COMMERCIAL BUILDING HANDBOOK 2015 International Building Code (IBC)

Similar documents
City of Rohnert Park When Permits are Required

Development Services Department. Building Division Handout San Pablo, CA Ph: (510)

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

BUILDING CONSTRUCTION

ORDINANCE NO BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF MANHATTAN, KANSAS: Section Adoption of the International Building Code.

Dave Harper, Building Official (509) Susan Davis, Administrative Secretary (509)

Uniform Construction Code

b. Nonfixed and movable fixtures, cases, racks, counters and partitions not over five (5) feet nine (9) inches high.

EXHIBIT A PERMIT FEE SCHEDULE EFFECTIVE DATE: July 1, 2003

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

Village of Corrales Planning and Zoning Department

Michigan Truss Design Drawing Submittals at Time of Permit Application Two-Step Market

Short title. This chapter may be cited as the "Kern County Building Code."

California Residential Code (CRC) Summary of Town of Tiburon Amendments

COUNTY OF NEVADA BUILDING DEPARTMENT POLICIES

OWNER-BUILDER? A HOMEOWNER S GUIDE TO BUILDING PERMITS AND INSPECTIONS FOR PROJECTS IN ARROYO GRANDE, CALIFORNIA

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Homeowners Building Permit Guide

ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department. [ NMAC - Rp,

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

PLEASE READ AND SIGN RESIDENTIAL ENERGY CODE AND EROSION CONTROL!

BUILDING PERMIT PROCESS

RESIDENTIAL BUILDING PERMIT APPLICATION TOWN OF EASTON Easton Valley Road Easton, NH Phone: Revised May 2016

BILL NO ORDINANCE NO Sponsored by: Mayor Hennessy

meters (16 Inches) Transportation (T)

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

CITY OF KIRKWOOD SINGLE FAMILY SITE PLAN WORKSHEET

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

ZONING CLEARANCE PERMIT APPLICATION

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

The following information is required when submitting a building permit application:

Building/Zoning Permit Fee Structure

BUILDING A NEW HOME. Construction Permit Tips For Home Owners

City of Centerville Building, Zoning & Code Enforcement Department

Citizens Guide to Residential Building Permits

PLEASE FOLLOW INSTRUCTIONS ON PAGE FIVE

TOWN OF FRANCESTOWN BUILDING/CODE ENFORCEMENT 27 MAIN STREET P.O. BOX 5 FRANCESTOWN, NEW HAMPSHIRE Building Permit Application Guide

Commercial Remodel Permit

PREFACE. The Erosion and Sediment Control Ordinance and its requirements can be found at:

ZONING CLEARANCE PERMIT APPLICATION

Permit Procedures For New Construction, Additions, and Alterations

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY. Deck/Porch Guide & Permit

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):

Incorporated Village of Lawrence

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

CHAPTER 6 INTERNATIONAL RESIDENTIAL CODE

Town of Kingsville. Building Department

Single Family Residential Building Permit. Application Guidelines. August 2000

ARTICLE VI - RESIDENTIAL DISTRICT R-1. be for one or more of the following uses:

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

BUILDING DEPARTMEN T

ACCESSORY BUILDING. Building Permit Requirements: (must be completed before submitting application)

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

Town of Orange, New Hampshire Application for a Building Permit

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507)

MINIMUM PLAN INFORMATION REQUIRED FOR A BUILDING PERMIT

Town of Ashford, Cattaraugus County, New York Local Law #2 of the year 2006

Detached Garages and Building Permits. 1 and 2 Family Dwellings

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions

Residential Miscellaneous Permits

Inspection Procedure Handout

ARTICLE VIII - RESIDENTIAL DISTRICT R-3. be for one or more of the following uses:

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

ONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS

Town of Grantham, NH Building Permit Application Procedures

City Of Mendota, Illinois Information Regarding Building Construction, Renovations, and Permitting.

Table of Contents. Foreword

Title 15 BUILDINGS AND CONSTRUCTION

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507)

BUILDING PERMIT SUBMISSION CHECKLIST NEW SINGLE-FAMILY RESIDENCE NEW TWO-FAMILY RESIDENCE NEW MULTIPLE SINGLE FAMILY (TOWNHOUSE)

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):

VILLAGE OF SHAWNEE HILLS 9484 Dublin Rd. Shawnee Hills, Ohio Phone Fax

HOME OWNERS GUIDE PERMIT & INSPECTIONS FOR OWNER OCCUPIED SINGLE FAMILY DWELLINGS

Residential Zoning Rules

District of Ucluelet Building Permit Guide

CHAPTER 14 BUILDING CODE

TOWN OF LOUDON OFFICE OF THE BUILDING INSPECTOR P.O. BOX 7032 ~ 8 COOPER STREET LOUDON, NH 03307

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

City of Buffalo City Application for Building Permit

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

WOODFORD COUNTY BUILDING & ZONING DEPARTMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION FORM OWNERS NAME & ADDRESS: PHONE #:

Proud of its Heritage, Preparing for its Future

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

Town of Fredonia. 25 N Main St. * PO Box 217 Fredonia AZ Fax: * Office

City of Milford, Connecticut Information Regarding Permits

MUNICIPALITY OF MIDDLESEX CENTRE BY-LAW NUMBER

ENGINEERING & CONSTRUCTION MANAGEMENT RESIDENTIAL PERMIT APPLICATION CHECKLIST

Accessory Structures- 430 Third Street Garages Farmington, MN (651) Information Sheet

Single Family Residential Building Permit Questions & Answers

THE RESERVE at Pueblo West

José Nuño, Chairman. Exhibit A Amendments to Table

Fees and Permit requirements are regulated by the Township s Building By-law

Transcription:

COMMERCIAL BUILDING HANDBOOK 2015 International Building Code (IBC) MINNEHAHA COUNTY PLANNING & ZONING 415 N. Dakota Ave 605-367-4204

TABLE OF CONTENTS Building Permits 3 Building Permit Documents 4 Building Permit Inspections 5 Building Permit Fees 6 Setback Requirements 7 On-Premise Sign Regulations 8 Legal Disclaimer: The Commercial Building Handbook is provided by the Minnehaha County Planning Department as an informational guide. The Commercial Building Handbook should not be used as a substitute for codes and regulations. The applicant is responsible for compliance with all code and rule requirements, whether or not described in this handbook. This Handbook is also not intended as legal advice, or a substitute for legal advice. Questions about interpretation of the codes and regulations, as any other laws, should be referred to a private attorney. Commercial Handbook 2015 2

BUILDING PERMITS Permits Required. Except as specified below, no building or structure shall be erected, constructed, enlarged, altered, repaired, moved, improved or converted unless a separate permit for each building or structure has first been obtained from the Planning Department. Work exempt from permit. Permits are not required for the following work. The work must still meet the provisions of the building code and other applicable ordinances. 1. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area is not greater than 120 square feet ( 11 m2). Such structures must still meet applicable setback requirements of the 1990 Revised Zoning Ordinance for Minnehaha County, the 2001 Revised Joint Zoning Ordinance for Minnehaha County and the City of Dell Rapids, or the 2002 Revised Joint Zoning Ordinance for Minnehaha County and the City of Sioux Falls. 2. Fences not over 6 feet (1829 mm) high. Fences must still meet applicable requirements of the 1990 Revised Zoning Ordinance for Minnehaha County, the 2001 Revised Joint Zoning Ordinance for Minnehaha County and the City of Dell Rapids, or the 2002 Revised Joint Zoning Ordinance for Minnehaha County and the City of Sioux Falls. 3. Oil derricks 4. Retaining walls that are not over 4 feet (1219 mm) in height measured from the bottom of the grade elevation to the top of the wall, unless supporting a surcharge or impounding Class I, II, or IIIA Liquids. 5. Water tanks supported directly upon grade if the capacity does not exceed 5,000 gallons (18,927 L) and the ratio of height to diameter or width does not exceed 2 to 1. 6. Sidewalks and driveways not more than 30 inches (762 mm) above adjacent grade, and not over any basement or story below and are not part of an accessible route. A driveway permit may be required by the applicable road authority. 7. Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. 8. Temporary motion picture, television and theater stage sets and scenery. 9. Prefabricated swimming pools accessory to Group R-3 occupancy that are less than 18 inches (457 mm) deep. 10. Shade cloth structures constructed for nursery or agricultural purposes, not including service systems. 11. Swings and other playground equipment accessory to detached one and two-family dwellings 12. Window awnings in Group R-3 and U occupancies, supported by an exterior wall that do not project more than 54 inches (1,372 mm) from the exterior wall and do not require additional support. 13. Nonfixed and movable fixtures, cases, racks, counters, and partitions not over 5 feet 9 inches (1743 mm) in height. Commercial Handbook 2015 3

BUILDING PERMIT DOCUMENTS Required Documents. For all commercial and industrial construction, the following documents and plans must be submitted for review prior to the issuance of a building permit. Submittal documents must consist of one complete set of hard copy plans with an additional hard copy site submittal and an electronic submittal in PDF format. 1. An approved Septic Permit for new construction. Must be approved by the State DNER for septic system or holding tank permit. 2. Detailed set of stamped engineered building design plans with foundation plans. 3. Building use and classification. Structures or portions of structures shall be classified with respect to occupancy in one or more of the groups listed in section 301 Use and Occupancy Classification of the 2015 International Building Code book. A room or space that is intended to be occupied at different times for different purposes shall comply with all the requirements that are applicable to each of the purposes for which the room or space will be occupied. Structures with multiple occupancies or uses shall comply with Section 508 of the IBC. Where a structure is proposed for a purpose that is not specifically provided for in this code, such structure shall be classified in the group that the occupancy most nearly resembles, according to the fire safety and relative hazard involved. 4. Architectural Design Review. The Building Inspector may require an architectural design review for any commercial or industrial construction project. 5. All construction must comply with all requirements stated in applicable conditional use permit and Minnehaha County Zoning Ordinance. Note: Review of construction documents may take days or weeks depending on complexity of plans and workload of the Building Inspector. Posting of Permits: The Permit placard (yellow card) shall be posted on the building near the main entrance or in front of the site or house, visible from the main road or entrance. Commercial Handbook 2015 4

