Specifications: Simplex Fiberglass Lift Station: Rail Pipe. Simplex Fiberglass Lift Station: Pre-Packaged Fiberglass Systems

Similar documents
Simplex Fiberglass Lift Station: Hard Piped

Duplex UltraGRIND Jobsite Wired Basin Package Stainless Rail with Junction Box

SAMPLE SPECIFICATIONS FOR PREFABRICATED FRP LIFT STATIONS

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS

Index - Section 40M Medium Sump / Drainage Pumps Bulletins 4508

A. Operation and Maintenance Data: For pumps and controls, to include in operation and maintenance manuals.

SECTION INFLUENT EQUALIZATION TANK PUMPS

B. Wiring Diagrams: For power, signal, and control wiring.

B. Pumps are to be manufactured by Flygt Pumps. No substitutes will be considered.

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems:

SECTION VIII. (Sub-section 448) Alternative Sewer Systems. 1. General Individual and Community Grinder Pump Stations thru

VSS-2 ½ D HIGH HEAD SUMP PUMP FREE STANDING

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION SLUDGE HOLDING TANK DECANTER PUMP

University of Delaware

High Light. Motors are fully submersible Pumps can handle up to 2½ spherical solids (for 3 Discharge pumps only) Indoor and outdoor installation

SECTION PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS

ISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION

High Light. Motors are fully submersible Pumps can handle up to ½ spherical solids Indoor and outdoor installation Easy installation and removal

SECTION PACKAGE BOOSTER PUMP STATIONS

University of Delaware

High Light. Motors are fully submersible Pumps can handle up to 2 spherical solids Indoor and outdoor installation Easy installation and removal

SECTION MOTORS AND PUMPS FOR PLUMBING SYSTEMS

AUGUST 2017 Tulpehocken Station Utility Improvements ADDENDUM 3 SECTION SEWAGE EJECTOR PUMPING STATION

SK50. Performance Data TOTAL HEAD IN FEET HEAD-METERS 6 SK50 SK Liters/Second Capacity-U.S. G.P.M.

SECTION CISTERN SYSTEMS

HPGR200 2 HP. Capacity-U.S. G.P.M.

Series Sump and Sewage Systems

VSS S U B M E R S I B L E S E W A G E P U M P S

ITEM NO SLIPLINING SANITARY SEWERS

METERING MANHOLE SPECIFICATION

Fiberglass Cooling Towers

SECTION SUBMERSIBLE GRINDER PUMPS FOR WASTEWATER (LESS THAN 10 HORSEPOWER)

ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

13340 FIBERGLASS REINFORCED PLASTIC (FRP) ENCLOSURE

SECTION FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FIBERGLASS RESIN TRANSFER MOLDED DOOR FRAMES

SHEF40. Performance Data. Wholesale Products Page: Section: Performance Data Dated: April 2002 Supersedes: January 2001

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

TYPICAL INSTALLATION INSTRUCTIONS

SUBMERSIBLE SEWAGE EJECTOR

HUP. Performance Data. Wholesale Products Page: Section: Performance Data Dated: January RPM: 1550 Discharge: 1" Solids: 1/8" GPM: TDH:

SPX50/SPX50H. Performance Data. Wholesale Products Page: Section: Performance Data Dated: October 2007

Complete Grinder Package Offering

SD/SW/VS50 SD50 SW50 VS50

HYDROMATIC BV-40 SUBMERSIBLE NON-CLOG, SEWAGE EJECTOR

San Antonio Water System Standard Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

Section BUILDINGS, SHELTERS, ENCLOSURES

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

FIBERGLASS WET WELLS

TOP Pre-engineered Fiberglass Pump Station

t y p e V S A S E W A G E P U M P

HYDROMATIC W/D/V-A1 SUBMERSIBLE SUMP/EFFLUENT

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

SK75/100. Performance Data TOTAL HEAD IN FEET HEAD-METERS 6 SK100 SK Liters/Second Capacity-U.S. G.P.M.

PREMIER Low Profile Induced Draft Cooling Tower Specifications

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMP UNITS

Pump Specifications 450 Series 1/2 hp Submersible Sump Pump

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

Stainless Steel Aeration Equipment Specification

HYDROMATIC SKV50 SEWAGE EJECTOR PERFORMANCE DATA SKV50. Wholesale Products Page: RPM: 1650 Discharge: 2 Solids: 2.

