C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

Similar documents
SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

DETAIL INSTRUCTION No. 1

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS

CEILING & WALL SYSTEMS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

SECTION ALL GLASS ENTRANCES. 1. Lock cylinders for tempered glass entrance doors are specified in Division 8 section Finished Hardware.

PanelGrip Dry Glaze Glass Railing System

ECONO 200 INPLANT OFFICE

SECTION SERIES ALL GLASS ENTRANCES

Section A2 Table of Contents ALL GLASS ENTRANCES

Revision Date: April 01, Premier Vinyl Enclosure

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

AXIOM Building Perimeter System Assembly and Installation Instructions

Floating Headers - 4-1/8, 4-1/2, 6. with RTS88 for single or double doors. Installation instructions

IMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly.

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

Multi-Piece EasyStep Product Installation Instructions

Exterior System installation instructions

VertiGreen Modular Living Wall System Installation Instructions (VGM-06 and VGM-10 Wall Mount)

Service Manual. PO Box 1565 Springfield, MO

PORTA-FAB Cleanroom Ceiling Systems

Modular Simplicity Dero

Multi-Piece EasyStep Product Installation Instructions

YCW 250 I-Beam Curtain Wall System Installation Manual

Tremline. Fascia System. Installation Procedures

Multi-Piece Shower with Trench Drain

Leveling Foot RB210. Leg Extender RLT66

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

PORTA-FAB Cleanroom Wall Systems

Installation Instructions

SPECIFICATION GUIDE SLIDING CLOSET DOOR PART 1 - PRODUCT

Conergy SolarFamulus II

YOW 250 T Window System

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)

ROOF MOUNT KIT OWNERS MANUAL

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

Impression Graphic panels

Inigo Console Table INSTALLATION INSTRUCTIONS P74300, P A Page 1 of 5

Mounting systems for solar technology

MOVEABLE GLASS WALL TECHNICAL DATA

BioPrism Solid Surface

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

Installation Instructions

ROOF MOUNT KIT OWNERS MANUAL

GroundTrac. Installation Manual

Multi-Piece Shower with Trench Drain

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

Axiom Building Perimeter System

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions

OmniFlex 300 Plus Installation Instructions

Installation Manual. Modular Bar Die. Krowne Metal Corporation 100 Haul Rd. Wayne, NJ Toll Free: (800) Fax: (973)

ZS880 Linear Shower Drain Installation Instructions

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

PRODUCT INFORMATION Dero Hoop Rack

SECTION PLASTIC TOILET COMPARTMENTS

Grizzly TM Part Number Spectrum Lane ~ Missoula MT ~

ASSEMBLY INSTRUCTIONS

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System

INSTALLATION MANUAL. All Types F Series Rev G

SECTION TOILET PARTITIONS. A. Section Structural Steel: Supports for ceiling hung compartments.

Reinforced Earth wall Construction Manual

Preference Slimline 5537 Utility Console I NSTALLATION GUIDE

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

Pre-Fabricated Roof Curbs

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

Multi-Piece Shower with Trench Drain

Prime Shower Enclosure & Base Kit

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Monaco tm Modular Railing System

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

AXIOM Building Perimeter System

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

INSTALLATION GUIDE. STEP 1.) Measure length of body/trailer; measure length of liner.

PrivaSEE All Glass Single Track Sliding System for Acoustical Separation

Guardian Wall Panel Installation Manual

SECTION NON-STRUCTURAL METAL FRAMING

INSTRUCTIONS AND GUIDELINES

AXIOM Direct Light Coves Assembly and Installation Instructions

SECTION FOLDING DOORS AMSTEL AS900CC DIVIDER SOUND

Prime Shower Enclosure & Base

You will probably need to perform this procedure in the loading dock area of the building. A fork lift or chain hoist may be needed.

