A Practical Approach to Managing DP Operations

Similar documents
On the Development of a Classification Guide for the Dynamic Positioning (DP) System

Scenario C-SS-1, Construction Vessel/Subsea Operation, number 1. Assessee Copy: Assessment Narrative:

Closed Bus Tie Systems Why to operate a DP vessel in closed bus tie configuration? Global Maritime 2013

Competence in dynamic positioning for key technical personnel

Contents Certification, Training, Competency & Manning Introduction Certification and Competency Requirements...

Specifying DP Control Systems and Appraising Suppliers Bids

RISK SESSION. DP Proficiency Development A Comprehensive Approach to Competency Assessment and Assurance

Today s vessels are advanced constructions

NavDP4000 Series Dynamic Positioning Systems

Prof. Pietro del Rosso

ENHANCED SYSTEM VERIFICATION (ESV)

PRIMAR RENC Guidelines and Specifications for approval of Pay As You Sail services version 2.0

On Board Use and Application of Computer based systems

Fanbeam 5 DP position reference system

PROJECT NAME SECTION GENERAL COMMISSIONING REQUIREMENTS

Redundancy and Criticality Assessment (RCA) System Applied in Deep Water Operations

DPO Assessment and Improvement

TECHNICAL AND OPERATIONAL GUIDANCE (TECHOP) TECHOP_ODP_16_(P) COMPETENCY ELEMENTS FOR DP PROFESSIONALS - DP SMEs / DP FMEA PRACTITIONERS APPENDIX 1

D.P. System Training. Meeting The D.P. Operators Needs?

Enclosure (3) to NVIC 15-14

NavDP4000 Series Dynamic Positioning Systems

MSC Guidelines for Design Verification Test Procedures Procedure Number: E2-05 Revision Date: 11/09/2011

Methods for Reducing Frequency and Voltage Variations on DP Vessels

2016 Supply Chain Collaboration Event

YES MARITIME SDN BHD

Commissioning Guide. Transportation and Works Building Design and Construction Division

.1 marine diesel engine.1 approved in-service appropriate experience.2 marine steam turbine.2 approved training.3 marine gas turbine ship experience

INFORMATION BULLETIN No. 23

Guidance for IACS Auditors to the ISM Code

ROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION

GUIDELINES FOR THE OPERATIONAL IMPLEMENTATION OF THE INTERNATIONAL SAFETY MANAGEMENT (ISM) CODE BY COMPANIES

API Shuttle Vessel Task Force: It s Work and Findings

MARINE CREW TRAINING AND COMPETENCE - RAISING THE STANDARD

Are you ready for the new ECDIS regulations? Your nine stage guide to meeting the revised SOLAS requirements

BAFE SP203-1 Assessment Check List

Reliable Power in the Offshore Drilling Industry

Early Production in Deep Waters. Mats Rosengren, Frontier Drilling do Brasil Vitoria, Brazil

GUIDELINES FOR BRIDGE EQUIPMENT AND SYSTEMS, THEIR ARRANGEMENT AND INTEGRATION (BES)

Remote operation Towards unmanned production in remote and harsh climates

System Verification Helps Validate Complex Integrated Systems. American Bureau of Shipping (ABS) RELIABILITY SESSION.

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

DP INNOVATION. Dynamic Positioning of Underwater Vehicles - Tethered or Not

Guidelines on Testing of DP Systems

Guidance Material. SMS Manual Format - Scalable. Notice to Users

NAVIGATION AND VESSEL INSPECTION CIRCULAR NO BACKGROUND.

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

Automated System Validation By: Daniel P. Olivier & Curtis M. Egan

THE WÄRTSILÄ 3C CONTROL & COMMUNICATION CENTRE

Audit of Weighing Services. Audit and Evaluation Services Final Report Canadian Grain Commission

Operational Excellence in Upstream Oil and Gas

RESOLUTION A.863(20) adopted on 27 November 1997 CODE OF SAFE PRACTICE FOR THE CARRIAGE OF CARGOES AND PERSONS BY OFFSHORE SUPPLY VESSELS (OSV CODE)

Wärtsilä NACOS VALMATIC Platinum. Integrated Automation System

BUREAU VERITAS GUIDANCE SHIPOWNERS

B. OPR, BoD, and BoD-HVAC documentation prepared by Owner and Architect contains requirements that apply to this Section.

