Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2

Similar documents
Radiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

Clenergy ezrack SolarRoof Code-Compliant Planning and Installation With Australia AS/NZS1170

PV-ezRack SolarRoof Klip-Lok Interface

PV-ezRack SolarRoof Longline Interface

PV-ezRack SolarTerrace II

PV-ezRack SolarTerrace III

PV-ezRack SolarMatrix Pro

PV-ezRack Trapezoidal Installation Guide V2.0

PV-ezRack SolarTerrace III-A Installation Guide V1.2

STRUCTURAL DESIGN CERTIFICATE No: CSM SC Job No: 14S 391

MRac Trapezoidal Metal Roof Mounting System. Installation Guide

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

MRac Tile Roof Installation Guide

Rack-in-a-BoxTM INSTALLATION MANUAL

Solar Panel Mounting Kits

STP Mount Series. Installation Manual. STP-LSCR-MAN 2017 Edition v1.0. For models: STP-SCR/045 STP-SCR/060 STP-SCR/070 STP-LCR/090 STP-LCR/120

GROUND MOUNT INSTALLATION MANUAL

PRR. Flush Mount Racking System. Installation Manual

Mounting systems for solar technology

Always be your solar support

The Racking System Designed By Installers for Installers

Chiko V Solar Ground Mount

DPA Solar Racking Solutions Ground Mount Installation Guide V1.5

MANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

PRB. Flush Mount Racking System. Installation Manual

Conergy SolarFamulus II

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

DynoRaxx EVOLUTION PR Quick Guide Installation Steps

XIAMEN MIBET NEW ENERGY CO., LTD. SOLAR PANEL SUPPORT FRAME ADJUSTABLE TRIPOD MOUNTING SYSTEM FOR CONCRETE AND METAL ROOF

MOUNTING SYSTEMS PRODUCT CATALOG

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

Mounting systems for solar technology

Stealth Residential Roof Mount System Installation Manual

Aurora Genmounts Install LT Installation Manual

PRU-D INSTALLATION MANUAL MONO-LEG SYSTEM. PRU-D / Portrait - Revision B July 31 st, 2017 Polar Racking Inc.

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

The Racking System Designed by Installers for Installers. PV Stealth Roof System Installation Instructions

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

Installation Manual Solar Mounting System (Flat Roof Tilted Solution)

MOUNTING SYSTEMS APPLICATIONS OVERVIEW

On-roof system Tau Installation manual

mounting systems applications overview

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Mounting systems for solar technology

SnapNrackTM GROUND MOUNT CODE COMPLIANT INSTALLATION MANUAL

TRAPEZOIDAL SHEET METAL RAIL

SECTION ORNAMENTAL ALUMINUM FENCING

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560

MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM

ST-AK 1/12. Photovoltaic Mounting Systems. Assembly Instructions. Mounting system for roofing with trapezoidal sheet metal

Modular. Lighter. Quicker.

PV s Most Versatile Mounting System

Mounting instructions

RAPIDRAC G10. Unirac Code-Compliant Installation Manual. Code-Compliant Installation Manual 650. Table of Contents. Bright Thinking in Solar

ASSEMBLY INSTRUCTIONS COMMERCIAL ROOF SOLUTIONS D DOME RAILLESS 2 SYSTEM. UL 2703 Listed System USA

Unirac Code-Compliant Installation Manual

SECTION COLD-FORMED METAL TRUSSES

PITCHED ROOF. Photovoltaic Mounting Systems. Assembly Instructions. for roofing tiles, plain tiles and slate

GC-X360S-W GC-X360S-B

INSTALLATION INSTRUCTIONS TRI-STAND East-West. energy for a better world. Mounting system for PV systems with east-west orientation on flat roofs

Adjustable S-Tile Installation Manual

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

Ballasted Roof Mounting Installation Manual

Mounting systems for solar technology

STRUCTURAL REPORT. Magerack Series 101 PV Mounting System. 130 mph Wind, Exposure B & C. California DESIGNER OF RECORD

SWH Solar Racking Ground Mount Installation Guide

SECTION ORNAMENTAL WELDED STEEL FENCING

DynoRaxx EVOLUTION PR Guide to Code Compliant Installation

EJOT Solar Fastenings. Installation Manual

Solcellspaket - Poly (4.2 kwp Jinko 265W Poly) System Plan. Created with Solar-Planit by Mikael Johansson Futura Energi AB in Simrishamn.

