Lessons learned from JICA-CMEA Project on Low Carbon Development and JCM

Similar documents
JICA Technical Cooperation on Low Carbon Development and Challenges of JCM in Indonesia

Current State of Joint Crediting Mechanism and Relevant JICA Cooperation in Indonesia

MRV development for market based mechanism implementation. a Joint Crediting Mechanism case. Dicky Edwin Hindarto Head of Indonesia JCM Secretariat

Joint Crediting Mechanism (JCM) and Market Based Mechanism in Indonesia. Dr. Rizal Edwin Manansang Coordinating Ministry for Economic Affairs

The Implementation of the Market Based Mechanisms in Indonesia a JCM Case Study. Dicky Edwin Hindarto Indonesia JCM Secretariat

Article 6 of the Paris Agreement and the Joint Crediting Mechanism (JCM) Kentaro Takahashi Programme Manager Climate and Energy Area

Joint Crediting Mechanism (JCM) Indonesia Japan

The Joint Crediting Mechanism (JCM) Experiences in the Energy Efficiency Financing

A Proposal for AWG-LCA Republic of Korea

Development of NAMA and MRV Guidebooks

Linkages of JCM with NAMAs, MRV and Registry: An Update

MRV SYSTEM IN CLIMATE CHANGE

Terms of reference INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Partnership for Market Readiness. Template for Expression of Interest and Questionnaire on Market Readiness Capacity

Market Based Mechanism in Indonesia, a JCM case study Dicky Edwin Hindarto

The Implementation Joint Crediting Mechanism Scheme in Indonesia Facts and Review

Indonesia JCM Methodology Development

Market Readiness: Building blocks for market approaches

Promoting Market Mechanism: Development of the JCM in Indonesia

The Joint Crediting Mechanism (JCM) Current

Overview of technology aspects of NAMAs in a MRV manner

Introduction to the Joint Crediting Mechanism. 24 August 2016

PARTNERSHIP FOR MARKET READINESS (PMR) IMPLICATIONS OF THE PARIS AGREEMENT ON PMR ACTIVITIES Workshop Summary Monday 25 April, 2016 Lima, Peru

NAMAs & MRV Update : INDONESIA. Farhan Helmy Secretary of Mitigation Working Group National Council on Climate Change -Indonesia (DNPI)

CDM pre/post 2012 and future instruments. New Market Mechanism Capacity Building-Osaka General Meeting Osaka, Japan, 7-8 March 2013

Integrated Capacity Strengthening for the Clean Development Mechanism

Implementation of the JCM in Thailand

IGES New Market Mechanisms Capacity Building Activities in Asia

Updates on the JCM and Article 6 of the Paris Agreement

Updates on JCM projects, financing programme, and JCM Matchmaking Platform

Updates on JCM projects, financing programme, and JCM Matchmaking Platform

Nationally Appropriate Mitigation Action (NAMA) Development in Lao PDR

Overview on Indonesia Market Readiness Barcelona PMR Meeting, May, 2011

Partnership for Market Readiness (PMR) Update and preliminary insights

Break out session: Challenges in implementation of NAMAs and ways of overcoming them

Joint Committee of the Joint Crediting Mechanism between Indonesia and Japan Eighth Meeting. Meeting Report

Carbon market trends in Asia and the Joint Crediting Mechanism (JCM)

An Introduction to Offsets

POLICIES AND PROGRAMS RELATED TO GHG MITIGATION

Tunisia. National Agency for Energy Conservation (ANME)

INPUT BY THE GOVERNMENT OF INDONESIA FOR TALANOA DIALOGUE

Link Technology Needs with Financing Options: IGES Approach to Mobilizing Private Climate Finance in Asia

Current Status of ETS in Thailand

Views on possible improvements to emissions trading and the project-based mechanisms

The Mitigation Action Assessment Protocol (MAAP) tool

DNA of REDD+? Dicky E. Hindarto and Doddy S. Sukadri

Barriers, Opportunities & Challenges faced by a private sector developer in CDM & JCM schemes

Experiences and lessons learned from JICA s activities to support mitigation actions in developing countries

National greenhouse gas emissions mitigation and the role of private sector

Masami TAMURA Director, Climate Change Division, International Cooperation Bureau, Ministry of Foreign Affairs, JAPAN

