TECHNICAL SPECIFICATION DESIGN, PROCUREMENT, INSTALLATION AND MAINTENANCE OF PHOTOVOLTAIC SOLAR POWER PLANT AT AZRAQ REFUGEE CAMP

Similar documents
Ref. No.: SRMU/NDP-I/VBMPS-II/ INVITATION FOR QUOTATION FOR SUPPLY OF GOODS UNDER SHOPPING PROCEDURES

REQUEST FOR BID (TURNKEY SOLUTION) 1MW GRID TIE SOLAR PV POWER PLANT. Location:

NORTH COUNTRY LIBRARY SYSTEM County Route 190 Watertown, NY 13601

7 Project Description

Objectives and Task Analysis for a Professional Small Wind Energy System Installer

PHOTOVOLTAIC SYSTEMS. Syllabus. 1 Photovoltaic systems

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash

Objectives and Task Analysis for a Small Wind Energy System Installer

MINUTES OF PRE-BID MEETING

Quotation Notice for installation of 20 Street Lights in Kaloor JLN Stadium premises

TENDER FOR COMMMUNITY ENERGY PROJECT

Pre-Qualification Certificate

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH

Clarification to Bidders Responses

Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System

Manitoba Electrical Code

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

ELECTRICAL SAFETY Information Bulletin

TERMS OF REFERENCE FOR SERVICE CONTRACTING

SPECIFICATION FOR THE MAINTENANCE OF HIGHWAY LIGHTING

GENERAL SPECIFICATION FOR ELECTRICAL WORK

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service

Small-Scale Solar Photovoltaic Energy Netting Regulations

GN7 Amendment 3-5 Agricultural and horticultural premises

JERUSALEM DISTRICT ELECTRICITY CO. LTD. Street Jerusalem P.O.Box Tel Fax JDECO. REQUEST for Bid. Photovoltaic PROPOSALS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

Ref. No.: SRMU/NDP-I/VBMPS-II/ INVITATION FOR QUOTATION FOR SUPPLY OF GOODS UNDER SHOPPING PROCEDURES

BID SPECIFICATION: ADDENDUM A

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

SIEA LUNGGA POWER STATION RETAINING WALL

Standard. Extra High Voltage (EHV) Post Insulators Standard R Version 1.0, June Tasmanian Networks Pty Ltd (ABN )

Specification for UDC Electrical Testing

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION

Long Island Power Authority Seventh Revised Leaf No. 16

There will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial.

BANKABILITY OF SOLAR PROJECTS HOW TO MAKE YOUR PV PROJECT BANKABLE? HOW TO SELECT EPC CONTRATCOR? ROLE OF TECHNLOGY SELECTION

ATTACHMENT A - TECHNICAL SPECIFICATIONS 1.1 GENERAL REQUIREMENTS

SECTION LIGHTNING PROTECTION SYSTEM

Lightning Protection Practice for Large-Extended Photovoltaic Installations

TABLE OF CONTENTS. FOREWORD... Error! Bookmark not defined. INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING...4

AS/NZS 3000: 2018 Changes to Wiring Rules Standard

MINUTES OF PRE-BID CONFERENCE. INVITATION TO BID INTERIOR FITTING-OUT WORKS FOR NEW UNDP CAMBODIA COUNTRY OFFICE Process No:

KATARGAM WATER WORKS (940 kwp)

Solar PV Nominated Technical Persons Criteria

CONTRACTOR S PERMIT APPLICATION for Residential PV Installation with e-inspection CA Health and Safety Code Section V p2s

METERING GUIDE PART 1 METERING GENERAL

SMS RETROFIT & PARTNERSHIP DELIVERY FRAMEWORK. An Introduction for SHAP Members

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

RISE Certified Solar Roofing Professional (CSRP) Job Task Analysis August 2011 RISE CERTIFIED SOLAR ROOFING PROFESSIONAL (CSRP) JOB TASK ANALYSIS

Invitation To Bid (ITB) Tender No. ( xx / 2015)

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

Request for Proposals for Photovoltaic System Installation

International Standard Corresponding Indian Standard Degree of Equivalence

SCOPE OF WORK FOR ELECTRICAL WORK

GB Translated English of Chinese Standard: GB NATIONAL STANDARD OF THE PEOPLE S REPUBLIC OF CHINA