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS

GLASSWALL SPECIFICATIONS

Cornerview Shower Enclosure & Base

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

PREMIER V Bucko Cast In Place

ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type PV

Frameless Hinged Door - Alcove. These instructions must be left with the user. Installation Guide W2-B

Linear Drainage Z886. Perma-Trench. Installation Instructions. 100mm Clear Opening

1 3 4 Tie Rod Aluminum Swing Entrance Doors

Deck Design Mike & Melissa Deck Option #02

Transcription:

Tools and Supplies: C.R. LAURENCE CO., INC. Intelli-Track SPS Phase One - Installation Instructions Ratchet Wrench with 4" Extension 9/16" Open-End Wrench (two required for suspension mounting) 9/16" Hex Socket 3/16" Hex Socket or Open-End Wrench 7/32" Hex Socket or Open-End Wrench Hammer with Smooth Face Measuring Tape CRL PLS2 Palm Laser or Optional Conventional Bubble Vial Level Circular Table/Bench Saw with Aluminum Cutting Blade Phase One SPS Track Installation IMPORTANT NOTES: 1) THE CRL STACKING PARTITION SYSTEM HAS UNIQUE STRUCTURAL SUPPORT REQUIREMENTS. PLEASE REQUEST OR DOWNLOAD, FREE OF CHARGE, OUR "SPS STRUCTURAL ENGINEERING DESIGN GUIDE" FOR USE BY THE ARCHITECTURAL/ENGINEERING DESIGN GROUP ON THIS PROJECT. 2) FASTEN TRACK TO THE OVERHEAD SUPPORT STRUCTURE WITH 3/8" HEX HEAD TYPE FASTENERS MADE FROM ONE OF FOLLOWING MATERIALS: A307 GALVANIZED OR A316 STAINLESS STEEL. ALWAYS USE LOCK WASHERS. 3) ALL GLASS SHOULD BE FULLY TEMPERED WITH POLISHED EDGES. LAMINATED GLASS SHOULD NOT BE USED WITH CRL WEDGE-LOCK RAILS. HOWEVER, LAMINATED GLASS CAN BE USED FOR FULLY FRAMED WALL PANEL INSTALLATIONS. 4) TRACK IS PRE-DRILLED TO ALLOW FOR MOUNTING TO OPTIONAL SUSPENSION BRACKETS OR DIRECTLY TO CONCRETE, METAL OR WOOD. PLEASE CONSULT WITH CRL TECHNICAL SALES. FASTENERS TO ATTACH TRACK OR BRACKETS TO STRUCTURE ARE NOT PROVIDED BY CRL. 5) THE CIRCULAR TABLE/BENCH SAW MUST BE CAPABLE OF CUTTING 3/8" (9.5 MM) THICK ALUMINUM SECTIONS. THE DIAMETER OF THE ALUMINUM CUTTING BLADE MUST ACCOMMODATE AN EXTRUSION PROFILE WITH THE FOLLOWING DIMENSIONS: 4-7/8" (124 MM) WIDE X 3-9/16" (90.5 MM) TALL. MITER CUTTING CAPABILITY WILL NOT BE REQUIRED IN MOST CASES, AS CRL PROVIDES PREFABRICATED CORNERS AND INTERSECTIONS. Page 1 of 5 AVD3873_SPS1

Steps: Read these instructions completely before beginning the installation. 1) Component Placement Plan (CPP) Review the Component Placement Plan provided by CRL to determine placement of the Track Components. Each component is labeled to match its designated location on the plan. 2) Lay Out the Track 2a) Lay out the Track on the floor as detailed by the Component Placement Plan. This will verify that all component pieces are present and correct. 2b) Position all Stops and Door Top Pivots in their approximate locations in the Track as detailed by the CPP. See Step 3 of the "SPS Door Top Pivot and Adjustable Roller Stop Installation Instructions" for proper installation procedures. Final adjustment will be done in Phase 2 after the Track has been completely installed. Page 2 of 5 AVD3873_SPS1

3) Before Track Installation, Consider the Following: 3a) CRL provides mounting systems for attaching Track directly to concrete, metal, and wood, as well as mounting systems for suspending Track beneath concrete and steel structures. When mounting Track directly to building structure, it is important that the mounting surface be level and parallel to the floor. The use of CRL shims to correct minor variations is acceptable. 3b) Measure from the track-mounting surface to the floor at multiple locations. The floor should be flat in all areas of panel movement. Abrupt changes in elevation can force all panels to be elevated above the nominal 1/4" (6.3 mm) floor clearance, as they must all clear the highest elevation when moving toward the parking area. 3c) 1/4" (6.3 mm) is the nominal clearance between the floor and bottom Wall Panel Rails; 5/16" (7.9 mm) is the maximum recommended clearance. 4) Install the Parking Area Assembly Install the Parking Area Assembly (ies), align and fasten to the overhead support structure. Use 3/8" hex head type fasteners made from one of the following materials: A307 Galvanized or A316 Stainless Steel. ALWAYS USE LOCK WASHERS. 5) Install the Remaining Track Sections 5a) If your SPS System Track was ordered prefabricated, proceed to Step 5d. Page 3 of 5 AVD3873_SPS1

