A guide to the installation of Junckers 20.5mm, 22mm and 14mm clip system floors

Similar documents
SOLID HARDWOOD FLOORS INSTALLING WITH CLIPS

18mm T&G Engineered Oak Fitting Guide & Warranty Information

SUPPORT - INSTALLATION ADVICE STEP1 - BEFORE YOUR FLOORING ARRIVES

Lock Installation Instructions for BT Strand Lock, BT Strand Engineered & BT Bamboo Engineered

Instructions for laying Parmate Engineered Flooring

Specification for Solid Timber Flooring Installation, Sanding and Coating

INSTALLATION INSTRUCTIONS FOR WICANDERS 2G FLOORS

RESIDENTIAL 15 YEARS W A RRANTY

INSTALLATION INSTRUCTIONS FOR WICANDERS HYDROCORK

INSTALLATION INSTRUCTIONS FOR WICANDERS 5G-C FLOORS

j u n c k e r s i d e a l w i t h u n d e r f l o o r h e a t i n g

Installation Procedure of Floating floors

Specification for Engineered, Laminate and Bamboo Installation

GENERAL INSTRUCTIONS: URBAN OAK 21/22MM ENGINEERED FLOORING

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING

Specification for Engineered, Laminate and Bamboo Installation

APPLICATION: Floor insulation precast suspended concrete floor. Products: Jabfloor 70, 100, 150, 200, 250

INSTALLATION GUIDE. Please read all the instructions before you begin the installation. Improper installation will void warranty.

STEP BY STEP D.I.Y INSTRUCTION MANUAL

APPLICATION: Floor insulation precast suspended concrete floor. Products: Jabfloor Premium 70 and 100

DURABASE CI 1/5. Underlay mats for decoupling and waterproofing tiled flooring APPLICATIONS AND FUNCTION.

Installation Instructions for SuperFast Hurricane

UNDERFLOOR HEATING THE LEVELDEK SYSTEM LIVING AND SPORTS

Garage Conversion - Between and Under Joist Applications

Please Note: PhoneStar was previously branded as Phonewell

Installation Instructions. For. Tuscan Engineered 5GC. Wood Floors

Jabfloor is also available in higher grades up to Jabfloor 250 which may be required in certain specialist industrial and commercial applications.

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

APPLICATION: Floor insulation below chipboard finish

Most products will act differently when installed over an UFH system than when installed on a standard unheated subfloor.

Storage: Store the unopened Lalegno packs in a dry, covered place, off the ground (on pallet or similar).

INSTALLATION INSTRUCTIONS LAMINATE

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

Installation Guidelines: Magnolia

QUICK STEP READYFLOR MULTIFIT INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

The flooring comes complete with a 20 year structural warranty providing peace of mind, which most of our competitors cannot offer.

WARRANTY INFORMATION

Quick Step TIMBER Multifit installation instructions

HYBRID. Pre-Laying Checks

Rigid Core Installation & Maintenance Instructions

September Saddle Flooring Systems

FLOORING RESIDENTIAL INSTALLATION GUIDE

General and Installation Instructions Laminate - 2G + 2G

CONTENT. Laying method. Herringbone installation method. Chevron installation method INSTALLATION REQUIREMENTS FOR WOOD FLOORS PAGE 2.

Jabfloor High Performance (HP) 70 and 100

Wooden suspended floors

INSTALLATION INSTRUCTIONS

Laminate Flooring Charlestowne Collection

TILING SPECIFICATIONS

premium click optimum click

Underfloor Heating. BS8425 Code of Practice for Installation of Laminate Floorcoverings and the Code of Practice issued by the

premium click optimum click

Floors Walls Roofs. Jabfloor Premium board Jablite Premium board Jabfloor board Jablite board. APPLICATION: Basements PRODUCTS: Vencel Resil Limited

DURABASE CI. Underlay mats for decoupling and sealing tiled flooring 1/5 A P P L I C A T I ONS AND FUNCTION.

14mm LOC Engineered Oak Fitting Guide & Warranty Information

1. The subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360.

APPLICATIONS AND FUNCTION:

INSTALLATION INSTRUCTIONS - Please read before installation

Solid Hardwood Flooring. Underfloor heating Sport

Vinyl Flooring Installation Guide Go online at bathstore.com for any assistance

WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions

optimum glue Preparation INSTALLATION INFORMATION We recommend to order all panels for the same commercial flooring project at the same time.

