Facility & Operations Field Division

Similar documents
Water / Wastewater Fund

Water / Wastewater Fund

MUNCIE WASTEWATER TREATMENT PLANT 5150 KILGORE AVE. MUNCIE, IN 47304

Water / Wastewater Fund

Donner Summit PUD Interactive Map Pop-up Text and Photos June 30, 2015

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

Anderson Water Pollution Control Plant

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011

Wastewater Treatment. Where does wastewater go when it leaves your house?

Chapter 2: Description of Treatment Facilities

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Tour of Regional Water Reclamation Facility

ADVANCED WATER OPERATIONS PART I COURSE OUTLINE 45 HOURS MINIMUM

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015

Water Treatment Overview. Gabe Sasser December 2016

Utility Partner Data Report

APPENDIX B THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION

Tour of Altamonte Springs Regional Water Reclamation Facility

REHABILITATION OF THE ROCKAWAY BEACH MISSOURI WASTEWATER TREATMENT PLANT TURNING AROUND A CHRONICALLY FAILED SYSTEM

City of Enderby Water Treatment Plant

Overview of Drinking Water Regulations

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Approved Capacity. March 2010

City of Topeka Utilities Department

SEWERAGE SYSTEM IN ULAANBAATAR

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY

Lynn Township Sewer Authority. Corrective Action Plan. March 2007

Backup Generators Bacon Road Water Treatment Plant Case Study

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

Welcome! Water & Wastewater Utility Operation and Management for Tribes

HOTCOG Water and Wastewater Treatment Efficiency Study Volume I Water Treatment Plant Efficiency Evaluation. Table of Contents...

DRIP EMITTER SYSTEM STUDY GUIDE

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director

ONTARIO ROCK ROAD LIFT STATION EQUALIZATION FACILITY

Wastewater Treatment clarifier

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet

Schedule 1: Specification. Super-Treat SE 10 Aerated Wastewater Treatment System

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

CEDAR CREEK Wastewater Treatment Facility

CITY OF WOOSTER WATER PRODUCTION DIVISION ANNUAL REPORT FOR YEAR Prepared by. Michael Hunter Utilities Manager

Wastewater Plant Tour. There Is Gold In Them There Plants

RECORD DRAWINGS NOTE: alt32 ARCHITECTURE DESIGN 310 OLD VINE STREET, SUITE 300 LEXINGTON, KY 40507

The operator stated that the rollers in one of the drum filters was recently replaced.

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

WASTE WATER TREATMENT SYSTEM

DRINKING WATER CONSTRUCTION PERMIT APPLICATON

DELTA WASTEWATER TREATMENT PLANT UPGRADES

CHARLES COUNTY GOVERNMENT JOB DESCRIPTION

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

M A N I T O B A ) Order No. 117/15 ) THE PUBLIC UTILITIES BOARD ACT ) November 18, 2015

Rectangular Basin = Volume, gal (Length, ft) x (Width, ft) x (Height, ft) x7.48 gal/cu.ft.

Utility Partner Data Report

Utility Funds. Department of Public Works Utilities. Fiscal Year 2017

CHAPTER 10 PRELIMINARY TREATMENT

Conducting Successful Energy Audits for Both Water and Wastewater Utilities By: Rich Atoulikian, HDR

Zero Liquid Discharge Project Extends Potable Water Supplies

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand

BIOLOGICAL WASTEWATER BASICS

CITY OF YUMA WASTEWATER TREATMENT PLANTS. Cactus Moon Education, LLC.

CHAPTER 3 INTRODUCTION TO TREATMENT PROCESSES

Need-to-Know Criteria Wastewater Treatment Operator Class III

CITY OF ALBANY BIOSOLIDS MANAGEMENT PROGRAM DEQ/EPA ANNUAL REPORT 2009

2017 Annual Performance Report

Module 20: Trickling Filters Answer Key

Walter E. Deuchler Associates, Inc. Consulting Engineers

Xi an South-Suburb Water Treatment Plant Shaanxi, China

Black River Wastewater Treatment Plant

CITY OF LAGRANGE, GEORGIA UTILITY DEPARTMENT WATER CONSERVATION AND DROUGHT CONTINGENCY PLANS

MANCHESTER WATER & SEWER DEPARTMENT GOVERNMENT 101 SEPTEMBER 2013

Wastewater Treatment. Knowledge. Commitment. Excellence.

