Doheny Ocean Desalination Project Alternative Power Supply Analysis

Similar documents
Doheny Desalination Project. Technical Studies. October 31, 2017

South Orange County Watershed Management Area Public Workshop. September 19, 2012

Why the 2018 Water Reliability Study

District s Regional Planning and Water Reliability Strategy

2018 OC Reliability Study Draft Report

SOUTH ORANGE COUNTY WATERSHED MANAGEMENT AREA 2013 INTEGRATED REGIONAL WATER MANAGEMENT PLAN An Integrated, Healthy and Balanced Watershed

Notice of Public Hearing. Notice of Public Hearing

South OC Water Providers: Integrated Water Planning

An Update of Coastal Desalination Status in the West Coast

10.1 Local Water Planning

Committee on Water. Desalination as a Water Source

Irvine Ranch Water District s Groundwater Banking Program

Supplemental Supply Option: Desalination DEEP WATER DESAL PROJECT

OC Water Reliability Study

South Watershed Management Area Executive Committee

Water Banking Projects Update for Municipal Water District of Orange County

Planning for Our Water Future: City of Santa Cruz & Soquel Creek Water District. September

Energy Management Strategies at Metropolitan Water District. Roy L Wolfe, Ph.D.

Amortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF)

South Orange County Watershed Management Area Stakeholder Workshop. April 30, 2013

Water Energy Nexus. Alexander R. Coate October 24, 2012

Seawater Desalination Concerns & Benefits

UPDATE: SNWA Groundwater Development Project Activities. August 20, 2009

Proposed Poseidon Desalination Project Distribution Facility Options Workshop

Metropolitan Water District. July 25, 2013

Colorado River Challenges Impacts to Southern Arizona

8-5. Special Committee on Desalination and Recycling. Board of Directors. 3/9/2010 Board Meeting. Subject. Description

Desalination. Section 10 SECTION TEN. Desalination

APPENDIX D Water Agency Profile: City of San Diego

ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE

Integrated Resources Planning Committee Item 7a December 12, 2016

Brackish Desalination Water Supply Planning for Resiliency and Growth

Clearwater Return on Investment (ROI) Case Study

Vallecitos Water District 2015 Urban Water Management Plan Page 6-1

URBAN WATER MANAGEMENT PLAN

Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water

City of San Diego Pure Water Project October 2014

Section 5 - Supply Allocation Methodology (Updated April 2012)

OC LAFCO RFPs on San Juan Capistrano Utility System Municipal Services Review Pre-proposal Conference Questions and Answers

Appendix B: Inventory of Data Sources

South Orange County Wastewater Authority JPA, Ten Member Agencies El Toro Water District Trabuco Canyon Water District Moulton Niguel Water District i

Metropolitan Water District of Southern California 2018 STATE LEGISLATIVE PRIORITIES AND PRINCIPLES

FOCUSED MUNICIPAL SERVICE REVIEW

Water Finance Conference. Carlsbad Desalination Project August 30, 2016

South Orange County Watershed Management Area Executive Committee. July 18, 2013

San Diego County Water Authority Special Water Planning Committee Meeting October 10, 2012

July 31, 2014 Get Ahead or Get Parched: Six Ways to Survive the Drought. Joe Berg Water Use Efficiency Programs Manager

Montecito Water District Desalination Facilities Status Update. Board of Directors Meeting March 17, 2015

Soquel Creek Water District s Groundwater Recharge Feasibility Study. Lydia Holmes

2015 Water Resources Status Report

CHAPTER 2 POPULATION, LAND USE & WATER USE TRENDS

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

PUBLIC PARTICIPATION/COMMENTS

AWWA PRESENTATION. Carlsbad Desalination Project October 27, 2015

CHART EXAMPLES OF WATER RATES AND CHARGES OF MWD MEMBER AGENCIES AND THEIR SUBAGENCIES

Section 5 Management Goals and Impediments

California League of Cities Briefing on Water Supply Issues

Climate Action Plans. Alan Zelenka Energy Services Leader Eugene, Oregon

Where Do We Get Our Water? 2015 Environmental and Occupational Health Technical Symposium

Orange County Water District. SCAP May 4, 2015

Wholesale water agency created by State Legislature in Mission is to provide safe and reliable water supply to member agencies Service area

