NEBBinar: Retro-Commissioning for Comfort and Energy Efficiency. August 21, 2013

Similar documents
NEBBinar: Technical Commissioning: The most effective commissioning process for new buildings. March 5, 2014

NEBBinar: Managing Building Performance through Commissioning. March 28, 2013

Project Information. Measure Description

Building Control Strategies That Work to Improve Your Energy Bottom Line

Reducing Hospital Energy Use and Maintaining Savings. Glen Anderson, PE

2-Pipe fan coil terminal units were selected as the parallel system to handle the remaining sensible cooling load.

Three Case Studies of the Application of Energy Systems Optimization Best Practices for Automatic Demand Response

Retro-Commissioning for Existing Facilities

How LEED & The Retro-Commissioning Credits Produce Energy Savings. James Vallort Vice President Environmental Systems Design, Inc.

Retrocommissioning: A Persistence Study

Variable Frequency Drive Retrofit Opportunities. Michael Kuk CERx Solutions LLC

Retrocommissioning Investigation Report

Karl Helmink, P.E., CEM Retrocommissioning Manager University of Illinois. Retrocommissioning Saving the Planet One Building at a Time

City of Fort Collins Building Automation Systems Enhances Savings and Commissioning Efficiency Works Training

CONTINUOUS COMMISSIONING OF SALT LAKE COMMUNITY COLLEGE SOUTH CITY CAMPUS

Success with MEASUREMENT & VERIFICATION

The energy benefits of View Dynamic Glass

Case Study for Fortune 500 Telecom: Retrofitting Pneumatic Controls for Energy Efficiency

9/13/2011. Mark Hanicits, Director of Facilities and Safety, MetroSouth Medical Center. Terry Malloy P.E., Cxa, Project Manager, Teng & Associates

SMART HVAC & LIGHTING SYSTEMS. Savings From Two Major C&I End Uses

Use of Building Automation Systems for (Retro)Commissioning

EBCx of the Connecticut Convention Center Complex

Strategies for Persistence: Measurement and Verification. Ryan Hughes PE, CEM, LEED AP Eaton Energy Solutions

The Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario

Recommissioning Workshop

Energy Savings Audit

Wireless Pneumatic Thermostats:

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

Building Retro-Commissioning

Xavier Energy Initiative

Freetown Elementary School

Continuous Commissioning Leading Energy Project Process - An Industry Approach

NEBBinar: Building Enclosure Testing. September 25, 2013

Retro-Commissioning in Hospitals

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Building Operator Certification Level I

Jim Huber, NEBB Vice President and President of Complete Commissioning

Building Retro-Commissioning

Technical Retro-Commissioning of Existing Buildings

Commercial Retro-Commissioning Program Manual for 2015 SECTION 1

Energy Efficiency in Multi-Tenant Office Buildings

Steps to Making Existing Commercial Buildings Become High Performance. Jim Bochat

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC

University of Minnesota Duluth Civil Engineering Building

Underf loor For Schools

NURTURING FUTURE GLOBAL CITIZENS THROUGH SUSTAINABLE FACILITIES

Technical Report Three Mechanical Systems Existing Conditions Evaluation

South Carolina Society for Hospital Engineers

Oklahoma University Children s Medical Office Building

Existing Building Cx: Processes & Results A Cultural Journey. Barry Abramson Senior Vice President Servidyne

Commissioning & Retro-Commissioning Meet Energy Code

05/14/2012 THE CRIME OF IMPROPER ENERGY MANAGEMENT AGENDA

CONTINUOUS COMMISSIONING OF THE MATHESON COURTHOUSE IN SALT LAKE CITY, UTAH. William D. Turner, P.E., Ph.D. Song Deng, P.E.