ROOFTOP PV GUIDELINES FOR SAFE AND LEGAL INSTALLATIONS IN CAPE TOWN

Apprenticeship Curriculum Standard. Powerline Technician. Level 1. Trade Code: 434A

PUBLIC WORKS DEPARTMENT NOTICE INVINTING QUOTATION

Wokingham Borough Council Street Lighting Design, Adoption Process and Specification Guide

Request for Proposals for

Dubuque County West Campus Secondary Roads Shop Solar Array Bid Documents and Specifications. Notice to Bidders

MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING

a-si/μcsi Tandem Module Installation Manual Macsun Solar Energy Technology Co., Limited Applied to MS-SDXX

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

JUNCTION BOX AND BAYMARSHALLING KIOSK

SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS

Tender No.:- RITES/CO/B&A/EE/CUK- Gulbarga/External/E-2/2012.

4. GENERAL REQUIREMENTS

ENGINEERING SPECIFICATION EE SPEC

TERMS OF REFERENCE FOR SERVICE CONTRACTING

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control

Central Silk Board Central Silk Board-CMER and TI Jorhat Tender Reference Number CSB/CMERTI/ 4-50/17-18/Str/2810A dtd

Approved Tasks for the Application of Safe Approach Distance Special

POWER TRANSFORMER INSTALLATION

IEC Installation Guide for SERAPHIM Photovoltaic Module

Electricity Supply Agreement

SPECIAL REQUIREMENTS AT AN OPERATIONAL AIRPORT

APDRP SCHEME, WESCO. Technical Specification for 33KV Air Break Switch PART 1: SCOPE AND CONDITIONS

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS

SECTION SPORTS FIELD LIGHTING

Terms of Business for the Supply of Services

Crystalline Photovoltaic Modules

Special Specification 6156 LED High Mast Illumination Assemblies

STATE OF NORTH CAROLINA B DEPARTMENT OF ADMINISTRATION February 1, 2013 PURCHASE AND CONTRACT DIVISION A MARCH 8, 1995

CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS

Certificate in Electrical Power Engineering - Overhead Lines at SCQF Level 5 ( )

GENERAL SPECIFICATION FOR ELECTRICAL WORK

Proposal Data. Submittal Form

Bulletin Grounding and bonding of solar photovoltaic systems Rules , , , and

4. GENERAL REQUIREMENTS

Section 4 - Bidding Forms

Route to Authorisation

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-SBP ADDENDUM No 3

CS-21 STREET STRUCTURES TABLE OF CONTENTS

LIGHTING PROJECT SPECIFICATIONS

YINGLI SOLAR TWINMAX MODULES Installation and User Manual

TONGA POWER LIMITED REQUEST FOR PROPOSALS INDEPENDENT POWER PRODUCERS. for SOLAR PHOTOVOLTAIC GENERATION 5 APRIL, 2018 RFP - TPL SOLAR IPP

Transcription:

TECHNICAL SPECIFICATION DESIGN, PROCUREMENT, INSTALLATION AND MAINTENANCE OF PHOTOVOLTAIC SOLAR POWER PLANT AT AZRAQ REFUGEE CAMP July 2015

