Tatum Ranch Community Association Guidelines for Installation of Solar Energy Devices

Similar documents
APPENDIX A MOHAWK HOMEOWNERS ASSOCIATION GUIDELINES FOR INSTALLATION OF SOLAR ENERGY DEVICES

ALTERNATIVE ENERGY RESOURCES ORDINANCE

CITY OF SCANDIA ORDINANCE NO. 193

CITY OF ST. MICHAEL WRIGHT COUNTY, MINNESOTA ORDINANCE NO THE CITY COUNCIL OF THE CITY OF ST. MICHAEL HEREBY ORDAINS:

CITY OF HARTFORD GUIDELINES FOR SOLAR ON HISTORIC PROPERTIES SECTIONS ADOPTED 2017

Garrett Farms Solar Guidelines

SOLAR ENERGY SYSTEMS APPLICATION

CITY OF ORONO HENNEPIN COUNTY, MINNESOTA

From Policy to Reality

PASSIVE SOLAR DESIGN. Substainable Architecture DESIGN PROJECTS M - ARCH: DONATA BIGAZZI

Planning and Zoning Division Department of Community & Economic Development. Applicant: Pat Milne

SOLAR ENERGY FARMS AND SOLAR ENERGY SYSTEMS

In addition to standard plan requirements, all plans submitted for PV installation shall include the following details:

The Renner Residence 2009 Mike and Elida Renner

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

RECENTLY APPROVED ACC GUIDELINES 6/24/09

CITY OF LA MESA FIRE DEPARTMENT SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE

WINDMILL CROSSING HOMEOWNERS ASSOCIATION, INC. Architectural Committee Guidelines For Townhomes

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Guidelines for Solar Photovoltaic Installation

Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Guideline for Fire Safety. Elements of Solar. Photovoltaic Systems

The Crossing at Twenty Mile

Job Ready Assessment Blueprint. Test Code: 4012 / Version: 01 Building Trades Maintenance

TOWN OF PREBLE PROPOSED LOCAL LAW NO. A FOR THE YEAR 2017

INTENT OBJECTIVES HISTORIC DESIGNATIONS

BURBANK FIRE DEPARTMENT 311 East Orange Grove Avenue, Burbank CA Fax

THERFORE, the Board of Supervisors hereby adopts the following amendments to the Zoning Ordinance by adding the following:

Administration Building Needs Assessment

(d) Metal buildings used for industrial uses are not exempt from additional landscape standards as required in Section (e).

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations

CHARTER TOWNSHIP OF PORT HURON

Installing Solar Water and Pool Heating Systems Objectives and Task Analysis for Solar Water and Pool Heating Systems Installation Contractor

REPORT CHECKLIST SUPPLEMENT

Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Green Points Worksheet

A Local Law amending Chapter Section 139, The Zoning Law of the Town of Lysander, New York.

Homesol Passive House Design Process

Oregon Administrative Rules. 1.5 Percent for Solar Energy in Public Building Construction Contracts

Design Guidelines and Planning & Zoning Code

ADDENDUM 2 - JULY 14, 2015

Digging Deeper SOLAR ENERGY. Forms of Solar Energy

ORDINANCE NO. BE IT ORDAINED by the City Council of the City of Waukee:

ENVIRONMENTALLY SUSTAINABLE CONSTRUCTION

10 tips from your Architect

Local Law No. 3 of 2015, entitled: Solar and Wind Energy Facilities Law

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Stage 10 Design & Building Guidelines

New Jersey Home Inspection - Standards of Practice

SECTION SECTIONAL OVERHEAD DOORS 511 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Division II Contractors

SOLAR PHOTOVOLTAIC ENERGY

COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ PHONE:

Passive Solar Energy Primer. Arizona Solar Center. Revised: 2015

COMMUNITY APPEARANCE STANDARDS

Solar Nova Scotia CANADIAN SOLAR HOME DESIGN MANUAL. for anyone wanting more than a suntan!

