GypLyner framed structural steel encasement system

Similar documents
FireCase. Frameless structural steel encasement system. FireCase.

GypLyner UNIVERSAL (Ceilings)

ShaftWall. Shaft and duct encasement system. ShaftWall.

Staggered stud acoustic partition system

GypLyner IWL Independent wall lining system

FireWall. High performance fire-resistant wall system. FireWall.

CO3. Steel encasements C03. Introduction - FireCase 01/12/2017 GypLyner encase 11/05/2017. Introduction Steel encasements

Tiling Tiling

GypLyner (Ceilings) Concealed grid ceiling lining system. GypLyner UNIVERSAL.

ShaftWall. Shaft and duct encasement system. ShaftWall.

GypLyner UNIVERSAL Metal framed wall lining system

GypWall AUDIO The ultimate sound insulating wall system

C08. S04. P02 P08 Tiling

GypLyner (walls) Metal framed wall lining system. GypLyner.

Single frame acoustic separating wall system

GypLyner UNIVERSAL Metal framed wall lining system

22 The Lowry Centre, Salford

GypWall TM ROBUST 4.4. GypWall ROBUST. Durable impact resistant partition system. Key facts. Sector Guide

Quantity take-off details

GypWall QUIET Acoustic separating wall system

C05. S03. P02 P08 FireWall

The ultimate impact resistant partition

C05. S03. P02 P08 FireWall

C04. S05. P02 P14 GypWall quiet sf

SoffitLine. Thermal lining system for semi-exposed soffits. SoffitLine.

Curved partition and wall lining system

GypWall RAPID db Plus

Issue date: 1st May Key changes since original publication (July 2005):

GypLyner UNIVERSAL Concealed grid ceiling lining system

GypLyner UNIVERSAL Concealed grid ceiling lining system

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

Tiling Tiling Finishes C08

C05. S02. P02 P30 ShaftWall

Independent twin frame high performance acoustic separating wall system

Single frame acoustic separating wall system

Gypframe profiles. Dimensional specifications

Gypframe profiles. Dimensional specifications

GypWall AUDIO The ultimate cinema wall system

The ultimate sound insulating wall system

Staggered stud acoustic partition system

Tiling. Tiling.

FlameLyner Industrial fire-resistant lining system

The extra strong, extra durable, sound resistant system that you can direct fix to

CasoLine MF Concealed grid MF suspended ceiling system

CO5. Specialist partitions C05. Introduction - ShaftWall 29/03/2018 FireWall 29/03/2018 GypWall curve 16/12/2016 GypWall secure 29/03/2018 BlastWall -

GypWall QUIET Acoustic separating wall system

Gypframe profiles. Dimensional specifications

C04. S11. P02 P13 Non-loadbearing timber stud

CasoLine MF Concealed grid MF suspended ceiling system

Boards. Products - Boards.

Cavity fire barriers. Cavity fire barriers. Fire separation within concealed spaces. C06 Floors and ceilings

C07. S04. P02 P10 GypLyner universal

Issue date: 15th January Key changes since original publication (July 2005):

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

Semi-exposed soffits. Thermal lining system for semi-exposed soffits. Semi-exposed soffits.

Selecting floors and ceilings

Loadbearing timber joist floors

October Plasterboard baffle. Hilti CP617 Putty Pad. Socket detailing. White Book supplement

C06. S02. P02 P22 CasoLine mf

Internal walls. Creating perfect living spaces. Technical Advice Centre Tel:

CasoLine mf. Concealed monolithic metal frame suspended ceiling system

SOUND SOLUTIONS FOR YOUR HOME. Controlling the volume of everyday living How to solve a problem you have with noise

GypWall TM EXTREME. GypWall EXTREME 4.5. Ultimate impact and abrasion resistant partition system. Key facts. Sector Guide

C06. S06. P02 P20 Loadbearing timber joist floors

C06. S05. P02 P12 GypFloor silent

SOUND SOLUTIONS FOR YOUR HOME. Controlling the volume of everyday living How to solve a problem you have with noise

C06. S05. P02 P12 GypFloor silent

CO9. Sound absorbing solutions C09

May 2012 C1/SfB (35) R17. Gyptone Access Hatch Trap Guide. Rapid access system for corridor above-ceiling services

GypFloor SILENT 6.4. Sound insulating floor system. Key facts. Sector Guide

Sheathing Board Xtra protection, built in.

Knauf C-Form Suspended Ceilings

SOUND INSULATION ASSESSMENT RANELAGH MULTI-DENOMINATIONAL SCHOOL, DUBLIN October 2014

promise Comprises only the highest quality components, designed to work individually and together to deliver the specified level of performance.

