ALTERNATIVE CONTRACTING METHODS

Similar documents
Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods

The Key to Successful Design and Construction

AIA Contract Documents

WATERTOWN ELEMENTARY SCHOOLS SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018

ALTERNATE FORMS OF PROJECT DELIVERY

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

SEPARATED PROJECT DELIVERY SYSTEMS

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)

Construction Project Delivery Methods Overview and Comparison. Operations Division

ECI: Two-Stage Contracts

FACILITY PROJECT BIDDING OPTIONS OVERVIEW

Progressive Design Build

PROFESSIONAL PRACTICE 544

Chapter 4 State Requirements for Educational Facilities Section 4.1

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA

Construction Contracts

A , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Is Your District Ready For the New Law?

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)

DESIGN IS GOOD BUSINESS

LB 889 The Political Subdivisions Construction Alternatives Act

Alternative Delivery for Municipal Water & Wastewater Projects in 2012

DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors

TECHNICAL REVIEW DESIGN DEVELOPMENT PHASE

Professional Practice 544

Professional Practice 544

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide

Construction Documents Education Program

Partnering for Alternative Delivery Projects

Project Delivery Options: Pros and Cons


Choosing Delivery Method

Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing

Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013

The documents in the A-Series relate to various forms of agreement between an owner and a contractor.

A101 Standard form of agreement between Owner and Contractor-Stipulated sum with instruction sheet wrapped (2017) $55.98

Committee Meeting. Procurement Processes for Professional Services and Contractors

Report on Effectiveness of the Construction Manager at Risk Project Delivery Method

February Significant reduction in delays, unexpected costs and disputes between the parties arising during construction.

Step 1 Preliminary Design and Engineering

Appendix A: Outline of Construction Management Functions /Roles for each phase of the project (source: Construction Management Association of America)

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

ConsensusDocs. Catalog. Updated Docs Inside

Procurement Options for NZ Construction Contracts

AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY

Standard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services

INNOVATIVE CONTRACTING GUIDELINES

45. Feedlot construction delivery

Project phases II. Tendering-constructionoperation

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

1/4/2014. Alternative Project Delivery Methods 1. Agenda

CONSTRUCTION MANAGEMENT. By GREEN PLANET SERVICES Lesley Padayachee Cell:

Document Synopses by Series

Document Price List Prices effective June 1, 2016

Project phases II. Tendering-constructionoperation

Procurement Management Processes

Role of Procurement / Purchasing Within the Authority

Figures, Examples and Lists

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering

TABLE OF CONTENTS I. PARTIES TO THE CONSTRUCTION PROJECT...1 A. OWNER...1 B. ARCHITECT...1 C. INSPECTING ARCHITECT...1 D. CONTRACTOR...

AN OWNER S GUIDE TO PROJECT DELIVERY METHODS: CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

PROJECT DELIVERY METHODS

Internal Construction Management at Michigan State University

Construction Family of Documents

Architectural and Engineering Basic Services Fee Estimating Guidelines

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

Project Delivery Method

Alternative Delivery Methods in the Post-Davis World

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process

Project Delivery Methods

AIA Contract Documents: Retail Price List

Unit 3: The Traditional Procurement Route

EXHIBIT A. 1) General:

THE PROCESS. Phase 1 Pre-Design Objective: Determine the owner s criteria for the project. Fee Breakdown: 5-10% of total fee.

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

City and County of San Francisco

G , Request for Proposal Land Survey

ROLES AND RESPONSIBILITIES

Procurement Guidelines

7111 Facilities Design & Construction (3/17)r Evaluating Existing Buildings (3/17)r Educational Specifications (3/17)r

AIA Contract Documents

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

A Primer Indianapolis, Indiana June 16, 2010

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built.

Lease-Leaseback Project Delivery Method

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

AIA Arizona Document Price List Prices effective April 2013

DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

Transcription:

ALTERNATIVE CONTRACTING METHODS Conventional Design-Bid-Build Design/Build Negotiated General Contractor By Jeff Warner, AIA, LEED AP Principal, ALSC Architects

CONVENTIONAL DESIGN-BID-BUILD The most traditional method of delivery of a construction project is where the Architect, after selection by the Client, totally completes the design documents which are then distributed to General Contractors for bidding. Usually, the low bidder is selected to construct the project and enters into a lump sum type contract agreement directly with the Owner. During construction, the Architect typically maintains a strong administrative role and is the focal point of most communication on the project between the Contractor and Owner. While proponents of this method of contracting feel that the lowest overall initial costs are obtained through pure competitive bidding, an adversarial relationship between principal parties can develop; making the administration of changes more difficult, time consuming and costly. Perhaps the biggest potential problem with this approach to a major, complex construction project is that the Owner does not obtain a firm handle on construction costs until the project has been bid, which may require re-design to address the budget problem. The conventional design, bid, build approach is also typically one of the longest in overall duration and for an accelerated or fast-tracked schedule, the project must be designed, bid and awarded in phases. 1. Costs may be lower due to competition. 2. Project design is typically complete prior to start of construction. 3. Owner receives a single lump sum proposal for the entire project not subject to cost escalation. 4. This approach conforms most directly to public bidding laws. 1. If bids exceed budget, the project may require re-design. 2. Difficult to fast-track or pre-order materials, resulting in later Owner occupancy. 3. The General Contractor may be in an adversarial relationship with the Owner and Architect/Engineer. 4. Prices for change order work are typically higher and more difficult to control. 5. A selected bid list can be made, but the Owner cannot actually select the contractor or subcontractors. Project may be released for bidding and constructed in phases to reduce schedule. Contractors can be prequalified before being allowed to bid the project.