INSTALLATION INSTRUCTIONS

Jabfloor 70, 100, 150, 200, 250

INSTALLATION OF LOOSE LAY VINYL

INSTALLATION INSTRUCTIONS

INSTRUCTIONS FOR INSTALLATION

Refurbishment site guidance for solid-walled houses ground floors

INSTALLATION WARRANTY GUIDELINES

Polyfoam Floorboard For thermal insulation of floors

COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION

Existing Floors & Low Profile Systems

INSTALLATION INSTRUCTIONS FOR HYDROCORK AS GLUE DOWN

Vinyl Flooring Installation Guide Any queries? Visit

Installation Engineered Flooring

Installation instruction

Xtratherm Thin-R Underfloor Board (XT/UF Grade)

Jabfloor 70, 100, 150, 200, 250

HDWPC Flooring Installation Guidelines

INSTALLATION INSTRUCTIONS

Concrete 1,8 2,0 Anidrite 0,3 0,5

Use a special underlay above 45 C. Click-it! Never use a hammer or tapping block. Keep indoor climate conditions above 0 C.

Mega Clic Laminate Floor Installation Instructions

PLYWOOD FLOATING FLOOR

hüma PARKETTSYSTEM GmbH INSTALLATION GUIDE

silkwood installation guide engineered hardwood flooring An easy-to-follow installation guide for Silkwood engineered hardwood flooring

INSTALLATION INSTRUCTION

Mohawk SolidTech. SolidTech Installation Guidelines. Preparation

Nu-Heat UNDERFLOOR & RENEWABLES

Pre-finished Engineered

SOLID HARDWOOD PLANK. Product Use & Installation Options. Before Installation Product Inspection & Site Preparation. 18mm Solid hardwood flooring

INSTALLATION METHODS ENGINEERED FLOORING FLOATING, GLUED-DOWN OR NAILED INSTALLATION METHODS

Specialists in Acoustic Flooring and House to Flat Conversions

J41 Reinforced bitumen membrane roof coverings

Solid Floor Systems. Underfloor heating for solid or screeded floors. Clip rail and staple system. Red Floor Panel

Malmo Click 5GC Flooring

Installation Recommendations

Transcription:

CI/SfB (43) Xi3 (D6) Information you will need for a perfect result every time! A guide to the installation of Junckers 20.5mm, 22mm and 14mm clip system floors 22mm and 20.5mm - sports, commercial and domestic 14mm - domestic, light-duty commercial Please follow these simple instructions We are concerned that your floor is a success and provides you with many years of trouble free service. Wood is a natural material and is, therefore, subject to infinite variations in colour, texture, knots and grain patterns. Natural timber also contains characteristics which are not found in man-made materials such as surface splits, shakes etc., and sometimes filling is necessary. These are accepted as being normal features of many of our products and are not detrimental to the performance of the floor. Wood is a hygroscopic material. Changes in humidity will cause natural expansion and contraction of the floor. Small gaps may occur. Details given in this brochure are also shown in the Junckers T I system available in CD Rom version or on the Junckers internet site at www.junckers.com Also see information sheets, Ref: C2.1.1, C5.1.1 and C3.1.1 STAGE 1 BEFORE, DURING AND AFTER INSTALLATION A dry environment In the area where the floor is to be stored and laid, conditions must be the same as expected when the area will be in use. The room must be weathertight, heating system in operation and wet trades (eg. plaster and cement) must be fully dry. Any damp problems must be remedied first. The relative humidity of the air should remain between 35% 65% RH. Heating and/or ventilation may be necessary to maintain conditions. This is especially important in newly built or renovated properties, or those which may remain unoccupied for some time after the floor is laid. The floor should be delivered as near as possible to the time when it is to be laid. The polythene wrapping is left intact during storage and the flooring must not be allowed to acclimatise. The polythene wrapping is not waterproof and must not be considered to be protection against damp. Packs can be opened for inspection upon delivery, but should be resealed until the time of fixing.