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide

Creating perfect living spaces. Shaping spaces for living, with internal lining solutions that enhance lifestyles. Creating perfect living spaces

C09. S02. P02 P14 CasoLine mf

Plasterboard selector guide Dedicated to plasterboard

CERTIFICATE OF APPROVAL No CF 422 PROMAT UK LTD

Selecting partitions

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness,

Assessment Number BTC 16422FA

The new high-performance lining for internal and external applications INSIDE OR OUT YOUR CHOICE

Tiling. Capital Gate Hotel, Abu Dhabi - UAE

CO8 Finishes. Finishes C08. Introduction - Plaster skimming 29/03/2018 Jointing 29/03/2018 Tiling 29/03/2018 Decorative effects 29/03/2018

THE STEELFORM GOLD STANDARD. Product Data Sheet. Non-loadbearing Steel Studs (NLB)

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

ColumnClad System. Rigid fire protection solutions for structural steel columns and beams

6.8. Semi-exposed soffits Semi-exposed Soffits. Key facts. Sector Guide. MultiBoard with thermally efficient phenolic foam

Plasterboard accessories - Products

Report Number BTC 14574S

C08. S02. P02 P08 Plaster skimming

Sheathing Board Xtra protection, built in.

Knauf MF Suspended Ceilings

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System

NATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System

steel stud drywall ceiling systems

C07. S03. P02 P24 DriLyner basic, tl, mf, rf

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING

Transcription:

GypLyner framed structural steel encasement system is a steel encasement system which provides a rapid method of cladding structural steel sections to provide up to 10 minutes fire resistance. The system will protect universal column and beam sections, with flange thicknesses between 6mm and 2mm, and will also protect many joist sections, portal frames, and castellated beam sections. It can be used in any type of building where encasement is required to structural steel. www.british-gypsum.com 396

Technical support: T 044 00 1991 F 044 561 16 E bgtechnical.enquiries@bpb.com Key facts Quick and simple to install Lightweight support framework constructed from 1 GypLyner components 2 Easy to box-out High levels of fire protection to structural steel Up to 10 minutes fire protection 1 2 Gypframe GL1 Lining Channel Gypframe GL10 GypLyner Steel Framing Clip 397

www.british-gypsum.com Components Gyproc and Glasroc board products Gyproc FireLine 2 Thickness Width 12.5, 15mm 900, 1200mm Take-off quantities 1 Gypframe metal products Gypframe GL1 Lining Channel Length 2400, 2700, 3000, 3600mm Take-off quantities 1 Gyproc DuraLine 2 Thickness Width 15mm 1200mm Gypframe GL3 Channel Connector Glasroc FireCase s Thickness Width 15, 20, 25, 30mm 600, 1200mm Gypframe GL10 GypLyner Steel Framing Clip Glasroc MultiBoard Thickness Width 6, 10, 12.5mm 1200mm Gypframe GA2 Steel Angle Length 3200mm 1Quantities will vary according to structural steel section dimensions. 2 Moisture resistant boards are specifed in intermittent wet use areas e.g. shower cubicles. 39

Technical support: T 044 00 1991 F 044 561 16 E bgtechnical.enquiries@bpb.com Fixing and finishing products Gyproc Drywall Screws For fixing boards to framing. Take-off quantities 1 Fixing and finishing products Gyproc jointing materials For a seamless jointing. Take-off quantities 1 Gyproc Wafer Head Drywall Screws For fixing channel noggings to Gypframe GL1 Lining Channel. Thistle Multi-Finish or Thistle Board Finish Providing a plaster finish as an alternative to jointing. Gypframe GFS1 Fixing Strap Length 2400mm Gypframe GFT1 Fixing T Length 2400mm or Thistle Durafinish To provide improved resistance to accidental damage. or Thistle Spray Finish Gypsum finish plaster for spray or hand application. 399

www.british-gypsum.com Construction tips Estimated construction time is 6m 2 / man hour (single layer encasement) or 3m 2 / man hour (multi-layer encasement) ready for finishing Determine if encasement needs to be boxed-out e.g. to achieve a specific common dimension or to build out beyond fixing bolts Partitions and wall linings can be fixed through to the metal framework Where the steel section web or flange dimension exceeds 600mm, additional support will be required for the cladding (see Installation Additional support) Select the correct type and thickness of board. This depends on the section factor, A/V (Hp/A), and the degree of fire protection required. Refer to the specification Maximum A/V (Hp/A) = 260-1, calculated on the basis of box protection to 3 or 4 sides 400