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

MANAGEMENT OF SAFETY AND ENVIRONMENTAL PROTECTION (SEP)

Offshore Support Vessels. Confidence in your position and attitude.

Maritime Safety Committee s 89 th Session

HOW THE UK INDUSTRY IS DEALING WITH REDUCING HYDROCARBON RELEASES

TECHNICAL AND OPERATIONAL GUIDANCE (TECHOP) TECHOP_ODP_16_(P) (COMPETENCY ELEMENTS FOR DP PROFESSIONALS - DP SMEs / DP FMEA PRACTITIONERS) APRIL 2018

HEALTH, SAFETY AND ENVIRONMENT MANAGEMENT SYSTEM

I. Development, Submittal, and Acceptance of a Quality Management System

TECHNICAL AND OPERATIONAL GUIDANCE (TECHOP) TECHOP_ODP_16_(P) (COMPETENCY ELEMENTS FOR DP PROFESSIONALS - DP SMEs / DP FMEA PRACTITIONERS) MARCH 2019

CONTINUOUS POWER-TIE CONFIGURATION

NAUTICAL SAFETY SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 8

3. Review of the Code for the implementation of mandatory IMO Instruments;

Effective Control of Instrumentation and Control (I&C) Modernization, Methods and Tools

ST. VINCENT AND THE GRENADINES

WORK PROGRAMME. Submitted by Israel and Poland SUMMARY

COMPARISON OF PROCESS HAZARD ANALYSIS (PHA) METHODS

Officer in Charge, Marine Inspection Eighth District Outer Continental Shelf

Unit Commitment of Generator Sets During Dynamic Positioning Operation Based on Consequence Simulation

e-navigation Frequently Asked Questions

Beier IVCS 4000 Dynamic Positioning System

PROCEDURE Control of Temporary Equipment Procedure UK-00180

NAUTICAL SAFETY SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 8

Gulfstream Flight Test Safety Management System. Evaluation Tool Guidance

System 800xA. Extending the reach of automation to achieve continuous productivity improvements

INTERNATIONAL SAFETY MANAGEMENT AUDIT CHECKLIST VESSEL: GRT: DOC ISSUED TO: DATE/ PLACE:

APPENDIX C Configuration Change Management Verification and Validation Procedures

Apache / Contractor X. Contractor/Vendor Bridging Document

United States Coast Guard COMDTPUB P NVIC MARCH 1994

IACS Recommendations May 2003 No. 81

MARITIME OPERATIONS DEPARTMENT MARINE SAFETY

National Occupational Standards. Offshore Surveying and Positioning

MARITIME ENGINEERING Operate maritime diesel propulsion plant outside normal parameters

PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A"

Business Continuity / Disaster Recovery Follow-up

MARPA s Guidance Material for a PMA Continued Operational Safety (COS) System

Fact Sheet. Commissioning WHAT IS THE PURPOSE OF THIS REQUIREMENT? WHAT VALUE DOES IT PROVIDE TO THE OWNER? HOW DOES IT SAVE ENERGY?

Integrated Operations - Parallels between Oil & Gas and Shipping

A. The purpose of this section is to specify Division 23 responsibilities in the commissioning process.

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT)

VALMATIC. Integrated Automation System. Exceeding expectations...

Operational Equipment Tests. OP NOTICE TO SHIPPING No. N

CONDUCTING CRITICAL CONTROL AUDITS CS-OHS-60

CORE TOPICS Core topic 3: Identifying human failures. Introduction

Maritime Safety Committee s 84 th Session

Transcription:

Gabriel Delgado-Saldivar The Use of DP-Assisted FPSOs for Offshore Well Testing Services DYNAMIC POSITIONING CONFERENCE October 17-18, 2006 Operations and Requirements A Practical Approach to Managing DP Operations Doug Phillips Global Maritime, Inc. Suman Muddesetti Shell International Exploration and Production, Inc.