MANUAL. portrait set-up. landscape set-up. ClickFit Evo mounting system for sloping roofs with roof tiles for solar panels

Mounting systems for solar technology

Mounting systems for solar technology

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Leveling Foot RB210. Leg Extender RLT66

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Cyclonic Area. Design Manual. Using TOPSPAN profiles and LYSAGHT roofing and walling claddings in cyclonic areas

ConSole, ConSole+ Flat-roof mounting system for PV-modules and -laminates. From visions to solutions

Clean Energy Creating A Bright Future

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

Model T2642E Wall Mount. Television Wall Mount with Tilt Option

Ground Mounting System I Installation Manual

At last! Construction bracing made easy...

Installation Instructions

Washer, Electrical Equipment Bond. WEEB Patent Pending INSTALLATION INSTRUCTIONS. For POWER-STRUT Mounting System only

Composition L-Foot Kit Installation Manual

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

Streamline Solar Photovoltaic Structural Criteria for Residential Rooftop Solar Energy Installations (Streamline Solar Form 5)

For Silverback Solar

Pallet Gate Installation Instructions and Operators Manual

Sub-construction for Wall-mounted Longlight

Transcription:

Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2 The Solar Tripod System has been developed as a universal system for roof-mounting on flat roofs. The use of patented (pending) aluminium base rails, Click-In Clamp and Base Rail Pre-Clamp technology eliminates custom cutting and enables particularly fast installation. Please review this manual thoroughly before installing your Solar Tripod system. This manual provides: (1) Supporting documentation for building permit applications relating to Solar Tripod Universal PV Module Mounting system. (2) Planning and installation instructions for Solar Tripod. The installer is solely responsible for: 1. Complying with all applicable local or national building codes, including any that may supersede this manual; 2. Ensuring that Rack and other products are appropriate for the particular installation and the installation environment; 3. Ensuring that the roof, its rafters, connections, and other structural support members can support the array under building live load conditions (this total assembly is hereafter referred to as the roof rafter assembly); 4. Using only rack parts and installer-supplied parts as specified by Rack (substitution of parts may void the warranty and invalidate the Radiant certification); 5. Ensuring that the leg screws have adequate pull out strength and shear capacities as installed; 6. Maintaining the waterproof integrity of the roof, including selection of appropriate flashing; and 7. Ensuring safe installation of all electrical aspects of the PV array. Installation tools 1. 6mm allen key; 2. Cordless drill; 3. Plain end screwdriver; 4. Power Cord; 5. Adjustable Spanner. Page 1 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

Code-Compliant Planning This document is designed to support for installations using Solar Tripod mounting System, manufactured by Radiant Co. Ltd. Follow steps below and the installation instructions section to install Solar Tripod in compliance with the AS/NZS1170.2. Before proceeding, note the following: This document addresses only wind loads on the assumption that wind produces the maximum load factor affecting an installation. Verify that other local factors, such as snow loads and earth quake effects, do not exceed the wind loads. Give precedence to any factor that does. Wind loads are considered to act on the entire projected area, or may be perpendicular to any surface. The roof on which the Solar Tripod will be installed must have the capacity to resist the combined Design Dead Load and Live Load per footing. 1. Determine the wind region of your installation site Region Definition: Wind regions are pre-defined for all of Australia by Australian Standard 1170. The Wind Region has nothing to do with surrounding topography or buildings. Most of Australia is designated Region A which indicates a Regional Ultimate Basic Wind Velocity of 45meter / per sec. Some areas are designated Region B (57meter / per sec). Local authorities will advise if this applies in your area. Region C areas (66meters / per sec) are generally referred to as Cyclonic and are generally limited to northern coastal areas. Most Region C zones end 100km inland. Region D (80meters / per sec) is Australia's worst Cyclonic Region between Carnarvon and Pardoo in Western Australia. 2. Determine the height of the of your installation site This document provides sufficient information for Solar Tripod system installation height less than 20 meters. If your installation site is more than 20 meters in height, please contact Radiant to obtain engineering data to support your installation. Page 2 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

