DISTRICT: Upper Peninsula CITY: L'Anse

Similar documents
The Benefits of Renewable Energy From Biomass. Traxys Power Group, Inc.

Florida Department of Environmental Protection Inspection Checklist

Construction & Demolition Debris Facility Daily Log of Operations {as required by O.A.C. Rules (B)(9)&(10)} Yearly Cover Sheet Form 1

During an inspection of 2015, the facility was determined to be in compliance with applicable Federal and State air quality regulations.

Solid Waste Transfer Facility Daily Log of Operations {as required by OAC Rule } Yearly Cover Sheet (Form 1)

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

Fugitive Dust Management Plan

Waste not want not: from sewage to sustainable compost

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

MACES- Activity Report. Page 1 of 5. /intranetdeq.state.mi. us/maces/webpagesniewactivity Report.aspx? ActivityiD=245...

Department of Natural Resources Forest Resource Management

PUBLIC SERVICE COMPANY OF OKLAHOMA (PSO)

Round Wood to Chips to Pellets

How to Avoid Wood Mulch Contamination

Savage Services Auburn, ME Operation

Case 1:17-cr DN Document 1 Filed 07/12/17 Page 1 of At all times relevant to this Indictment, Defendant Stone Castle, L.L.C.

TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Common Solid Waste Designation Questions. February 21, 2019

Manifest Information. Types of Manifests. Universal Hazardous Waste Manifest

EXECTIVE SUMMARY TO DETERMINE EFFECTIVE RE-USE OF FLY ASH, BOTTOM ASH AND COAL DUST FROM CAÑON CITY POWER PLANT

Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam

DOCUMENT CONSTRUCTION WASTE MANAGEMENT

NYC Bar Association meeting, March 22, Jim Warner

Union Pacific Service Feasibility Questionnaire Union Pacific - Owned Track

Solid Waste Technical Conference Part 115 Update

PROPOSED INCREASE IN GARBAGE FACILITY FEES

Oregon E-Cycles Biennial Report

Construction & Demolition (C&D) Materials Management in the Northeast in 2013 December 7, 2017

Composting Facility Log of Operations Index Each form represents an individual tab in the binder that houses the Log of Operations

UNION PACIFIC RAILROAD GRADING RULES AND GUIDELINES FOR FOREST PRODUCTS PREPARED BY THE FOREST PRODUCTS GROUP OF THE UNION PACIFIC RAILROAD

TLA Bale Tech LLC A subsidiary of TransLoad America Inc.

INCREASE IN GARBAGE FACILITY FEES

Developer s Packet. Water Construction

Dredging and Processing Arsenic Contaminated Sediment. Menominee River Marinette, Wisconsin

An Evaluation of Used Wood Crossties

COUNTY OF SACRAMENTO DEPARTMENT OF WASTE MANAGEMENT & RECYCLING APPLICATION FOR WASTE CLEARANCE DECISION. Initial Request Renewal Previous WC #

Baling Fireline and WUI Fuels Reduction Woody Biomass: Alternative to on-site Chipping. Jim Dooley Mike Perry Jason Perry

Introduction and Summary

L Anse Warden Electric Company

Local Services FISCAL YEAR 2004 ANNUAL REPORT 133

Tough on Winter, Easy on You

CONCRETE BATCHING PLANT

TieReport # 12. Assessment of Concrete Tie Life on U.S. Freight Railroads

Densified Fuel Inspection Program


Dem-Con Recovery & Recycling

Verso Quinnesec LLC & Specialty Minerals (Michigan) Inc. SRN: B7192. Located at. Staff Report Date: May 6, 2013

Asset Recovery Solutions: A fundamental commitment to the environment

Changing Building and Property Uses: What Could Possibly Go Wrong!

Hudson River PCBs Superfund Site

COLBY COLLEGE: New Biomass Facility

April 20, Document ID # comp. Mr. Harold Mills 9001 Roman Lane Jacksonville, AR Dear Mr. Mills:

Union Pacific Service Feasibility Questionnaire Privately - Owned Track

The Paint Exchange, LLC

FUGITIVE DUST CONTROL PLAN

Assessment of Concrete Tie Life on US Freight Railroads

Washington County Landfill Reconstruction Project: Progress Updates

Rec d Digitally S W M D. West, Tommi AFIN: From: McConnell, Melissa Sent: Thursday, November 01, :56 AM PMT#: 0028-SWTP TO: BL>File

University of Michigan Ann Arbor Campus-Wide Compost Feasibility Study. USCC January 25, 2011 Nicole Chardoul, PE, Principal and C.O.O.