STAGE 2 SUB-FLOORS General notes and preparation Junckers Clip System Floors can be laid upon most types of dry, level sub-floor, including sand and cement screed, and timber such as floor boards, chipboard etc. 1 SAND AND CEMENT SCREEDS No more than 3mm gap under a 3m straight edge Maximum 5% moisture content Maximum 75% Relative Humidity Note: For floors with higher levels of moisture, contact Junckers Technical Department. Figure 1 These must be flat and fully dry. This means the moisture content must be maximum 5% or 75% Relative Humidity. (Fig. 1). On ground and all cementitious floors, a surface moisture barrier of Junckers SylvaThene polythene, Sisalkraft Moistop 728 or PolyLay must be laid with the joints well lapped and taped, and turned up at the walls. The screed must be levelled to a tolerance of no more than a 3mm gap showing under a 3m straight edge. A self-levelling compound may help to achieve this tolerance if the base is found to be uneven. (Fig. 1). 2 TIMBER SUB-FLOORS These may be floor boards, chipboard, ply or similar. Ensure the floor has adequate protection against damp from below. If the floor is on joists, ensure the void below is ventilated to building regulation standards. Air-bricks must not be blocked. The moisture content of the timber base must be 12% 14%. It must be soundly fixed and flat. The base must be levelled to no more than a 3mm gap showing beneath a 3m straight edge. If the base is unlevel, it is sometimes possible to achieve a flat surface by sanding or securely nailing down plywood of sufficient thickness. 3 MIXED SUB-FLOORS Junckers Clip System floors can be laid onto a base made from more than one material eg. part screed, part timber. Clip System Floors may be laid onto polystyrene insulation, with a moisture membrane underneath. No additional underlay should be necessary. Polystyrene must be tongue and groove jointed and have a minimum density of 20kg/m 3 for 22mm and 20.5mm floors, and 40kg/m 3 for 14mm floors. STAGE 3 CHOOSING UNDERLAYS The range of underlays is as follows: For 22mm, 20.5mm and 14mm floors PolyLay An underlay and moisture barrier. 1.5mm thick for use in domestic and commercial installations. Offers good step sound absorption and cushioning. 2mm For commercial or domestic floors SylvaFoam laid onto timber sub-floors and 2mm where a moderate amount of shock SylvaFelt absorption is required. Additional moisture barrier is necessary if laid onto cementitious floors. For 22mm and 20.5mm floors 5mm Sports or multi-use applications MultiFoam where good shock absorption is needed. Moisture barrier is necessary when used over cementitious floors. 10mm Sports floors where a floor fully ProFoam complying with standards BS7044 Part 4 and DIN 18032 Part 2 is required. Moisture barrier is necessary when used over cementitious floors. Note: With underfloor heating systems, a second layer of Junckers Sylvathene is also required. See separate Guide E4.1. SELECTING THE CORRECT SIZE OF CLIP Three Clip sizes are available, each to suit the humidity level expected when the building will be in use. Select the Clip size using the table below (see back page for further details). Site Conditions Relative Label Clip Clip Humidity Colour Type Size Dry, well heated constant conditions Mostly well heated, some fluctuations Intermittently/rarely heated CLIP CONSUMPTION Domestic installations: 13 clips per m 2 Commercial and Sports installations: 17 clips per m 2 Wide Board Range Floors (20.5mm): 17 clips per m 2 STAGE 4 EXPANSION ALLOWANCES 35%-50% Green One Hole 129.1mm 45%-65% Yellow Two Holes 129.4mm 60%-90% Mauve Three Holes 129.8mm Gaps will be necessary around the floor s perimeter and ALL fixed points. (Fig. 2). Gaps at A must be left empty. For 22mm and 20.5mm floors, these gaps must be 2mm for every metre of floor width at each side, minimum gap 15mm. For 14mm floors, 3mm for every metre of floor width at each side, minimum gap 15mm. Gaps at board ends, B, are to be filled with Junckers Cork or Rubber Strip, ensure the strips are a close fit in the gaps. The size of these gaps to be 1mm for every metre of floor length, minimum 10mm at each end. The gaps and strips are usually covered with a skirting, quadrant or scotia moulding, available from Junckers. See also Edge Details and Other Tips.