Analyzing the Water-Energy Nexus: Case Studies that Examine the Crucial Connection

SB 843 (WOLK) Community Based Renewable Energy Self Generation Program. Utility & Policy Maker Frequently Asked Questions

lrvine Re: Ranch MWDOC Engagement on Legislation Related to "Making Water Conservation a California Way of Life"

San Diego IRWMP Public Meeting. Agenda. Morning Agenda

Potable Reuse as an Alternative Water Supply. AWRA Conference Orlando, FL

FOCUSED MUNICIPAL SERVICE REVIEW

FOCUSED MUNICIPAL SERVICE REVIEW

2.1 South Orange County IRWM Group

Local Water Supply and Salinity Impacts

California s s Water Supplies and Uses

Regional water wholesaler Serves 6 counties, 19 million people Growth: 170,000 people/yr. $1 trillion regional economy

5.1 Process to Consider Resource Management Strategies

Brackish Desalination Water Supply Planning for Resiliency and Growth

WESTCAS June 21, Maureen Stapleton, General Manager San Diego County Water Authority

on potable water, recycled water and sanitation service rates

NOTICE OF PREPARATION OF THE CITY OF SAN JUAN CAPISTRANO 2015 URBAN WATER MANAGEMENT PLAN

Glossary DAMP A document required under the First Term Permits issued by the Santa Ana and San Diego Regional Boards.

Priorities & Metrics Workgroup Proposed Vision, Mission, Goals, Objectives, and Targets

APPENDIX C 2012 RECYCLED WATER FEASIBILITY STUDY PUBLIC COMMENT RESPONSES

The Los Angeles Desalination Project

Santa Ana River Watershed. SAWPA Celeste Cantú April 17, 2012

N IO T C U D PRO Y G ER EN

Senate Interim Committee on Veterans and Emergency Preparedness

Water-Energy-Carbon Nexus and Your Membrane Plant

Local, State and Federal Funding Opportunities

Los Angeles 3 rd Regional

City of Redondo Beach Community Energy Efficiency Strategies

Chapter 1. Context and Research Objectives

PRESENTATION TITLE. Orange County Water and Beyond!

Update on California WaterFix

International Seminar on Energy and Resource Productivity

Sierra Mountains. LA Aqueduct. Supplies Conservation

The Evolution of the World s Largest Advanced Water Purification Project for Potable Reuse

Green California Schools Summit Metropolitan Water District of Southern California

This board letter outlines the state and federal 2015/16 legislative priorities recommended by staff for the Board's consideration and adoption.

UWMP Standardized Tables. Dominguez District Urban Water Management Plan Appendix H

Decentralized Scalping Plants

NOTICE OF PUBLIC HEARING PROPOSED CHANGES IN WATER, WASTEWATER, AND RECYCLED WATER RATES AND FEES

Transcription:

Doheny Ocean Desalination Project Alternative Power Supply Analysis CalDesal Conference - February 2018

South Coast Water District Created in 1932 Five-member Board of Directors Serves 40,000 residents 1,000 businesses Two million annual visitors Water and wastewater services to: Dana Point South Laguna Beach Areas of San Clemente Areas of San Juan Capistrano South Coast Service Area 2

Right now 85-100% reliant on imported water from the Metropolitan Water District of Southern California (MWD) Via the Municipal Water District of Orange County (MWDOC) Beginning to recover from five-year statewide drought Limited groundwater We are susceptible to earthquake-caused interruption SCWD 2015 Water Supply 13% Imported Recycled 87% Imported water from Northern California and the Colorado River becomes more unreliable as drought, growth and restricted pumping continue. 3

Efforts towards a balanced portfolio Conservation District customers are achieving 22% water conservation Over past 25 years, District s population increased by approx. 10%, but Potable Water Demands have dropped by 36% Daily Per Capita Potable Water Demand is currently at 131 gallons per capita per day (gpcd), compared to 2020 State target of 150 gpcd Groundwater Recovery Facility Currently operational, but was shut down for over 2 years due to basin stress Recycled water Aliso Creek Runoff Recovery & Reuse Project Recycled water system expansion 4

