Fact Sheet: Bringing Soil to an RSC Property

Similar documents
Overview of Ministry Contaminated Sites and Brownfields Program

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

A Plain Language Guide to the Proposed Excess Soils Management Regulation in Ontario

Proposed Excess Soil Regulatory Package New Proposed Regulation and Amendments to Existing Regulations

CONSTRUCTION SPECIFICATION FOR BORROW

Soil Management. Date: Friday, January 18, Submitted to: Ministry of Environment, Operations Division, Central Regional Office

CONSTRUCTION SPECIFICATION FOR BORROW

CONSTRUCTION SPECIFICATION FOR EARTH BORROW

CONSTRUCTION SPECIFICATION FOR BORROW

CONSTRUCTION SPECIFICATION FOR BORROW

CONSTRUCTION SPECIFICATION FOR DEWATERING

Guideline for Proximity to Distribution Lines

Bill 56 Brownfields Statute Law Amendment Act

Top 10 Risks of the Clean Fill Dump Site

April 21, 2010 (Revised June 21, 2010) Re: Ontario Regulation 511/09 Impact on Management of Surplus Construction Site Soils and Fill

Management of Excess Soil A Guide for Best Management Practices

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR

Amendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility Installation by Jacking and Boring

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF GABIONS

Interim Guideline for Excavating in the Proximity of Underground Distribution Lines

Corporate Policy and Procedure

CITY OF GUELPH Brownfield Redevelopment CIP Update

CONSERVATION HALTON LARGE FILL POLICY AND PROCEDURAL GUIDELINES

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER

Presentation to RCCAO: Excess Soil Management: A Guide for Best Management Practices. Central Region Operations Division.

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

The Forest Resources Management (Saskatchewan Environmental Code Adoption) Regulations

CITY CLERK. Consolidated Clause in Works Committee Report 2, which was considered by City Council on April 25, 26 and 27, 2006.

CITY OF GUELPH GUIDELINES FOR DEVELOPMENT OF CONTAMINATED OR POTENTIALLY CONTAMINATED SITES 2016

The Dirt on Excess Soil Across Canada How Will Brownfields Be Affected?

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR COMPACTING

MATERIAL SPECIFICATION FOR NON-PRESSURE POLYETHYLENE (PE) PLASTIC PIPE PRODUCTS

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

Farmland to Residential Community Environmental Assessment, Remediation and Challenges

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations

MATERIAL SPECIFICATION FOR NON-PRESSURE POLYETHYLENE (PE) PLASTIC PIPE PRODUCTS

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

MUSHROOM COMPOST FACILITIES REGULATION 413/98

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION

MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF GABIONS

CONSTRUCTION SPECIFICATION FOR CLEARING, CLOSE CUT CLEARING, GRUBBING, AND REMOVAL OF SURFACE AND PILED BOULDERS

Remediation Certificates 101

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION

Technical Guideline for. Section 8. Inspection and Approval of Construction

MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION

TOWAMENCIN TOWNSHIP GRADING PERMIT PROCEDURES. A grading permit is required for all earthwork of 100 cubic yards or more.

CONSTRUCTION SPECIFICATION FOR SUPPORT SYSTEMS

MATERIAL SPECIFICATION FOR CLAY SEAL

MATERIAL SPECIFICATION FOR SODIUM CHLORIDE SOLID AND SODIUM CHLORIDE SOLUTION

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

Source Protection Bulletin: Requirements for Municipal Drinking Water Systems August 2018

CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS

Construction Specification for Trenching, Backfilling and Compacting

Higher National Unit Specification. General information for centres. Unit code: F19W 35

MATERIAL SPECIFICATION FOR NON-PRESSURE POLYETHYLENE PLASTIC PIPE PRODUCTS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

NOTICE OF MINOR AMENDMENT CLASS ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES OF THE MINISTRY OF NORTHERN DEVELOPMENT AND MINES UNDER THE MINING ACT

GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES

Record of Site Condition Under Part XV.1 of the Environment Protection Act N4K 5W8

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION

RMM # 1202 Title: Spills to the Environment - Emergency Response & Reporting Program

Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine

CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS

Canadian Solar Developers Ltd.

