RTGO Developers Inc 67 Shamrock Crescent, Corner Brook, NL A2H 7H5

Similar documents
ENVIRONMENTAL ASSESSMENT REGISTRATION DOCUMENT

Environmental Assessment Registration Destination RV Resort

Jeremy s Construction Ltd.

Environmental Assessment. Pinchgut Lake (West) Cabin Area Project. Corner Brook, NL

Environmental Assessment Application. for. Deer Lake Commercial Sub-Division. V & J Tectonic INC 11 Chaulk s Lane Deer Lake, NL A8A 1C8

Breakwater Construction Mary s Harbour, NL Environmental Registration Document

ENVIRONMENTAL ASSESSMENT REGISTRATION

Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage

ON Grade Construction Inc.

TIMBERLAND GOLF RESORT

Activities that may Require Permit/Approval. Permit/Approval Required Electrical Safety Authority. Approval (CAA) process.

Environmental Assessment Registration April 30 th, 2004

Cox's Construction Ltd. P.O.Box 157 Lawn A0E-2E0 Tel: (709) Fax: (709)

Harbour Improvements. St. Lunaire, NL. Environmental Registration Document

Registration Request for Environmental Assessment

FACT SHEET: Water Rights and Property Rights

Physical Works Terms of Reference

IBEC will continue to have the authority and responsibility for maintaining and protecting the Indian Bay Watershed.

The rezoning application and proposed transportation facility warrants consideration.

Sustainable Natural Environment Fish Habitat

Environmental Assessment. Registration Document

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Feather River Coordinated Resource Management Watershed Restoration Monitoring

ENVIRONMENTAL ASSESSMENT REGISTRATION DOCUMENT

Environmental Assessment Registration Form Newfoundland and Labrador Department of Environment and Conservation

Harbour Improvements. La Scie, La Scie Harbour, NL. Environmental Registration Document

Fish Habitat Protection Development Permit Area

TABLE OF CONTENTS 5.0 FOREST MANAGEMENT PLANNING...

Goffs Quarry Environmental Assessment OVERVIEW FOR CONSULTATION

Katahdin Forest Management 2016 SFI Summary Audit Report

B ig E ast R iver. Stewardship Works! S ubwatershed. Grades. Land Water Wetlands Biodiversity. Not Stressed Not Stressed Not Stressed Vulnerable

City of Fredericton. Environmental Impact Assessment Registration. Type of Document: Preliminary. Project Name: Lincoln Lagoon Decommissioning

streams Taking Care of

A SUSTAINABLE FUTURE. Enhancing Resilience to Climate Change in Newfoundland and Labrador

Paddy s Pond Float Plane Hangar Lots and Access Road Extension. Environmental Assessment Registration

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

FINAL WILDLIFE and VEGETATION RESOURCES STUDY PLAN. Blue Lake Hydroelectric Project FERC No Expansion. Prepared by:

Commercial Operating Area Sheet

2.4 Description of the No Action and Action Alternatives

D EROSION AND SEDIMENT CONTROL. Table of Contents

H ollow R iver. Stewardship Works! S ubwatershed. Grades. Land Water Wetlands Biodiversity. Not Stressed Not Stressed Not Stressed Vulnerable

Exhibit B Shoreline Checklist & Statement of Exemption Form for Ensuring Consistency with SMP Policies and Regulations and No Net Loss Policy

SEPA Environmental Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy

Department of Environment and Conservation. Strategic Plan

2. That the Big Mountain lndustrial Park Area Structure Plan, attached hereto as Schedule A, is. 3. That Bylaw No is hereby repealed.

Environmental Resource Inventories. What are ERIs? Significance of information How to use them

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

14. Sustainable Forestry Principals

Humber Valley Regional Planning Advisory Authority

1.0 Name of Undertaking: CRANBERRY CREEK. 2.0 Proponent: Mr. Robert McFatridge. (i) 143 West Street Stephenville, NL A2N 1E7. (ii)

AVALONIA LAND CONSERVANCY FEE LAND STEWARDSHIP PRINCIPLES

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Canadian Agricultural Partnership Newfoundland and Labrador

REGISTRATION PURSUANT TO. PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR. Newfoundland and Labrador

KINGS RIVER PLANNING UNIT Kings River Watershed

Environmental Regulation & Mine Permitting in Ontario

ENVIRONMENTAL ASSESSMENT EMULSION PLANT - CLIFFS RESSOURCES MINES

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016

Corner Brook Pulp and Paper Limited Five-Year Operating Plan Forest Management Districts 9 and 16. January 1, December 31, 2011

meters (16 Inches) Transportation (T)

