The Mekong River Commission s Initiative for Sustainable Hydropower. Oslo, Norway 4-6 September Presented by: Voradeth Phonekeo

Similar documents
MRC Guidelines and Tools for Sustainability Development of Hydropower SHDS, PDG, PNPCA, and Future Updates

Review and Update Sustainable Hydropower

Technical Workshop: Xayaburi HPP

Technical Workshop. Xayaburi HPP

Basin-wide Strategy for Sustainable Hydropower Development for the Lower Mekong Basin

Implementation of Previous PNPCA Processes and Lessons Learnt

1 Consultancy Summary

MEKONG RIVER COMMISSION. Concept Note Final Draft Version

Xayaburi Hydropower Project

Broad aims of the SEA. SEA SUMMARY OVERVIEW REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June The context for the SEA

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

Mekong River Commission

I C E M - I n ternat i o n a l C e n tre fo r E n v i ro n m e n t a l Manage m e n t

MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework

PROMOTING A FAIR BALANCE ON MEKONG S SHARED WATER. Te Navuth (Mr.) Secretary General, Cambodia National Mekong Committee

Mekong River Commission

SUMMARY 2013 EDITION

The Role of the Mekong River Commission (MRC) in Conflict Management. SATIT PHIROMCHAI Mekong River Commission Secretariat

USING CUMULATIVE IMPACT ASSESSMENT AND SUSTAINABILITY TOOLS FOR RIVER BASIN MANAGEMENT Peter John Meynell Chiang Mai, 11 March 2011

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

The LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018

Ranking significance of impacts 7/13/2010. SEA OVERVIEW OF CONCLUSIONS REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June 2010

Guidelines for Transboundary Environmental Impact Assessment in the Lower Mekong Basin 1

Economic, Environmental and Social Impacts of Hydropower Development in the Lower Mekong Basin

Geopolitical benefits of transboundary water cooperation. The Mekong River Basin Case

Internal review at Lao PDR level before PNPCA

PRIOR CONSULTATION PROJECT REVIEW REPORT

Profiles of 12 proposed Mainstream developments in the LMB

Presentation Transboundary water cooperation in Mekong Countries, key issues, challenges and intervention to address

Siem Reap Declaration

Siem Reap Declaration

Siem Reap Declaration

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012

Progress Overview and Next Steps

BACK TO FUTURE PAST? Cooperation Challenges and Opportunities in Hydropower and Water Resources Development in the Mekong

Technical Review of Pak Beng Hydropower Project Water Quality, Aquatic Ecology and Fisheries

MEKONG RIVER COMMISSION

MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS. Letters from the EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF

Xayaburi Hydroelectric Power Project

PNPCA Commentary from the PNPCA Lessons Learnt

Update MRC s Preliminary Design Guidance (PDG)

Report of the Mekong River Commission **

COMMENTS BY LAO PDR ON THE MRCS TECHNICAL REVIEW REPORT OF THE PROPOSED XAYABURI DAM PROJECT

Identifying and Valuing the Benefits: the Experience of Mekong River Basin

FINAL REPORT SUMMARY OF THE. Prepared for the Mekong River Commission STRATEGIC ENVIRONMENTAL ASSESSMENT OF HYDROPOWER ON THE MEKONG MAINSTREAM

Joint Environmental Monitoring (JEM)

SCOPING AND PLANNING OF THE ASSESSMENT OF BASIN-WIDE DEVELOPMENT SCENARIOS

Review of Existing Knowledge on the Effectiveness and Economics of Fish-Friendly Turbines

Key features and development challenges for the Mekong River Basin

Review and Update of the MRC Design Guidance for Proposed Mainstream Dams of the Lower Mekong Basin

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION

Cumulative Impact Assessment Key Findings Report

The Council Study. Sustainable Management and Development of the Mekong River Including Impacts of Mainstream Hydropower Projects

ANNUAL REPORT Version 2.0

Chapter 3: Fish Passage on Mainstream Dams

Guidelines and Recommendations for Mitigation of Hydrological and Flow Impacts Kees Sloff and Jenny Pronker