Figure 2. STAGE 5 Figure 4. INSTALLING THE FLOOR When installing a surface moisture barrier, ensure the sub-floor is free from loose particles. Figure 3. Unroll the moisture barrier and extend it up the walls just over the finished height of the skirting. (To be trimmed off after the skirtings are fixed). (Fig. 3). Ensure the moisture content of the cementitious base is less than 5%. It is not possible to cover up a damp problem with a moisture barrier. It will protect the Junckers floor from residual moisture only. For SylvaThene and Sisalkraft, edges must be lapped by 100mm and taped with Junckers Waterpoof Tape. Sisalkraft is placed black side downwards. The underlay is then placed over this. There is no need to fix the underlay or moisture barrier to the base. PolyLay is laid felt side downwards with the polythene edges lapped. No additional moisture barrier should be necessary. LAYING THE FIRST ROW OF BOARDS See Figures 4 (Domestic) and 5 (Sports and Commercial Floors). Use temporary spacer blocks to form the correct size expansion gap between the wall and the first board. Note: these must be removed upon completion. Note Clip spacings in Figs 4 and 5. If the wall is not straight, it may be necessary to scribe the first row of boards to suit. Check the expansion gap can easily be covered. Figure 5. With a hammer, tap the correct end of the Clip into the groove on the back of the board. This is the end with the holes. The plain end of the Clip must point towards the board s tongue, as shown in Fig 6. Note: take care to align the Clip correctly before hammering. One firm tap with the hammer is usually necessary. Excessive or repeated hammer blows may cause the Clips to become loose. Note: The Clips and boards must NEVER be fixed directly to the sub-floor! Lay the board in place, tongue pointing away from the wall. Continue to the end of the row, cutting the last board to length. The offcut will be used later. All board header (end) joints must be glued with Junckers SylvaFix Adhesive. Excess adhesive must be wiped from the surface with a damp cloth (Fig. 7). Never apply glue to the long joints (except last board - see below). SECOND AND SUBSEQUENT ROWS The off-cut from one row of boards is then used to begin the next row. Ensure the board and stave (strip) end joints are staggered to produce a random strip pattern. They must not fall into line on adjacent boards (Fig. 8). Ensure the stave ends on adjoining boards are no closer than 80mm and header (board end) joints

Figure 8. Figure 6. are no closer than 250mm. When tapping Clips into the new board, take care to ensure they are no closer than 50mm to the Clips on the last row. To lay subsequent rows of boards, fit the Clips as before and offer the tongue and groove together. Using a wooden block, (or installation kit for 14mm floors), gently tap the joint together, working evenly along the board, taking care not to put weight upon the new board until the joint is nearly closed. Moderate downward pressure will then push the Clips home. With some types of Clip it is normal for there to be small gaps between the boards. The last row of boards will probably require cutting to width to fit. This row is glued along the tongue and groove joint only if a Clip cannot be fixed and is the only board to be glued this way. Do not forget to leave the appropriate clear expansion gap. Use a joint puller to fully close the joint (Fig. 9). A tapered wedge is then cut from the board as shown and this is glued back into place after the board is laid. The gap around the pipe is then covered with a Junckers radiator pipe cover, available in hardwood or plastic. 3. Door Frames and Architraves The boards must be fitted under door frames and architraves, allowing the appropriate expansion gaps. Use an off-cut of flooring plus underlay to make the cut at the correct level (Fig. 11). Figure 9. Figure 7. FINISHING THE JOB Remove all temporary wooden spacers at the perimeter. EDGE DETAILS AND OTHER TIPS 1. The Perimeter Gaps can usually be covered with Junckers skirting, scotia or quadrant. These are usually nailed, screwed or glued to the wall or existing skirting. Large installations such as sports halls, due to the relative size of expansion gaps, may require special section skirtings or cover-strip edge details. 2. Radiator Pipes Drill a hole in the board to accommodate the radiator pipe. The space around the pipe must be the same as the expansion gap at the wall (Fig. 10 (a) and (b)). Figure 10a. 4. Door Thresholds An expansion allowance will usually be necessary. Where levels do not change, the gap can be covered with a Junckers Threshold Strip in hardwood or polished brass. Where levels reduce, a Junckers Ramp section may be suitable. To ensure the expansion of the floor is not restricted,

