Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Similar documents
Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pacific Grove ASBS Storm Water Diversions to MRWPCA

Pacific Grove Garbage Disposal Buy-Back Program

PROJECT INFORMATION FORM Project Review Process is described by Chapter 7 of the IRWMP Form Revised

DRAFT 2018 MAC IRWMP Update Policies, Goals, Objectives

Section 6 Resource Management Strategies

Developing Metrics & Indicators for the California Water Plan. CA Sustainability Indictors Symposium February 23, 2011

4 Water Management Strategies

Santa Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

Santa Ana River Watershed. SAWPA Celeste Cantú April 17, 2012

Napa Watershed Symposium. Factors affecting future water quantity and quality in Napa County, and strategies for adaptation

Climate Change Workgroup Meeting No. 3

San Diego IRWM Project Scoring Guidelines for Prop 84 Round 3 Drought Relief Grant Cycle. Scoring Guidelines

California Water Commission. June 28, 2018

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants

Antelope Valley. available. The State regional water. presented. is Desalination: Precipitation. and therefore it

A10. Cost and Benefits Summary

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

Tahoe Sierra IRWM Please submit by 17 January 2014 to Project Template

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

Overview of Conjunctive Management in California Let s Have a Frank Discussion

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

Wastewater Treatment Plant Improvement Project

South Orange County Watershed Management Area Stakeholder Workshop. April 30, 2013

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

5. RESOURCE MANAGEMENT STRATEGIES

Frequently Asked Questions*

Project Application Form

Regional Water Recycling Plant No. 5 (RP-5) Expansion

San Diego IRWMP Public Meeting. Agenda. Morning Agenda

South Orange County Watershed Management Area Public Workshop. September 19, 2012

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

DRAFT ANNOTATED OUTLINE 12/4/2006

Jurupa Community Services District Joint Projects for Inclusion in the Santa Ana River Watershed-scale Conjunctive Use Program (SARCUP) Future Phases

Section 4 Regional Water Management Strategies

6 Regional Priorities

5.1 Process to Consider Resource Management Strategies

Regional Water Recycling Plant No. 1 (RP-1) Expansion

Local, State and Federal Funding Opportunities

RW Supply Optimization and Drought Relief Project Project ID: 3064

Pacheco Reservoir Expansion

Alternatives Analysis

UPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM

Priorities & Metrics Workgroup Proposed Vision, Mission, Goals, Objectives, and Targets

Integrated Regional Water Management

WATER QUALITY STATUTORY AND REGULATORY COMPLIANCE OVERVIEW

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

ATTACHMENT 6-Description of Proposal

North Monterey County Drought Contingency Plan

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

There is a reliable, clean water supply for current and future generations.

-For SAC Discussion Purposes Only- Page 1 of 17

Supplemental Supply Option: Desalination DEEP WATER DESAL PROJECT

WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB

Tahoe Sierra IRWM Please submit by 17 January 2014 to Project Template

Hollister Urban Area Water and Wastewater Master Plan Update

Santa Barbara County Region

8 Resource Management Strategies

Chapter 13. Implementation Plan

Water Supply Master Plan Update

Carpinteria Valley Water District Carpinteria Advanced Purification Project

Storm Water Resource Plan Criteria and Metrics Checklist

Central Coast Climate Collaborative

2009 Comprehensive Water Package

A7. Economic Analysis Water Supply Cost and Benefits

In Hot Water: Climate and Water in the West

Jordan River Basin. Planning for the Future. Salt Lake County Watershed Symposium (August 11, 2011) Todd Stonely Utah Division of Water Resources

Flood Prevention Authority. Agency Presentation. Gilroy Meeting. June 3, Pajaro River Watershed. Flood Prevention Authority

The Los Vaqueros Reservoir Expansion Project

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632

SOAP LAKE FLOODPLAIN PRESERVATION PROJECT

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999

Chapter 3 Planning Objectives and Constraints and the Alternative Development Process

Attachment 7: Program Preferences

SOUTH ORANGE COUNTY WATERSHED MANAGEMENT AREA 2013 INTEGRATED REGIONAL WATER MANAGEMENT PLAN An Integrated, Healthy and Balanced Watershed

Lane Channel (OCFCD Facility No. F08) from Confluence with F05 channel to Von Karman.

