Construction Noise Management Plan

Similar documents
Appendix P. Construction Noise Assessment. (Prepared by Marshall Day Acoustics, November 2013)

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol

Out of hours works protocol

1 18 August 2017 Version 2 (Noise and vibration)

I335. Western Springs Stadium Precinct

Status: Rev: Comments Date: Author: Reviewer:

8. Appendix F Acoustic Assessment

Residential Impact Mitigation Guidelines for Construction

STATEMENT OF EVIDENCE OF CURT ROBINSON ON BEHALF THE AUCKLAND UTILITY OPERATORS GROUP

UC Press Building 2120 Berkeley Way Berkeley, CA

WAIKATO POWER PLANT SH31, KAWHIA ROAD OTOROHANGA ASSESSMENT OF NOISE EFFECTS

Impacts of Dredging and Reclamation on Noise and Amenity

Traffic Management Plan. Environmental Management and Monitoring Program. Appendix VI

BSM SD PLN 0126 MANAGEMENT PLAN 1. COMMITMENT AND POLICY 2. BACKGROUND. 1.1 Purpose. 1.2 Scope. 2.1 Development Consent Requirements

NOISE MANAGEMENT PLAN

I321. Mount Smart Stadium Precinct

I321. Mount Smart Stadium Precinct

This report assesses the outward noise and vibration impact of the proposed development on its surrounding environment.

8 Noise and Vibration

I503. AUT Millennium Institute of Sport Precinct

Noise Impact Assessment

CHRISTCHURCH SOUTHERN MOTORWAY STAGE 2 & MAIN SOUTH ROAD 4 LANING. Assessment of Construction Noise & Vibration. Rp009 R C.

Use of long term monitoring data for defining baseline sound levels

AND STATEMENT OF EVIDENCE OF CHRIS FISHER

EDINBURGH TRAM LINES ONE AND TWO

OBERON WHITE GRANITE QUARRY

I300. Alexandra Park Precinct

Out of Hours Work Protocol

TAURANGA CITY COUNCIL

No significant construction or operational vibration impacts are expected.

I310. Eden Park Precinct

Roma to Brisbane Pipeline Dalby Compressor Station Upgrade Environmental Management Plan. Appendix 8. Noise Assessment

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT

ARCHITECTUS FEBRUARY 2010

Chiles Ltd. 13 September 2018 Ref: Shearer Consulting Ltd. Dear Craig

APRIL 2017 UNDER CONSTRUCTION

Construction Method Statement

I322. Mount Wellington 5 Precinct

O. NOISE. 1. Existing Conditions. 2. Future without the Proposed Project

SPECIFICATION FOR NOISE MITIGATION

32 RULES FOR NOISE AND VIBRATION

HAUC (ENGLAND) HIGHWAY AUTHORITY AND UTILITIES COMMITTEE

Additional information relevant to Section 7 is presented in Appendix D in Volume 2 of 3 of the EIS.

Code of Construction Practice Part B: Site Specific Requirements

Notice of Requirement, Resource Consent Application and Assessment of Environmental Effects. Appendix K. Noise and Vibration Assessment

Auckland Transport Code of Practice 2013

4 Major Challenges 2,000. with Constructing the Hung Hom Section. hours. Aug. of work everyday. On average. Hung Hom Section newsletter.

WHAKATU ARTERIAL PROJECT ASSESSMENT OF NOISE AND VIBRATION EFFECTS

Safeway Berkeley Renovation (0691) - Berkeley, California

SCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE 1 JUNE 2015 APPLICATION FOR PLANNING PERMISSION

FRINGE COMMERCIAL ZONE RULES

PROPOSED KLONDYKE WATER STORAGE ASSESSMENT OF NOISE EFFECTS

ZAB Hearing May 14, 2015

Noise and Vibration Assessment Aurecon

E25. Noise and vibration

Construction Environment Management Plan. Planning Condition 5.