5b) If your SPS System was ordered with stock length Track(s), locate and install the Roller Access Splice as shown on the CPP. The Roller Access Splice is pre-drilled and ready to receive two fasteners. Align the Roller Access Splice with the end of the Parking Area Assembly, and fasten into place. Use 3/8" hex head type fasteners made from one of the following materials: A307 Galvanized or A316 Stainless Steel. ALWAYS USE LOCK WASHERS. 5c) Carefully measure back to the Roller Access Splice to determine your cut lengths of the remaining Track, allowing for slight clearance for later removal of the Roller Access Splice. Cut Track and then proceed to Step 5d. Drive-In Alignment Strip 5d) Install four Drive-In Alignment Strips at all Track joints, except at the Roller Access Splice. Each Drive-In Alignment Strip installs barbed-end first, align with the receiving socket in the Track extrusion, and then drive-in with a smooth faced hammer. One half of each Alignment Strip's length should remain exposed, ready to engage the next Track section. 5e) Install the remaining Track section(s), working toward the Roller Access Splice and carefully following the CPP. Use 3/8" hex head type fasteners made from one of the following materials: A307 Galvanized or A316 Stainless Steel. ALWAYS USE LOCK WASHERS. Page 4 of 5 AVD3873_SPS1

5f) Before installing the Track section(s) immediately before and after the Roller Access Splice, you will need to remove the Roller Access Splice, if previously installed, to allow room to engage the Drive-In Alignment Strips. 6) Roller Access Splice 6a) If you have not previously installed the Roller Access Splice, do so now. The Roller Access Splice is pre-drilled and ready to receive two fasteners. Align the Roller Access Splice with the end of the Parking Area Assembly and/or Track section(s), and fasten into place. Use 3/8" hex head type fasteners made from one of the following materials: A307 Galvanized or A316 Stainless Steel. ALWAYS USE LOCK WASHERS. 6B) Ensure slight clearance for later removal of the Roller Access Splice. This First Phase of the installation is complete. Page 5 of 5 AVD3873_SPS1

Tools and Supplies: Ratchet Wrench with 4" Extension 3/16" Hex Socket or Open-End Wrench 7/32" Hex Socket or Open-End Wrench 9/16" Hex Socket 7/8" Open-End Wrench (two required) Hammer with Smooth Face #1 Phillips Screw Driver Measuring Tape Pencil CRL Glass Cleaner C.R. LAURENCE CO., INC. Intelli-Track SPS Phase Two - Installation Instructions Phase Two SPS Glass Wall Panel Assembly, Installation Steps: Read these instructions completely before beginning. 1) Component Placement Plan (CPP) Review the Component Placement Plan provided by CRL to determine wall panel bottom rail configuration, size, and sequence number. NOTE: The #1 wall panel is the panel farthest from the parking closet. Each component is labeled to match its designated location on the plan. 2) Adjusting Pivots and Stops 2a) If the system features Pivoting Door(s), locate the SPS Door Top Pivot that was previously installed into the Track during Phase 1 and position the center of the spindle at 2-3/4" (70 mm) away from the finished wall. Follow the "SPS Door Top Pivot and Adjustable Roller Stop Installation Instructions" to secure the Pivot(s). SPS Door Top Pivot Page 1 of 13