THE KEMPER BUILDING 1 EAST WACKER DRIVE PHIL KEUHN SIEBEN ENERGY ASSOCIATES

Retrocommissioning Within the U.S. Green Building Council s LEED for Existing Buildings (LEED-EB) Certification System

Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation

Final Commissioning (Cx) Retro-Commissioning (RCx) Policy

You Can t Afford Discomfort. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

Georgetown University New Science Center

Building X Retrocommissioning Final Report

MBCx: The Next Wave of Energy Savings in Utility Incentive Programs

Teague Research Center

Existing Building Commissioning (or Retro-Commissioning)

BOMA s Energy Efficiency Program BEEP Course 4. No- and Low Cost Operational Adjustments to Improve Energy Performance

Retrocommissioning Investigation Study of the Sheraton Chicago Hotel

Retro-Commissioning for Energy Efficiency

Recommended Methods to Evaluate Performance of Variable Air Volume Fume Hood Systems

EnergyPro Building Energy Analysis. Single-story School Building

Introduction to Building Analytics

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel Mechanical Option

Characteristics of Energy Consumption by building type of a U.S. Navy Installation in Hot and Humid Climate

LOW CARBON HEATING FOR COMMERCIAL BUILDINGS USING GRID SUPPLIED ELECTRCITY DURING-OFF PEAK PERIODS

WHOLE BUILDING RETROFITS: A CONTRACTOR/SUPPLIER DEMONSTRATION

Mechanical Systems Proposal

Energy Treasure Hunt ESI Members Meeting. Shaunna Tobin, TE Connectivity Kelli Swain, TE Connectivity

Matt Gudorf Campus Energy Manager. Page 1

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System)


Figure 26.5 Potential fan energy savings using fan speed limiting 16.

OPTION 1: PERFORMANCE RATING METHOD

RETROCOMMISSIONING S GREATEST HITS

Management Committee December 3, Johnson County Community College Retrocommissioning Report

BETA OPTION 1: PERFORMANCE RATING METHOD. Section General Information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Do-It-Yourself Energy Audit. Bob Furgeson, PE CEM CBCP GBE CEA Shive-Hattery Architects+Engineering

Turn off fossil fuels. Turn on the power of nature. Energy Audits Hot Water Solutions. Solar Electricity Heat Pumps

how to read an energy model

Building Controls Strategies Conference. Retro-Commissioning with BAS Overview. 10 March Steve Brown, CAP ESD Controls Team Leader

COOLING COIL (35% ETHYLENE GLYCOL)

Analysis of the Energy Savings Potential in K-5 Schools in Hot and Humid Climates. Jeff S. Haberl, Ph.D., P.E.

University of Southern California Main Campus Plant Energy use reduction of 49% compared to previous plants and control strategies.

Promulgation Details for 1 RCNY

Energy Reduction in Hospitals

ILLINOIS ENERGY NOW Energy Efficiency Incentives for State Facilities. December 2016

FirstEnergy s Pennsylvania Utilities. Energy Efficiency Programs for Business

Energy Saving Calculations for Recommissioning and Design

Final Thesis Report: Mechanical Alternative Systems

Pay Now or Pay Forever Commissioning the Design of Control System Software

Commercial Building Performance Evaluation System for HVAC Diagnostics and Commissioning

Transcription:

NEBBinar: Retro-Commissioning for Comfort and Energy Efficiency August 21, 2013 0

Moderator Jim Huber, NEBB Vice President and President of Complete Commissioning Jim Huber is the President of Complete Commissioning. He has over 29 years of industry experience, is a Certified Energy Manager, and has extensive experience with BACNET, LON, MODBUS, and other building automation protocols and communication networks. He has programming, tuning, and testing experience with multiple systems and applications, as well as building systems commissioning, sound and vibration measurement, and testing and balancing. 1

Speaker Dave McFarlane, Principal Project Director, Atkins Dave McFarlane is a principal project director in the asset management practice and head of the Retro-Commissioning group for Atkins, one of the world s leading engineering, design, and project management consultancies. Prior to joining Atkins, Dave was the president of Technical Commissioning, Inc. (Fort Myers, FL) and McFarlane, Inc. (Grand Forks, ND). He was a member of NEBB s Commissioning Committee; he chaired the committee in 2003-2004 and rejoined in 2011. Dave serves as an instructor for NEBB s courses in Commissioning and Retro- Commissioning. He speaks at conferences nationwide, and has written numerous articles for a variety of industry publications. 2