GENERAL SPECIFICATION 1. The contractor shall quote for the complete design, supply, installation, training of local staff and commissioning of photovoltaic solar power plants in Azraq Refugee Camp, as outlined in the specification below. Azraq camp is located at 32 54 33 N; 36 35 10 E. 2. The current objective is to complete a photovoltaic solar power plant with total combined nominal power output of 6,012kWp. The project will be implemented in separate phases over a period of 3 years. 3. The implementation is foreseen in six phases, each of which shall have a nominal power output of 1,002kWp and will be independent of all other phases. (i.e. each phase will have its own net metering equipment, transformer, connection to EDCO grid etc.). Nevertheless, the actual size of each phase will depend on available funding and local requirements, therefore phases may be larger or smaller than 1,002kWp. No phase shall be smaller than 0.5MWp and could range in size up to a maximum of 1.5MWp. Separate purchase orders shall be issued for each individual phase, depending on the available funds. The UNHCR does not guarantee to issue purchase orders for any minimum amount or for a minimum number of phases. 4. The contractor shall submit a proposal for the installation of a photovoltaic solar power plant with a nominal power output of 1,002kWp which will be used as a base for the purchase orders of each and every phase of the project depending on funds availability. 5. The solar power plant will be grid-connected via net metering agreements with the local electricity distribution company EDCO. 6. The solar power plant installation shall include but is not limited to support structures, foundations and fixings, PV modules, inverters, control systems, circuit combiners, switchgear, metering equipment, transformers and cabling. 7. The contractor s complete design shall be submitted along with the quotation to the UNHCR. This design shall include all drawings, equipment and material specifications, in addition to methods of installation, training plan and project programming for each element of the installation. 8. The contractor shall provide details of the manufacturer and the technical specifications for each item of equipment included in the design and quotation. This shall include separate details for all components parts of each installation. Please provide only one manufacturer/supplier for each item of equipment which shall be used as the minimum standard for the installation. 9. All designs, installation works and equipment shall comply with local and international regulations and standards including the laws of the Energy and Minerals Regulatory Commission, the Ministry of Energy and Mineral Resources, local authorities and the standards of the International Electro-technical Commission (IEC). The Contractor shall include for all necessary equipment, materials and work practices in order to comply with

these standards and regulations, even where not precisely specified in this outline specification. 10. All designs must be agreed with the UNHCR Project Manager prior to commencement of the contract. Notwithstanding this agreement, the contractor shall be responsible for all design works and ensuring that all installations function correctly in accordance with these designs. The contractor shall be responsible for any systems that do not function correctly as a result of improper design and/or improper workmanship. 11. All installations shall be designed and installed to facilitate inspection, cleaning and maintenance and to ensure continued operation under conditions prevailing at the site, and under such voltage and load variations encountered in operating the systems. 12. All equipment shall be suitable for use from -5 C to 40 C and all external equipment shall be IP65-rated. 13. Any changes to these designs and specifications during the contract works shall be agreed with the UNHCR representative prior to the commencement of these installations. No payments shall be made for any additional works or changes to any aspect of the contract without prior written agreement. 14. Precise locations of all equipment shall be agreed on site with the UNHCR Project Manager prior to installation. 15. The contractor shall supply and erect all necessary work signs, fencing, warning signs, lighting, safety barriers etc. required to ensure the safety of the public and workers on the site. 16. The contractor shall include for full site investigations in their system designs, including route surveys, ground testing, geo-technical, hydrological and any other testing necessary to properly design and complete the installations. The contractor shall be responsible for any difficulties encountered in site conditions that could reasonably have been foreseen or investigated. 17. All working methods employed and all plant and apparatus under this contract shall be subject to approval by the UNHCR. 18. The Contractor shall include for all associated civil and construction works necessary for the complete installation of all equipment, including but not limited to excavations, concrete works, backfilling, earth ramming, foundations, building alterations and repairs. Pricing, designs and specifications for these works shall also be fully detailed in the quotation. 19. The contractor shall be responsible for ensuring that all areas of the site are left in the same condition as prior to the commencement of these works. 20. Water is not available on site and the contractor shall provide an adequate water supply for all installations. 21. The contractor shall maintain respect for all residents and workers in the camp. Legal action may be taken against the contractor should they threaten, coerce or otherwise behave in a manner which negatively affects the refugee population.