Christchurch City Plan Proposed Plan Change

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

MINING OPERATION SERVICES

SUBURBAN COMMERCIAL ZONE - RULES

IN THE MATTER of the Resource Management Act 1991

Noise Abatement Guidelines. Regional Official Plan Guidelines

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome

Chapter 4 Environmental Setting, Impacts, and Mitigation 4.6 NOISE Environmental Setting. Approach to Analysis

Gisborne District Council

Proposed Model Text for Conditions

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 20, 2018

URBAN SETTLEMENT ZONE - RULES

Technical Report - Noise Monitoring OOHW: 5 to 7 March Sydney Metro City and Southwest North Corridor Works. Nathan Lynch; Paul Douglass

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road

Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332

This summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions.

Draft Noise Abatement Guidelines

The Nine Elms Vauxhall Partnership. London Borough of Lambeth London Borough of Wandsworth. Construction Charter. Summary SB15-22 APPENDIX 1

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

APPENDIX 2 DUST AND NOISE MONITORING AND MANAGEMENT PROGRAMMES

Exhibit G. Construction Mitigation Plan

Mitigation Monitoring and Reporting Program

CROSSRAIL INFORMATION PAPER D26 SURFACE RAILWAY NOISE AND VIBRATION

Audley Square House Presentation January 2017

REPORT Condition D19 Permanent Noise Barriers

E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS

Appendix B Noise and Blasting Impact Assessment

MAIN STREET PRECISE PLAN ENVIRONMENTAL NOISE STUDY REDWOOD CITY, CALIFORNIA

Level 5 NVQ Diploma in Controlling Lifting Operations Planning Lifts (Construction)

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash

Auckland Unitary Plan Operative in part 1

GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES

South East Permit Scheme for Road Works and Street Works

11. NOISE AND VIBRATION

Noise and Vibration Management Plan

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

Construction Requirements

ANNUAL NOISE MONITORING REPORT. Environmental Protection (Fimiston Gold Mine Noise Emissions) Approval 2016

H28. Special Purpose Quarry Zone

BURNABY BUILDING DEPARTMENT

1 Introduction. Mine EPL. report. Dear Leonard, J13083L2_24 assessment. operation of. the crusher, RASP Mine. 2015); and

SECTIONAL DISTRICT PLAN REVIEW PLAN CHANGE 15 NORTH EAST INDUSTRIAL ZONE NOISE

Transcription:

Construction Noise Management Plan Victoria Park Viaduct Side Protection Upgrade Project 27 November 2014 Final

Page 2 Record of amendment Revision Description of change Effective date Updated by Incomplete Draft Incomplete draft for comment. 10 Sept 2014 J. Exeter Draft Update to incorporate NZTA comments. 26 Nov 2014 J. Exeter Final Update to timing of works and contact details. 27 Nov 2014 J. Exeter

Page 3 Contents 1. Introduction 4 1.1 Contact details 4 2. Project overview 5 2.1 Construction methodology 5 2.2 Timeframe 5 2.3 Hours of operation 5 2.4 Location plan 5 3. Noise performance criteria 6 3.1 Construction noise limits 6 3.2 Potentially affected receivers 7 4. Stakeholder engagement 8 5. Noise emissions 8 6. General noise mitigation measures 9 7. Schedules to the CNMP 10 8. Monitoring and reporting 11 9. Corrective action measures 11 10. Complaints procedure 11 11. General requirements 11 Appendix A: Noise receivers 12 Appendix B: Schedules 15