The Fish River Chain of Lakes Concept Plan

CLC Meeting 23 November 23, 2016 FACILITY CHARACTERISTICS, CLIMATE CHANGE & PLANNING ASSUMPTIONS

South Canoe Wind Project: Environmental Fact Sheet

Community Workshops Summary Prepared February 2016

Chapter 3 Affected Environment and Environmental Consequences

2014 Managed Forest Inspection Program

Environmental Assessment Approval

Silverdale Water District 2018 Environmental Checklist

The Fish River Chain of Lakes Concept Plan

Environmental Impact Statement for the Slave Falls Tramway Conversion Project

Bee Meadow Pond Shoreline Restoration Project

ENVIRONMENTAL CHECKLIST

Amisk Hydroelectric Project Update

Department of Environment and Energy. Site Assessment Handbook for Subdivisions

BACKGROUND INFORMATION

2.4 Description of the No Action and Action Alternatives

Town of Huntsville Official Plan Section 9 Rural Area Page 104

AREA STRUCTURE PLAN SW W4M CAMROSE COUNTY BYLAW ## JULY 2017(REVISED) PREPARED BY: AUSTROM CONSULTING &VICINIA PLANNING & ENGAGEMENT INC.

STAFF REPORT ACTION REQUIRED. Waterfront Landforms Study SUMMARY. Date: February 29, Public Works and Infrastructure Committee.

3.0 Natural Resource Management Policies. 3.4 Resource Extraction Policies

The Social and Economic Importance of Canada s Privately Owned Forest Lands

s. w. Wolff T.A. Wesche W.A. Hubert

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6" minus)

Terms and Conditions for Water Sustainability Act

Lower Churchill Hydroelectric Generation Project. A description of the proposed project and its potential effects on the environment

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

Forest Health in Terra Nova National Park

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In

Executive Summary. Consistent with Schedule 3 of the Environmental Assessment Act, IWM is submitting for evaluation this registration document.

Eagle Harbor 2025: Planning for a Sustainable Community

RE: Glenburnie Drydock (Reg. 1962) - Proponent: 3 T s Limited

Maine s Land Use Regulations and Erosion Control Techniques

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED.

RIPARIAN AREAS REGULATION

Introduction to the Riparian Areas Regulation

OFFICIAL PLAN FOR THE MUNICIPALITY OF MAGNETAWAN

Transcription:

Environmental Assessment Registration Document Humber River Estates Resort Development Prepared by: RTGO Developers Inc 67 Shamrock Crescent, Corner Brook, NL A2H 7H5 February 23, 2004

Section 1 1.0 Background Information 1.1 Name of Undertaking Humber River Estates Resort Development 1.2 The Proponent Name of Corporate Body: Address: RTGO Developers Inc 67 Shamrock Crescent, Corner Brook, NL A2H 7H5 Chief Executive Officer: Name: Greg Osmond, B.Comm. Official Title: President, RTGO Developers Inc Telephone Number: (709) 634-4690 Principal Contact Person: Name: Greg Osmond, B.Comm. Address: 67 Shamrock Crescent, Corner Brook, NL A2H 7H5 Official Title: President, RTGO Developers Inc Telephone Number: (709) 634-4690 1

Section 2 2.0 The Undertaking 2.1 Nature of the Undertaking The proposed development will involve the development of a resort property that will include the construction of up to 45 chalets that will be used as residential and/or rental units along with an Administration Building, a Riverfront Beach House and a Service Building. The development will also provide a permanently installed boat launch and floating docking facilities for guests and residents of the resort to utilize. The riverfront property will offer a variety of watercraft rentals including sea-doo s, power boats, kayaks, canoes, windsurfers and more. The project will involve the development of approximately 54 acres of land presently owned by the proponent into a quality resort/residential area. Approximately two kilometres of road will be constructed from Goose Arm Road to provide access to the waterfront lots and the Riverfront Beach House. 2.2 Rationale for the Project Over the past five years the popularity of the Humber River and Humber Valley area has grown significantly resulting in a growing demand for waterfront properties by both people in the Deer Lake-Pasadena-Corner Brook and people from various other parts of the world. The Town of Deer Lake has shown significant growth in recent times and is an ideal location for a resort development in the Humber Valley. 2

Section 3 3.0 Description of the Undertaking 3.1 Geographical Location The project is located in the Humber Valley area of western Newfoundland in the Town of Deer Lake. The site consists of approximately 54 acres of undeveloped land that is bounded by Goose Arm Road on the north side, the Humber River to the south, a residential area along Riverbank Road to the east and agricultural land to the west. Access to the site will be provided through a two kilometre road that will connect to Goose Arm Road. Figure 3-1 shows the location of the proposed development superimposed on an aerial photo of the area. Figure 3-1 3

