Please print or type.

Similar documents
Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

PERMIT APPLICATION for Part 91 SOIL EROSION AND SEDIMENTATION CONTROL

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

Permit Application: Soil Erosion and Sediment Control Program

Cass County Soil Erosion & Sedimentation Control Program

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Cass County Soil Erosion & Sedimentation Control Program

Residential Site Soil Erosion and Sedimentation Control Permit Application

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

PERMIT APPLICATION for Part 91 SOIL EROSION AND SEDIMENTATION CONTROL

REQUEST FOR SERVICES FROM INGHAM COUNTY DRAIN COMMISSIONER S OFFICE

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Single Family Residential Construction Erosion/Sediment Control Standards

Soil Erosion and Sedimentation Control (SESC) Information and Application Packet

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

E & S Plan Approved. Not required but may be a municipal requirement** Not required but may be a. municipal. requirement** Not required but may be a

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Soil Erosion and Sedimentation Control (SESC) Information and Application Packet

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

SECTION 903 EROSION CONTROL

DEPARTMENT OF ENVIRONMENTAL QUALITY WATER BUREAU PART 17. SOIL EROSION AND SEDIMENTATION CONTROL

Soil Erosion and Sedimentation Control Application Packet 2011

LAND DISTURBANCE PERMIT

WAKULLA SITE PLANNING

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

EROSION CONTROL AND GRADING PERMIT APPLICATION

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

LAND DISTURBANCE PLAN AND IMPLEMENTATION REQUIREMENTS

Erosion & Sedimentation Control Policy

Jackson County Environmental Health Department Lansing Avenue Ste. 221 Jackson, MI Phone (517) Fax (517)

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

VILLAGE OF HODGKINS 8990 LYONS STREET, HODGKINS, ILLINOIS OFFICE: FAX:

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

GRADING, EROSION AND SEDIMENTATION CONTROL

City of Glendale Stormwater Management Plan Checklist

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

IN T R A / M IN T R A M

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

REQUEST FOR SERVICES FROM INGHAM COUNTY DRAIN COMMISSIONER S OFFICE

Storm Water Pollution Prevention Plan (SWP3) Checklist

PART 1 GENERAL REQUIREMENTS

SECTION EROSION AND SEDIMENTATION CONTROLS

JEFFERSON COUNTY STORM WATER MANAGEMENT

Part 91, Soil Erosion and Sedimentation Control

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Building Better Storm Water Quality

Rock Sock (RS) Rock Sock height.

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

CCSD#1 Stormwater Standards

City of Centerton Grading & Erosion Control Application Package

CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS

Appendix B Construction SWPPP Short Form

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

SOIL EROSION CONTROL PERMIT APPLICATION

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Performance Standards Compliance Checklist

Planning & Building Department. Requirements for Erosion and Sediment Control

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

Accessory Building/Detached Building Permit

Small Site Stormwater Quality Permit Application

CITY UTILITIES DESIGN STANDARDS MANUAL

SACHSE EROSION CONTROL GUIDELINES

Guidance on each of the 23 basic elements follows: Plan Index showing locations of required items: The plan index should include a list of the

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

APPENDIX I. Plan Reviewer Checklist

WEST BRANDYWINE TOWNSHIP 198 Lafayette Road Coatesville, PA Fax PERMIT NO.

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

SECTION EROSION AND SEDIMENTATION CONTROLS

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00

Erosion and Sediment Control Plan for a Timber Harvesting Operation

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

Soil Erosion and Sedimentation Control 12 Items required on a SESC Plan pursuant to Rule 1702

CITY OF MILTON CONSTRUCTION NOTES

STORMWATER POLLUTION PREVENTION PLAN

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Construction Phasing Bad

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre

APPLICATION FOR A SITE CONSTRUCTION PERMIT

WOODFORD COUNTY, ILLINOIS EROSION, SEDIMENT AND STORM WATER CONTROL ORDINANCE

7.00 INTRODUCTION... 1

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Transcription:

SOIL EROSION AND SEDIMENTATION CONTROL PERMIT APPLICATION 6-18-07 Ann kjjkjkff- ANN ARBOR CHARTER TOWNSHIP 3792 Pontiac Trail, Ann Arbor, Michigan 48105-9656 Phone (734) 663-3418 Website: www.aatwp.org Please print or type. 1. APPLICANT (Please check if applicant is the landowner or designated agent*) *Designated agent must submit a written statement from landowner authorizing the agent to secure a permit in the landowner s name. Name Landowner Designated Agent FEES Admin $ Escrow $ Performance Deposit $ TOTAL $ OFFICE USE Permit Number Date Issued Expiration Date Address E-mail Address City State Zip Code Telephone No. ( ) 2. Location in ANN ARBOR CHARTER TOWNSHIP T2S R6E, Washtenaw County Section Lot No. Tax ID Number Subdivision Street Address 3. Proposed Earth Change Project Type: Single Family Residential (Existing) New Residential Construction (Single or Multi-Family Residential) Commercial Other Industrial Land Balancing Stockpiling NPDES Permit Required 5 acres Yes No Name of project Describe project Size of earth change (round up to nearest acre) Name of and distance to nearest lake, stream or drain Project start date Project completion date Chronological sequence and expected time of year for each major phase of earth disruption (attach list if necessary) Page 1 of 9 Adopted June 18, 2007

4. Soil Erosion and Sedimentation Control Plan (Refer to attached SESC Plan Checklist and Rule 323.1703) 2 complete sets of soil erosion control plans must be attached. (One (1) approved plan will be returned with the permit.) Estimated Cost of Erosion Control (attach itemized cost estimate) Plan Preparer s Name Telephone No. ( ) 5. Parties Responsible for Earth Change Name of Landowner (if not provided in Box No. 1) Address City Sate Zip Code Telephone No. ( ) Name of Individual On-Site Responsible for Earth Change Company Name Address City State Zip Code Telephone No. ( ) E-Mail Address 6. Administration Fee (Non-Refundable) $ 7. Escrow Deposit for Review and Inspection Fees $ Fee and Deposit must be submitted with the permit application. See attached fee schedule for amount required. Amount Required $ 8. Performance Guaranty Performance guaranty must be submitted with the permit application. See attached performance deposit schedule. Amount Required $ Cash Cashier s Check Address City State Zip Code Telephone No. ( ) I (we) affirm that the above information is accurate and that I (we) will conduct the above described earth change in accordance with Part 91, Soil Erosion and Sedimentation Control, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended, applicable local ordinances, and the documents accompanying this application. Take Notice: The Ann Arbor Charter Township Ordinance is more restrictive than Part 91 and the Rules as it governs all earth changes regardless of size unless otherwise exempt under the Ordinance. Landowner s Signature Print Name Date Designated Agent s Signature * Print Name Date * Written statement from above landowner authorizing him/her to secure a permit in the landowner s name attached. Page 2 of 9 Adopted June 18, 2007

ANN ARBOR CHARTER TOWNSHIP SOIL EROSION FEE SCHDULE Fees for a soil erosion control permit are as follows: GENERAL A. FOR MAJOR PROJECTS OR MINOR PROJECTS: 1. A non-refundable $250 administrative fee, 2. An Escrow Deposit of $5000 for a Minor Project or $10,000 for a Major Project as defined in the Soil Erosion and Sedimentation Control Ordinance. The escrow deposit will be evaluated by the Township when there is approximately 25% remaining in the account and if determined by the Township to be necessary in view of the status of the Project, the applicant will deposit an additional amount not to exceed one-half of the original escrow amount. If the applicant fails to pay the additional deposit in a timely manner, the municipal enforcing agency shall issue a stop work order, the escrow account shall be deemed inactive and an additional $300 administrative fee will be required to re-activate the account. Any remaining funds in the escrow account will be returned to the applicant when the project is complete, permanent stabilizing measures are installed and functioning, temporary measures are removed and final inspection has been approved. 3. A Performance Guarantee in the form of cash, cashier s check or letter of credit. The Performance Guarantee (or residual balance if funds are used pursuant to the Ordinance) will be released when the project is complete, all permanent stabilizing measures are installed and functioning, temporary measures are removed and final inspection has been approved. The performance guarantee shall be $500 per acre disturbed, with a minimum of $2,000. B. FOR SINGLE FAMILY RESIDENTIAL PROJECTS (EXISTING STRUCTURES): 1. A non-refundable fee of $230 (which includes 2 inspections). 2. $65 for each inspection after the first two inspections. C. FOR A PERMIT WAIVER: A non-refundable fee of $35. NOTE: The landowner must provide an affidavit that the earth change will disturb less than 225 square feet and the earth change will not contribute to sedimentation of lakes and streams or onto properties adjacent to the earth change. (SEE SEPARATE APPLICATION FORM) ** Note, you must include a Soil Erosion and Sedimentation Control Plan in accordance with the attached SESC Plan Checklist** Page 3 of 9 Adopted June 18, 2007