The Project Up to 15 MGD potable water Initial phase of 3-5 MGD Subsurface Ocean water Intakes Slant wells @ Doheny State Beach Desalination Plant @ existing District property Product Water Conveyance Brine Discharge Via existing SOCWA Outfall Project Partners for 15 MGD 5

Estimated Power Consumption Desalination Plant Capacity Peak Operating Load (kw) Average Operating Load (kw) Estimated Annual Power Consumption (MWh/year) 5 mgd 3,900 3,100 27,000 10 mgd 7,450 6,200 54,000 15 mgd 11,000 9,300 81,000 6

Local Power Supply by SDG&E Current San Diego Gas & Electric Infrastructure can support up to 5 mgd facility (i.e. 4 MW) Any desal facility larger than 5 mgd would require additional electrical infrastructure by SDG&E, ~3 years to complete Underground Power Lines Laguna Niguel San Juan Capistrano 7

Alternative Power Supply Study Why consider alternative power supply? Overall Cost of Water Overall Project Reliability Environmental Stewardship 8

Impact of Power Cost Cost of Electricity at Start of Project ($/kwh) Cost of Doheny Desalination Project Water at Start of Project* ($/AF) 0.085 $1241 (equal to projected MWD Rate) 0.10 $1294 0.12 $1395 0.14 $1497 0.16 $1599 5 mgd Project 30 year State Revolving Fund Loan, Fixed @2% MWD LRP Rebate of $475/AF $10M DWR Prop 1 Grant Year 2020 9

Improve Overall Project Reliability & Environmental Stewardship Multiple Sources of Power Improves Overall Project Reliability Electricity from the grid supplied by San Diego Gas & Electric Natural gas supplied to the site from Southern California Gas On site solar (beneficial but limited can only supply ~ 3% of phase 1 power demand) Offsite renewables wind/solar farms located in the desert, for example 10

Electricity and Natural Gas Supply SDG&E Service Area SoCal Gas OC pipelines 11

Off-site Power Supply Options Option Description Near Term Viability Direct Access Community Choice Aggregation (CCA) Allows for an end user to contract directly with a third party power generator. Power is distributed via existing utility network. DA under SDG&E is currently capped, and new subscribers are subject to lottery program. CCA may procure electricity on behalf of local citizens, businesses, and itself. There are currently no existing CCA programs in South Orange County. NOT Viable NOT Viable 12

Off-site Power Supply Options Option Description Near Term Viability Schedule RES-BCT Enables customers like the District to lower their energy bills by crediting one account with excess power generated from another account. Potentially Viable for less than 5 MW SB 1755 Wheeling Exemption With SB 1755, the District may not be constrained by the normal prohibition against wheeling power to itself using utility transmission and distribution lines. Specifically, can be used for desalinization operations. Viable 13

On-site Generation Available Footprint Approximately 15,000 sq. ft of available footprint for On-site Power Generation Equipment (in addition to solar panels on suitable flat roof space) 14

On-site Power Generation Options with Natural Gas Natural Gas would be used to generate electricity, which would power the Desal Facility Technology Pros Cons Internal Combustion Engines Reliable, Proven Technology Air quality/ permitting Turbines Proven and reliable Fuel Cells Lower emissions than combustion technology Lower efficiency than internal combustion Medium Maturity 15

Estimated Power Cost Estimated 20 year Estimated Additional Estimated Final Technology Levelized Generation Levelized SDG&E Levelized Cost to District Cost $/kwh Fees/Charges ($/kwh) ($/kwh) SDG&E AL-TOU 0.144 NA 0.144 On-Site Natural Gas Internal Combustion Engine On-Site Natural Gas Turbine On-Site Natural Gas Fuel Cell 0.067-0.086 0.0144 0.081-0.10 0.07-0.09 0.0144 0.084-0.104 0.10-0.12 0 0.10-0.12 Offsite Solar 0.07-0.08 0.0171 0.0871-0.0971 Offsite Wind 0.06-0.07 0.0171 0.0771-.0871 Highly Variable Highly Variable Waste-to-Energy Variable (0.08-0.20) (0.08-0.20+) 16

Next Steps on Power Supply District continues to evaluate options with the end goal being some type of competitive procurement process 17

Example Draft Desalination Plant Rendering Thank You! 18