Identifying and Monitoring of Sustainable Development Benefits on CDM Projects and PoAs

Indonesia REDD+ Prospective and Implementation: An UPDATE

Current Status of the JCM and UNFCCC negotiations on markets

Making NAMAs work for Indonesian provinces

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness PRIME MINISTER. /QĐ -TTg. Hanoi, dd..mth

Current Preparation of Nusantara Carbon Scheme (NCS): Indonesia case on completing the building blocks

Current state of Joint Crediting Mechanism development in Mongolia

The views expressed herein are those of the consultant and do not necessarily represent those of ADB s

GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT

Market Readiness: Building blocks for market approaches

Procedures and Criteria for Screening, Evaluating and Approving CDM Projects: A Case Study in Kazakhstan

JICA IGES Seminar on Climate Change Policy Development in Indonesia Tokyo, Japan, 24 May 2013

Joint Crediting Mechanism (JCM) in Japan s INDC

Survey on the International Negotiation on Market Mechanism Report

Current status of the implementation of the JCM in Mongolia

ClimaSouth Seminar. Briefing on the Global Climate Agreement in Preparations in Israel

NAMA/MRV FRAMEWORK IN VIETNAM

Outcome of COP20 and Outlook for COP21

Implementation of National mitigation initiatives scope for capacity building

Promoting JCM scheme in Indonesia. Dicky Edwin Hindarto Head of Indonesia JCM Secretariat

Capacity Development Project on Nationally Appropriate Mitigation Actions (NAMAs)

Low carbon Development in Asia Challenges and JICA s Assistance

Additional priority areas for capacity-building relating to the implementation of the Kyoto Protocol

INSTITUTIONAL ARRANGEMENT FOR NAMA DEVELOPMENT AND IMPLEMENTATION IN INDONESIA

Reaching national targets and goals of the Paris Agreement: GIZ training modules for NDC implementation

Canada-Chile Program to reduce Emissions in the Waste Management Sector:

Experience of the Clean Development Mechanism as a result based mechanism for methane abatement

Sri Lanka s Market Readiness Proposal (MRP)

Título Subtítulo o texto necesario

TERMS OF REFERENCE ACTIVITY REVIEW THE ORGANIZATION AND IMPLEMENTATION STRUCTURE OF UNFCCC IN VIETNAM AND PROVIDE SOLUTIONS FOR IMPROVEMENT

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

such as improvement of transportation and well-being of the elderly, reduction of administrative costs for infrastructure per capita, and urban heat i

Technical Support for NDC Implementation Advisory Note no.4

Updates on Climate Change Policy Measures

National Mitigation Roadmap & its MRV - What and how do we track Korean mitigation progress? -

WORLD BANK CARBON FINANCE UNIT 2014 ANNUAL MEETING CPF NEW CREDITING INSTRUMENTS: PILOT CONCEPTS CARBON PARTNERSHIP FACILITY 1

The Networked Carbon Markets Initiative. Work Plan June 2016

The Joint Crediting Mechanism MRV and

INDONESIA POLICY ON MEASUREMENT, REPORTING AND VERIFICATION OF CLIMATE CHANGE MITIGATION ACTION

CDM Policy Dialogue Report and recommendations

GREEN and J-MRV ~ Public Private Financial Partnership ~

India s Market Readiness Proposals (MRP) Country: India Responsible agency: MoEFCC, GOI Date of submission: 28th February, 2017

The Joint Crediting Mechanism (JCM) at a glance

CARBON MARKETS AND MRV

LEDS Cooperation: Indonesia s Perspective

Experience, challenges, and opportunities for Carbon Markets in Thailand and AEC, how can the carbon market support RE and EE investment

Readiness for Market Mechanism in Myanmar

Organizing Framework for Scoping of PMR activities

Preliminary Discussion on the Development of GHG Emission Profile and MRV System for Industry Sector

Institutional arrangements for NAMAs

Transcription:

Lessons learned from JICA-CMEA Project on Low Carbon Development and JCM Jun Ichihara, Chief Advisor Project of Capacity Development Assistance for Low Carbon Development in the Republic of Indonesia December 7, 2017