3.2 Physical Features 3.2.1 Major Physical Features of the Undertaking The proposed land development consists of the development of 45 individual serviced residential and commercial lots that will connect with Goose Arm Road by way of a paved service road. Residential style houses ranging in size from 1800 to 4500 square feet will be constructed on these blocks. In addition there will be a 3000 square foot Administration Building constructed near the entrance to the development, a 10,000 square foot Riverfront Beach House will be constructed near the shoreline and a 5000 square foot Service Building near the centre of the property. A. Land Development The property will be subdivided into one, three and five acre blocks according to the requirements of individual purchasers. Houses to be constructed on the waterfront properties will be a minimum of 15-metres from the edge of the property. Each lot will have water, sewer, electrical services and will be serviced by the main road through the development. B. Access Road The access road through the property will be constructed to municipal standards. The connections to Goose Arm Road will be completed in accordance with provincial standards. C. Utilities (1) Electrical The development will reserve an electrical right-of-way to provide electrical service to each lot within the development area. Newfoundland Power will provide electrical power to all units within this development. 4

(2) Water The source of water for the development will be the Deer Lake municipal water system. The water supply from the municipality will be extended to the site with access provided to each unit as required. (3) Sewer The developers will connect the units within the development to the Deer Lake municipal sewer system. Culverts will be utilized to control excess water within the perimeters of the development. Appropriate approvals will be obtained prior to the installation of culverts. 3.2.2 Area to be Affected by the Undertaking Research of available literature and personal communications with various sources have helped to provide the information contained herein related to the physical, biological and socio-economic features of the project. The area affected by the proposed project includes the physically impacted area within the development site and areas indirectly impacted by the development in the surrounding areas. The main impact outside of the immediate area will be economic in nature as the development creates more economic activity in the Town of Deer Lake. During the implementation of this project all efforts will be made to protect the environment and to have minimal impact on the natural environment in the immediate area. Vegetation will be maintained to provide an effective buffer between the project and the Humber River. No activity will take place in the 15 metres between the development and the Humber River. (a) Climate Environment Canada information reveals that the area adjacent to the proposed development is characterized by cool temperatures with an inland influence due to its distance from the Gulf of St. Lawrence. Tables 3-1 below shows the average monthly highs and lows and average monthly precipitation for the development site. 5

Table 3-1 Month Avg. High Avg. Low Avg. Precip. January -4/-2 C -12/-10 C 95/100 mm February -4/-2 C -14/-12 C 70/75 mm March -0/2 C -10/-8 C 70/75 mm April 5/7 C -4/-2 C 60/65 mm May 11/13 C 0/2 C 65/70 mm June 17/19 C 5/7 C 80/85 mm July 21/23 C 10/12 C 80/85 mm August 20/22 C 10/12 C 100/105 mm September 16/18 C 6/8 C 90/95 mm October 10/12 C 1/3 C 100/105 mm November 4/6 C -3/-1 C 105/110 mm December -1/1 C -9/-7 C 100/105 mm (b) Geology In terms of geology, the site is located within the Humber Zone, which is one of four principal tectonic divisions in Newfoundland. The Humber Zone contains the oldest bedrock in the province. Geological sources state that the area consists predominantly of gneisses and other grantitic compositions. (c) Vegetation The proposed development is situated in an area that is predominantly covered with Balsam fir and black spruce. (d) Fish and Fish Habitat The proposed development is located in close proximity to the Humber River. The Humber River is a scheduled Atlantic salmon (Salmo salar) river with populations of brook trout (Salvenlinus fontinalis). The river is the largest salmon producing river in Western Newfoundland. All work done on the site will adhere to federal, provincial and local regulations and guidelines to ensure as little impact as possible on the river and the salmon population. 6

(e) Mammals, Furbearers, & Waterfowl The proposed development is located in Moose Hunting Area 5 (Trout River), however, given the location of the project in the municipal boundaries of the Town of Deer Lake no hunting is permitted in the proximity of the development. The site is in close proximity to the Humber River, which has been known to have many species of waterfowl including the American black duck (Anas rubripes), green-winged teal (Anas crecca), ring-necked duck (Aythya collaris), common meganser (mergus merganser), comon goldeneye (Bucephala clangula), common pintail (Anas acuta), Canada geese (Branta canadenis) and Harlequin ducks (Histrionicus histrionicus). Several varieties of furbearers including beaver (Castor canadensis) and muskrat (Ondatra Zibethicus) are sometimes present along the Humber River shoreline but no specific concentrations have been identified close to the development area. (f) Human Activities The proposed development site is close to the Humber River where use of water craft is common. 3.3 Construction and Operational Issues 3.3.1 Construction Time Frame The developer plans to start work on the project in the summer of 2004. The first phase of the project will entail the completion of some preliminary roadwork and providing services to individual sites as necessary. The second phase will involve the completion of the roadwork and the completion of individual lots for specific businesses. This phase will be ongoing over a five year period as dictated by demand. 3.3.2 Potential Sources of Pollutants Potential sources of pollutants during the construction phase of the project include:! silt and sediment! dust 7