BACKGROUND Following some costly DP related incidents Shell embarked on evaluating all DP vessels to be used by them for critical operations. This was seen as a means of avoiding similar problems in the future. After performing this on some 12 DP vessels a process was established and a requirement specification developed by the authors, to encapsulate this process for use on all future projects involving DP. INTRODUCTION The requirement specification covers the types of equipment and minimum performance levels that Shell requires for conducting operations safely using a DP vessel. Shell s philosophy is to manage DP operations using these requirements to gain a clear understanding of the safest mode of operation for the vessel. A pre hire verification process is initiated to gain this understanding. Upon final selection of the vessel and placement of a contract, the Contractor is to develop Field or Well Specific Operational Guidelines that will be used to execute DP operations safely. The FSOG and WSOG for the safest mode of operation being decided in collaboration with the contractor. The overriding philosophy behind developing the process was to: - 1) Understand the worse case failure and significant single point failures (if any) of the DP system. 2) Determine the configuration for the safest mode of operation. 3) Undertake defined critical activities with vessel s DP system, configured for safest mode of operation. 4) Ensure that all key DP Personnel on the vessel are brought to the same level of understanding with regards to the FSOG/WSOG. 5) Have robust contingency plans in place. This paper presents the contents of the Requirement Specification that has now been incorporated as a Shell DEP (Design and Engineering Practice). SCOPE The types of equipment and minimum performance levels required to conduct operations safely using a dynamically positioned (DP) vessel are specified. DP Vessels operated or chartered by Shell, need to comply with the specification, additionally project specific operational guidelines (FSOG or WSOG) are to be established for the project and implemented during the execution of the work. The requirements are applicable to the following activities Offshore Construction Accommodation Support Drilling and Well Intervention Dynamic Positioning Conference October 17-18, 2006 Page 1

DP Offshore Supply vessels when executing specific construction activities. REFERENCE SPECIFICATIONS The following documents are referenced and are to be complied with unless specifically directed otherwise. Specification Title IMCA M 103 Guidelines for the Design and Operation of DP Vessels (Feb 1999) and supplement M161 IMO MSC Circular 645 Guidelines for vessels with Dynamic Positioning system IMO MSC Circular 738 Guidelines for Dynamic Positioning system (DP) Operator Training DP CLASS The DP equipment class required for a particular operation is to be based on a risk analysis of the consequences of a loss of position for the specific activity being considered. In certain areas of operation the administration or coastal state may dictate the minimum class required. TECHNICAL CAPABILITY Contractors are to provide necessary documentation for assessment of the technical capability of the DP vessel being proposed. Documentation and evidence is also to be provided to help assess the competence of the contractor s operational management and personnel. Dynamic Positioning Conference October 17-18, 2006 Page 2

VERIFICATION PROCESS The contractor needs to provide documentation listed in Tables A and B for the purpose of Validation of technical suitability of the vessel for the activity Identifying the vessel s configuration for the safest mode of operation Understanding the vessel s station keeping capabilities following the worst case failure Understanding the general level of compliance with reference documents IMCA, Guidelines for the Design and Operation of DP Vessels (IMCA M 103 Feb 1999) and supplement M161 two vessel operation IMO DP Guidelines for vessels with Dynamic Positioning system MSC / Circ 645 Relevant class requirements Any relevant mandatory standards and guidelines applicable in the particular Coastal State Training and experience of key DP personnel IMO MSC/Circ.738. (Refers to IMCA 117 as acceptable standard). Project specific requirements may demand a higher standard than the IMCA guidelines. A formal submittal of the following is required as part of the Contractor s proposal. Documents requested in Table A: Documentation for detailed review is to be subjected to a detailed review. The outcome of this review along with submittals requested in Table B, Documentation for Basis for Audit, will be used to aid in carrying out audits. DOCUMENTATION FOR DETAILED REVIEW Table A: Documentation for Detailed Review No. Document Remarks 1 Vessel's Class Notation and Copy of Certificate 2 FMEA of DP System See FMEA requirements later 3 FMEA Proving Trials Results 4 Annual Trial Results 5 Power System discrimination and selectivity study, protective device calibration/testing documentation and vessels bus tie philosophy 6 DP Capability Plots 7 8 Results of Capability proving tests for intact condition and worst case failure Results of tests that show generators and thrusters can produce full power upon worst case failure Power System Study is to be sufficiently detailed and provide a clear understanding of the safe mode configuration for the vessel. Closed bus tie operations may be accepted if this study shows this to be a safe mode. However operations with an open bus may still be required for critical operation. Capability plots must include condition following worst-case failure. Capability plots should include current conditions of 1.0kt, 1.5 kt and 2.0 kt Dynamic Positioning Conference October 17-18, 2006 Page 3