Series - 1

Gas meter clearances and service installation requirements

SMOKY RIDGE HOMEOWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITTEE (ACC) GUIDELINES EFFECTIVE DATE: April 22, 2019

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

ORDINANCE NO. THE LENT TOWNSHIP BOARD OF SUPERVISORS ORDAINS: The following language is hereby added to the Lent Township Zoning Ordinance:

Section X - Miscellaneous

Section 32 - Miscellaneous

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program

Architectural and Design Guidelines

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

The surface receives about 47% of the total solar energy that reaches the Earth. Only this amount is usable.

WOODCHASE SUBDIVISION GENERAL BUILDING GUIDELINES MANUAL

Appendix H Solar Energy Systems (SES) (Revised Ord. No )

SOLAR ENERGY INTRODUCTION:

ANALYSIS AND MITIGATION OF THERMAL EFFECTS ON A LARGE FACADE-MOUNTED PV ARRAY

Wildwood Home Owners Association Architectural Review Board Guidelines

BUILDING DESIGN MANUAL BLUE MOUNTAIN RETIREMENT ESTATE GEORGE Version 6

Heating, Cooling, Lighting: Sustainable Design Methods for Architects

PIERCE POINTE HOMEOWNER'S ASSOCIATION ARCHITECTURAL COMMITTEE GUIDELINES Post Office Box 930 Suwanee, Georgia 30024

Planning Rationale. A) Family Oriented Development

ENERGY EFFICIENT GLASS LESS ENERGY, MORE SAVINGS, BETTER FUTURE

Town of Worcester Local Law No. 1 of 2018 Solar Energy Systems

Sonoma County Energy Independence Program APPENDIX A ELIGIBLE IMPROVEMENTS

SMALL CELL DESIGN STANDARDS POLICY

Chapter 7. Passive Solar Contents


Building Trades Maintenance

OF THE PLANNING CODE FOR APPROVAL, MODIFICATION, OR DISAPPROVAL TO THE PLANNING DEPARTMENT. Planning

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

ENGINEERING AND CONSTRUCTION BRIEF REPORT. Áts Árpád Dudás Péter. Budapest University of Technology and Economics. Decathletes

Al Raha Gardens Development Control Regulations

Bid due date has been extended. Bids are due Wednesday, December 7 th at 2:00PM

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

Morning Glory Meadows 8345 North Morning Glory Road Paradise Valley, Arizona

Part 1 Review Questions on material covered in Midterms I & II

Solar Energy Technologies


Application Date: Received by: Application No. DRP-E, DRP-D, or DRP # Date Approved: By: Conditions? Fee: $ Plan Check: Date: Bldg Official: Date:

Basic technical information on solar PV

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Transcription:

INTRODUCTION The installation of Solar Energy Devices for Tatum Ranch businesses and residences is permitted following Architectural Committee review and approval. These guidelines for installation of Solar Energy Devices provides definitions, application requirements for Architectural Committee review, and Architectural Committee approval standards. DEFINITIONS A Collector is a component of a solar energy device that is used to absorb solar radiation, convert it to heat or electricity and transfer the heat to a heat transfer fluid or to storage. A.R.S. 44-1761(1). Solar Day Lighting is a device specifically designed to capture and redirect the visible portion of the solar beam spectrum, while controlling the infrared portion, for use in illuminating interior building spaces in lieu of artificial lighting. A.R.S. 44-1761(3). A Solar Energy Device is a system consisting of a series of mechanisms designed primarily to provide heating, to provide cooling, to produce electrical power, to produce mechanical power, to provide solar lighting or to provide any combination of the foregoing by means of collecting and transferring solar generated energy for such uses either by active or passive means. Such systems may also have the capability of storing such energy for future utilization (batteries or heated water). Passive systems shall clearly be designed as a solar energy device such as a Trombe wall and not merely a part of a normal structure such as a window. A.R.S. 44-1761(4). A Solar Energy Device does not include heat pumps, evaporative coolers, conventional windows and window treatments (dual pane, low-e, shade screens, reflective or dark coatings, awnings, interior shades, drapes and blinds), conventional skylights, reflective roof coatings, insulation, outsulation, radiant barriers, misting systems, and vegetation (shade trees, shrubs and grass). A Storage Unit is a component of a solar energy device that is used to store solar generated electricity or heat for later use. A.R.S. 44-1761(5). APPLICATION REQUIREMENTS Prior to installation of a Solar Energy Device, an application must be submitted for Architectural Committee review. The application should include scaled drawings showing construction details, elevations, location of the Solar Energy Device, location 1