Agenda What is Retro-Commissioning Case study: Grand Forks ND County Office Question and Answers 3

Retro-Commissioning A systematic, documented process that identifies and implements low cost operational and maintenance improvements which improve building efficiency and allows the building to meet the current design requirements 4

Retro-Commissioning Ensure that the building meets the Current Facility Requirements (CFR) Reduce energy usage Improve comfort 5

Agenda What is Retro-Commissioning Case study: Grand Forks ND County Office Question and Answers 6

Grand Forks County Office Retro-Commissioning 7

Grand Forks Country Office Seven story - 140,000 square feet Five floors office space w/conference rooms Meeting rooms on sixth floor Mechanical room on the 7 th floor 8

Interior/exterior walls and conference rooms Floors 1-5 9

Interior/exterior walls and conference rooms Floor 6 10

Interior offices Perimeter offices 11

County Commissioners Chambers 12

Perimeter link Meeting room 13

Establish baseline Review the past 2-3 years energy bills Convert to MM BTU ft2/year Energy intensity is ~ 151,000 BTU/ft2/yr Session 21 Energy Savings 14

Natural Gas 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000-1 2 3 4 5 6 7 8 9 10 11 12 Premodification Gas Use 15

Electrical Usage KWH 330,000 280,000 230,000 180,000 Premodification KWH 130,000 80,000 1 2 3 4 5 6 7 8 9 10 11 12 16

Electrical Demand KW 800 700 600 500 400 300 200 100 0 1 2 3 4 5 6 7 8 9 10 11 12 Premodif ication KW 17

Compare baseline to typical For North Dakota typical energy intensity: 93,000 BTU/ft2/yr County office energy intensity: ~ 151,000 BTU/ft2/yr Projected savings achievable through retrocommissioning: $45,000 annually 18

Discovery phase Determine what is wrong Review documents, plans and specs Interview maintenance staff 19

Plans and specs showed VAV boxes with 2-way valves 4 VAV air handlers 4 boilers 20

AHU Quadrants Session 21 Energy Savings 21

Plans and specs showed HW pumps and fans with VFD s Pump and fan VFD s 22

Discovery and maintenance staff perspectives Building had electric baseboard supplement heat Too many occupant complaints about temperature controls Lack of understanding of Building Management System (BMS) Systems in overridden and in manual control BMS system not used to potential 23

Light shelves 24

Heating pumps VFD 60 Hz 25 100% Leaking reheat valves

Site investigations Fresh air dampers open on night set back Control sequence cooled building Building in occupied mode Occupied air flow: meeting/conference rooms Space stats not controlling within 1 o F Occupants had full thermostat control Mixed air control set at a constant 55 F o 26

Site investigations Equal occupied and unoccupied heating variable air volume (VAV) set points Min/max heating VAV set points are the same Equal unoccupied interior and exterior zones air flow 27

Site investigations Boilers reset to 120 during summer months Heat from dimmer switch 28

Site investigation Electric baseboard on whenever OA below 50 F Duct static pressure sensor set at 2 pressure Most VAV boxes call for reheat Most VAV boxes damper position 50-75% in summer 29

Site investigations Outdoor CO2 is 370 PPM. Indoor CO2 is 425 PPM Chiller energized at 50 F OAT Many VAV min / max set points had been occupant complaint adjusted Room registers read between.5 and 4.0 CFM / Ft2 Building positive, then negative 30

RA fan and SA fan not tracking 31

Analysis phase Computer modeling Determine if we can predict the current energy usage before changes are made 32

Corrective action items Recalculate new air flows based on the actual people, lights, equipment, glass walls and roof loads. Use ASHRAE 98% design Use actual people loading for fresh air 33