3. Determine the Maximum Rail Support Spacing Base Rail 40 Please use the following table to determine the Base Rail40 support spacing for flat roof installations timber purlin screws. This applies to the tripod being installed flat, or with appropriate Radiant lifting legs, or klip lok clamps (see p.5). MAXIMUM SOLAR TRIPOD IN mm FOR TIMBER BATTENS / PURLINS ROOF ZONE Installation Height Region A & B (mm) Region C (mm) 5 Meters 1325 780 Internal Zone 10 Meters 1200 730 15 Meters 1160 680 20 Meters 1100 640 5 Meters 660 390 Edge 10 Meters 600 365 Zone 15 Meters 680 340 20 Meters 550 320 The above figures are based on modules lengths of up to 2000mm, maximum weight of 29Kg 2000mm modules requires 2 rails with fixing as per table above The above spacing applies for fixing through thin sheet purlins (greater than 1.0mm thickness) or a minimum embedment of 50mm into timber purlins. Solar Tripod system should be fixed to the purlins under using 2 x 14G self-drilling screws, The above figures are based on modules lengths of up to 2000mm, maximum weight of 29Kg Installation degree from 10 degree to 45 degree Please use the following table to determine the Base Rail 40 support spacing for flat roof installations using steel purlin screws. This applies to the tripod being installed flat, or with appropriate Radiant lifting legs, or klip lok clamps (see p.5). MAXIMUM SOLAR TRIPOD IN mm FOR STEEL BATTENS/PURLINS ROOF ZONE Installation Height Region A & B (mm) Region C (mm) 5 Meters 1250 730 Internal Zone 10 Meters 1150 680 15 Meters 1100 650 20 Meters 1000 600 5 Meters 630 360 Edge 10 Meters 570 340 Zone 15 Meters 550 320 20 Meters 500 300 2000mm modules requires 2 rails with fixing as per table above The above spacing applies for fixing through thin sheet purlins (greater than 1.0mm thickness) or a minimum embedment of 50mm into timber purlins. Solar Tripod system should be fixed to the purlins under using 2 x 14G self-drilling screws, The above figures are based on modules lengths of up to 2000mm, maximum weight of 29Kg Installation degree from 10 degree to 45 degree Page 3 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

Base Rail 60 Please use the following table to determine the Base Rail60 support spacing for flat roof installations timber purlin screws. This applies to the tripod being installed flat, or with appropriate Radiant lifting legs, or klip lok clamps (see p.5). Note: these spacing calculation are only applicable with use of the Radiant Base Rail 60 ensure you have the correct rail. MAXIMUM SOLAR TRIPOD IN mm FOR TIMBER BATTENS / PURLINS ROOF ZONE Installation Height A B C D 5 Meters 2400 2250 2020 1730 Internal Zone 10 Meters 2230 2140 1910 1660 15 Meters 2120 2050 1840 1590 20 Meters 2030 1980 1780 1510 5 Meters 2020 2250 1820 1610 Edge 10 Meters 1930 2140 1630 1520 Zone 15 Meters 1790 2050 1510 1420 20 Meters 1650 1980 1400 1350 The above figures are based on modules lengths of up to 2000mm, maximum weight of 29Kg 2000mm modules requires 2 rails with fixing as per table above The above spacing applies for fixing through thin sheet purlins (greater than 1.0mm thickness) or a minimum embedment of 50mm into timber purlins. Solar Tripod system should be fixed to the purlins under using 2 x 14G self-drilling screws, The above figures are based on modules lengths of up to 2000mm, maximum weight of 29Kg Installation degree from 10 degree to 45 degree 4. Verify Acceptable Rail End Overhang Rail End Overhang must equal 1/3 or less of foot spacing. Thus, if foot spacing is 1500mm, the Rail End Over hang can be up to 500mm. In this case, two feet can support a rail of as much as 2500mm (1500mm between the feet and 500mm of overhang at each end). 5. Determine Roof slope Solar Tripod system can be used for roof slope up to 60 degrees. Please verify the Installation site roof slope should be between 0 degrees and 60 degrees. 6. Determine Roof Installation Roof Areas A typical procedure in calculating the maximum building height for the installation of solar panel is given above.if you know the building height, terrain category, wind region and roof pitch, and then you can determine the edge distance as well. A roof can be divided into two zones, the internal zone and the edge zone. The width of these outer zones can be determined based on the length, width and average height of the building. If fixings are located in the internal or edge zones, then the maximum spacing to the next fixing must be reduced, as per the tables above on page 3 and 4. Page 4 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

Solar Tripod Components for Flat Roof Installation RADIANT SOLAR TRIPOD PLANNING AND INSTALLATION GUIDE v1.2 *Both Klip Lok Clamps and Lifting Leg options are for Radiant Solar Tripod installation. Two per a tripod and are required to install at set rail support spacing found on page 3. Radiant certified Klip Lok clamps include: Lysaght 700, 700, Lysaght 406, 406, & Diamond III. Note: Installations using the Base Rail 60 include all above mentioned components except the Base Rail 40. Spacing for this rail is on page 4 of this installation guide. Page 5 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

Installation preparation Overview of system components Planning the module area 1. Number of modules in horizontal direction x (module width + 23.5 mm) + 60 mm 2. Distance between the modules: 23.5 mm 3, Overhang: 40mm 4, Number of modules in the vertical direction x module height (please check also the installation manual of the manufacturer of the solar module) Page 6 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