Page 4 1. Introduction Styles Group has been engaged by Conspec Construction Limited to prepare a Construction Noise Management Plan, (CNMP) to enable appropriate management of noise effects arising during the construction works involved with the upgrade of the existing side protection along the Victoria Park Viaduct overpass and local street lighting. This CNMP has also been prepared to satisfy the requirements of Condition 9.4 Construction Noise Management Plan of the Auckland Motorway Alliance Project Specification. The CNMP must be considered a living document to be updated as the works progress and as changes become necessary. The details of the CNMP will be updated as further information for various works becomes available and further site specific information will be added as Schedules to this CNMP if required. Further relevant information regarding construction noise and vibration may be found in the NZ Transport Agency document State Highway Construction and Maintenance Noise and Vibration Management Guide. 1.1 Contact details Table 1: Contacts Role Name Organisation Phone Email Contractor Manger David Flaws Conspec Construction Ltd 021 682 915 david@conspec.co.nz Site Manager Nick Parrot Conspec Construction Ltd 021 865 821 Contractor's Acoustics Consultant Jamie Exeter Styles Group Acoustic & Vibration Consultants 09 308 9015 jamie@stylesgroup.co.nz Communications and Stakeholder Liaison Paula Lewis Auckland Motorway Alliance 09 5200 200 or after hours 027 733 9995 vpv@nzta.govt.nz Auckland Council noise complaints Auckland Council 09 301 0101 The Contractor and Site Manager will be present on site during the works and will be responsible for the implementation of this CNMP. Complaints and queries should be directed to the Communications and Stakeholder Liaison.

Page 5 2. Project overview The works comprise the removal of the existing posts and outer pipe rail presently screening each side of the Victoria Park Viaduct overpass and installation of new Thriebeam guard rail. Local street lighting in the area will also be upgraded; the streetlight works will be relatively minor as the existing base of the lights will be retained. The area of the works is illustrated in Section 2.4 of this CNMP. 2.1 Construction methodology The works require the northbound and southbound lanes of State Highway 1 (SH1) to be closed whilst the respective guard rails are being replaced. The works therefore must be undertaken at night to minimise disruption to traffic. The works will involve the complete replacement of all rails on one side of SH1; the opposite side will be completed subsequently. 2.2 Timeframe The expected timeframe for the side protection upgrade works is 40 nights in total (with up to 25 of these nights including the street light works). The works will be undertaken between 05 January and 18 March 2015 (with contingency dates up to 31 March 2015). 2.3 Hours of operation The works will take place at night during road closures between 22:00 and 05:00 the following day (Sunday to Friday). 2.4 Location plan Figure 1: Location of side protection and street light upgrade works within the SH1 designation.

Page 6 3. Noise performance criteria 3.1 Construction noise limits There are no conditions for this designation with respect to noise. Typically, maintenance works would be required to comply with the noise limits specified by NZS 6803:1999 Acoustics Construction Noise. However, in consultation with Auckland Council it has been agreed that less stringent noise controls for the maintenance works are appropriate due to the high level of road traffic noise in the area. The noise limits adopted for previous construction works at night within this designation (Victoria Park Tunnel project) have been adopted by the Contractor and will generally be complied with with the exception of those activities set out as Schedules to this CNMP. With the exception of the prescribed noise limits, all construction noise shall be measured and assessed in accordance with the provisions of NZS 6803:1999. The following noise criteria apply at 1 m from the most exposed façade of the dwelling or building. The noise limits most relevant to the works are emphasised in bold. Table 2: Noise criteria for residential zones Day Time L Aeq(T) L AFmax Weekdays 06:30 07:30 65 db 75 db 07:30 18:00 75 db 90 db 18:00 20:00 70 db 85 db 20:00 06:30 60 db 75 db Saturday 06:30 07:30 65 db 75 db 07:30 18:00 75 db 90 db 18:00 20:00 60 db 75 db 20:00 06:30 45 db 75 db Sundays and public holidays 06:30 07:30 45 db 75 db 07:30 20:00 55 db 85 db 20:00 06:30 60 db 75 db Table 3: Noise criteria for industrial and commercial zones Time Period L Aeq(T) 07:30 18:00 75 db 18:00 07:30 80 db