Report Documenting the Reasonableness of the Conjunctive Use Benefit of Surface Water and Recycled Water to Groundwater Customers

PLUMAS COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT UPPER FEATHER RIVER INTEGRATED REGIONAL WATER MANAGEMENT MEMORANDUM OF UNDERSTANDING

Proposition 1 Funding Opportunities for Los Angeles

Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water

Board Work Plan FY

Lane Channel (OCFCD Facility No. F08) from Von Karman to 1000 downstream Redhill Avenue

3.3 GROUNDWATER ALLOCATION TRANSFERS FROM DEVELOPED PROPERTIES

Chapter 1 Introduction

2015 Comprehensive Facilities MASTER PLAN SMART INFRASTRUCTURE FOR A SUSTAINABLE FUTURE

Stakeholder Meeting #1

CHAPTER 8 Wastewater and Recycled Water

Ocean View Channel (OCFCD Facility No. C06) from downstream of Bushard Street to downstream of Brookhurst Street

Appendix K: Preliminary Project Assessment

Staff contact: Mr. Bob Holden, Principal Engineer Phone: (831) Fax: (831)

Carbon Creek Channel (OCFCD Facility No. B01) from upstream Intersection of Western/Orange to upstream Beach Boulevard.

Investigation Highlights

ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE

8-2. Communications and Legislation Committee. Board of Directors. 12/11/2018 Board Meeting. Subject. Executive Summary. Details

East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Warner Avenue to downstream Goldenwest Street.

O R A N G E C I T Y S INTEGRAT E D W AT E R R E S O U R C E S M A N A G E M E N T & R E S I L I E N C Y P L A N

Transcription:

Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation Project Location: Gilroy Estimated Cost: $19,981,000 Brief Project Description (1 to 2 sentences): This project completes construction of the South County Recycled Water Master Plan Short-term CIP to increase delivery capacity by about 900 AFY and improve infrastructure reliability. The short-term CIP includes construction of approximately 16,000 feet of 16-inch diameter pipeline, approximately 24,000 feet of 30-inch diameter pipeline, a second 3 million gallons of onsite treated recycled water storage capacity (for a total of 6 million gallons), and an additional 6 mgd of distribution pumping capacity (for a total of 9 mgd of new capacity). Project Proponent Information Contact Name: Emmanuel Aryee Affiliation: Santa Clara Valley Water District Address: 5750 Almaden Expressway, San Jose, CA 95118 Phone Number: 408-630-3074 Email: earyee@valleywater.org Other participating agencies/organizations (if applicable): South County Regional Wastewater Authority, City of Gilroy DETAILED PROJECT INFORMATION Description Please provide a description of your project (including the location) and its purpose, what will be constructed and/or implemented, how the project will function, the area(s) and/or entities that will be affected by or will benefit from the project, and any potential obstacles to implementation. SCVWD, SCRWA, Gilroy, and Morgan Hill completed the South County Recycled Water Master Plan in 2004 for expanding the use of tertiary treated recycled water. The master plan included three capital improvement program phases. The immediate-term CIP has been completed. The short-term CIP includes looping and expanding the existing system by contructing a new recycled water pipeline extending from the SCRWA facility to Christmas Hill Park and an extension off the existing system. The short-term CIP includes construction of approximately 16,000 feet of 16-inch diameter pipeline, approximately 24,000 feet of 30-inch diameter pipeline, a second 3 million gallons of onsite treated recycled water storage capacity (for a total of 6 million gallons), and an additional 6 mgd of distribution pumping capacity (for a total of 9 mgd of new capacity). New customers include the Gilroy Sports Park, Glen Loma Development, and Cintas Corporation. An extension from the existing recycled water pipeline to the Gilroy Sports Park has been completed, as has the first 1/2-1 REVISED South County Recycled Water project form.xls