Philosophy for carrying out critical 9 DP operations in proximity of sub sea or surface hazards 10 Service reports concerning the DP system (last three years) 11 Details of any DP related modifications since last FMEA 12 Details of any acoustic noise tests conducted on the vessel 13 Audit Results (last three years) of Vessel and DP inspection Includes methodology for risk assessments and contingency planning (examples to be provided) For Determination of suitability of the Acoustic Position Reference System Include close out reports 14 DP Operations Manual Vessel Specific DP Operations Manual (not manufacturer s DP manual). 15 DP Incident reports (last three years) Advisory, yellow alert and red alert levels including close out reports 16 Details of spare capacity and interface for additional position reference sensors 17 Details of Logging/Data Capture Capability 18 Examples of FSOG/WSOG that vessel has used in the past See Appendix for example DOCUMENTATION REQUIRED AS BASIS FOR AUDIT Table B: Documentation Required for Basis for Audit No. Document Remarks 1 Vessel's Class Notation and Copy of Certificate 2 FMEA of DP System 3 FMEA Proving Trials Results 4 Annual Trial Results 5 Power System discrimination and selectivity study, protective device calibration/testing documentation and vessels bus tie philosophy 6 DP Capability Plots 7 8 9 Results of Capability proving tests for intact condition and worst case failure Results of tests that show generators and thrusters can produce full power upon worst case failure Philosophy for carrying out critical DP operations in proximity of sub sea or surface hazards To include copies of relevant certification and record of DP hours Includes methodology for risk assessments and contingency planning (examples to be provided) Dynamic Positioning Conference October 17-18, 2006 Page 4

10 Service reports concerning the DP system (last three years) FMEA / PROVING TRIALS AND ANNUAL TRIALS FMEA/proving trials and Annual Trials submitted have to comply with the following minimum requirements FMEA clearly defines safest mode of operation, the worse case failure(s) and significant single point failures in the summary. FMEA has been updated after any major modifications and proving trials have been conducted. FMEA s have been reviewed and updated once every five years (even if no major modifications have been carried out). Proving trials (if necessary) or comprehensive Annual trials will be conducted following this review. This review will incorporate lessons learned within the industry and from failures and incidents on the vessel. FMEA Proving Trials must be adequate. Periodic FMEA testing will be scheduled for high-risk FMEA issues (e.g. blackout recovery). Annual trials are adequate and have been conducted in the past 15 months and were witnessed by an independent party. Action items from FMEA, proving trials, annual trials, audits and incidents have been or are in the process of being closed out. Closing out of actions items is to be well documented and auditable. FMEA s are required to have vessel specific Details of governor failure modes Details of AVR failure modes Details of main switchboard control power failure modes Details of position reference system processing provided by the DP control system Details of DP control system consequence analysis feature DP control system Input/Output Schedule Details of Networks Satellite based position references one line diagram Hydro-acoustic position references one line diagram Other position reference systems (e.g. Taut Wire, Laser based etc) one line diagram(s) Details of communications and alert systems provided for the DP operator and their redundancy (systems and power supply) It is recognized that some FMEA s may not contain all the above information. In such cases the requested information must be supplied as separate documents in sufficient detail with clear identification of the content. OPEN AND CLOSED BUS TIE OPERATIONS The vessel may be expected to operate with an open bus tie(s). Closed bus tie operations may be considered for non-critical operations when it can be demonstrated that closed bus tie operation is capable of preventing a black out under the following fault conditions Dynamic Positioning Conference October 17-18, 2006 Page 5

Any single generator or Automatic Voltage Regulator (AVR) fault Any single equipment failure or fault Any single diesel or diesel speed control fault Any single switchboard or electrical buss fault Any single shared systems fault (e.g. control power or fuel) and Closed bus tie operation is inherently safer DATA LOGGING, ALARMS AND SCREEN CAPTURE Vessels are required to have an independent data logging system. The purpose of having such a system is to aid in understanding the real causes of failures and provide faster diagnosis and recovery following a failure. As a minimum this has to be ability to capture and store in electronic media key parameters of a DP system (including key power plant data) for a minimum period of 30 days means of analyzing data and depicting it in a usable format ( graphs/reports) provision of hard copies in color capability to read logged data using off the shelf commercially available software and in Windows environment data logger processor connected to a UPS capability to print DP control system screens to a color printer and printer connected to a UPS provision of alarm printers for hard copy of alarms from the DP control system computers (the printing of these alarms should not require any operator intervention). STATUS ALARM SYSTEM AND COMMUNICATIONS The status alarm system and DP related communications is required to have visual and audible status alarm indication for yellow and red alarms at DP control position, ECR, the work area and the area where the work is controlled alarms manually initiated from the DP console. alarms logged on the DP alarm printers alarms operational in a black out alarms recorded on the data logging computers accessible redundant means of direct communications between the DP console and ECR, work area and the area where work is controlled from. one means of communication for the above to be hands free and still be operational in a black out Dynamic Positioning Conference October 17-18, 2006 Page 6