and routing of all associated plumbing or electrical runs to and from the Solar Energy Device, and location of all associated components (pumps, filters, meters, tanks, utility disconnects, electrical control/safety devices). Product literature for the proposed Solar Energy Device and associated components must also be submitted. The color of the Solar Energy Device and associated components (i.e., electrical cabling, plumbing runs) must also be included. The Architectural Committee may request additional information or documents which must be supplied before the application is deemed complete. The Architectural Committee may choose to visit the Tatum Ranch home or business site where the Solar Energy Device is proposed to be installed to inspect the location and visibility to clarify and resolve any application ambiguities. APPROVAL STANDARDS Collectors or solar panels shall be mounted to minimize visual impact and shall comply with the following criteria: Collectors shall be mounted or located so as not to be seen from the ground level of common areas, neighboring properties, or the streets unless such location prevents the installation, impairs the functioning, or restricts the use of the Solar Energy Device or adversely affects the cost or efficiency of the device. For example, Collectors which can be hidden behind a parapet wall or a flat roof are preferable to Collectors located on a pitched roof. Photovoltaic panels (collectors) hidden behind a parapet wall on a flat roof If installation on a pitched roof is necessary, mounting of Collectors on the streetside of the home should be avoided if possible. If the street-side pitched roof has a southern exposure, mounting on other roof faces must be considered first. For example, reverse pitched mounting on the roof face toward the back of the house is preferred over street-side mounting. 2

Reverse Pitched System prior to screening If street-side mounting is necessary on a house with a southern exposure, side roof areas must be considered (with collectors grouped away from the street side as much as possible to reduce the visibility of the collectors from the street-side). Collectors must be mounted flush to the roof unless pitched collectors will reduce the visibility of the collectors from the street-side of the home (such as in the case of a reverse pitched system). Where pitched Collectors are used, the degree of pitch should be minimized to avoid visibility as much as possible. Collectors must be of a contiguous color with no metallic details or connections on or in the panels available to be seen from the street view. Collectors must be placed on the roof in a manner where the equipment has a balanced look and symmetry. 3

Non compliant street-side roofs with exposed and metallic mounting hardware and lack of symmetry in application of equipment Street-side application with metallic look and exposed mounting hardware Components of Solar Energy Devices other than the Collectors should be installed completely out of view inside the business or residence structure or on the grounds unless such placement prevents the installation, restricts the functioning, impacts the efficiency or adversely increases the cost of the Solar Energy Device. For a photovoltaic electric system, for example, unless there is an impairment to the system, no major components should be installed on the exterior of the home except for Collectors, roof mounted combiner box, dedicated photovoltaic meter, and photovoltaic system utility disconnect switch. 4

All required electrical components of a Solar Energy Device must be mounted or grouped with existing utility boxes, such as photovoltaic dedicated meters or photovoltaic system utility disconnects and must be painted to match the color of the business or residence structure. Except for the Collector panels, all other components of the systems (e.g., mounting assemblies, rails, solar panel edges, tilt legs, electrical and plumbing runs, combiner boxes) must be painted to match the color of the roof or wall to which they are attached or adjacent to. Wires, conduit, pipe, tanks and other associated components shall be hidden from view unless such placement prevents the installation, impairs the functioning or restricts the use of the Solar Energy Device or adversely affects the cost or efficiency of the device. If a solar water heater or similar system requires a roof-mounted tank, the tank must be painted to match the roof color of the business or residence unless painting it impairs the function of the system. 11/19/2008 5