22. Should any incidents arise within the site that affects the work of the contractor, the contractor shall first advise the UNHCR for resolution of the issue. Should any serious incidents arise which could result in the injury of persons or damage to property, the contractor shall contact the Syrian Refugee Affairs Directorate (SRAD) and UNHCR immediately. The UNHCR will contact the Syrian Refugee Affairs Directorate, (SRAD) UNHCR s primary government counterpart in Azraq if necessary. 23. The UNHCR reserves the right to assign individual contracts to separate parts of the works or to omit any section of the works detailed below from the overall contract. The UNHCR is not bound to accept any tender or to award a contract to the lowest bidder. 24. The UNHCR may receive donations of specific items of equipment (e.g. transformers, inverters, solar modules). The contractor shall agree to accept these items supplied by UNHCR for installation as part of the contract, provided the equipment is of a suitable, approved standard and does not affect the integrity of the operation of the overall system. This shall be agreed in advance prior to the issue of any purchase orders. 25. Following the RFP process, the UNHCR will present the selected contractor with copies of Government permissions to use the land for the purpose of constructing and operating a solar power plant on this specific site within the refugee camp. 26. Specific contract details regarding penalties, incentive payments, programming, delays, bank guarantees, advance payments etc. shall be agreed at a later date. The contractor should highlight any concerns in this regard in their tender submission. REFUGEE AND LOCAL LABOUR The Contractor might employ workers from the refugee population within the camp to carry out the installations and in maintenance operations. The contractor might also employ workers from the local area i.e. Azraq Town. There are many qualified electricians, engineers, builders and labourers living in the camp and suitable workers might be selected by cooperation between the UNHCR and the contractor. Candidates for skilled positions shall be subject to tests and interviews to evaluate their level of expertise. In case the Contractor decides to employ refugees, the following minimum wages are to be taken into consideration: Unskilled labourers shall be paid 1 Jordanian Dinar per hour; skilled labourers 1.5JD/hour and qualified tradesmen/professionals shall be paid 2JD/hour. Unskilled labourers shall be alternated every month to allow work opportunities for the maximum number of people in the camp. Local labourers and electricians shall be paid at normal national rates. TRAINING PROGRAM The contractor shall undertake to train 20 skilled labourers in the installation, operation and maintenance of solar PV plant and equipment each year. Each person should receive certification for successfully completed training.

Contractor is to propose a training plan of labourers as part of the technical proposal ENVIRONMENTAL CONSIDERATIONS All packaging and wastes associated with the installations shall be carefully disposed of in accordance with the laws or Jordan. The contractor shall be responsible for ensuring that waste materials, packaging, and any other items associated with these installations, do not get blown or otherwise distributed around the site. They shall also be careful not to create excessive dust or debris in any area. Any costs incurred in cleaning wastes or debris generated by the contractor shall be charged to the contractor. The contractor shall be responsible for repairing and/or replacing anything which has been damaged by the contractor or their sub-contractors within the site. They shall also be responsible for the cleaning of any debris, wastes or other items created during these works. PREVIOUS PROJECT EXPERIENCE 1. The contractor shall submit details of previous similar projects completed by the contractor (and for any proposed subcontractor), outlining the suitability and capacity of their operation to carry out these works. The Contractor shall also provide details of the experience and qualifications of the key personnel proposed for the project. 2. The contractor must have completed at least two solar photovoltaic power generation plants with single project size of 10MWp or greater, which must be in operation for at least 2 years, and at least 1MW project in the region, preferably in Jordan. 3. The contractor must have experience in the operation and maintenance of a solar power plant of minimum 10MWp for at least 2 years. 4. The Contractor must have a registered operation in Jordan or an established partnership with suitable Jordanian sub-contractor/implementation partner. 5. Any local subcontractor/ implementation partner proposed by the contractor, must be in operation for a minimum of 2 years in the supply, installation and maintenance of solar PV systems or related systems (MEP, solar thermal )within Jordan, and preferably also within the region. 6. The contractor and or sub-contractor must have adequate full-time employees with demonstrated relevant experience and expertise to implement this solar PV project. They should be registered with the social security corporation and minimum number of 5 staff registered with the Engineering Association.

