RSP is around 350 miles and, given the time-consuming nature of road travel in India, transport had to be scheduled meticulously, also with respect to the site s maximum ability to accept containered as well as oversized shipments at the same time. Foreign materials came from all continents, and Canadian and Northern European winters brought challenges given the risk of waterways freezing. At one point, a ship had to be chartered from the warmer Mediterranean area to pick up cargo in Antwerp, Belgium, since all ships in that area were suffering from frozen cranes and decks. Despite the above and the extensive efforts required for importing goods into India, logistics ran relatively smoothly. On site, two indoor storage facilities were made available specifically to Danieli Corus for the dry storage of materials, a r Fig 5 Lifting bosh segment of shell 23

the larger of which was designated for refractories. In addition, RSP stored an amount of materials in other facilities within the plant, some of which were in the open air. For the pre-assembly of larger components, such as segments or BF rings and hot blast stove shells, lay-down areas were allocated within the fi nal plot plan of the BF plant (see Figure 5). With designated areas for each of the several pre-assembly activities, scheduling and execution of these activities could be optimised (see Figure 6). r Fig 6 Construction activities r Fig 7 BF amid existing plants CLIMATE/MONSOON Temperatures well over 100 F in the May to July period and monsoon rains in the July to September period added a level of complexity to the project execution. Daytime work was shifted towards the early morning and late afternoon. Lighting was set up to enable work in the darker, yet cooler hours. Work on refractories inside the furnace shell and stoves was carried out mostly in cooler seasons. In the hot seasons, wind may at times make working outside impossible, given the risk of facial burns through of prolonged exposure. Foundations and cable tunnels needed to be finished before July, and ditches for water evacuation were excavated every year before the start of the monsoon. Finally, blowing in a furnace during monsoon requires special safety measures to avoid steam explosions, eg, in the slag pits and dry pits. These measures will be discussed later in conjunction with the furnace s blow-in and ramp-up. TIE-IN TO EXISTING PLANT The new furnace and its ancillary equipment had to fi t within existing plants. The space available was suffi cient, albeit with adjustments to accommodate existing routing for the supply of coke and ferrous raw materials and tie-ins with routing for hot metal transfer towards the steel plant and downstream slag processing (see Figure 7). Whereas during the early phases, the plot layout was sufficiently spacious to carry out several erection activities (with or without need for lay-down areas) simultaneously, the final revised layout for the plant was a very tight fit. However, none of the logistical movements were hampered and the layout has proven to be well thought-out. COMMISSIONING AND RAMP-UP On 6 August 2013, BF No. 5 was blown in by a joint commissioning team consisting of RSP operators and Danieli Corus specialists. The furnace was filled with wood, to tuyere level, and on top of that, a 1,260 tonne coke blank was charged. The remainder of the working volume received a burden with an 800kg/thm coke rate. Around 29 hours after the furnace was lit, the first cast was made through taphole No. 1. During the first few hours, the coke rate was decreased fairly aggressively and, as a consequence, hot metal slag separation started faster than planned. Also, the 24

lower coke rates ensured that all hot metal tapped after the start of separation had a sufficiently low silicon content to be used in the steel plant (see Figure 8). Given the monsoon, there were large amounts of water in the blast furnace area, especially in the slag pits, so major safety precautions had to be taken. This was driven largely by SAIL management, and no accidents occurred. During the ramp-up, the furnace appeared to be very forgiving, accepting, for example, many low blast periods from causes within and beyond the blast furnace complex. Danieli Corus had provided extensive training for RSP operational, maintenance and automation personnel, with good results; in the months after the blow-in, assistance was hardly needed while RSP operators took over the furnace and proceeded forward. After blow-in and ramp-up, transition to normal operation was made quite quickly. With these labour-intensive periods and the need to have direct access to the old trough and runner systems, the several working areas and platforms could be cleared and housekeeping straightened out. Both of the cast houses are excellent examples of modern design, where the fl ush and fl at design offers all of the intended ergonomic advantages now that the area is cleared and operations have normalised (see Figure 9). r Fig 8 Hot metal silicon content (%) during first days after blow-in CONCLUSIONS ` The RSP No. 5 project proves that plant capacity can be doubled within a few years in a smooth way with the dedication of the workforce and provided that plant management is willing to demonstrate leadership. Especially under circumstances such as those described, these steps can be taken sustainably by investing in superior, best available technology as well as the training of operational as well as maintenance personnel. ` Current technology allows for new plants to be fi tted into tight plots and tied in to existing plant logistics without problems. However, technology development may be benefi cial for this process when equipment such as hot blast systems and gas cleaning systems would become more compact rather than allow for increasingly complicated connection and tie-ins. ` The prospects for the Indian economy are promising in the medium and longer term and further, similar projects can be expected where the lessons learned will prove their value in design as well as construction. In many other developing economies in the region, greenfield projects are expected in the slightly longer term, mostly without the brownfield aspects of those in India. J Bak and Edo Engel are with Danieli Corus, Velsen-Noord, The Netherlands CONTACT: comms.offi ce@danieli-corus.com r Fig 9 Flat casthouse floor 25