BUILDING PERMIT INSPECTIONS Work commencing before permit issuance. If work is stared before a building permit is issued, the permit fee will be doubled. The doubled fee may be applied for each week that the permit is not obtained. Such fees are in addition to the required permit fees. Legal and/or civil proceedings may also be commenced. Required Inspections. All construction work for which a permit is required is subject to inspection and all such construction or work must remain accessible and exposed for inspection purposes until approved. It is the responsibility of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Minnehaha County is not liable for expense entailed in the removal or replacement of any material required to allow the inspection. 1. Footing /Foundation inspections: to be made after excavations for footings are complete, forms and reinforcing steel including concrete encased electrode or UFER ground with a minimum of 2 inches of concrete cover are in place prior to pouring. 2. Framing Inspection: to be made after the roof, all framing, fire blocking, and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical systems are in place. 3. Final Inspection: final inspection shall be made after the permitted work is complete and prior to occupancy. The Building Inspector will either approved that portion of the construction as completed or will notify the permit holder or agent of the permit holder that changes are necessary for compliance to the adopted building enforcement code. Expiration. Every permit issued shall become invalid 365 days after its issuance. The building official is authorized to grant, in writing, one extension of time, for a period not more than 180 days. The extension shall be requested in writing and any fees paid before the original permit expires. Commercial Handbook 2015 5

BUILDING PERMIT FEES Permit Fees. A fee for each permit is based on the construction costs as adopted by Resolution by the Board of County Commissioners. The fee schedules for the issuance of a building permit shall be as follows: Dwellings - site built Finished habitable space Finished basements Unfinished space (basement) Attached garages Detached garages, accessory structures, & decks Dwellings - moved Finished habitable space Finished basements Unfinished space (basement) Attached garages (moved on) Detached garages & accessory structures (moved on) Manufactured and Mobile Homes Finished habitable space Finished basements Unfinished space (basement and upper level) Foundation (no basement) Attached garages Detached garages $83.84 per square foot $55.90 per square foot $33.67 per square foot $33.67 per square foot $27.95 per square foot $27.95 per square foot $55.90 per square foot $33.67 per square foot $22.77 per square foot $11.64 per square foot $33.67 per square foot $55.90 per square foot $32.60 per square foot $11.64 per square foot $32.60 per square foot $27.95 per square foot 1. Residential structures...$60.00 or.4% of construction costs, whichever is greater. 2. Commercial/Industrial structures. $100.00 or 1% of construction costs, whichever is greater. 3. Agricultural structures $30.00 or.2% of the construction costs, whichever is greater. Other Inspections and Fees. 1. Inspection outside of normal business hours, per hour* (*minimum charge one hour) $70.00 2. Inspections for which no fee is specifically indicated, per hour* (*minimum charge one half hour) $70.00 3. Building Permit Extension (maximum 180 days) $50.00 4. A mileage fee based on the current rate per mile authorized by the Internal Revenue Service shall be charged for any inspection occurring outside Minnehaha County. Commercial Handbook 2015 6

R.O.W Side Property Line MINIMUM SETBACK REQUIREMENTS (C, I-1, I-2 Zoning Districts) Rear Property Line 20 Rear 10 Side 10 Side Side Property Line Parking 30 Front 15 Parking Lot Setback Ditch Front Property Line/ Right-Of-Way (R.O.W.) Line Street Ditch Height Maximums are as follows C Commercial 35 I-1 Industrial 45 I-2 General Industrial 55 Commercial Handbook 2015 7

ON-PREMISE SIGN REGULATIONS C, I-1, I-2 Zoning Districts Sign Area for Commercial & Industrial Signs 1. Wall, Roof, and Projections Signs: 2 square feet per linear foot of building frontage, or 15% of the area of the frontage wall 2. Freestanding Signs: 1 square foot per linear foot of street frontage - Maximum size of 200 square feet 5 feet Max. P R O J E C T I N G WALL SIGN ROOF SIGN 5 feet Max. FREESTANDING SIGN 40 feet from ROW 40 feet from ROW 30 feet Max. 10 feet Yard. 16 feet Driveway. Specific Regulations: 1. Projections Signs: 5 feet max. projection from building 5 feet max. projection above roof peek 10 feet min. above yard, or 16 feet min. above driving surface 2. Roof Signs: 5 feet max. projection above roof peek - not to exceed zoning height regulations 3. Freestanding Signs: Max height of 30 feet Intersection Safety: Sign face to not obstruct view of an intersection as depicted as a triangle on the left Signs within the triangle must have sign face 12 feet above grade Right-of-Way Line (ROW) Commercial Handbook 2015 8