World Pulp & Paper THE INTERNATIONAL REVIEW FOR THE PULP AND PAPER INDUSTRY

EPB 243- Quality Assurance and Quality Control Policy for Waterworks: An Overview for Smaller Waterworks June 2015

American Water College 2010

Rawal Lake Water Treatment Plant Rawalpindi, Pakistan

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

OPERATOR DUTIES WEEDKDAY SHIFT

SEACOAST UTILITY AUTHORITY ANNUAL ENGINEER S REPORT ON THE PHYSICAL CONDITION OF THE SYSTEM

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

Operational Plan. for the. Sydenham Drinking Water System. Uncontrolled Copy

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Why do we treat wastewater? We treat wastewater in order to remove substances that are harmful or upsetting to the natural environment or man.

Department of Environmental Quality

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant

Need-to-Know Criteria Wastewater Treatment Operator Class I

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

Water Treatment Plant 2016 Summary Report

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

Capacity Analysis for the Hartsburg Wastewater Lagoon

Transcription:

Facility & Operations Field Division Mission Statement: To regularly inspect utility facilities and review plant operating practices to ensure regulated utility service providers deliver safe, reliable and quality service.

Complaint Investigations The Facility & Operations Field Division also investigates complaints that require field activity and technical expertise. Complaint updates and final resolutions are provided to IAD.

Water and Wastewater Section: The PUCO regulates investor-owned water and wastewater utilities, including 6 water, 4 wastewater, and 4 combined water and wastewater companies. These companies, whose total facilities comprise 41 water and 10 wastewater systems, serve more than 323,000 Ohioans The Section enforces Commission Orders and Chapter 4901:-1-15 of the Ohio Administrative Code (Standards for Waterworks Companies and Sewage Disposal System Companies).

Field Audits/Inspections Categories Water/Wastewater Plant Facilities Structure Intakes Low Service Pumps Aerators Iron Removal Filters Flocculation Basins Clarifiers Filters Chemical Feed Equipment Clearwell High Service Pumps Backwash Equipment Source of Supply Ground water Surface water Administrative Billing Community Contacts (Mayors/Fire Chiefs) Contingency Plan Disconnections Fire Contacts NOCR One Call Service Outages / Interruptions Records / Reports Usage Restrictions Distribution Booster Stations Dead Ends Flushing Program Flush Valves Hydrants Metering Service Replacements Storage Valve Working WT Chlorine, Iron, Hardness, Pressure Collection System Lift Stations Manhole Inspections

The Water & Wastewater Section conducts reviews or audits for the following Ohio Administrative Code Standards: 4901:1-15-10(B)(1): Maintenance of plant and equipment: 1) System Specific Maintenance Plan and Schedule 2) Water: Avoid dead-ends, and provide flushing facilities that can deliver at a flow at a minimum of 2.5 feet per second where not possible. 3) Flush all mains annually and all dead-ends bi-annually 4) Establish a valve and hydrant program Water Treatment Plant High Service Pump Wastewater Treatment Plant Sludge Belt Press

Standards: 4901:1-15-14(A) Records and reports. Maintain records and reports to demonstrate compliance in the following areas (among others): Quarterly Reports Operations Maintenance Customer Inquiries and Complaints Annual Hydrant Flushing Annual Valve Operations Maps and Records

4901:1-15-19 Meter reading, inspecting, testing and the location of meters: Read Consumers meter at least once each quarter Inside meter reading at least once a year. Maintain billing meter accuracy according to industry (AWWA) standards