Page 7 3.2 Potentially affected receivers The receivers potentially affected by construction noise are those immediately adjacent to the designation, generally with 100 m of the proposed works. These properties are listed in Table 4 and illustrated in the attached Appendix A. Those receivers lying immediately adjacent to the works will be exposed to higher levels of noise, and those more distant will be deemed to comply where the noise levels at the closest receivers are compliant. It is possible that in exceptional circumstances, dwellings beyond those identified in Appendix A may be affected by noise to a degree that requires management by this CNMP. The potential effects on these properties will be dealt with by responding to complaints in accordance with Sections 9 and 10. Any such additional dwellings will be added to Table 4 and Appendix A, should they arise. We note that the residential use noise limits have been adopted for buildings comprising both commercial and residential use. Noise predictions for some of these sites show that the adopted noise limits will be exceeded at times (see Schedules to this CNMP, attached as Appendix B). Where measurements are required in accordance with Sections 8, 9 and 10 they may be conducted at representative locations and not necessarily at all receivers listed here. Table 4: Potentially most affected sites Address Land Use Reference to Appendix A 31 41 Sale St Mixed 1 43 45 Sale St Commercial 2 70 Sale St Commercial 3 81 95 Union St Commercial 4 20 24 Centre St Mixed 5 22 48A Drake St Mixed 6 27 37 Drake St Commercial 7 48 Drake St Commercial 8 210 218 Victoria St West Commercial 9 220 Victoria St West Residential 10 27 37 Napier St Commercial 11 4A 4M Wilkins St Residential 12 5 9 Wilkins St Commercial 13 111 Franklin Rd Commercial 14 115 121 Franklin Rd Residential 15 The Birdcage Bar & Restaurant Commercial 16

Page 8 20 Beaumont St Commercial 17 77 85, 62 98 Fisher Point Dr Residential 18 1/7, 2/7, 1/8, 2/8 Telpher St Residential 19 98 Beaumont St Commercial 20 185 Fanshawe St Commercial 21 101 107, 100 120 Beaumont St Commercial 22 15, 23, 23B Westhaven Dr Commercial 23 1 11, 4 16A Harbour St Residential 24 14 16 Waitemata St Residential 25 1 1A London St Residential 26 4. Stakeholder engagement No less than 2 weeks prior to works commencing on the site, the site manager must notify the potentially affected persons (as identified in Appendix A) via letter drop to advise the following: i. Expected start date of works; ii. iii. Expected duration of works; The days and hours of the week when works may be undertaken; iv. Details for the Stakeholder Communications Manager (including a phone number) for the receipt of any noise complaints or concerns. 5. Noise emissions A list of the expected construction activities throughout the project is provided below with the closest distance these activities can approach neighbouring dwellings whilst being compliant with the noise limits applicable between 20:00 and 06:30, Monday to Saturday. There will be no significantly noisy activities undertaken during this project such as rock breaking, piling or blasting. The acoustic screening referenced in Column 2 is detailed in Section 6 of this CNMP. This table is provided as a guide only and will be updated as measurements of the site specific equipment are undertaken during the project. With reference to the following table, if works are required closer than the distances in Column (3) where no natural or existing screening is available, then noise mitigation by localised screening will be required. If the works program requires machinery to work closer than the distances set out in Column (4), further noise mitigation measures such as those specified in Section 6 of this CNMP should be adopted wherever practicable.