! construction debris! sewage! risk of fuel, lubricant and hydraulic fluid spillage! airborne emissions from construction equipment! noise pollution 3.3.2.1 Mitigation Measures (a) Silt and Sediment The developers will ensure that run off from construction areas will not be permitted to discharge directly into any body of water. Silt screens will also be utilized to prevent silt from entering any body of water. Where necessary, run off will be diverted to settling basins to ensure silt is settled out prior to the final release of the water. (b) Dust The creation of dust will be minimized during the construction process through the use of water during activities that create excessive dust. No chemicals or oils will be used to control dust. (c) Construction Debris Construction debris will not be permitted to be disposed of on site and will be contained on site until it can be disposed of at an approved disposal site. Solid waste and garbage from construction activities will be minimized. Materials will be collected on a regular basis and disposed of at an approved disposal site. (d) Sewage The sewage generated during construction activities will be collected using portable toilets that will be cleaned by a licensed operator on a regular basis. No sewage will be permitted to be released into the local ecosystem. (e) Fluid Spillage To minimize the risk of a fuel, lubricant or hydrocarbon release, construction equipment will not be permitted to be refueled within 30 metres of any water body and equipment will be well maintained with any worn hydraulic lines to be replaced immediately. If fuel storage is necessary, it will only be done in approved containers with all necessary permits in place. 8

(f) Airborne Emissions Construction equipment will be required to have their exhaust systems maintained to provide emission releases that conform to the manufacturers and Canadian emission standard guidelines. (g) Noise Pollution Exhaust systems will be maintained to ensure that noise levels are within the design specifications for the equipment. 3.3.3 Resource Conflicts (a) Vegetation The developers will not cut any vegetation that is not necessary for the development. Any wood cut during the project will be salvaged for either logs or firewood. Individual businesses will be encouraged to keep as much green space as possible on the site. (b) Fish and Fish Habitat A minimum 15-metre buffer will be maintained between the residential/rental units and the Humber River. This buffer, along with the other mitigation measures outlined in this document, will ensure that this project has no effect on the fish or fish habitat in the Humber River. (c) Mammals and Waterfowl The development is anticipated to have no effect on the distribution of big game animals or furbearers. The construction at the site is not anticipated to have any negative effects on waterfowl populations. No construction will take place in any area that a local nesting site is found and if nesting waterfowl are encountered, construction work will be stopped in the nesting area until the chicks have left the nest. The Wildlife Department will be consulted to ensure the protection of any nesting birds or other waterfowl that may visit the site. (d) Human Activities There may be a conflict with members of the local population who presently use the site for hiking or snowmobiling activities. The shoreline of the Humber River will not be affected by the project or construction activities. 9

3.3 Occupations There will be a significant number of construction and operational jobs involved with the project since the project involves the construction of residences as well as service facilities for a resort operation. Job Title Code # of Jobs: Description: 0711 1 Project Manager 2154 1 Land Surveyor 7411 3 Truck Drivers 7421 2 Heavy Equipment Operators 1131 1 Bookkeeper 7251 1 Plumber 7611 6 Labourers 0211 1 Engineering Manager 0712 2 Home Builders 2231 1 Civil Engineer Technologist 7271 4 Carpenters 7611 6 Construction Helpers & Labourers 10

Figure 3-2 11

Section 4 4.0 Approvals Required for Undertaking 4.1 Approvals Required by Department The proposed project or components of the project may require some or all of the following approvals. The following section lists the issuing agencies and the permits, approvals or authorizations that may be required. Minister, Environment and Labour! Approval for the project Water Resources Division, Department of Environment and Labour! Water course crossings, Certificate of Environmental Approval! Construction site drainage, Certificate of Approval! Culvert installation, Certificate of Approval Roads & Highways Division, Department of Works, Services & Transportation! Approval to access the highway Engineering Services, Department of Government Services and Lands! Approval under the National Building Code of Canada! Approval under the National Fire Code of Canada Operations Division, Department of Government Services and Lands! Building accessibility design registration! Fuel storage and handling! Food establishment license Customer Services, Department of Government Services and Lands! Crown Lands applications/licenses! Approval to erect private signs! Electrical permits 12

Forest Fire Protection Specialist, Forest Resources and Agrifoods! Permit to burn brush Newfoundland Forest Service, Forest Resources and Agrifoods! Permit to cut timber on Crown Lands! Operating permit for fire season Section 5 5.0 Schedule The developer plans to start work on the property in April, 2004. Section 6 6.0 Project Funding This project is being privately funding and is not dependent on a loan or grant from any government agency. Section 7 7.0 Signature Date: Signature of Chief Executive Officer 13