DOCUMENTATION Documentation submitted per Tables A and B is reviewed with a view to gain an understanding of: - Effective incident reporting, investigation and closeout. Adequacy of DP related drills conducted on the vessel Accuracy of vessel s capability plots and proving tests Assessment of system reliability and outstanding issues from the service reports Confirmation that the capability plots cover the worse case failure(s) identified Confirmation that the consequence analysis feature covers the worse case failure(s) identified Suitability of position reference system processing Suitability of data logging and screen printing features for post incident investigation Suitability of communication and alert systems Adequate manning of DP operation DP operator shift pattern and DP/ECR manning OPERATIONAL GUIDELINES A FSOG/WSOG has to be developed for the intended operations. This document is considered as a key document and an important tool to effectively manage DP operations. This encompasses pertinent findings of Review of the documents Results of Proving/Field Specific Trials Risk Analyses Specific Nature of Intended Operations Vessel s operational personnel are to be engaged in risk identification and assessment practices. Operational personnel assigned to a given vessel are to have a key role in the development of the FSOG/WSOG and own the document. This document is to be signed by the OIM and provided to Shell for acceptance. The FSOG/WSOG can be modified in the field with the explicit concurrence of the on board representative and the vessel s OIM (MASTER). Nothing in FSOG/WSOG should relieve the operational personnel of the vessel of their responsibility to take the necessary actions in order to bring the vessel to a safe position either at the threat of an imminent DP incident or onset of an unplanned/unforeseen DP incident ADDITIONAL EQUIPMENT Additional equipment and features may be decided upon as required for the particular activity. This will involve a consultation process between Shell and the contractor. The following are examples of additional equipment or features that may be considered Dynamic Positioning Conference October 17-18, 2006 Page 7

Force feed forward feature Heavy lift mode Relative positioning modes Position reference sensors PRE FIELD ARRIVAL REQUIREMENTS The pre field arrival process is designed to ensure that all DP related equipment is set up correctly, fully operational and fit for purpose. Special attention will be given to the performance of certain systems for the given location and the particular operation to be conducted. Prior to the vessel arriving at the field the agreed FSOG or WSOG are discussed in detail on board the vessel with all key DP personnel prior to the arrival at the field. Pre field arrival trials need to include Vessel s own standard field arrival tests Correct functioning of all manual thruster and propulsion controls Repeat of capability test for worse case failure condition Additional tests required as a result of the review of the FMEA(s) Generator and thruster maximums and step load transfer on worse case failure Operation and test while in the safest mode of operation - in particular relating to the power management system and load sharing functionality Functioning of additional equipment, special features or special modes of operation Key Drills (Vessel Specific e.g. Black out drills) REPORTING Reporting is mainly to be dictated by the FSOG/WSOG however Records are to be maintained for both field arrival and watch keeping checklists. Daily report submitted has to include a section on DP equipment status, planned maintenance and any DP related incidents. SIMULATOR TRAINING At Shell discretion and cost, the Contractor may be required to carry out Project Specific Simulator Training. This training will be conducted at a suitable training facility and, as far as practicable, be carried out on equipment similar to that on the vessel. The training has to include theoretical instruction and practical simulation. The intent of the training is to communicate: Overview of the Project. Criticality of the specific operation(s) to be carried out. DP and Contingency Planning required. Worst case failure and significant single point failures of the DP system. Configuration for the safest mode of operation. Development and practical use of Well or Field Specific Operational Guidelines. The course content developed for the training has to be submitted. Dynamic Positioning Conference October 17-18, 2006 Page 8

The following personnel need to attend the training Master(s) Chief Mate(s) DPO(s) Chief Electricians Dynamic Positioning Conference October 17-18, 2006 Page 9