Shipment Management Tool. Order Cars by Quantity

Quality Compost from Source Separated Organic Material and Biosolids in East Prince County Prince Edward Island

SPECIAL ARRANGEMENT TARIFF

Maria Byndom, Andrew Fell, Tyler Fitch, Lew Hopkins, Bernadine Stake, David Trail

SEBASTIAN COUNTY REGIONAL SOLID WASTE MANAGEMENT DISTRICT. Final Rules Solid Waste Assessment Regulation. Proposed March 17, 2011

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.

ACHIEVING SOLID WASTE COMPLIANCE: The Many Regulations that Apply to Solid Waste Activities. Ramon Rivera Omid Rabbani, P.E., PMP

Asphalt Plant Level 1. Module 3 - Sampling Bituminous Paving Mixtures. Release 10 4/19/

Intermodal Transportation of Spent Nuclear Fuel from Office of Civilian Radioactive Waste Management Sites 9328

Placing waste is a location likely to cause pollution to the waters of the State.

Section 505. CHIP SEALS

ADDENDUM 1 FOR SUMITOMO RUBBER USA RAILROAD TRACK IMPROVEMENT PROJECT NYSDOT PIN

ADEQ MINOR SOURCE AIR PERMIT

Refuse-to-Energy Facility

Developer s Packet. For Developments Requiring Large Meters

Hazardous Waste Handling Certification

Summary of Current State of Practice for Composite Crossties

Evolution Of WM Strategy. David Steiner Chief Executive Officer

Hazardous Waste Small Quantity Generator Checklist

TITLE 7. ENVIRONMENTAL PROTECTION CHAPTER 26. SOLID WASTE SUBCHAPTER 6. SOLID WASTE PLANNING REGULATIONS N.J.A.C. 7: (2009) 7:26-6.

Solid Waste in Oregon Part 1

STATE OF SOLID WASTE IN NEBRASKA

Annual Environmental Report 2013

Up to 500,000 tons of coal, FOB Barge, beginning in January 2017 and ending in March 2017 (refer to Nymex Specification A )

D. L. Gillas U. S. Department of Energy, Savannah River Operations Office P. O. Box A, Aiken, SC 29802

Results: 6 th Annual Railroad Report Card 2016

SPECIAL WASTE CLEARANCE ACCEPTANCE POLICY

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007

Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS

Tie Specifications Utilizing

3M: Waste Minimization

THE UNIVERSITY OF SOUTHERN MAINE. Universal Waste Program

Results: 6 th Annual Railroad Report Card 2015

Best Management Practices Inspections

INTERMODAL TRANSPORTATION, USACE STYLE

THE INTERNATIONAL RESEARCH GROUP ON WOOD PRESERVATION CURRENT AND FUTURE OPTIONS FOR MANAGING USED PRESERVATIVE-TREATED WOOD

THE BEAST HORIZONTAL GRINDERS WEAR PARTS CATALOG

October 13, Todd Risius, EHS Manager Cargill Pork, LLC P.O. Box 699 Russellville, AR RE: Inspection of Cargill London Feed Mill

Sieve Size 2" 1" 3/8" No. 10 No. 40 No. 200 % Passing Size

Melville Water Tower Soil Excavation Completion

Optimal Scheduling of Railroad Track Inspection Activities and Production Teams

Transcription:

\.. MACES- Activity Repmi Page 1 of7 DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION ACTIVITY REPORT: Self Initiated Inspection U071 60107435006 FACILITY: M.A. Energy Resources, LLC SRN /ID: U071 601074 LOCATION: 17691 U.S. Hwy 41, L'Anse DISTRICT: Upper Peninsula CITY: L'Anse COUNTY: BARAGA CONTACT: Steve Puhl, Manager ACTIVITY DATE: 05/02/201 6 STAFF: Ed Lancaster I COMPLIANCE STATUS: Compliance SOURCE CLASS: SUBJECT: Meeting was to gather more information on MA Energy's relationship to LWEC and to determine if pentachlorophenol treated railroad ties were still on the property. RESOLVED COMPLAINTS: I arrived at M.A. Energy Resources (MAER) and met with Steve Puhl, Fuel Yard Manager, and Mindy Raymond, Office Manager, to discuss a number of issues regarding their operation and relationship to L'Anse Warden Electric Company (LWEC). I began by asking for manifests of the disposal of pentachlorophenol railroad ties and/or their return to Canadian National Rail (CN). Ms. Raymond provided me with a list of six railcar numbers and the number of penta-ties in each car, that were shipped back to CN on March 26, 2016. The total number of ties was 3,902. Ms. Raymond reported these are the only ties that have been shipped back to CN. The remainder of the penta-ties have been sent to K&W Landfill in Greenland, MI. Manifests for the month of April showed 57 loads of ties were taken to K&W, carrying a total of 1,493.16 tons of material. Mr. Puhl said the 57 loads were not all penta-ties, some of the material included "out of spec" materials, such as creosote treated ties imbedded with metal, and yard waste (soil and treated chips mixed together). Mr. Puhl said you can tell the difference between Canadian and U.S. ties, because the Canadian ties are processed to remove the metal for recycling. Approximately 50% of U.S. ties have some metal attached to them. I then requested the monthly analysis of fuel samples. Ms. Raymond said she has not received the April sample results and provided me with copies of January through March. The TDF results were a single sample composited over the first three months of 2016. There was no analysis of the penta-ties in January. Wood chip and creosote tie analysis was provided for all three months. MAER had each fuel type analyzed for percentages of moisture, ash, sulfur, chlorine, and btu/pound of fuel. Mr. Puhl and I then walked into the fuel yard where he showed me a row of "legacy ties" that he estimated to contain 30,000 ties. He explained these ties are a mix of creosote and penta-ties and his employees are monitoring each one for chlorine content using the two XRF monitors they have on site. He estimated it would take at least a month to measure all the ties. Mr. Puhl said typically the end of the ties will give a higher chorine reading than the middle section of the tie. While we were observing the employees, I asked if they could monitor the ends and middle of three random ties for. Chlorine (ppm) Tie End I Middle l Interior l Under plate I I I http:/ /intranet.deq.state. mi. us/maces/webpagesniew Activity Repmi.aspx? Activity ID=245... 6/17/2016

Page 2 of7 1 159 480 2 3384 448 3 4672/5319 1333 ND/125 ND Readings were taken at both ends of Tie #3. The tie was then broken in two and each interior end was sampled. A final reading was taken at the point where a metal plate had been removed from the tie. We were joined by Mr. JR Richardson at this point. We continued around the fuel yard to the rail tracks where Mr. Puhl pointed out the difference between the two gondola rail cars, railroad ties are delivered in. The large gondola holds approximately 1,000 ties, and the small one 400. We finished the meeting by observing the grinding of the ties. No visible emissions were observed and Mr. Puhl stated there is a spray bar on the grinder and they use approximately 3,500 gallons of water per day to control the dust. Image 1 (Tie #3) : View of random tie chosen for XRF monitor chlorine analysis, prior to be broken in half by grappling arm. http://intranet.deq.state.mi.us/maces/webpagesniewactivityreport.aspx? ActivityiD=245... 6/17/201 6

MACES- Activity Repmi Page 3 of7 Image 2(XRF of Tie #3) : MA Energy employee using an XRF to monitor the chlorine content of the interior of Tie#3. http:/ /intranet. deq. state.mi. us/maces/we bpages/v iew Activity Report.aspx? Activity ID=24 5... 6/ 17/20 16

Page 4 of7 Image 3(Legacy pile): View of "Legacy Pile" of railroad ties on May 2, 2016. http://intranet.deq.state.mi.us/maces/webpagesniewactivityreport.aspx?activityid=245... 6/17/2016

Page 5 of7 Image 4(Leqacy Pile vs 2) : Second view of "Legacy Pile" on May 2, 2016. http://intranet.deq.state.mi. us/maces/webpagesniewactivityreport.aspx? Activity ID=245... 6/17/2016

Page 6 of7 Image 5(Waste pile) : View of "off-spec" material MA Energy sends to landfill. http://intranet.deq.state.mi.us/maces/webpagesniewactivityrepmt.aspx? ActivityiD=245... 6/17/2016

Page 7 of7 Image GCRR tie grinder): View of MA Energy's RR tie grinder in operation on May 2, 2016, at 10:45 AM. ~ NAM E~ - DATE. SUPERVISORJ)/)V'\ (}J,,vivl http ://intranet.deq.state. mi. us/maces/webpages/view Activity Report.aspx? Activity ID=245... 611 7/2016