DIVISION 15- MECHANICAL Section Fire Pumps

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

The following document can be provided to an Engineer, Contractor, or Owner to allow them to

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION VERTICAL MEZZANINE GATE U.S. Patent No:

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS

SECTION FIBERGLASS REINFORCED PLASTIC (FRP) ENCLOSURE

Phenolic Exterior Wall Cladding

SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

2 HP SIMPLEX GRINDER PUMPS

SITHE SUBMERSIBLE CHOPPER PUMPS BY BARNES. Excellence in Innovation.

SITHE SUBMERSIBLE CHOPPER PUMPS BY BARNES. Excellence in Innovation.

Available In Stainless Steel Epoxy Coated Steel Fiberglass

Section [ ] Stormwater Catch Basin Filtration Device

The following shall be incorporated into the Contract Documents dated 8 August 2018

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section AUTOMATIC CONTROL VALVE INSULATED ENCLOSURE (HOT BOX)

The following document can be provided to an Engineer, Contractor, or Owner to allow them to properly specify MESAN s MXR-KM series Cooling Towers.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

Section 10 Design Criteria: Components

SECTION XXXX POLYMER CONCRETE PUMP STATIONS

All definitions are defined according to ANSI/AWWA C

Section [ ] Stormwater Catch Basin Filtration Device

SaniTite. HP Sewer Pipe 300mm 750mm

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.

SECTION WASTEWATER FORCE MAINS

SECTION 807 PUMP STATION REHABILITATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION

FAIRBANKS NIJHUIS SUBMERSIBLE SOLIDS HANDLING PUMPS.

SAFE-TANK DOUBLE WALL TANKS HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)

DIVISION VI INDIVIDUAL GRINDER PUMP INSTALLATIONS

SPECIFICATIONS - DETAILED PROVISIONS Section Welded Steel Tanks for Water Storage C O N T E N T S

SPECIAL SPECIFICATION 8810 Communication Hub Enclosure

Transcription:

Simplex Fiberglass Lift Station: Rail Pipe PS-027 www.cranepumps.com Specifications: inches (mm) Pre-Packaged Fiberglass Systems BASIN... Fiberglass w/ 3 (76) Ballast Support Flange DISCHARGE... Polypropolene Size... 1¼", 2", or 3" NPT, Female INLET... 4 (102) Fiber Insert Hub (For Field Installation) COVER: Fiberglass... 24" (610) thru 36" (914) Basins. Aluminum... 36" Dia. Alum. 3/4 Hatch with Stainless Steel Hinges and Hardware (Frogmouth) VENT... 2" Bug Free RAIL SYSTEM... 1" SCH40 Stainless Steel BASE ELBOW FITTING: Stationary... Cast Iron Mounting... Bolted to bottom of basin VALVE: Material... Gate PVC (1¼, 2") Ball-PP (3") Size... 1¼, 2", or 3" NPT SWING CHECK VALVE ON 3" UNITS Material... BR Size... 3" ELECTRICAL... 2" NPT Conduit Hub Qty (1) (For Field Installation) EXTENSION HANDLE... 3/8 Dia. (9.5) Stainless Steel (For Units 60" and Deeper) LIFTING DEVICE... Stainless Steel Chain HARDWARE... 300 Series Stainless Steel DISCHARGE PIPING... SCH80 PVC/PP LEVEL CONTROLS: Floats... Quantity of three mechanical level controls, with N.O. contacts polypropylene housings with 18-2, SJOW cord with adjustable fl oat weights, suspended from stainless steel fl oat rack MOVABLE SUB-ASSEMBLY: (For fi eld installation) Discharge Piping... Stainless Steel Ball Check Valve... Included on 1¼ and 2" units Material... CI Simplex Fiberglass Lift Station: Rail Pipe 1¼" NPT Discharge, or 2" NPT Discharge, or 3" NPT Discharge A Crane Co. Company USA: (937) 778-8947 Canada: (905) 457-6223 International: (937) 615-3598 SECTION PAGE DATE 3E 17 12/15