4901:1-15-20 Quality and Adequacy of Service Water Systems 1. Furnish potable water that is of safe and satisfactory quality for all domestic use. 2. Provide certified operators having class of certification at least equal to that required by the Ohio Environmental Protection Agency 3. Provide each water service with a curb stop 4. Maintain pressure between 35 to 125 pounds per square inch at the curb stop. 5. Determine amount of unaccounted-for-water in each system. Wastewater Systems 1. Avoid blockages in system 2. Minimize collection system infiltration 3. Maintain system in safe and sanitary manner

Standards: 4901:1-15-10(B)(6) Each waterworks company's storage tank(s) shall be inspected at least every five years. 250,000 elevated storage tank located in the water distribution system. This style tank is used for added supply and to aid in increasing pressures to the surrounding area. 2.9 million gallon Bunker Hill Reservoir (Ohio American Ashtabula District). Finished water storage facility located away from the treatment plant in the distribution system.

Water Treatment Systems

Filter gallery in old plant of original part, Aqua Ohio Ashtabula district, water treatment plant. Filters remove impurities from the treated finished water before it is sent into the distribution system.

These are two 0.290 MG sedimentations basins, part of the original Aqa Ohio - Ashtabula treatment process. Alum is applied prior to the basins and mixing/coagulation is accomplished by vertical paddle mixers. Sludge is then manually removed when necessary.

This photo is of the two modified Aldridge purification units and the 2, 225,000 plant clearwell storage tanks where the treated and filtered water is stored prior to being pumped into the distribution system.

Finished treated water goes into plant (clearwell) storage. High service pumps and motors like this one deliver the water from the clearwell to the water distribution system.

Aqua Ohio - Ashtabula Division main treatment plant building housing the production offices, computer SCADA equipment, and electronic controls. The chlorine and fluoride storage and feed rooms are also located here.

250,000 elevated storage tank located in the water distribution system. This style tank is used for added supply and to aid in increasing pressures to the surrounding area. Harmon Rd Aqua Ohio - Ashtabula

Wastewater Treatment Systems

Influent Comminutor grinds solids before flows can enter the treatment process. Ohio s One-Stop Utility Resource

Roto Strainer Used to remove large debris from the influent before it enters the aeration tanks. By removing the large debris, the various pumps and motors do not become clogged and plant equipment failures are reduced.

Hoffman brand blowers supply air to wastewater treatment plant aeration tanks.

Air from blowers is injected in Aeration tanks as a fine mist. This begins the process by allowing oxygen consuming bacteria to eat dissolved organics.

Detention time to allow solids in the mixed liquor settle is provided in clarifier units. The collected sludge on the bottom of the tank is then pumped to a stabilization tank.

Liquid sludge is allowed to thicken in sludge holding tank before being pumped to the sludge drying beds.

Chlorine Contact Chamber. Chlorine is injected to the effluent to kill remaining bacteria. Chlorine is then chemically removed before the effluent is released into the receiving stream.

Wastewater treatment plant auxiliary/backup power. Ohio s One-Stop Utility Resource

Electrical control panel. All wastewater treatment controls and electrical components are linked to an alarm system and auto-dialer in case of failure when the plant is unmanned.

Sludge Press Mixing Chamber. Thickened sludge is mixed with a polymer to give it more body before the liquid is pressed between a series of belts. The remaining caked material is removed to an approved landfill.

Sludge Drying Beds. Utilized to remove material that has gone though the treatment process and reduce moisture content before dried sludge is removed to an approved landfill.

Consumer Satisfaction Surveys Ohio s One-Stop Utility Resource Survey Instructions Sample Survey & Result (Standard)

Accomplishments The PUCO conducts approximately 250 on-site investigations (1,300 inspection units) of water and wastewater companies each year. To further underwrite the provision of quality service, the PUCO conducted written surveys of residential and business consumer perceptions of water quality and service, polling 2,765 consumers in 5 different systems in 2011. Information from these surveys enables the PUCO to identify and subsequently resolve consumer-identified service-related problems. Survey results are posted on the PUCO website at www.puco.ohio.gov.