BEAST SCREED SYSTEM INSTALLATION INSTRUCTIONS

Similar documents
SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

end curbs at the top andd 2. Sight and ely 32 wide for the side good installation. Seee Figure 1A. Figure 1A

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

General Commercial Installation Guide LAMINATE

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

Information Kit. Table Of Contents. Radiant Floor Tubing Comparison Page 1. Butt Weld Verses Overlap Weld Page 2

Installation Guidelines

Garden WallScape Installation Guide

Table of Contents. 1 Introduction. 2 Description. 3 Tools and materials. 4 Footings or slabs. 5 Coursing placement. 6 Reinforcing steel

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

Vapor Retarders ,

FLOORING INSTALLATION INSTRUCTIONS

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com

Gravity Wall. A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures

Installation Guidelines VBC Products

System Application Guideline

IVC US Residential Installation Guide - Laminate. Leading the Way

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

STEGO WRAP CLASS C VAPOR RETARDER A STEGO INDUSTRIES, LLC INNOVATION VAPOR RETARDERS , VERSION: JAN 5, 2018

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION

SECTION CONCRETE FORMWORK

For more information, call PERGO

GUIDELINE FOR PLANTED INFILL INSTALLATIONS. Please read prior to installation, and have proper equipment and safety precautions in place.

CONCRETE Joint and Crack Sealing Basics

A. Submittal Procedures: See Article 13 of the General Conditions.

adjustable fusion shower pan on wood joists installation guide

Mbrico Tile Rooftop/Raised Floor Installation Guidelines

NOTE ON PERFORMANCE TESTING

BioPrism Solid Surface

2007 FLORIDA BUILDING CODE TEST PROTOCOLS HVHZ (RAS)

Laborers Cement Mason Machine Operations & Concrete Sawing Syllabus

Concreting. A guide to managing a concrete pour

L. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only*

INSTALLATION METHODS ENGINEERED FLOORING FLOATING, GLUED-DOWN OR NAILED INSTALLATION METHODS

INSTALLATION GUIDELINES

Installation Manual. Foundations. Version 2

ACO DRAIN Site Installation Manual

T-WALL Retaining Wall System

For more information, call PERGO

Instructions for 12 IGT system

INSTALLATION GUIDELINES

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

Wabo FireShield Model: FSH

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS

installation section three: Installation

Porcelain Paver Installation Guide

Application and Maintenance

Blue Barrier Liquid Wrap 2300

be installed while the adhesive is wet for better pattern matching capabilities. Concrete floors must be sealed if dusting or powdering exists. The fo

adjustable fusion shower pan surface mounted on subfloor installation guide

INSTALLATION INSTRUCTIONS LAMINATE

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

GEOGRID CONNECTION DETAIL OLYMPIA RADIUS UNIT

GUARANTEED ASPHALT LIMITED

INSTRUCTIONS FOR LAYING

INSTALLATION GUIDELINES

MANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade.

SECTION CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS

Concrete Formwork Systems

Slab on Grade. Introduction CHAPTER 10

Floor Preparation Recommendations. Best Practices to Prepare Concrete for Polishing

ARMOR-BLOCK. Installation guide. Installation Manual: ARMOR-BLOCK Retaining Wall System. Cap Block. Exposed void for planting.

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

EVOH PENETRATIONS INSTALLATION GUIDELINES PERMINATOR PLACEMENT

STEGO WRAP 20-MIL VAPOUR BARRIER A STEGO INDUSTRIES, LLC INNOVATION VAPOUR RETARDERS , VERSION: 20 JUL 2018

Features. Specifications. VersaShield MBX slashes up to half the total cost with a quick and effective concrete moisture mitigation up to 99.5% RH.

G R A V I T Y / G E O G R I D

Installation Instructions for Hercules Rib 52

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

CONSTRUCTION MANUAL. T-WALL Retaining Wall System FOR RAILROAD PROJECTS. The T-WALL Solution...