7. The contractor and/or subcontractor must have a single solar PV project of minimum size 5MW for which they have taken through the required government, Electricity and Minerals Regulatory Commission, National Electric Power Company and/or electrical distribution company approval processes in Jordan. The contractor shall provide an outline of the steps required to obtain all necessary permissions and approvals for the solar power plant. EDCO CONNECTIONS APPROVALS AND APPLICATIONS PROCEDURE 1. The Contractor shall allow for connecting the solar power plant to the Electricity Distribution Company (EDCO) 33kV grid which runs from the Azraq highway along the main service ring road in the camp. This shall include all necessary junctions, transformers, insulators and any other items required by EDCO to facilitate these connections. 2. All equipment to be supplied and installed by the contractor in the power plant shall be subject to approval by EDCO. The contractor shall confirm that their proposed equipment meets EDCO minimum standards. 3. All necessary permits, load impact studies, environmental impact studies, geo-structural surveys, and any other required studies, certificates and licences shall be organised and coordinated by the contractor as part of this project. These shall be detailed in the contractor s offer and separately priced in the BOQ. All fees payable to EDCO shall be made by the UNHCR, all other charges shall be paid for by the contractor. 4. The contractor shall provide details of the steps required in this process and any evidence of previous experience in taking a Solar PV project through this regulatory process. 5. BILL OF QUANTITIES The Contractor shall prepare a complete Bill of Quantities (BOQ) for a phase of 1MW detailing all individual items necessary to carry out the installations. A sample BOQ is provided as Annex C of the Tender. Contractor shall provide the reviewed and completed BOQ by adding items which are deemed necessary (if any) and removing item which are deemed unnecessary (if any). The BOQ shall be submitted the following way: The first BOQ for a complete phase of 1 MW has to be submitted as part of the technical proposal. It has to include all the items, goods and services that are needed for the turnkey construction of a phase of a single1 MW solar PV power plant. This first BOQ shall not contain any price information since it will be considered for the technical evaluation of the proposal only. Second BOQ for a complete phase of 1 MW has to be submitted as the Financial Offer. The second BOQ shall be identical to the first BOQ with the addition of all pricing information. Individual prices shall be shown for all separate items of equipment in calculating the totals. Unit rates shall be deemed to include all direct and indirect costs. The item costs, labour and overheads should be separately detailed in calculating the total for each item. The contractor shall provide full details of all insurances and any other expenses necessary to complete the installation of a 1 MW power plant.

The contractor shall include for the operation and maintenance of a 1 MW power plant and shall separately price for the first 2 years of operation, maintenance and security of this power plant as detailed in the BOQ. The contractor shall also include cost of training of 20 people each year in in the installation, operation and maintenance of solar PV plant and equipment, as outlined in the refugee & local labour section above. These costs will be added to the Financial Offer (BOQ with pricing information) and will be considered as the final, all inclusive turnkey price offered by the contractor. That will be the contractor s final price to be considered for the financial evaluation! Prices in the BOQ will be used in as a basis for any purchase orders for each and every phase of the project should UNHCR decide to issue purchase orders. The contractor shall allow for 5% of the value of the works to be retained by the UNHCR for 1 year after completion of the works as a guarantee against faulty equipment or poor workmanship. Should any equipment require replacement or repair during this time, the costs shall be deducted from this retention amount. REMINDER: The Bill of Quantities without pricing information shall be submitted as part of the technical proposal. NO INFORMATION REGARDING PRICING SHALL BE INCLUDED IN THE TECHNICAL SUBMISSION. TECHNICAL SPECIFICATION OF WORKS 1.0 SYSTEM DESIGN The contractor shall provide all design calculations for the output of the proposed installation. This shall include the following: Solar irradiation at the site, detailing the average and monthly the Global Horizontal Irradiance and Direct Normal Irradiance Output of each module and total number of modules required Module type, performance specifications and warranties Mounting arrangements, inclination and orientation of modules Area of land required for total installation of 6MWp PV system losses Electrical system losses Temperature co-efficients Total Energy Produced Performance Ratio Total Energy output in kwh to EDCO grid per year for power plant with nominal power output of 1,002kWp.