Figure 10b. Figure 12. ADDITIONAL POINTS TO REMEMBER 1. Wood will expand and contract with changes in the environment. Therefore, expect to see wooden floorboards close together in the summer months and slightly apart in the winter. 2. In kitchens, Agas or similar heat sources will dry the environment which may result in small gaps appearing between boards. 3. Use 22mm or 20.5mm boards in conservatories. 4. Junckers lacquered boards laid in kitchens can have an additional coat of Junckers Isolacquer, Junckers STRONG or Junckers Sport High Performance lacquer applied immediately after installation. This helps to reduce the effects of spillages and splashes upon the floor. Spillages must be wiped up immediately. 5. Junckers floors are not suitable for use in bathrooms or other wet areas. Water left upon the surface can cause damage. Figure 11. ramps are best fitted to the edge of the Junckers boards and not the sub-floor. The ramp can be supported by hardboard or ply instead of underlay if the underlay is 2mm or thicker. This would also apply to junctions with mat wells. Floors over 12m wide, or those in irregularly shaped rooms should be laid starting from the centre. A special Double Clip is available and is used with a loose tongue which is glued to one side (Fig. 12). These methods are also useful for floors which are laid diagonally or where changing the laying direction. MATERIAL SELECTION Junckers Floors are graded in accordance with established criteria. However, it must be expected that for certain grades of flooring, the laying process will include some on site filling, selection and making good. Factory filling may not always provide a perfect result as it may become dislodged during the handling and laying process. Junckers are able to provide tubes of filler for this purpose. As a general rule, most floors will require a 3% allowance for cutting and selection. TECHNICAL ASSISTANCE Junckers can provide a full range of technical assistance for anyone who is specifying or laying Junckers floors. Contact our Witham Office. 6. Junckers 14mm, 20.5mm and 22mm Clip System Floors can be laid over most types of underfloor heating. Contact Junckers for specific recommendations and refer to information sheets ref: E 4.0 and E 4.1. 7. The Clip System must NOT be used directly over joists or battens. Boards must be laid onto an existing subfloor. 22mm and 20.5mm boards can, however, be secret nailed to joists or battens, see separate instructions. 8. The polythene backing on the underside of the boards is a balancing membrane and must not be removed. 9. Clip System floors are floating floors and must never be directly fixed down to the sub-floor. 10. Due to the staining process, SylvaRed colour may vary from batch to batch. CLEANING AND MAINTENANCE Use only recommended Junckers cleaning and maintenance products upon the floor. Maintenance instructions are available from your supplier or direct from Junckers. Do not leave puddles of water to dry upon the surface, as moisture damage may occur. Junckers cannot be held responsible for problems associated with lacquers, oils and cleaning products from other manufacturers. NB Every Junckers product is manufactured from selected material and is subject to the Company s stringent quality control procedures. The Company cannot take responsibility for the installation of their systems which is dependent upon the condition of the sub-floor and the standard of work of individual contractors.

Recommendations for Clip Selection Note: Remember, the Clip size is chosen to suit the environment of the building when in normal use, based on the expected maximum relative humidity during the year. It is not necessarily based on the relative humidity of the day of installation, especially in new buildings. Commercial Buildings Clip Size Air conditioned aerobics and gym clubs Art galleries and museums Retirement homes Air conditioned offices Retail outlets in shopping centres 129.1mm High street shops and restaurants Sports centres Offices - non air conditioned Hotels and public buildings Schools 129.4mm Village halls Community centres (irregularly heated) Holiday homes Sports halls (irregularly heated) 129.8mm Homes 129.1 or 129.4mm dependent on location in UK and Ireland Consult Junckers for advice. Note: This list is not definitive and may be subject to amendment. Please contact Junckers for advice or clarification. Junckers Limited Wheaton Court, Wheaton Road, Witham, Essex CM8 3UJ Fax: (01376) 514401 Tel: General Enquiries (01376) 534700 Technical (01376) 534720 Sales (01376) 534710 Brochures (01376) 534700 Technical E-mail: tech@junckers.co.uk Website: www.junckers.com MAY 2000 E&OE