ANN ARBOR CHARTER TOWNSHIP GENERAL 1. The Ann Arbor Charter Township Ordinance is more restrictive than Part 91 and the Rules as it governs all earth changes regardless of size, unless otherwise exempted. 2. The contractor shall implement and maintain the soil erosion control measures as shown on the plans at all times during construction on this project. Any modifications or additions to the soil erosion control measures due to construction or changed conditions, shall be complied with as required or directed by the owner, project engineer or Ann Arbor Township. 3. All soil erosion and sedimentation control work shall conform to the permit requirements of Ann Arbor Township and the laws of the State of Michigan. 4. An NPDES construction activity permit is required for all sites greater than 5 acres. 5. Daily inspections shall be made by the contractor. Periodic inspections may be made by the owner/project engineer/township to determine the effectiveness of erosion and sedimentation control measures. Any necessary corrections shall be made without delay. 6. Erosion and sedimentation from work on the site shall be contained on the site and not be allowed to collect on any off-site areas or in waterways. 7. All mud/dirt tracked onto roads from the site due to construction, shall be promptly removed by the contractor. 8. Restoration of all disturbed areas, including placement of topsoil, seed, fertilizer and mulch and/or sod shall be done within 5 days of the completion of final grade. 9. Construction operations shall be scheduled and performed so that preventative soil erosion control measures are in place prior to excavation in critical areas and temporary stabilization measures are in place immediately following backfilling operations. 10. Special precautions will be taken in the use of construction equipment to prevent situations that promote erosion. 11. Proper dust control shall be maintained during construction by use of water trucks and/or chloride as required. 12. The contractor shall be responsible for maintaining all temporary soil erosion control measures and removal of some upon authorized completion of project. Completion of project will not be authorized until all site work, home building, road work and utility construction is complete and all soils are stabilized. Page 4 of 9 Adopted June 18, 2007

13. The contractor shall not grade in existing wetland or conservation areas to be protected. Silt fence shall be installed and maintained adjacent to existing wetland and conservation areas to prevent grading, erosion and sedimentation into them. 14. Tree protection fencing must remain intact until restoration of the site is complete. SEQUENCE OF CONSTRUCTION 1. Install sediment fence and tree protection fencing prior to any grading operation. 2. Install mud tracking pad. 3. Construct temporary sediment/detention basin. 4. Place topsoil, fertilizer, seed and mulch over the entire detention basin area. 5. Rough grade site, stockpile topsoil and begin building construction. 6. Install storm drainage system including riprap and parking lot inlet filters and detention basin standpipe. 7. Maintain erosion and sedimentation control measures, as required. 8. Install sanitary sewer and water systems. 9. Bring pavement areas to sub-base grade, place sub-base and bituminous pavement. 10. Install franchised utilities. 11. Finish grade, redistribute topsoil, seed and mulch all disturbed areas. 12. Remove any accumulated sediment within the detention basin and replace clean washed stone around standpipe. 13. Complete construction of site. 14. Insure all soil is stabilized. Remove all temporary soil erosion control measures. SEEDING/SOD 1. Seed or sod in accordance with project specifications. 2. All areas of disturbed earth that are not to be paved or sodded shall have 4 inches of topsoil, seed, fertilizer and mulch. 3. Immediately after seeding, mulch all seeded areas with unweathered small grain straw (preferably wheat) or hay spread. Spread uniformly at the rate of 1 ½ to 2 tons or 100 pounds Page 5 of 9 Adopted June 18, 2007

(2 to 3 bales) per 1,000 square foot. This mulch should be anchored with a disc-type mulchanchoring tool. 4. Any disturbed area not paved, seeded or mulched, sodded or built upon by November 15, is to be mulched in the manner as specified above, in order to provide soil erosion protection during the winter and early spring. 5. All erosion and sedimentation control prevention procedures and structures are to comply with the Standards and Specifications for soil erosion and sediment control of the Washtenaw County Soil Conservation District. CATCH BASIN/MANHOLE PROTECTION 1. Protect storm sewer catch basins with Dandy Products Inc. or approved equivalent as follows: a. Dandy Bag for 1040 storm covers. b. Beaver Dam for all curb structures. c. Dandy Sock over all detention pond outlet structures. ROADS 1. During construction, all roads shall be protected from unvegetated areas washing onto road surfaces by placement of silt fence behind curb or a 10 foot wide straw mulch bank behind the curb or other approved method and/or as shown on the plans. 2. During construction of any portion of the project, roads shall be maintained free of dirt, silt and construction debris. Page 6 of 9 Adopted June 18, 2007