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

Concrete Formwork Systems

Adhesive Pull Test Standard Testing Procedures

Installation Instructions

INSTALLATION GUIDELINES - With VaporSeal Tape

Chapter 10. Pipeline Installation

INSTALLATION. The no mess, fast and easy, Peel & Stick flooring underlay and installation system... Quick Glance - Features and Benefits

Grizzly TM Part Number Spectrum Lane ~ Missoula MT ~

Installation Instructions Tuscan Field Applied Limestone Finish

STANDARD INSTALLATION GUIDELINES

WARMFLOOR. Installation Guide.

Installation Instructions

Installation Guide. Rain Screen Panel System

Easy to apply Nonflammable Low odor Castable Make excellent materials of construction

SECTION FLEXIBLE FLASHING SYSTEM FOR MASONRY VENEER

Instructions for 12 and 15 IGT systems (12 pictured)

Universal Door Installation Instructions (Good, Better, Best)

For wooden fabricated underlay e.g. plywood, care must be taken to store the material in an area where it will not become damp or contaminated.

FIVE STAR PRODUCTS, INC. (800)

Installation of Ecodure Bamboo or Ecodure Oak over particle board, plywood and existing timber floors

Technical Service. INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS over Gypsum base Products. This document refers to the following products:

TECHNICAL SPECIFICATION

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

For wooden fabricated underlay e.g. plywood, care must be taken to store the material in an area where it will not become damp or contaminated.

Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade

PVC Project Assembly Guide a FORMUFIT field manual

Transcription:

BEAST SETUP PROCEDURES P of 5 4 The concrete crew responsible for placement of the concrete should be made aware Beast Screed will be utilized on the project. The placement crew should have input on, or approve of, where the Beast Screeds will be placed, the spacing, and the direction of the bays (or strips) to be poured, i.e. N to S or E to W. Stego recommends following ACI 0 to determine bay width. For strict FL tolerance, ACI 0.R-5 (0..) recommends using a maximum 6 ft. screed board for hand screeding, with minimum ft. of overlap onto the previously poured bay or strip, essentially leaving you with a maximum 4 ft. bay width. Pulling a string-line from edge form to edge form along the bay lines can be helpful to line up the Beast Screeds. It is also helpful to determine at what length to cut the Screed Posts. (See Illustration a) Note: The step of pulling a string-line is only an aid and can be omitted if determined by the pour crew or set-up crew. Next, determine the spacing for Beast Foot. (See Illustration b) Spacing should be equal to or less than the length of the screed board being used. Keep in mind Beast Screed is a Point-to-Point Screed Guide System. Illustration a Illustration b SCREED String Line OPTIONAL SCREED SPACING OF BEAST SHOULD NOT EXCEED LENGTH OF SCREED BOARD 5 It is best to identify ONE person responsible for establishing slab elevation and making elevation adjustments to the Beast Screed Adjustable Caps. Note: Ensure the pour crew understands the Adjustable Cap & Screed Post are designed to be reused. It is best to place the used screed caps and posts in water until the pour has been completed and they can be properly cleaned for reuse.

BEAST P of 5 INSTALLATION PROCEDURES Clean the vapor barrier in the area where placing Beast Foot by wiping it with a clean, dry rag. Be sure to remove any dust, moisture or other contaminants prior to adhering Beast Foot to the vapor barrier. b. If there is a blotter[] (sand) layer present, you will first need to pull away the blotter layer material in a small area to expose the vapor barrier. Once the vapor barrier is clean and dry, remove the release liner from the bottom of Beast Foot (Illustration a) and apply it to the vapor barrier in the desired location. Immediately apply downward pressure by standing on either the center hub portion (Illustration b) or on the outer edges of Beast Foot. b. Apply pressure for a minimum of 5 to 0 seconds. c. As with other Stego adhesives, the more set time the adhesive has, the better the bond. d. For best adhesion results store Beast Foot in a temperature conditioned space prior to application to the vapor barrier. In cold temperatures apply downward pressure for an additional period of time to ensure maximum adhesion. Illustration a Illustration b Beast Foot Remove adhesive liner with pull tab MINIMUM 5-0 SECONDS ADDITIONAL TIME REQUIRED Determine the depth of the S.O.G. (from the vapor barrier) by measuring from the vapor barrier to the string-line (Illustration c), or by use of a grade rod and laser level. Illustration c String Line S. O. G. [] See ACI 0.R-06 (Section 7.) for discussion of the use of a blotter layer on top of vapor barrier.