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

LAND DISPOSAL RESTRICTIONS (LDR) HANDBOOK

4.0 REMEDIATION AND RISK MANAGEMENT

Continuing Professional Education

CONSTRUCTION SPECIFICATION FOR THE CLEANING AND FLUSHING OF PIPE SEWERS, CATCHBASINS, MAINTENANCE HOLES, DITCH INLETS, AND OIL-GRIT SEPARATORS

Potential Changes to Ontario s Building Code: PARKING STRUCTURES

Amendment to OPSS 518 (Nov 2011) Construction Specification for Control of Water from Dewatering Operations

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

MATERIAL SPECIFICATION FOR ADMIXTURES FOR CONCRETE

MATERIAL SPECIFICATION FOR EXTRUDED EXPANDED POLYSTYRENE PAVEMENT INSULATION

Electronic Medical Devices and Equipment Stewardship Plan for British Columbia

Late 2007 saw two particular requirements come into force under the Landfill Directive/Landfill Regulations. (England and Wales), namely:

Vapour Intrusion Regulatory Framework and Case Law Review

CONSTRUCTION SPECIFICATION FOR PIPELINE INSTALLATION BY TUNNELLING

City of Guelph Transfer of Review Procedures 7 March, 2017

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

MATERIAL SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE

CONSTRUCTION SPECIFICATION FOR ROOTWAD STRUCTURES

APPENDIX. Environmental Protection and Enhancement Act REMEDIATION CERTIFICATE AMENDMENT REGULATION

MATERIAL SPECIFICATION FOR PRESSURE POLYETHYLENE PIPE PRODUCTS

SYLLABUS ASBESTOS IN SOILS AWARENESS

MATERIAL SPECIFICATION FOR CLAY SEAL

Spills to the Environment and Reporting Policy

Transcription:

Fact Sheet: Bringing Soil to an RSC Property The amendments to Ontario Regulation 153/04 (O. Reg. 153/04) contain new requirements for conducting environmental site assessments (ESA) for filing a Record of Site Condition (RSC). These requirements come into effect for RSCs submitted as of July 1, 2011. Setting out minimum ESA requirements and objectives will provide consistency and improve the quality of RSCs. Brownfield properties often require soil. As part of the ESA requirements, there are specific rules for bringing soil to a property where an RSC will be filed, to remain at the property after the RSC has been filed. The ministry implemented the new requirements to help improve the integrity of the RSC process. A purpose of an RSC is to determine that the contaminants present in soil, ground water and sediment meet the applicable site condition standards or standards specified in a risk assessment for the contaminant on, in or under a property. Note: Soil is defined in O.Reg 153/04 as unconsolidated naturally occurring mineral particles and other naturally occurring material resulting from the natural breakdown of rock or organic matter by physical, chemical or biological processes that are smaller than 2 millimetres in size or that pass the US #10 sieve. RULES FOR BRINGING SOIL TO A PROPERTY WHERE AN RSC WILL BE FILED SAMPLING The new rules require a qualified person to sample, analyse and document soil brought to a property where an RSC is to be filed that is intended to remain there after the RSC is filed. This is to ensure that the concentrations of any contaminants in the soil meet the applicable site condition standards or standards specified in a risk assessment for the contaminant. These same rules

are already required for soil found on in or under the RSC property. DIFFERENT PROPERTIES AND ASSESSMENTS There may be different requirements for soil brought to the property, depending on the characteristics of the RSC property and the type of assessment being undertaken to support the RSC filing (eg., an RSC based only on a Phase One ESA, vs. an RSC based on a Phase One and Two ESA, vs and RSC based on a Phase One and Two with an accepted Risk Assesment). PERMITTED SOIL USES AT AN RSC PROPERTY Soil brought to a property where an RSC will be submitted for filing can only be used for final grading or to backfill an excavation. SOIL BROUGHT TO A PROPERTY WITH AN RSC TO BE FILED ON THE BASIS OF A PHASE ONE ESA ONLY As there is no intrusive physical investigation of a RSC property where the RSC is being submitted on the basis of a Phase One ESA only, and since such a property is not expected to have any contaminants on, in or under it at a concentration that would interfere with any use to be made of it, there are specific rules for soil brought to such a property. The standards which must be met for concentration of contaminants are the most stringent. These rules are found in s. 55 of, and Schedule F, O. Reg. 153/04. Paragraph 55(3)2 of Part XII of O.Reg. 153/04 specifies that soil can be brought to a property where a qualified person has determined that an RSC may be submitted without a Phase Two ESA. Schedule F details the requirements for moving soil to the property: The concentration of each contaminant in the soil must be equal to or less than the concentration for the contaminant set out in Table 1 of the Soil, Ground Water and Sediment Standards. The samples must be analyzed for contaminants that may reasonably be expected to be present in the soil, having regard to; Page 2 of 6