2.0 EQUIPMENT HOUSING AND SUPPORT STRUCTURES 2.1 The contractor shall supply and install all support structures or housings necessary for the installation of PV modules, transformers, inverters, switchgear and all other items of equipment necessary to complete the installation. 2.2 This shall include all necessary concrete bases, support pads, building constructions, weatherproofing, access etc. including all excavations, backfilling and making good of the site. 2.3 The contractor shall submit design drawings and specifications for all buildings, support structures, bases, and connections with the quotation. 2.4 The contractor shall provide a minimum warranty of 10 years on the support structure. 3.0 TRANSFORMERS 3.1 The contractor shall supply and install all transformers necessary for the connection from the PC plant to the 33kV electrical network located along the Main Service ring road, close to the SRAD main building. This shall include all mountings, fittings, bushings, taps, connectors, glands, insulators, terminals, rating plate, 33kV switching devices and lightning arrestors. Transformers shall be connected to the 33kV overhead line by means of 33kV fuse switches. 3.2 Transformers shall be liquid filled, low loss units capable of continuous operation in outdoor location with temperatures between -5 C and 40 C. 3.3 The transformers shall be located within the perimeter fencing of the solar power plant with any support structures / foundations etc. to be supplied and installed by the contractor, as approved. 3.4 The contractor shall provide full specification sheets and certificates, including details of the rated reactance, no-load and full-load losses, temperature rise, winding resistances, insulation characteristics, efficiencies, regulation and impedance. 3.5 The contractor shall also provide drawings detailing the transformer, cabling and switchgear installation layouts including all necessary support steelwork etc. 3.7 Transformers shall be located as close to the load as possible to minimise distribution losses. Exact transformer locations will be as approved on site. 3.8 The neutral point of transformer should be connected to earth by not less than two separate and distinct connections with its own earth electrode. 3.9 The transformer shall be free from abnormal hum or vibration. The design shall be such as not to cause any undesirable interference with radio or communication circuits. 3.10 The Contractor shall provide details of quantities and pricing for the supply and installation of each type and size of transformer proposed.

4.0 CABLING 4.1 The Contractor shall design, supply and install all cabling and connectors, including all supports, fittings, terminators, junctions, connectors, shackles, support stays, clamps, insulator strings and any other items necessary to complete the installation. 4.2 Cabling shall be sized to minimise voltage drop and losses in the system and in order to properly the balance the loads across the system. 4.3 Design drawings shall clearly show cable routes, types and sizes for each section of the installation. Technical specifications and standards certificates shall be provided for all elements of the installation including current ratings, short circuit ratings, maximum resistances, reactance, impedance, capacitance, maximum charging currents, withstand ratings, neutral earthing arrangements and mechanical properties. 4.4 The Contractor shall also detail the installation methods to include phase rotation, conductor stringing, tensioning, sagging, joints, steelwork and pole numbering system. 4.5 The contractor shall design and install the cabling system to withstand the climatic conditions with temperature ranges from -5 C to 40 C and winds up to 140kmh. All low voltage cabling shall be in accordance with IEC 60085/IEC 60228 / IEC 60502. 4.6 All cable sizes, specifications and routes shall be agreed onsite with the UNHCR Electrical Engineer prior to installation. 5.0 INVERTERS 5.1 The contractor shall supply and install all necessary inverters for the correct operation of the system and which allow for future expansion of the PV power plant in phases. This shall include all foundations, supports, housings and enclosures with all necessary cooling and dust protection equipment. The contractor shall also include for all ancillary cabling, switchgear, metering etc. necessary for the installation of the system. 5.2 The contractor shall provide details of the following characteristics for each inverter: Max input power Max output power Efficiency Rating Protection features Voltage, current and power ratings Communication capabilities Operating parameters Controls and displays Standards and certificates

5.3 The Contractor shall provide all controls for the operation of the inverters. This shall include master-slave with rotating-master functions for multiple inverters at varying PV outputs. 5.4 The contractor shall supply install and commission a system to allow the remote monitoring of system performance via internet/4g connection. 5.5 The contractor shall include a weather station to monitor wind speed, insolation, ambient temperature and module temperature. 6.0 DISTRIBUTION BOARDS AND SWITCHGEAR 6.1 The contractor shall supply all distribution boards and switchgear necessary for the protection of cabling and equipment within the solar power plant installation in accordance with IEC 62271 and IP65-rated. This shall include for all necessary supports, steelworks, concrete etc. to properly complete the installation of these boards and connecting cabling. 6.2 Design drawings shall clearly show distribution board locations with separate detailed drawings for each board in each section of the installation. Technical specifications and standards certificates shall be provided for all boards including voltage and current ratings, insulation levels, withstand voltage and current ratings, short-circuit current ratings, busbar capacities and earthing. Specifications shall also be provided for all switchgear within each distribution board, detailing all compulsory rated characteristics, 7.0 EXTERNAL SECURITY LIGHTING 7.1 The Contractor shall design and install a complete public lighting system with LED luminaires in the Solar PV compound for the security of the installation. 7.2 This shall include all necessary poles (see above), supports, fittings, connections, switchgear and cabling necessary to complete the lighting installation. Materials shall be corrosion resistant for the life of the complete system (i.e. 10 years). All parts shall be suitable for the conditions of the site in which they shall be installed. 7.3 The contractor shall provide a minimum warranty of 10 years for supports, fittings, housings etc. and 1 year warranty for luminaire components. 7.4 The Contractor shall provide a complete design for each system with their quotation. This shall include all drawings detailing pole and lamp position, minimum lux levels in each area, and also, specifications of lamp performance, colour temperature levels, photometric charts and standards compliance certificates for each lighting system.