Analysis phase Actual operating data Total fan air flow Actual fan static pressures Actual fan amperage readings System type, fan wheel type and fan speed Actual run times 34

Analysis phase Actual data Average Min / Max set points Occupied / unoccupied set points VAV occupied unoccupied set points Fan type and fan speed Run times Actual fresh air CFM 35

Analysis phase Actual operating data Total fan discharge temp Hot water temps Chilled water temps Space temp Type of fin tube heat and fin tube parameters 36

Analysis phase: actual space data Actual people, light load, equipment load Actual occupied times Actual space temperatures Actual glass area and parameters Actual roof area, wall area and parameters 37

Analysis phase: actual utility cost data Gas cost per therm KWH cost KW demand cost Auxiliary fuel costs Local degree days / bin temperatures 38

Analysis phase DOE 2 or Super DOE Crunch the numbers and compare 39

Natural Gas 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000-1 3 5 7 9 11 Projected Gas Use Premodification Gas Use 40

Annual Natural Gas Summary 150,000 120,000 90,000 60,000 Premodification Projected 30,000-41

Electrical Demand KW 800 700 600 500 400 300 200 100 0 1 2 3 4 5 6 7 8 9 10 11 12 Projected KW Premodification KW 42

Annual Electrical KW Demand Summary 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 - Premodification Projected 43

Electrical Usage KWH 330,000 280,000 230,000 180,000 Projected KWH Premodif icatio n KWH 130,000 80,000 1 3 5 7 9 11 44

Annual Electrical KWH Summary 2,500,000 2,000,000 1,500,000 1,000,000 Premodification Projected 500,000 0 45

Office Energy Intensity Current Intensity is ~ 151,000 BTU/ft2/yr Area Average ~ 93,000 BTU/ft2/yr Computer modeling ~ 85,000 BTU/ft2/yr 46

Corrective action items Make the corrections needed to obtain the results outlined in the modeling. Rebalance air and water flows to new ASHRAE 98% requirements Session 21 Energy Savings 47

Repair leaky valves 48

49 Eliminate restrictive duct

Corrective action items Adjust throttling range and dead band on all VAV thermostats and AHU Controllers 50

Improper Control - Too tight 51

Improper Control - Too Loose 52

Proper Control 53

Adjust occupied/unoccupied sequence 54

Fixes and corrective actions Rezone for interior exterior zones Set VAV box up with different occupied/unoccupied min/max Set conference room VAV box to standby Unoccupied interior VAV set to zero air flow Set 6th floor conference room VAV s to standby mode 55

Fixes and corrective actions Lock thermostats between 68 and 75F Reset discharge temperature on cooling Reset hot water 140 to 180F De-energize electric fin tube above 30 F De-energize the fin tube in the unoccupied mode Rotate the fin tube usage off for 1 of 5 minutes Shut boiler off at 40F unoccupied 56

Acceptance phase Energy Procedures Winter temps-- 70-74 F Summer temps 73-77 F No space heaters Monitor usage for one year 57

58 Grand Forks County Office Retro-Cx Results

59

60

61

62

63

64

Yearly energy usage per square foot Pre-modification 151,000 BTU/FT² Typical 93,000 BTU/FT² Modeling 85,000 BTU/FT² Actual: 76,000 BTU/FT² 65

Results 2002-2012 Gas 29.8 % $417,200 KW-hr 45.9 % $642,600 Demand 26.3 % $368,200 Total 100 % $1,400,000 Energy levels have stayed at projected levels for the past eleven years 66 \

Three years after RCx 67

68 Question and Answers

Contact information Jim Huber, NEBB Vice President and President of Complete Commissioning Tel: +1.301.877.2260 Email: JHuber@completecx.com Dave McFarlane, Atkins Tel: +1.239.791.8771 Ext. 460-1021 Email: Dave.McFarlane@atkinsglobal.com 69

Thank you for joining the webcast. To improve future NEBBinars, please take a minute to answer a brief survey that will be sent to you. 70

2013 NEBB. All rights reserved. 71