INSTALLATION INSTRUCTIONS SOLAR TRIPOD INSTALLATION 1, Unfold the Pre-Assembled Solar Tripod. 2, Enclosed inside the tripod is the back leg used for angle adjustment. Pull out the back leg to create a triangle. 3, Determine your chosen degree of angle from the adjustable back leg holes. Bolt the Solar Tripod using bolt and nut. 4, Tighten and your Solar Tripod is ready. Continue installation by deciding on your fixing system using either Ballast, Anchor Bolt, or Sheet. FIXING ON THE ROOF(BALLAST) 5A. If you are installing the Solar Tripod using a ballast weight system: Place Tripods in position and secure with determined weight ballast blocks designed to secure system to the roof. 5B. Repeat Ballast to all Solar Tripods in each array. When you are complete you will be ready to install the rails. Page 7 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

FIXING ON THE ROOF(ANCHOR BOLT) 6A. Fix Tripod with Anchor Bolt to the concrete roof. Solar Tripod has two predetermined holes for bolt insertion. 6B. Repeat Anchor Bolt installation to all Solar Tripods in each array. When you are complete you will be ready to install the rails. FIXING ON THE ROOF(SHEET ROOF) 7A. Position Solar Tripods parallel or across the sheet purlins. Using wood screws, attach the Solar Tripod using 2 screws. If applicable, installer can use 2 x klip lok clamps, or 2 x lifting legs, to attach between tripod and appropriate profiled roof. 7B. Repeat sheet installation to all Solar Tripods in each array. When you are complete you will be ready to install the rails. BASE RAIL INSTALLATION 8. When Tripods are all aligned and secured to the roof, simply slide the rail down until rail clicks into the preassembled rail clips. Page 8 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

9. Using a cordless drill, tighten the rail clips to firmly tighten the rails into place. 10. Ensure to insert splice (joiners) underneath rail to connect long arrays. 11. Tighten using Allen Key. WIND CROSS SET INSTALLATION 12. To finish the racking installation, and ensure the system is secure, assemble the wind cross set at the back of Solar Tripod system. 13. Tighten the wind cross set. Page 9 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

PV MODULES INSTALLATION 14. Place the module end clamp into the rail by entering on an angle (hooking one side of the rail) and applying pressure. 15. Layout first panel against the first end clamp. Put module middle clamp (including earthing plate) into the rails, place it firmly against the module and fasten loosely (approx. 2-3 turns). Now inset the next module against the previously installed module and tighten the inter-module clamp using the Allen key. (Recommended torque is 15 Nm). 16. Put rail cap into the base rail, Continue mounting the modules as described in steps 11 to 12 until all modules are installed. The installation is finished! Page 10 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)

15 Years Standard Warranty Terms and Conditions RADIANT International ( RADIANT ) warrants to the original purchaser ( Purchaser ) of product(s) that it manufactures ( Product ) at the original installation site that the Product shall be free from defects in material and workmanship for a period of fifteen (15) years, except for the anodized finish which shall be free from visible peeling, or cracking or chalking under normal atmospheric conditions, from the earlier of: 1). the date the installation of the Product is completed, or; 2). 30 days after the purchase of the Product by the original Purchaser. The Warranty does not apply to any foreign residue deposited on the finish. All installations in corrosive atmospheric conditions are excluded. The Warranty is VOID if the practices specified by AAMA 609 & 610-02 Cleaning and Maintenance for Architecturally Finished Aluminium (www.aamanet.org) are not followed by Purchaser. This Warranty does not cover damage to the Product that occurs during its shipment, storage, or installation. This Warranty shall be VOID if installation of the Product is not performed in accordance with RADIANT s written installation instructions, or if the Product has been modified, repaired, or reworked in a manner not previously authorized by RADIANT IN WRITING, or if the Product is installed in an environment for which it was not designed. RADIANT shall not be liable for consequential, contingent or incidental damages arising out of the use of the Product by Purchaser under any circumstances. If within the specified Warranty periods the Product shall be reasonably proven to be defective, then RADIANT shall repair or replace the defective Product, or any part thereof, in RADIANT s sole discretion. Such repair or replacement shall completely satisfy and discharge all of RADIANT s liability with respect to this Limited Warranty. Under no circumstances shall RADIANT be liable for special, indirect or consequential damages arising out of or related to use by Purchaser of the Product. Manufacturers of related items, such as PV modules and flashings, may provide written warranties of their own. RADIANT s Limited Warranty covers only its Product, and not any related items. Page 11 of 11 Solar Tripod installation manual-version 1.2 (updated January 2013)