the property from which the soil was taken before being brought to the RSC property; handling of the soil, including its storage and transport after excavation; and Any other relevant factors, including potentially contaminating activities and sampling the soil before bringing it to the property, at a frequency of: one sample per 160 cubic metres for the first 5,000 cubic metres; one sample per 300 cubic metres thereafter. The results of analyses, demonstrating that soil brought to a Phase One property meets Table 1 standards, must be submitted as part of the RSC submission. Soil brought to the property is to be used solely to backfill an excavation or for final grading. SOIL BROUGHT TO A PROPERTY WITH AN RSC TO BE FILED ON THE BASIS OF A PHASE ONE AND TWO ESA There is an intrusive investigation of the RSC property in this scenario. The rules for soil that is brought to the RSC property and is to remain there after filing the RSC are found in the rules for conducting the investigation, i.e., in Schedule E and Parts VI-VIII of O. Reg. 153/04, as well as in Part XI, s. 55. The rules specify the property characteristics and applicable standards for contaminants, as well as setting out sampling, analysis and reporting requirements identical to those where the RSC is being filed based on a Phase One ESA only. Paragraph 55(1) of Part XII of O.Reg 153/04 specifies the conditions under which soil can be brought to an RSC property where the RSC is being submitted for filing based on a Phase One and Phase Two ESA: Soil that did not originate at an RSC property may be brought from another property to an RSC property if; the property is being used or has been used for - in whole or in part - an industrial or a specified commercial purpose (garage, bulk liquid dispensing facility or dry cleaning equipment operation); a potentially contaminating activity is or has been identified; Page 3 of 6

the property was last used, in whole or in part, for an industrial or specified commercial use (garage, bulk liquid dispensing facility, or dry cleaning equipment operation); one or more contaminants of concern is present. If any of the above conditions do not apply, then soil brought to the RSC property must meet Table 1 Standards. Once these conditions are met, the applicable requirements are found in Schedule E of O..Reg 153/04 for soil brought to a Phase Two property to remain at the Phase Two property after the filing of a record of site condition The concentration of each contaminant in the soil must be equal to or lower than the applicable site condition standard. Soil must be sampled and analyzed before being brought to the property. The samples must be analyzed for contaminants that may reasonably be expected to be present in the soil, having regard to; the property from which the soil was taken before being brought to the RSC property, handling of the soil, including its storage and transport after excavation; and, any other relevant factors, including potentially contaminating activity. Samples will be analyzed at the following rates to verify that soil brought to the property meets applicable site condition standards; one per 160 cubic metres for the first 5,000 cubic metres; and one per 300 cubic metres of soil in excess of 5,000 cubic metres. Soil brought to a Phase Two property is to be used solely to backfill an excavation or for final grading. In addition to the requirements for bringing soil to a Phase Two property, there are also several reporting requirements. The mandatory reporting requirements are listed in Schedule E, Table 1 Mandatory Requirements for Phase Two Environmental Site Assessment Reports, 10. Appendices (c) Soil Excavated at or Brought to a Phase Two Property. Page 4 of 6

They include: A rationale for selecting chemical parameters analyzed by a laboratory in accordance with Section 32 of Schedule E; A description of the soil sampling activities conducted, including; a) the number of samples analyzed b) the soil sampling program, including methods used to ensure the samples represent any areas where a contaminant may be present at a concentration greater than the applicable site condition standard for the contaminant; c) the address of the source property and any property where the soil was stored before it was deposited on, in or under the Phase Two property; d) the former and current uses of the source property, including identification of any potentially contaminating activity; e) total volume of soil brought to the Phase Two property; f) the results of analyses of soil samples, including a comparison of the results to the applicable site condition standard for each contaminant analyzed; g) a figure showing the locations on the Phase Two property where soil was deposited; and h) tables: showing all soil quality data contained in laboratory certificates of analysis of soil, samples analyzed; and comparing the analytical results to the applicable site condition standard for each contaminant analyzed; and A description of why the soil was brought to the Phase Two property. SOIL BROUGHT TO A PROPERTY WITH AN RSC TO BE FILED ON THE BASIS OF A PHASE ONE AND TWO ESA AND A RISK ASSESSMENT The rules for bringing soil to an RSC property where the RSC is submitted for filing based on a Phase One and Two ESA and the risk assessment are the same as when the RSC is submitted for filing based on a Phase One and Two ESA, with the following exception: Page 5 of 6

If the risk assessment is accepted by the Director and contains a soil management plan, and a contaminant in the soil being brought to the RSC property has a standard specified in the risk assessment, then the concentration may be equal to or less than the standard specified in the risk assessment. Disclaimer: This fact sheet provides summary information about the amendments regarding Soil Brought to the RSC property. This fact sheet is provided for educational use, and are not complete or exact reproductions of the legislation. It is not intended, or to be used, as advice, legal or otherwise, about the requirements for records of site condition or the obligations of those submitting them. Such advice should be obtained from competent experts, including lawyers. Where there is a discrepancy between anything in this fact sheet and a legislative provision the legislation prevails. Ontario legislation may be found at http://www.e-laws.gov.on.ca/index.html. Page 6 of 6