Pajaro River Watershed Integrated Regional Water Management Plan Update An extension from the existing recycled water pipeline to the Gilroy Sports Park has been completed, as has the first 1/2- mile of new recycled pipeline from the SCRWA facility. The next phase of work includes extending the new recycled water pipeline from Southside Drive to the Sports Park (which will loop the system provide redundancy and additional capacity) and an extension to Cintas Corporation. The last phase of work will be to extend the new recycled water pipepline through the Glen Loma Development to Christmas Hill Park and add additional storage and pumping capacity. The master plan estimated the the short-term CIP will increase recycled water use by about 900 AFY at build-out. The project reduces demands on groundwater in the Llagas Groundwater Subbasin and is part of the SCVWD 2012 Water Supply and Infrastructure Master Plan. Technical Feasibility Discuss the technical feasibility of the project. If possible, cite references that contain information about the proposed project and detail the technical feasibility of the project. The project was evaluated as part of the 2004 South County Recycled Water Master Plan. http://www.cityofgilroy.org/cityofgilroy_files/city_hall/community_development/engineering/master_plans/southcountyrecw atmp.pdf. The challenges with the project are matching recycled water expansion with development, as well as utility conflicts in the preferred alignment. A programmatic EIR has been completed, as has the project-level EIR for extending the new pipeline from the SCRWA facility to the Sports Park. Pajaro River Watershed IRWM Regional Goals & Objectives Put an next to any goal that the proposed project will achieve. Water Supply 1. Meet 100% of M&I and agriculture demands (both current and future conditions) in wet to dry years including the first year of a drought. 2. Meet 85% M&I and 75% agriculture demands (both current and future conditions) in second and subsequent years of a drought. 3. Identify and address water supply needs of disadvantaged communities in the Pajaro River Watershed. 4. Implement water conservation programs to reduce M&I and agricultural water use consistent with SBx7-7 and CVPIA. 5. Maximize the use of recycled water during the irrigation season and expand other uses of recycled water. 6. Optimize the use of groundwater and aquifer storage. 0 7. Maximize conjunctive use opportunities including interagency conjunctive use. 8. Optimize and sustain the use of existing import surface water entitlements from the San Felipe Unit. 2 REVISED South County Recycled Water project form.xls

Pajaro River Watershed Integrated Regional Water Management Plan Update 9. Maximize the beneficial use of existing local water supplies while protecting existing surface water rights. Water Quality 1. Meet or exceed all applicable groundwater, surface water, wastewater, and recycled water quality regulatory standards. 2. Identify and address the drinking water quality of disadvantaged communities in the Pajaro River Watershed. 3. Protect groundwater resources from contamination including salts and nutrients. 4. Address impacts from surface water runoff through implementation of Best Management Practices or other surface water management strategies. 5. Meet or exceed delivered water quality targets established by recycled water users. 3 REVISED South County Recycled Water project form.xls

Integration and Coordination Pajaro River Watershed Integrated Regional Water Management Plan Update Flood Protection 1. Implement flood management strategies throughout the watershed that provide multiple benefits. 2. Reach consensus on the Pajaro River Risk Reduction Project necessary to protect existing urban areas and infrastructure from flooding and erosion from the 100- year 3. event Work and with to stakeholders maximize opportunities to preserve to existing protect flood agricultural attenuation land by uses. implementing land management and conservation strategies throughout the watershed. 4. Develop approaches for adaptive management to minimize maintenance requirements and protect quality and availability of water while preserving ecologic and 5. stream Provide functions. community benefits beyond flood protection such as public access, open space, recreation, agriculture preservation and economic development. Environmental Protection and Enhancement 1. Address opportunities to enhance the local environment and protect and/or restore natural resources, in cooperation with landowners, when developing water management strategies. 2. Improve biological and cultural resources, including riparian habitats, habitats supporting sensitive plant or animal species and archaeological/historic sites when 3. implementing Address strategies opportunities and to projects. protect, enhance, or restore habitat to support Monterey Bay National Marine Sanctuary marine life in conjunction with water supply management strategies. 4. Address opportunities for open spaces, trails, parks along creeks and other recreational projects in the watershed that can be incorporated with water management strategies, consistent with public use and property rights. Put an next to any Resource Management Strategies (RMS) that the proposed project will address. Reduce Water Demand Agricultural Water Use Efficiency Urban Water Use Efficiency Improve Operational Efficiency and Transfers Conveyance - Delta Conveyance - Regional/local Increase Water Supply System Reoperation Water Transfers Conjunctive Management & Groundwater Storage Desalination Precipitation Enhancement Recycled Municipal Water Surface Storage - CALFED Improve Water Quality Surface Storage - Regional/local Drinking Water Treatment & Distribution Groundwater Remediation /Aquifer Remediation Matching Quality to Use 4 REVISED South County Recycled Water project form.xls