7.5 Pricing shall detail the individual costs of each type of light fitting, lighting controls, cabling, poles and labour. 7.6 The contractor shall supply and install smart astronomic electronic time switches for the control of the public lighting circuits. These shall be 365-day programmable timers with USB port for uploading, downloading and transferring of control programs, and shall be mounted within the distribution boards. 7.7 The lamps shall be installed at a minimum height of 5m above ground level. 8.0 STORAGE, WC s AND SECURITY 8.1 There are no storage areas provided within the camp for equipment, tools, offices etc. The contractor shall allow for the supply and installation of all necessary rub halls, office caravans, WC s, electrical connections etc. close to the main SRAD Police location marked PS on the drawing. Exact locations will be agreed on site. 8.2 The contractor shall also allow for the supply and installation of fencing and gates around these storage areas. 8.3 The contractor shall store all tools, equipment, vehicles etc. at this location and shall also locate any administrative personnel, offices etc. at these points. The contractor shall also allow for providing security for all property and personnel at these locations to protect their property. 8.4 The UNHCR shall not be responsible for any damage, theft or other security issues arising at these storage areas and the contractor shall liaise directly with the SRAD should any assistance be required in this regard. 8.5 The contractor shall indicate the approximate area required for storage, vehicles and administration buildings. 8.6 The Contractor shall be responsible for organising all necessary permissions to enter the site from the Syrian Refugee Affairs Directorate (SRAD), Amman for the duration of the contract. This shall include access passes for vehicles, equipment, personnel and all other items necessary to complete the contract. 9.0 EARTHING 9.1 The contractor shall design and install a complete earthing & grounding system for the complete solar PV installation. 9.2 The contractor shall test the earthing system according to EN 50522 to prove that touch and step voltages do not exceed the values given in EN 50522.

10.0 SITE FENCING 10.1 The Contractor shall supply and install perimeter fencing to surround and secure the complete solar power plant and all associated equipment. 10.2 This shall include all necessary foundations, fixings, supports and access gates to facilitate the operation and maintenance of the plant. 10.3 The contractor shall provide specifications and working drawings for the proposed fencing installation and for the complete site layout, indicating locations of all items of equipment. 11.0 OPERATION AND MAINTENANCE 11.1 The contractor shall include the cost for the operation and maintenance of a 1 MW power plant and shall separately price for the first 2 years of operation, maintenance and security of this power plant. The contractor might employ local and refugee labour in the operation and maintenance of the plant. 11.2 Equipment damaged during this period as a result of improper operations, inadequate maintenance or poor security measures shall be replaced or repaired by the contractor at their expense. 11.3 The contractor shall detail all personnel requirements, security measures, scheduled equipment replacements, maintenance schedules and operational procedures for each year. 11.4 The contractor shall include a guarantee of annual minimum energy output for the PV power plant quoted. Any shortfall in output below this guaranteed minimum shall be paid by the contractor to the UNHCR at rates charged by EDCO per kwh at the time of the shortfall. This minimum energy output shall be detailed by the contractor in their proposal by completing the table below : Size of PV Plant 1,002kWp Total energy output in kwh to EDCO grid per year Guaranteed minimum annual output to the EDCO grid (kwh) 12.0 TESTING AND COMMISSIONING 12.1 The contractor shall test and commission each and every completed phase, including all individual items of equipment within the system, providing certificates for each item.

12.2. The contractor shall also allow for any independent testing and commissioning of the system for each and every phase of the plant, as required by EDCO or MEMR. 12.3 The Contractor shall supply as built drawings, specifications and operation guides for each and every phase of the project.