Page 9 Table 5: Noise emissions to residential land use Activity on site Reference L Aeq at 10 m from plant Column 3: Minimum compliance distance between unmitigated noise source and 1 m from dwelling facade (60 db L Aeq ) Column 4: Minimum compliance distance including mitigation from temporary acoustic screening (60 db L Aeq ) Cutting steel posts during removal of existing barriers 83 db 179 m 57 m Concrete drilling 80 db 127 m 41 m Hiab (under load) 77 db 90 m 29 m Generator 66 db 26 m 8 m Tracked Excavator 30 t 75 db 72 m 23 m 6. General noise mitigation measures The contractor will take all practicable steps to reduce the noise associated with the works by implementing the general noise mitigation measures listed below: Control at Source Where possible, the quietest machinery and methods available and practicable will be used; All machinery will be either new or in good condition upon its arrival at the site, and will thereafter be maintained in good condition throughout the entire duration of the project. For example, all saw blades will be kept sharp, and any tracked plant will be greased to reduce squeaking; Upon arrival at the site, the machinery and plant will be checked to ensure that it is not generating unnecessary noise, and will be rectified if necessary; When selecting any compressors, generators or pumps for use on the project, the degree of noise generation between models will be considered as a major factor; All machinery, (including excavators, cranes and generators) will be fitted with appropriate exhaust silencers. If any supplier offers an accessory silencing kit, this should be used if practicable; When machinery or plant on site is not required to be running, it should be switched off and not left idling; Noisy plant and machinery should be strategically positioned on the site to reduce the effects on neighbours where practicable; Where practicable, all plant and equipment shall utilise broadband reverse alarms in place of traditional pure tone beepers ; The tail gates of trucks must be closed with care and not slammed or allowed to fall closed causing unnecessary noise; Horns shall not be used under any circumstances unless in the case of an emergency; Any radios or music played on site must be inaudible at the nearest dwellings; All workers on site shall be familiar with this CNMP and the above methods that can be used to minimise noise emissions;

Page 10 At any property where a reasonable level of noise will be exceeded during the night-time period, it may be appropriate to offer temporary relocation to the residents to avoid sleep disturbance. Acoustic Screening Where possible and appropriate, the plant and machinery on the site should be located in such a way that quiet machinery and structures can provide as much screening as possible to other noisy equipment working on the site; Temporary acoustic screening will be erected for all steel and concrete cutting operations. All screening will be constructed from materials with a surface density of no less than 10 kg/m 2. A small portable acoustically effective enclosure will be constructed to screen noise from cutting the existing pipe rails on the western side of the bridge. The enclosure will be moved along with the activity as the works progress; All screening should be located as close as practicable to the noise sources to improve their effectiveness. This will be particularly important when undertaking cutting works in the northern area where the nearest noise receivers are elevated above the site; Where localised screens are used, they should block line-of-sight from the noisiest part of the machinery to the receiver by as much as possible. The screens should either wrap around the noise source or if straight, should be at least 1.5 times the height of the noise source past the end of the noise source; The design of all acoustic screening and barriers shall be overseen by a suitably qualified and experienced specialist. 7. Schedules to the CNMP Where noise predictions have shown that the adopted noise limits (Section 3) will be exceeded during certain activities (including all practicable forms of noise mitigation) a Schedule to the CNMP has been prepared and attached as Appendix B. Where measured noise levels during the works show that the adopted noise limits are being exceeded, mitigation measures will be implemented with reference to Section 6 of this CNMP. Further measurements will be undertaken to demonstrate the effectiveness of the mitigation measures implemented. If the noise limits are still exceeded with all practicable mitigation measures implemented, the works shall cease and a Schedule will be prepared. The Schedule will be provided to Auckland Council for information and to the Auckland Motorway Alliance (AMA) for approval. All Schedules to this CNMP shall provide the following information as a minimum: The proposed activity and equipment to be used, location, duration and timing of the works; The proposed mitigation methods, including any mitigation options that have been discounted as impracticable and why; The predicted noise levels in accordance with NZS 6803:1999 at the nearest affected receivers; Identify all receivers where the relevant criteria will be exceeded; Identify any properties where a reasonable level of noise will be exceeded during the night-time period and any temporary relocation of residents required to avoid sleep disturbance. If monitoring shows that the levels specified in the Schedule are being exceeded, the work generating the exceedance will stop and will not recommence until further mitigation is implemented in accordance with an amended Schedule, approved by the AMA and provided to Auckland Council for information; The abovementioned process for Schedules to the CNMP does not apply to emergency works.