2b) Then locate the Adjustable Roller Stop(s) near the Pivoting Door(s) and position as detailed on the CPP. This stop will prevent the movable wall Panel from running into the Pivoting Door. Locate the remaining Adjustable Roller Stops and position them at the ends of the Track. Follow the "SPS Door Top Pivot and Adjustable Roller Stop Installation Instructions" to secure the Stop(s). Adjustable Roller Stop 3) Determining Glass Sizes 3a) If field conditions have been carefully inspected, glass can be fabricated before Track installation, but the safest route is to measure for glass after the Track is installed. 3b) CRL Technical Sales can provide glass deduction dimensions for the various combinations of Glass Wall Panel Rail profile heights, in combination with the Supporting Track (at the nominal roller height adjustment). The CRL SPS allows for plus and minus 3/16" (4.8 mm) height adjustment from nominal, for a total of 3/8" (9.5 mm) height adjustment. Page 2 of 13

3c) Before measuring for glass sizes, consider conditions detailed in 3b and 3c of Phase 1. Measure from the bottom of the Track to the floor, deduct for the top and bottom rails, as well as the nominal 1/4" (6.3 mm) clearance above the floor. The determination of panel width requires many considerations, but in normal conditions the glass widths match the Wall Panel Rails and Door Rails. All vertical gaps between walls, Wall Panel Rails, and Door Rails are calculated at 1/8" (3.2 mm) unless specific instructions were given at time of ordering, refer to CPP to verify. IMPORTANT NOTE: All glass should be fully tempered. Laminated glass should not be used with CRL WedgeLock Rails when fabricating Moving Wall Panels. However, laminated glass can be used for fully framed wall panels (supplied by others). 4) Wall Panel Assembly Wall Panel Rail Glass Wall Panel Rail Attach the top and bottom Glass Wall Panel Rails onto the glass per the "Glass Wall Panel Assembly Instructions". Page 3 of 13

5) Installing the Sliding Wall Panels into the Track 5a) Remove the Roller Access Splice, which is typically located in front of the first Parking Area Track intersection. Consult CPP for location. 5b) Starting with panel #1, install a pair of Intelli-Track Roller Assemblies into the SPS Track through the roller-access opening. ELEVATION OF TOP RAILS-FROM OUTSIDE Refer to the CPP for proper orientation of the Tracking Rollers of each Intelli-Track Roller Assembly before installing. The programming of the Movable Wall Panels is determined by the orientation of the rollers and must match the CPP. This is the key element in determining how the Wall Panel is routed by the SPS Intersections. Page 4 of 13

5c) Care should be taken to protect the finished flooring from possible damage while hanging the Movable Wall Panels. Do not use protective materials under the Wall Panels that are more than 1/4" (6.3 mm) thick, as this make hanging the panels difficult. Carefully position the #1 panel, centered under the Track and between the corresponding pair of Intelli-Track Roller Assemblies hanging from the Track. Support Block 5d) The top Wall Panel Rail (WPR) End Caps are not installed at the factory, but are included in the WPR box. The End Caps should not be installed onto the top WPR until the panels are hung and adjusted. Rotate the Support Block until the setscrew is facing outward. Lift one end of the Wall Panel until aligned and push the Support Block into the WPR. Repeat this process for both ends of the WPR. The Roller Assemblies are set to the maximum floor clearance adjustment at the factory. This can be verified by seeing that the pendant bolt is flush with the bottom of the Support Block. This should provide adequate clearance between the floor and Wall Panel for movement. Page 5 of 13

5e) Slide the Intelli-Track TM Roller Assemblies inline with the WPR (Wall Panel Rail) until the distance from the WPR s ends (without the End Cap) to the centers of the pendant bolts equals 2-3/8 (60.3 mm) or matches a custom dimension given on the CPP. Tighten the Lateral Adjustment Locking-nuts with a 7/8 open-end wrench to lock the rollers at this location. The weight of the Wall Panel is now fully supported by the Track. CAUTION: Do not attempt to slide the Wall Panel until this step is completed. When you first move the panel, make sure to check floor clearance throughout the entire opening as you move the panel, and be aware at all times where the open splice is located in the Upper Track. 6) Adjusting the Sliding Wall Panels 6a) Slide the #1 Wall Panel to its proper location as indicated on the CPP. Position the panel against the wall or pivoting door's edge. Examine the vertical and horizontal gaps and adjust as required. Page 6 of 13