Project of Capacity Development Assistance for Low Carbon Development in Indonesia (1/2) Project Term: 2014 May-2017 December (3.5years) Project Counterparts: Coordinating Ministry for Economic Affairs (CMEA) and ministries/agencies related to JCM Overall Goal: Investment and deployment of low carbon technologies, products, services and infrastructure are promoted in Indonesia Project Purpose: Capacity of the Joint Committee Team and the Secretariat of Joint Crediting Mechanism (JCM) to effectively perform the duties as stated in the Deputy Minister Decree 01/2014 is strengthened 2

Project of Capacity Development Assistance for Low Carbon Development in Indonesia (2/2) 1. To operationalize Indonesia JCM Secretariat 2. To promote JCM for low carbon growth to potential project proponents and other related parties/stakeholders, and enhance their capacities 3. To enhance the capacity to monitor and evaluate the implementation of JCM 4. To enhance additional capacities to assess policy issues relevant to JCM for low carbon growth 3

Project Progress (1/4) Output 1: JCM Secretariat operationalization Indonesia JCM Secretariat was launched Secretariat s business plan and mid-term strategy for sustainable operation were developed Support for smooth operation of JCM project appraisal and registration process Facilitation of JCM-related process including inter-ministerial coordination meeting and dialogues in order to enhance JCM sustainable operation Japan visit conducted in February 2017 for further facilitation 4

Project Progress (2/4) Output 2: Information Dissemination and Capacity Building on JCM for stakeholders Information dissemination and capacity development plan prepared Outreach materials such as booklet and Indonesia JCM website were prepared and maintained Activities on information dissemination conducted such as: Business Forums and relevant meetings/seminars Media briefing was held in February 2017 Participation in domestic and international conferences and seminars such as COP 21, COP 22, COP 23 5

Project Progress (3/4) Output 3: Monitoring and Evaluation of JCM Monitoring and evaluation plan of JCM scheme & project levels Regular site-visit in order to secure monitoring and evaluation of JCM projects Periodical reports on monitoring and evaluation of JCM in both scheme and project levels 6

Project Progress (4/4) Output 4: Policy Assessment for Low Carbon Growth Policy assessment on linkage b/w JCM and national climate change policy and measures Assessment on benefit of JCM in terms of emission reduction calculation, technology, finance, capacity building and other aspects Policy assessment on options for implementation and replication of JCM projects / low carbon technology projects, by arguing financing barriers Policy assessment on palm oil industry (methane capture) 7

Policy Assessment Key Questions How to ensure sustainability of JCM? How to replicate advanced low carbon technology projects, even without JCM subsidy? What kind of benefits obtained from JCM? How to facilitate private sector and local government involvement for JCM and advanced low carbon technology projects? Component 1 Reviewing of JCM benefits Review following aspects: -Technology benefit -Economic/financing benefit -Social benefit -Carbon emission reduction benefit Component 2 Policy assessment for low carbon technology diffusion Review followings and give recommendation: -Analysis on regulatory barriers and policy Incentives (tariff) -Procurement system and other measures for low carbon technology diffusion and replication -Financing situation (including challenges and barriers) 8

JCM benefits Financing/economic aspect JCM subsidy may be a useful tool for introducing new / uninstalled technologies (not that technology was installed here) to encourage private sector to participate in mitigation actions. Payback period is shorter. Some projects are replicated without JCM application. Reliability and credibility to JCM technologies are higher after implementation JCM project (PT Adib, PT ISTEM (Toray project)). Operation & maintenance costs are reduced in JCM project. JCM subsidy increase opportunities for obtaining further investment from JCM participants of both countries.