Simplex Fiberglass Lift Station: Rail Pipe www.cranepumps.com Pre-Packaged Fiberglass Systems PS-028 1. Diameter 24 (.6m) 30 (.8m) 36 (.9m) 2. Depth 48 (1.2m) 60 (1.5m) 72 (1.8m) 84 (2.1m) 96 (2.4m) 3. Level Control Individual Suspended Floats 4. Cover Type Cover Restrictions: 24 (.6m) Solid Fiberglass 30 (.8m) Solid Fiberglass 36 (.9m) Solid Fiberglass 36 (.9m) Aluminum 3/4 Hatch 5. Sensor Options Sensor Restrictions: a.) PGPP & PGPH CANNOT Use Moisture Sensors. Temperature Only 6. Inlet Type 4 (102mm) SCH 40/80 Fiberglass Inlet Hub 7. Lifting Device Stainless Steel Chain 8. Pump (OPTIONAL) - See online epump confi gurator to build a station with or without a pump 9. Panel (OPTIONAL) - See online epump confi gurator to build a station with or without a panel NOTE: Pump and panel are shipped loose when configured with station. SECTION PAGE DATE 3E 18 6/15 A Crane Co. Company USA: (937) 778-8947 Canada: (905) 457-6223 International: (937) 615-3598

Specifications Simplex Fiberglass Lift Station: Rail Pipe Pre-Packaged Fiberglass Systems www.cranepumps.com FILE: SPEC40B DESCRIPTION: The manufacturer shall furnish a complete Pump Station(s). The pump station shall consist of a basin package, pump and control panel. The Basin Package shall include the following: fi berglass basin with antifl otation collar, BAF lift out system with stainless steel guide rails, isolation valve, mechanical fl oats, basin cover, check valve, stainless lifting chain, fi eld locatable conduit fi tting, and bug free station vent. All equipment in the wet well shall be capable of constant submerge in sewage to a minimum depth of 30 feet without electrical power being energized. The Control Panel (optional) shall include a NEMA 4X weather tight thermoplastic enclosure with removable mounting fl anges. The panel shall have indicators showing pump run, fl oat status, and control/alarm power indicators. The high level alarm shall consist of a horn for audio warning, as well as a top mounted red beacon. The interior of the panel shall consist of magnetic motor contactors, a circuit breaker, a terminal block for customer connection of power, pump leads, and level switches, and hand-off-automatic switches are provided for manual operation of the pump. The Pump (optional) shall include a Barnes Grinder, Effl uent, or Sewage Ejector, and shall be selected based on the hydraulic requirements of the system. SHOP DRAWINGS AND MANUALS: After receipt of notice to proceed, the manufacturer shall furnish the engineer a minimum of eight (8) sets of shop drawings detailing the equipment to be furnished including dimensional data and materials of construction. The engineer shall promptly review this data, and return two (2) copies to the manufacturer as approved, or approved as noted. Upon receipt of accepted shop drawings, the manufacturer shall proceed with order entry and fabrication of the equipment. Prior to completion of equipment delivery, the manufacturer shall supply four (4) copies of Operation and Maintenance Manuals to the owner, and one (1) copy of the same to the engineer. PRE-APPROVAL OF MANUFACTURER: The system design is detailed in the drawings. Any pump manufacturer not specifi ed, but wishing to be pre-approved as an acceptable supplier shall submit a complete hydraulic analysis based on the design detailed in the drawings at least fi fteen days prior to bid date. All manufacturers must have been in the business of manufacturing complete pump stations for a minimum of ten years. Manufacturer Representatives, Distributors, or Packagers will not be considered to be manufacturers. Manufacturer must demonstrate to the satisfaction of engineer that the proposed pump equipment will meet system fl ows and heads required. In addition, pre-submittal must also demonstrate to the satisfaction of the engineer that the equipment being proposed meets or exceeds all performance and safety requirements, materials of construction, and user benefi ts of the specifi ed equipment. Only preapproved pump station manufacturers will be considered. All bids utilizing manufacturers not pre-approved will be considered non-responsive. ACCEPTABLE MANUFACTURER(S): Acceptable pump station manufacturer(s) are Barnes pumps as manufactured by Crane Pumps & Systems., or pre-approved equal. CORROSION PROTECTION: All materials exposed to wastewater shall have inherent corrosion protection: i.e., painted cast iron, fi berglass, stainless steel, PVC. STATION CONFIGURATION: Basins shall be supplied in a wet well confi guration. LEVEL DETECTION: Level detection for controlling the pump and alarm operation shall be accomplished by use of a detection mechanism specifi cally designed for use in a sewage system and shall be removable without the need to remove the pump. Switches utilized in the system shall be hermetically sealed in a submersible, watertight protective casing. Level detection mechanism shall be suspended mechanical fl oats with adjustable weights for sight specifi c settings to provide switch protection from solids, greases, oils, and fats. Level detection mechanism shall not require any regular, preventive maintenance. The level detection mechanism shall consist of three switches, one for each function (HIGH WATER ALARM, PUMP ON, PUMP OFF). The level controls shall be serviceable without the need for a confi ned space entry as defi ned by OSHA or the need to remove the pump. Use of mercury fl oats will not be acceptable. SHUT-OFF VALVE: The pump discharge shall be equipped with a factory installed, manual valve with separate union. Valves shall be, constructed of (Gate PVC(1-1/4 and 2 ) Ball-PP (3 )), with a minimum rated pressure of 150 PSI (10.6 kgs/sq. meter). All valves shall be operable from ground level. Shut off valve must be replaceable without excavating basin exterior. Shut off valves shall be each equal to the size of the station discharge. BASIN CONSTRUCTION AND ASSEMBLY: The basin shall be fi berglass reinforced polyester resin with a 3" (76.2 mm) ballast support fl ange. The basin shall be furnished with one fl exible inlet fl ange (shipped loose to facilitate fi eld location) to accept a 4.50" (114 mm) OD DWV pipe. Inlet location can vary to accommodate ease of installation. (See installation instructions or consult factory for details.) Basin capacities and dimensions shall be as shown on the contract drawings or as specifi ed herein. The basin FRP wall laminate thickness shall vary with the wetwell depth to provide the aggregate strength to meet the tensile and fl exural physical property requirements. The basin FRP wall laminate must be designed to withstand wall collapse or buckling based on a hydrostatic pressure of pounds per square foot, a saturated soil weight of 120 pounds per cubic foot, a soil modulus of 700 pounds per square foot. Basin must comply with the pipe stiffness values as specifi ed in ASTM D 3753. The basin laminate must be constructed to withstand or exceed 150% of the assumed loading on any depth. The fi nished FRP laminate will have a Barcol hardness of at least 90% of the resin manufactures specifi ed hardness for the fully cured resin. The Barcol Hardness shall be the same for both interior and exterior surfaces. Manufacture must submit documentation including calculation and production certifi cation that basin (s) on the project are in compliance with the above requirements. All piping inside the basin silhouette shall be at a level in the station that is lower than the frost depth or depth of bury specifi ed for the low pressure sewer piping, whichever is lowest. Fiberglass cover shall be grass green color. Steel cover shall be black in color. Aluminum cover shall be natural silver color. All discharge piping shall be constructed of Schedule 80 PVC and terminate outside the stations with a bulkhead female NPT fi tting. The manufacturer shall guarantee all bulkhead penetrations watertight. PUMP REMOVAL SYSTEM: Each basin shall be equipped with a 300 series stainless steel pipe guide rail assembly to facilitate removal of the pump(s) from ground level. A stainless steel lifting chain with harness shall be supplied for pump removal. Pump removal system must not require the loosening of fasteners to facilitate pump removal, and shall provide for automatic alignment and re-connection of discharge piping for the replacement pump. Pump replacement shall be accomplished while the basin is full of sewage without the need to dewater the basin. WARRANTY: The manufacturer shall provide a warranty of twenty-four (24) months after date of manufacture. The owner will return any equipment found to be defective to the manufacturer for inspection and validation of the defect. Defective equipment will be repaired or replaced and shipped back to customer at no charge. Consult factory for extended warranty information. End SECTION PAGE DATE 3E T 12/15 A Crane Co. Company USA: (937) 778-8947 Canada: (905) 457-6223 International: (937) 615-3598