Improve Flood Management Practice Resources Stewardship Other Strategies Please describe: Pajaro River Watershed Integrated Regional Water Management Plan Update Pollution Prevention Salt & Salinity Management Urban Runoff Management Flood Risk Management Agricultural Lands Stewardship Economic Incentives (Loans, Grants, & Water Pricing) Ecosystem Restoration Forest Management Recharge Area Protection Water-Dependent Recreation Watershed Management Crop Idling for Water Transfers Dewvaporation or Atmospheric Pressure Desalination Fog Collection Irrigated Land Retirement Rainfed Agriculture Waterbag Transport/Storage Technology The project is part of SCVWD's conjunctive management program and helps maintain groundwater storage. The project provides water that is of quality for its intended to use and preserves potable water for potable uses. List the projects that were integrated to develop a single proposed project, if applicable. List the agencies and organization that are working together to implement the project. SCVWD, SCRWA, Gilroy, United States Bureau of Reclamation 5 REVISED South County Recycled Water project form.xls

Climate Change Mitigation and Adaptation Pajaro River Watershed Integrated Regional Water Management Plan Update Put an next to any climate change adaptation or mitigation strategy the proposed project will contribute to. Adaption Strategies Improve water supply reliability Expand conjunctive use of multiple water supply sources Increase water use and/or reuse efficiency Provide additional water supply Promote water quality protection Reduce water demand Advance / expand recycled water use Promote urban runoff reuse Address sea level rise Address other anticipated climate change impacts Improve flood control Promote habitat protection Establish migration corridors Re-establish river-floodplain hydrologic continuity Re-introduce anadromous fish populations to watershed Enhance and protect watershed forest and meadow systems Please describe: Mitigation Strategies Increase water use efficiency or promote energy-efficient water demand reduction Improve water system energy efficiency Advance / expand recycled water use Promote urban runoff reuse Promote use of renewable energy sources Contribute to carbon sequestration Please describe: Does the proposed project reduce regional greenhouse gas emissions and/or improve energy efficiency? If so, explain how. Social Benefits and Impacts Does the project provide specific benefits to disadvantaged communities and/or Native American tribal communities? If so, explain. 6 REVISED South County Recycled Water project form.xls

Pajaro River Watershed Integrated Regional Water Management Plan Update There are 11 DAC blocks, with a total population of about 14,000, in the Llagas Subbasin. This project will help maintain water supply and water quality throughout the subbasin. Does the project address any known environmental justice issues? Project Cost Total Estimated Capital Cost $19,981,000 Annual Operation & Maintenance (O&M) Cost $20,000 Cost Basis (Year) 2012 Source(s) of Funding for Capital Local agency water utility funds; federal grant Source(s) of Funding for O&M Cost Project Life (years) Provide link to project cost estimate, if available Local agency water utility funds 0 years; Pumps - 20 years The District's CIP (http://www.valleywater.org/cip.aspx) has information on estimated costs. See Water Supply section. Economic Feasibility Has a benefit:cost or cost effectiveness analysis been completed for your project? If so, please cite reference and briefly summarize. If no economic analysis has been completed for the project, the project may receive zero points out of a possible 100 points for the financial considerations criteria unless the project is a DAC project. If the project is not a DAC project but the B:C ratio is expected to be greater than 1, please provide a justification. The lack of an economic analysis may also affect the project's readiness score. The estimated cost per acre-foot for the Short-term CIP (in 2004 $) is $1,180 per AF. The cost effectiveness of the project is currently being evaluated. If known, please provide the Benefit:Cost Ratio. Provide a detailed discussion of the benefits the project will provide. To the extent possible, quantify changes and benefits (e.g. water quality and water supply benefits) that will result from project implementation; otherwise, describe benefits qualitatively. At build-out, the project will provide approximately 900 AFY of recycled water. Other benefits included reduced wastewater discharge at the SCRWA facility and, potentially, less recycled water discharge to the Pajaro River during wet weather. Project Readiness 7 REVISED South County Recycled Water project form.xls

Proposed Project Start Date: Anticipated Project Completion Date: Pajaro River Watershed Integrated Regional Water Management Plan Update In process 2020 Please Indicate the status (pending, in process, complete) of the following. Estimated Completion Project Element Status % Complete Date Feasibility Study Complete 100% 2004 Preliminary design In progress 10% 2016 CEQA/NEPA In progress 50% 2016 Permit Acquisition In progress 10% 2016 Construction Docs In progress 10% 2016 8 REVISED South County Recycled Water project form.xls