ANN ARBOR CHARTER TOWNSHIP SESC Control Plan Checklist REVIEWED BY: NAME: STATUS: APPROVED (STANTEC USE ONLY) (STANTEC USE ONLY) DATE: APPROVED AS NOTED PROJECT NAME: DATE OF PLAN: REJECTED DATE RECEIVED: RECEIPT #: ADDRESS: CONTACT NAME: PHONE NUMBER: SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECKLIST General Requirements - The SESC plan shall show all proposed improvements on the site to scale as well as existing and proposed contours at 2-foot intervals. If revisions are deemed necessary, two (2) copies of revised soil erosion plans shall be submitted for each subsequent review until the plan has been given approval by the Township, at which point two (2) copies will be required for permit approval. SHOWN N/A ITEM NO. ITEM COMMENTS 1. Plan at scale of not more than 1 =200 including legal description, location, proximity to lakes, streams or wetlands and predominant land features 2. A soils survey or a written description of soil types of the exposed land area 3. Limits of earth disruption 4. Existing vegetation and predominant land surface features Page 7 of 9 Adopted June 18, 2007

SHOWN N/A ITEM NO. ITEM COMMENTS 5. Description and location of all existing and proposed on-site drainage and dewatering facilities. If dewatering is necessary, a dewatering plan must be submitted prior to construction. 6. Detailed sequence of construction shown on the plans including a time schedule for the installation of soil erosion and sedimentation control measures 7. Description and location of all proposed temporary and permanent soil erosion and sedimentation control measures 8. Program proposal for continued maintenance and individual responsible for permanent soil erosion and sedimentation control measures 9. Grading plan submitted 10. Itemized Cost Analysis of all temporary and permanent soil erosion and sedimentation control measures 11. Description of how to install each control measure 12. Potential stockpile areas shown with a note stating silt fence shall be installed and maintained around perimeter of such stockpile 13. Construction mud tracking entrance: minimum depth of 6-inches of 1x3-inch limestone, minimum length of 100 feet, width 20 feet 14. Silt fence: prominent line type in legend, 6 minimum anchor trench, stakes 6 maximum spacing, stakes driven into ground 1 minimum 15. Inlet filters: all storm structures within vicinity of project and road(s) adjacent to project including maintenance program Discuss with WCRC what they will accept for catch basin protection a. Dandy Bags for all existing and proposed catch basins Page 8 of 9 Adopted June 18, 2007

SHOWN N/A ITEM NO. ITEM COMMENTS b. Beaver dams in addition to Dandy Bags for all curb-style catch basins c. Dandy Socks for pipe or pond installation 16. Sedimentation basins: should be at least four times long as wide with the inlet and outlet at opposite ends and a proposed schedule of cleaning out when 40 to 50 percent filled 17. Detention basins: seed and stabilize immediately upon achieving final grade and follow WCDC approved specs 18. Swirl chamber: Noted to inspect weekly for sediment accumulation until site is stabilized and will clean as required 19. Potential storm water runoff and soil loss with corresponding calculations 20. Soil stabilization: a. Drainage ditches and slopes steeper than 1:4 (25%) stabilized with erosion control blanket b. Steep slopes that do not take upon initial seeding must be re-seeded and stabilized with erosion control blankets 21. Tree protection fence: standard 48 high snow or construction fence, 6 maximum spacing of stakes, fence located outside drip-line 22. Landscaping notes: a. Stabilization must be started within 5 days of final grade. Use 3-4 topsoil minimum. b. Where excavation has been through lawn areas, the CONTRACTOR shall restore the disturbed area by placing topsoil and seeding or sodding over the final backfill material. ADDITIONAL COMMENTS AND CONCERNS: 1. Please note that a field pre-construction meeting must be held prior to any earth change activity. 2. Please add the General Soil Erosion Notes found on the Application to the Soil Erosion plan. Page 9 of 9 Adopted June 18, 2007