BEAST P of 5 INSTALLATION PROCEDURES 4 Cut the Beast Screed Post at one of the kerf lines to accommodate the proper slab depth. There are numbers marking each of the kerf lines which correspond to the various slab depths each post length will accommodate. (Illustration a) b. The designed depth of the slab should fall directly between the marked numbers on the Screed Post. c. For instance; for a 6 slab depth the post should be cut at the [5 7 ] kerf line and an 8 slab depth should be cut at the [7 9 ] kerf line. This will give one full inch of adjustment up and down to accommodate for variation in slab depth. d. There is inches of overall height adjustment once Beast Screed has been set. e. Stego recommends the use of a scissor-type PVC tubing cutter to cut the Beast Screed Post. Other types of PVC cutters work, as well as a thin blade saw such as a hack saw. Caution: For safety purposes, power tools should never be used to cut the Screed Posts. Illustration a Beast Screed Post Kerf Lines [4 6 ] [5 7 ] [6 8 ] [7 9 ] [8 0 ] [9 ] If you have a 6 designed slab depth cut here

BEAST P4 of 5 INSTALLATION PROCEDURES 5 Attach the Adjustable Cap to the Screed Post by engaging the matching threads. (Illustration 4a) 6 Insert the opposite end of the Screed Post fully into the press-fit center hub of Beast Foot. (Illustration 4b) 7 Partial engagement is sufficient at this point. If a blotter layer is present, you can now push the material back into place where it was pulled aside initially to install Beast Foot. Using a laser level and check rod or grade rod set to the required slab elevation, rotate the Adjustable Cap to adjust up or down until the proper slab elevation is achieved. (Illustration 4c) Illustration 4a Illustration 4b Illustration 4c Beast Screed will easily adjust to ensure a fixed elevation and more accurate FL numbers than traditional wet-screeding. Beast Adjustable Cap Beast Foot Beast Post Blotter/Sand* *See ACI 0.R-06 (Section 7.) for discussion of the use of a blotter layer on top of vapor barrier. CONCRETE PLACEMENT Illustration 4d Concrete Concrete Concrete is placed in bays or strips, in the same manner as if wet-screeding. However, instead of floating cow patties Beast Screeds are installed in those locations as a fixedelevation, point-to-point guide screed system. As concrete is placed near, and around Beast Screed, be careful not to side load the screed hardware as this could adversely affect the elevation of the Adjustable Cap. (Illustration 4d) i. Note: The taller the screed hardware is, the more critical this becomes. b. Try to avoid pouring concrete directly over the top of Beast Screed as this will make it much more difficult to see. (Illustration 4d) i. Note: If using a drag-line pump or Georgia Buggy, it may be prudent to install the Beast Feet in their desired locations, then precut the Posts to the correct length, install the Caps and set them aside. Once the placement equipment has passed by the Beast Feet, and the area is clear, insert the Screed Post and Adjustable Cap and set them to the proper slab elevation.

BEAST P5 of 5 CONCRETE PLACEMENT As soon as concrete is placed in an area around the Beast Screed, float a flat area, the width of a hand float, around and at the same level as the top of the Beast Screed Adjustable Cap. (Illustration 5a) Note: This step can be omitted by the pour crew, however, it gives the screed crew a larger area to screed from, as well as keeps the Adjustable Caps clean for easy location and removal. Using the appropriate length screed board or straightedge, strike off grade strips between the Beast Screeds and commence with normal screeding operations. (Illustration 5b) Illustration 5a Illustration 5b Hand Float 4 To maximize the cost benefits of Beast Screed, reuse the Screed Post and Adjustable Cap. Illustration 5c Reusable Beast Cap and Post The best time to remove the Adjustable Cap and Screed Post is when the screeding crew approaches each Beast Screed from the previous bay. (Illustration 5c) i. Note: Beast Foot remains adhered to the Stego Wrap and buried in the concrete. b. Stego recommends leaving the screed hardware in place as long as practical during the screeding process to ensure a fixed-elevation point is maintained throughout the screeding operation; however, this will be up to the placement crew s discretion. As the screed hardware is removed, it is recommended to place the hardware in a bucket or wheelbarrow filled with water so cleanup will be easier Water once the pour is complete.