. Pendant Bolt Height Adjustment Nut Lateral Adjustment Locking-Nut 6b) To adjust the panels, loosen the Lateral Adjustment Locking Nut with a 7/8" open-end wrench, and rotate the Pendant Bolt Height Adjustment Nut to set the floor clearance gap at 1/4" (6.3 mm) depending on field conditions. CAUTION: The gap between the Track and top of Wall Panel Rail must not exceed 1-9/16" (39.7 mm). Do this for both Roller Assemblies, while at the same time, checking the vertical edge gaps to produce a consistent 1/8" (3.2 mm) vertical gap from top to bottom. 6c) When desired clearances are attained, using a 3/16" hex wrench, tighten the setscrew located at the end of the support block in a clockwise rotation until locked against the pendant bolt. Now re-tighten the Lateral Adjustment Locking Nuts to lock the rollers at this location. 6d) Repeat steps 5b through 6c for each Sliding Wall Panel. Page 7 of 13

7) Re-install the Roller Access Splice After all Sliding Wall Panels have been attached to the Top Track, re-install the Roller Access Splice that was removed in Step 5a. 8) Adjust Roller Spacing for the Parking Area 8a) Move the panel nearest to the parking area to the parking area's double track entrance. Working with the roller assembly that first enters the parking area, loosen the Lateral Adjustment Locking Nut on this end only. Carefully move the Wall Panel into the parking area until it comes to rest. Adjust the position of the IntelliTrack Roller Assemblies laterally until both pendant bolts are centered in the track slots (important step for smooth operation), and retighten the Lateral Adjustment Locking Nut. 8b) Repeat step 8a for all of the Sliding Wall Panels. Page 8 of 13

9) Install Floor Keepers 9a) Move the #1 Wall Panel into its closed position and verify the vertical gap of 1/8" (3.2 mm), or as specified. Adjust if necessary as described in Step 6. Locking Bolt Locking Bolt 9b) The #1 Wall Panel will have two locking bolts. Mark their centerline positions on the floor. Keeper Then slide the panel out of the way, drill for, and install, the Keepers into the floor. Move the Wall Panel into position and lock it to the floor. 9c) Repeat Steps 9a and 9b for all sliding Wall Panels. Page 9 of 13

10) Install the Top Wall Panel Rail End Caps End Cap The End Caps are located in a package along with the Seal Kits. using a Phillips screwdriver, fasten the End Caps to both ends of all Sliding Wall Panels in the system. Finish matched fasteners are taped to the back side of the End Caps. Note: SPS End Caps are taller than the bottom rail's in order to match up with Top Seal System as described in the next step. 11) Install the Top Seal System 11a) Move #1 Panel into the closed position and lock. Page 10 of 13

Brush Seal Double-Faced Tape Aluminum Base Extrusion Double-Faced Tape 11b) The Top Seal Kits are numbered to match the Wall Panel Rail for ease of mating. There is an Aluminum Base Extrusion and a Brush Seal for both sides of each rail. For clad finishes there is a strip of matching cladding attached to the aluminum Base Extrusion. Double-faced tape is factory applied to the bottom surface of the Base Extrusion for adhesion to the Wall Panel Rail, and to the Brush Seal for adhesion to the Base Extrusion. 11c) Dry-fit by placing the Base Extrusion on top of its Wall Panel Rail mate with the tape liner intact. If properly aligned with the rail's edge, it will drop down into an alignment slot. Page 11 of 13

11d) Dry-fit by positioning the Brush Seal on the exterior side of the Base Extrusion with its tape liner intact. Move the Brush Seal up until it has an even line with the Track above, and make a pencil mark on the Base Extrusion at both ends for later alignment of the Brush Seal. Remove the Brush Seal and Base Extrusion from the Wall Panel Rail. 11e) The Brush Seal is tape applied to the interior of the Base Extrusion (the opposite side that was marked with the pencil in the previous step). Remove the tape liner from the Brush Seal, align the bottom edge with the pencil marks made on the opposite side, and press the two pieces together. Apply moderate pressure for the full length of the extrusions to set the tape. Page 12 of 13

11f) Remove the tape liner from the Base Extrusion and adhere the assembly into the Wall Panel. Pressure should be applied to the top of the Base Extrusion along its full length to set the tape. 11g) Repeat Steps 11b through 11f for both sides of all Wall Panels in the system. The Second and Final Phase of the installation is complete. Page 13 of 13