DESIGN/BUILD Under a design/build arrangement, the Owner obtains both design and construction services from a single entity, thereby having a single point of responsibility for all phases of the work. The Owner or hired consultant must prepare a detailed project program and quality requirements (Bridging Documents) for the Design/Build team to use in establishing a project cost. Major benefits experienced by Owners utilizing the design/ build approach are that the design and construction services are streamlined and that having one responsible entity ensures that required construction components don t fall through the cracks. (However, building elements not identified in the Bridging Documents will have an extra charge added after the contract is signed.) Some Owners, however, are uncomfortable with the design/build approach because it lacks a system of checks and balances in an arrangement where the Architect and Contractor are independent. It is for this reason that many Owners using the design/build approach feel it is necessary to employ a separate building consultant to inspect the plans, specification and construction and to review estimates, change order proposals and payment requests furnished by the design/build firm. In addition, there is the problem of integrating the Owner s special consultants in the design process as well as some confusion over the extent to which the Owner participates to ensure the function and quality of the finished product. With thorough Bridging Documents and a professional and responsible team, the design/build process can be one of great success. 1. Single prime responsibility for design/construction of total project. 2. Construction cost, schedule and methods are controlled by a single entity. 3. Value engineering is performed by design/build entity and implemented to provide the most cost effective solutions for systems and materials used on project. 4. Enables project to proceed on a phased schedule, reducing overall schedule. 5. Competitive bidding is retained. 1. Owner may require a separate building consultant to provide Bridging Documents and an appropriate system of checks and balances to monitor design and costs. 2. Criteria for project would have to be generally preestablished, which may expose Owner to substantial change orders. 3. Some Owners have difficulty integrating their input into the design of the project because of pre-established criteria and no direct relationship with the Architect. 4. The quality of the project may be diminished through design/build efforts to maintain the established cost. 5. Owner may not be able to control cost of additional work (would have to rely solely on design/build contractor). 6. Selection of design/build entity can be difficult to manage under competitive bidding laws, particularly for large, complex projects. Design/build services may be provided by a specialty firm having all service in-house or by a consortium of Architect, Engineers and General Contractor.

NEGOTIATED GENERAL CONTRACTOR On many construction projects, particularly in the private sector, a General Contractor is hired on the basis of his knowledge, experience, resources, assigned personnel and fee to participate in the project during the design phase as well as during construction. Under this arrangement, the General Contractor can provide services such as estimating, cost analysis, scheduling, value engineering, etc. During the construction phase, the negotiated General Contractor operates in a more conventional role, usually performing certain trade work with his own construction forces. However, here too the Contractor, Architect and Owner function more as a collaborative team than under a more conventional competitively bid process. A major benefit to the negotiated General Contractor approach is that under the disciplined scheduling of the General Contractor, the project may be phased or fast-tracked whereby the design and construction periods are overlapped to permit an earlier start and completion of construction. The Owner will typically require the General Contractor to provide a Guaranteed Maximum Cost (GMC) for the project prior to the start of any construction work and thereby the Owner can receive a commitment on cost at an earlier date than under conventional design/bid/build delivery. 1. Construction costs are identified and predicted reliably during the design phase. Team interacts related to construction cost, completion schedule and quality work to maximize Owner s value. 2. The General Contractor contributes to a synergistic team approach in the Owner s interest. 3. Value engineering can be done at a time when results can be most easily incorporated into the design. Major design decisions can be made on the basis of complete information. 4. Construction cost established early can facilitate financial planning and avoid potential delays for re-design. 5. All records, books and estimates are open book. 6. Prudent buying and value engineering with trade contractors results in cost savings reverting to the Owner, not the General Contractor. 7. Competitive bidding is retained on all work, except a portion of that which the General Contractor may perform with his own forces. 8. Flexibility to pre-quality trade contractors for better control of schedules and costs. 9. The General Contractor, who is responsible for costs, schedule and quality, can be selected based on knowledge, experience, performance record and fees. 10. Schedule is controlled during the design phase to ensure that design efforts are integrated with construction phase requirements. 11. Facilitates fast-track or phased construction, providing earlier completion. 12. Single prime responsibility for construction. 13. No additional Owner personnel required to monitor construction. 14. Ability to pre-order long lead items.

NEGOTIATED GENERAL CONTRACTOR (cont.) 1. If a phased approach is used, the project may not be fully designed at start of construction which may expose Owner to change orders. This potential is inherent in any form of fast-track construction, but can be controlled to a minimum. 2. Difficult to arrange within structure of public bidding laws on public sector projects. 3. Some contractors who claim to have expertise in services similar to construction management do not. 4. The General Contractor cannot be considered an agent of the Owner in a pure sense and may not be viewed as to having the Owner s interests as a priority. 5. The General Contractor may hold too much contingency, causing elements to be taken out of the project. The General Contractor may automatically be permitted to undertake work with own forces, or may be required to take bids from other contractors. Timing of introduction of the General Contractor to the project varies considerably. The General Contractor should be added to the team as early as possible to maximize benefits.