JCM benefits Technology aspect Technologies used in JCM energy efficiency projects considered mostly innovative, advanced, efficient and reliable in general. Technologies installed are proven energy efficient showing a significant reduction in electricity consumption Some companies installed another projects without JCM subsidy In some cases, spare parts for technologies are produced in Indonesia. In the case of Yamaha, the Indonesian participant has received assistance in the form of training and technical aspects of manufacturing spare part for the regenerative burner. Instead of importing all the equipment, part of equipment is manufactured in Indonesia. For the case of Alfa midi, CO2 refrigerant should be imported since the technology installed were a model

JCM benefits Capacity building (CB), social aspects Conducted many CB and information sharing activities on JCM in general by JICA, IGES, GEC, etc At project level, project proponents/technology providers provided CB (on technologies) to staffs. Usually in the form of training in class and overseas trip for the company s employee. Monitoring activities under JCM might enhance capacity related to MRV In the case of City-to-City cooperation, some local government officials also conducted study trip to their partner city Improving environment quality and health condition for workers (surrounding people potentially): i.e. reducing dusts in cement factory JCM provided fora to expand networking among relevant stakeholders (new business entities, tech. providers, policy makers), and their knowledge and their potential contribution on reducing climate change impacts

JCM benefits Policy Relevance JCM projects considered in general in line with government policies and programmes to enhance efficiency and environmental quality. National Energy Policy, which promote renewable energy, energy efficiency, advancement of new and innovative technologies in energy sector 10 Percent Energy Saving Movement, part of RPJMN programme on energy sector Ministry of Industry Regulation 123/M-IND/PER/11/2010 on revitalization program and industrial development through machinery/equipment restructuration in the textile industry, textile products and footwear industry 10% rebate of the machinery and equipment for advance technology 15% rebate if the machinery contains high national content Ministry of Industry Regulation 12/M-IND/PER/1/2012 on the road map of CO 2 emission reduction in cement industry. In this regulation, cement industry is obliged to reduce 3% of their emissions within the period of 2016-2020 based on the 2009 baseline Potential Policy Impacts JCM experience and lessons could potentially contribute to: National MRV and registry system: i.e. emission factors etc Policy development for utilization of carbon market. Considering ways to promote private participation in mitigation actions

JCM benefits Emission reduction JCM total annual emission reduction for its 29 projects is 281,542 tco2/year. majority energy efficiency Net emission reduction from JCM projects are not yet estimated. Net emission reduction can be used for achievement of NDC in Indonesia if appropriately calculate BAU emission for JCM projects

Baseline Approaches JCM Baseline Approach: Reference Emissions

Emissions Accounting of Mitigation Results from JCM 0. Uncalculated emissions reduction to ensure net emissions reduction. JCM project s emissions reduction 1. Allocated for GoI (10%) 2. Allocated for Indonesian participant (as agreed) 3. Allocated for Japanese participant (as agreed) 4. Allocated for Japanese government (with the current subsidy scheme, min. 50%) 0: Net emissions reduction (can be accounted as national emissions reduction) 1: National emissions reduction 3: Internationally transferred mitigation outcomes (ITMOs) 2: National emissions reduction 4: Internationally transferred mitigation outcomes (ITMOs) Net emission reduction is not readily available from JCM methodology, thus have to be calculated separately by government. Net emissions reduction can be reported as national emissions reduction as well. Time

Issues for Upscaling JCM and Mitigation Actions Barriers in Indonesia Indonesia is top runner of JCM partner country. However, how do we further promote JCM projects? It would be useful to investigate possible obstacles/barriers. Conducted several survey and interview studies on barriers/challenges Categories of barriers (example) JCM policies and rules (international / domestic) Carbon Market Barriers Domestic policy Issues not specific related to CDM/JCM Financing barriers Method (survey): apply analytic hierarchy process (AHP) to related stakeholders in Indonesia 16

Issues for Upscaling JCM and Mitigation Actions Survey Results on Potential JCM Barriers in Indonesia Indonesia is top runner of JCM partner country. However, how do we further promote JCM projects? It would be useful to investigate possible obstacles/barriers. 35.0% 30.0% Relative significance of barriers 30.9% 25.0% 20.0% 15.0% 14.7% 15.2% 20.9% 18.3% 10.0% 5.0% 0.0% JCM Policies Carbon Market Domestic Policies Financing Knowledge Financing Barriers Domestic Regulatory Barriers (Domestic Policies and Rules not specifically related to JCM) Knowledge and Capacity Barriers 17

Issues for Upscaling JCM and Mitigation Actions Financing Barriers (for EE) in Indonesia Financing issue is the most significant from our survey. Some of our initial findings from our study on barriers to implementing energy efficiency projects in Indonesia. are; Regulatory barriers (i.e. related to financing institution) Barriers related to financing institutions Lack of technical capacity and experience in clean energy investment High transaction cost for project assessment for financing inadequate institutional support and lack of focus on green financing in institutions Barriers related to project proponents and third parties Limited capacity of raising funds invalidates the project by project developers ESCO industry grows slow 18