Technical support: T 044 00 1991 F 044 561 16 E bgtechnical.enquiries@bpb.com Installation 1 2 3 Four-sided protection to steel columns Friction-fit Gypframe GL10 Steel Framing Clips onto the column flanges. Position Gypframe GL10 clips within 100mm of the base and soffit, and at intervals in between (00mm maximum centres). Ensure that clips are fully engaged so that each row is in alignment. The Gypframe GL1 Lining Channel stand off from the face of the structural steel frame is 25mm and 10mm from the edge of the flange. Snap Gypframe GL1 Lining Channel section over the clips to form the steel framework. Where lengths of Gypframe GL1 Lining Channel abut, position Gypframe GL10 clips to either side to provide a fixing support to each channel end (i.e. two Gypframe GL10 clips to each joint ) or alternatively use Gypframe GL3 Channel Connectors to join the Gypframe GL1 Lining Channels. 401

www.british-gypsum.com 4 5 6 Cut boards to width and fix to all framing members at 300mm centres using Gyproc Drywall Screws. Start with a half length board on opposite sides to stagger board joints around the column. Select the length of Gyproc Drywall Screw to provide a nominal 10mm penetration into the steel framing. Cut short lengths of Gypframe GL1 Lining Channel (Figure 5) or Gypframe GFT1 Fixing T (Figure 6) so as to form horizontal noggings to back board end joints. If the steel section web or flange dimension exceeds 600mm, a nogging should be formed from Gypframe GL1 Lining Channel installed at 600mm intervals (see Installation Additional support). Fix to vertical channels using Gyproc Wafer Head Drywall Screws, and when board fixing provide an intermediate screw-fixing through each board end into the nogging. 402

Technical support: T 044 00 1991 F 044 561 16 E bgtechnical.enquiries@bpb.com 7 Continue cladding in the same manner progressively working up the column. To complete the encasement, cut boards to suit and screw-fix. Multi-layer linings Locate a short length of Gypframe GFS1 Fixing Strap behind board joints at right angles to the Gypframe GL1 Lining Channels. Install board layers as per the first layer, staggering board joints between each layer. Cut boards to width making the additional allowance necessary to cover the thickness of the previous board layer. Three-sided protection to steel columns and beams Locate Gypframe GA2 Steel Angle to both sides of the wall/soffit flange. Position such that the face of the angle section is level with the edge of the flange and secure using appropriate fixings (e.g. shot fired into steel) at 600mm maximum centres. 403

www.british-gypsum.com 9 Friction fit Gypframe GL10 clips to both edges of the room facing flange. Position at 00mm maximum centres, ensuring that adjacent clips are in alignment. Snap Gypframe GL1 Lining Channel over the clips to form the steel framework. Where lengths of Gypframe GL1 Lining Channel abut, position Gypframe GL10 Clips to either side to provide a fixing support to each channel end (i.e. two Gypframe GL10 clips to each joint ), alternatively use Gypframe GL3 Channel Connectors to join the Gypframe GL1 Lining Channels. 10 Cut boards to width and fix to all framing members at 300mm centres using Gyproc Drywall Screws. Start with a half length board on opposite sides to stagger board joints. Select the length of drywall screw to provide a nominal 10mm penetration into the steel framing. 404

Technical support: T 044 00 1991 F 044 561 16 E bgtechnical.enquiries@bpb.com 11 12 Install Gypframe GL1 Lining Channel or Gypframe GFT1 Fixing T noggings to support board end joints as for four sided encasements. Continue boarding in the same manner progressively working up the column or along the beam. To complete the encasement, cut boards to suit and screw-fix. Multi-layer linings A short length of Gypframe GFS1 Fixing Strap is located behind board joints at right angles to the Gypframe GL1 Lining Channels. Install outer layer boards as per the first layer, staggering board joints between each layer by a minimum of 600mm. Cut boards to width making the additional allowance necessary to cover the thickness of the previous board layer. Additional support Where the steel section web or flange dimensions exceed 600mm, additional support will be required for the cladding. Fix noggings of Gypframe GL1 Lining Channel at 600mm centres between adjacent Gypframe GL1 Lining Channels, to supplement the framing. Position noggings to coincide with board end joints. 405

www.british-gypsum.com 13 14 15 Boxing out Extend encasements by installing a Gypframe metal stud and channel framework independant of the steel lining height. Use intermediate Gypframe I Stud to maintain board support at maximum 600mm centres. See GypLyner IWL for guidance. Additional fire protection Where 10 minutes fire protection is required (to columns only), Glasroc FireCase S is specified as the cladding. Fix Glasroc FireCase S boards through to the metal framing as for Gyproc FireLine or Glasroc MultiBoard, using appropriate length Gyproc Drywall Screws. 406

Technical support: T 044 00 1991 F 044 561 16 E bgtechnical.enquiries@bpb.com 407