Page 11 8. Monitoring and reporting Noise monitoring must be performed at the commencement of the works to verify the noise predictions. The results of the monitoring will be used to determine whether further mitigation is required. The results shall be used to update and maintain this CNMP to ensure that minimum compliance distances and mitigation measures are specifically tailored to the equipment used on site. If, in the opinion of the Site Manager, the noise arising from any activity on the site appears excessive, or following the receipt of any reasonable complaint, monitoring must be undertaken. Any monitoring shall be carried out by a suitably qualified and experienced person. Noise measurements shall be undertaken using a sound level meter conforming to at least IEC651 Type 2 (preferably Type 1) criteria. All noise measurements and assessments shall be carried out in accordance with NZS 6803:1999 Construction Noise and NZS 6802:2008 Measurement of Environmental Sound. 9. Corrective action measures Should noise measurements undertaken by either Auckland Council (or its representative) or the contractor (or their representative) identify non-compliance with the limits set out in this CNMP (or a Schedule relevant to the activity), the following corrective action measures shall be taken: The activity responsible for the exceedance shall cease as soon as practicable and only if safe to do so; Mitigation options shall be investigated and those deemed practicable shall be implemented; Monitoring shall be undertaken to confirm performance of mitigation measures; A report detailing steps 1 3 shall be submitted to, the AMA and Auckland Council within 24 hours of the non-compliance being identified. 10. Complaints procedure In addition to the requirements of Section 9 of this CNMP, noise measurements will be undertaken (with reference to Section 8 and 9 of this CNMP) on receipt of any construction noise complaints from the public that correlate with an activity on site. The contractor will maintain a complaints register. This will include a record of the action taken for each complaint. The complaints register must remain on site at all times and made available to Auckland Council upon request. The register shall include as a minimum: a) Details of each complaint, including date and time received and the nature of the complaint; b) Methods used to investigate the complaint; c) The results of any measurements undertaken as a result of the complaint; and d) Details of how and when the complaint / noise issue was resolved. 11. General requirements This CNMP is intended to be a living document and may be updated throughout the works. Auckland Council will be provided with a copy of this CNMP, any additional Schedules that may be prepared and details of any noise complaints received throughout the project. A copy of this CNMP shall be kept at the work site at all times All workers shall read the CNMP before undertaking night works and shall be familiar with its provisions

Page 12 Appendix A: Noise receivers Potentially affected noise receivers within approximately 100 m of the works Residential zone receivers are shaded yellow, Commercial zone receivers are shaded blue. Refer to Section 3 for the noise limits within these zones. 26 24 23 22 25 20 21

Page 13 21 20 18 19 17

Page 14 10 16 9 7 15 8 6 5 14 12 4 2 1 13 3 11

Page 15 Appendix B: Schedules The following activities have been predicted to exceed the residential use noise limit (60 db L Aeq ) or commercial use noise limit (80 db L Aeq ) adopted in Section 3 of this CNMP. Measurements will be undertaken to validate the noise predictions at the beginning of the works, and Table B1 updated accordingly. If measurements demonstrate an exceedance of the noise limits during any other construction activity on site (including all forms of practicable mitigation) the activity will be added to Table B1 as a Schedule to the CNMP. Table B1: Schedules to the CNMP (in accordance with Section 7) Activity Plant / Equipment Time of works Expected duration of exceedance Sites at which the noise limits will be exceeded Predicted noise level (L Aeq ) Possible noise mitigation options Cutting steel posts during removal of existing barriers and drilling holes in concrete barriers. There is no requirement for resident relocation during these works. Grinder, concrete drill. 22:00 05:00. Dates for each receiver to be confirmed. 1 2 nights during Jan 2015 March 2015 (relative to each receiver) Drake St: 40, 48A Wilkins St: 4 (residential units). Victoria St West: 220 (residential units). Harbour St: 4, 6, 8, 10, 10A, 12, 14, 16, 16A. Birdcage Bar & Restaurant (Commercial use site) 65 db 61 db 62 db 63 db 82 db Temporary screening, acoustic enclosure, low noise drill. Temporary screening, acoustic enclosure, low noise drill. Temporary screening, acoustic enclosure, low noise drill. Temporary screening, acoustic enclosure, low noise drill. Temporary screening, acoustic enclosure, low noise drill.