Issues for Upscaling JCM and Mitigation Actions Procurement rules One of challenges is related to procurement rules It is challenging when local governments participate as a project proponent. Still many rooms for future JCM implementation with local governments. (i.e. City to city cooperation.) Why challenging? 1) Mismatching budgeting plan cycle: Harmonizing process in Japan and Indonesia sides. 2) Difference in Procurement System: Harmonizing system of Government of Indonesia and JCM system 19

Issues for Upscaling JCM and Mitigation Actions Procurement rules Recommendation for 1) Mismatching budgeting plan cycle In order to facilitate JCM Project that uses state budget as counterpart fund, Project proponents should recognize process of its rupiah counterpart fund/budget from Indonesia state budget (timing and availability). Then, make project plan / schedule Recommendation for 2) Difference in Procurement System Basic rule is Prepres 54/2010. It required not to specify certain brand or manufacturer before procurement, while certain brand, manufacture of low carbon technology equipment and/or system might be predetermined by Japanese partner. Also no country preference. As it is possible for harmonisation of the articles under Prepres 54/2010 for Provision on Procurement of Good/ Service which funded either partly or wholly from Foreign Loan/Grant. It is suggested that the necessity of harmonisation can be argued and exercised far in advance by stakeholders such as both governments, cities etc. 20

Issues for Upscaling JCM and Mitigation Actions Regulatory and other issues Another regulatory issues. Domestic incentives and pricing policies are crucial, for sustainability and feasibility of projects. Parallel cost regulation (MEMR No.1/2017) Regulation on revising tariff for Renewable energy (FIT price cap) (MEMR No.50/2017) 21

MSW to Energy Electricity tariff capped at 85% of PLN production costs in 2017 (new regulation no. 50, 2017)

23

Issues for Upscaling JCM and Mitigation Actions Regulatory and other issues Harmonize JCM with relevant domestic policies and regulations: NDC / national mitigation plan Policies and regulations in relevant sectors (i.e. energy policy, national plan in energy sector) Domestic MRV and registry systems Policy assessment and improvement are crucial 24

Integrated MRV system Overall image of reporting system and process BR Japan Registry UNFCCC Indonesia Boundary JCM Scheme CDM and Other Carbon Market KP Period NFP to UNFCCC BUR 3 rd Party Verification (Independent verification) 3 rd Party Verification (Independent verification) REDD Scheme RAN/RAD GRK Scheme Supported/ credited NAMAs Scheme INDC 3 rd Party Verification (Independent verification) National Communication Coordination National MRV Committee & Registry Lead by MoEF 3 rd Party Verification (Independent verification) National Verification Nusantara Carbon Scheme Coordination/sharing of data 3 rd Party Verification (Independent verification) PROPER SIGN Center (Climate Change Data Center) at MoEF 25

Lessons learnt from JICA Cooperation Lessons learnt on implementation of JCM in Indonesia: Strong ownership by host country and (unique) Institutional arrangement and development (Indonesia JCM secretariat) to bring early success: Worked well for developing rules and guidelines Raise awareness. Facilitate processes to project development and implementation * In Indonesia, the first JCM project registered, the first JCM credit issued among countries Utilization of Indonesian expertise and knowledge: i.e. rules and guidelines (SD), methodologies Continuous efforts for improving coordination with key stakeholders Monitoring & evaluation of JCM projects Can identify obstacles/barriers for JCM project implementation could be utilized for further improvement i.e. domestic regulatory reform Variety of activities on awareness raising and information dissemination. JCM became well known scheme in Indonesia. 26

Way forward: Possible Future Steps Enhance harmonization among domestic climate policies and measures such as JCM and NDC Continue policy assessment and further streamlining sectoral regulations related to JCM (NDC too). Address specific key issues/barriers Establish integrated and harmonized national MRV and Registry system Further capacity development to and coordination with key stakeholders including financing sector and local governments (Explore on the potential collaboration between JCM and other climate financing sources) 27