MRC stakeholder engagement

VIETNAM ENGAGEMENT IN TRANSBOUNDARY WATER COOPERATION IN MEKONG RIVER BASIN

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Consultation Proceedings

The Living Mekong Programme Goal :

RIVER HEALTH, ENVIRONMENTAL FLOWS AND CASCADE MANAGEMENT IN LAO PDR

The First Mekong River Commission Summit 2010

Content of Presentation

MRC SEA FOR HYDROPOWER ON THE MEKONG MAINSTREAM INCEPTION REPORT VOL II MAINSTREAM PROJECT PROFILE SUMMARIES 23 OCTOBER 2009

Mekong River Commission

Basin Development Strategy

NATIONAL INDICATIVE PLAN

M RC S EA FOR H YD ROPOW E R O N TH E M E KO NG M AI NS T R EAM IMPACTS ASSESSMENT. (Opportunities and Risks) Volume II: Main Report.

cct R SAT Rapid Basin-wide Hydropower Rapid Basin-wide Hydropower Sustainability Assessment Tool e] Ill Joint Initiative

HYDROPOWER DEVELOPMENT IN THE MEKONG BASIN

TRANSBOUNDARY DIALOGUE

Initiative on Sustainable Hydropower (ISH) Document. Discussed at the first meeting of the ISH Regional Advisory Committee

Annex III. Report of the 1 st Planning Meeting for the Council Study

THE FIRST MEKONG RIVER COMMISSION SUMMIT Hua Hin, Thailand

The Mekong River Commission s state of knowledge and state of governance with respect to Mekong mainstream dams

Transboundary Cooperation Workshop # January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management

M RC S EA FOR H YD ROPOW E R O N TH E M E KO NG M AI NS T R EAM INCEPTION REPORT VOL II MAINSTREAM PROJECT PROFILE SUMMARIES 23 OCTOBER 2009

ENERGY AND POWER SUMMARY (Avoidance, mitigation and enhancement considerations)

FISHERIES IMPACTS AVOIDANCE AND MITIGATION

From Upstream to Downstream:

Water Resources Security A Framework for Action. Martin Kerres Water Security and Climate Change Conference Cologne, 19 September 2017

Mekong River Commission Secretariat

Case Presentation: Law for Benefit sharing on hydropower projects in Viet Nam - & - Linking national benefit sharing to Transboundary benefit sharing

Draft Concept Note Agriculture and Irrigation Programme (AIP) ( )

Trends and long-term outlook for the Mekong region

Mekong, hydropower and climate change: Reflection from community-based research towards sustainable livelihood

Mekong Climate Change and Adaptation Initiative and the Mekong River Commission

1. Background Provisioning Regulating: Cultural:

Benefit sharing in hydropower development. Initiative on Sustainable Hydropower

and Action Plan Mekong Climate Change Adaptation Strategy

EXPERT GROUP (EG) MEETINGS & BASELINE WORKSHOPS + CONFLICT 2 ND AG MEETING FRIDAY, 13 TH JANUARY 2017

Second meeting of the Task Force on the Water-Food-Energy-Ecosystem Nexus, 8-9 September 2014,

Associated Event : SDG 6 on Water and Sanitation

Mekong Climate Change and Adaptation Initiative of the Mekong River Commission

Overview of the Social Impact Monitoring and Vulnerability Assessment (SIMVA) : Introduction, Approach, Indicators

Key messages. RCC/ FiA Don Sahong Workshop, Phnom Penh 16 June Carl Middleton, International Rivers 1. A Brief History of Mekong mainstream dams

Equitable and Low-Carbon Society: Aspiration and Strategies for Southeast Asia

Trans-boundary Flood Issue in Lower Mekong River Basin

The ADB/ World Bank/ MRC Mekong Water Resources Assistance Strategy (MWRAS): Justifying large water infrastructure with transboundary impacts

Transcription:

The Mekong River Commission s Initiative for Sustainable Hydropower Oslo, Norway 4-6 September 2017 Presented by: Voradeth Phonekeo

Mekong hydropower development context Rational for Initiative on sustainable hydropower

MOU Lao-Thai MOU Lao VN MOU Lao - Cambodia By 2025 : 9,000MW By 2030: 5,000 MW By 2025 : 1,500 MW Mekong HP development context: High increase in demand and supply of electricity energy => more HP GMS plan for Regional Grid Interconnection

Legal Framework Relation to the Mekong Agreement 1995 and the Prior Notification, Consultation and Agreement

1995 Mekong Agreement (42 Articles) Article 1. Areas of Cooperation Article 2. Projects, Programs and Planning Article 3. Protection of the Environment and Ecological Balance Article 4. Sovereign Equality and Territorial Integrity Article 5. Reasonable and Equitable Utilization Article 7. Prevention and Cessation of Harmful Effects Article 8. State Responsibility for Damages Article 9. Freedom of Navigation Article 10. Emergency Situations

MRC Strategic Plan 2011-2015, 2016-2020 and Sustainable Hydropower planning and management 2009-2010 1. The Strategic Environment Assessment (SEA) for the proposed 11 MS Dams 2. The Preliminary Design Guidance (PDG) 2011-2015 A series of studies to assist Sustainable Hydropower Planning and Management in the Mekong Basin have been implemented by the MRC Initiative on Sustainable Hydropower. 2016-2020 While recognizing regional energy needs, national economic development priorities, and the preservation of key environmental assets for economic, social and environmental purposes, etc. a basinwide strategy is needed to address the difficult trade-offs and to design more optimal and sustainable hydropower development pathways.

Knowledge and guidance from new studies, tools guidelines help to : Acquire essential knowledge to address uncertainty and minimise risk of the identified development opportunities; Consider different options for sharing the potential benefits and risks of development opportunities Improve the sustainability of hydropower development and design in the review of proposed mainstream dams during the PNPCA processes; Better integrate basin development planning considerations into national systems; Address the opportunities and consequences of the ongoing developments including development in the Lancang-Upper Mekong Basin; Plan expansion/intensification of irrigated agriculture for food security and poverty alleviation..

Hydropower Planning within Ecologically Sensitive Sub-basins (ISH01) The management of tributaries becomes particularly relevant for joint and basin-wide cooperation These tributaries are significant to the mainstream regarding specific impacts that can be assessed. This study help to plan hydropower across multiple catchments in order to minimize impact on Ecologically Sensitive Areas and consider, at a basin scale, areas that should not be developed to preserve ecosystem integrity. http://www.mrcmekong.org/aboutmrc/programmes/initiative-on-sustainable-hydropower/the-identification-ofecologicallysensitive-sub-basins-for-sustainable-development-of-hydropower-on-tributaries-ish01/ 8

Development of guidelines on the multipurpose evaluation of hydropower projects (ISH02) 1. To provide Guidelines for valuation of the assessed socioeconomic and environmental costs and benefits of hydropower, including the evaluation of the multi-purpose use of the schemes; and 2. To provide methods for these valuations to be internalized in the economic or other analysis and integrated with the strategic power planning approaches of the member countries. 9 http://www.mrcmekong.org/about-mrc/programmes/initiative-on-sustainablehydropower/development-of-guidelines-on-the-multi-purpose-evaluation-ofhydropowerproject-ish02/

Guidelines for hydropower environmental impact mitigation and risk management in the Lower Mekong mainstream and tributaries (ISH0306) Describe the potential impacts of these developments as assessed by existing studies; Research regional and global experience on mitigation options appropriate for these Mekong hydropower developments; Undertake analysis and research into the effectiveness of these mitigation options; Provide guidelines and a substantial knowledge base on mitigation approaches and solutions based on researches and case studies suitable for dissemination; Make recommendations on improvements and new approaches to impact mitigation; Recommendations for further researches to cover significant knowledge gaps; and Build capacity in all areas of assessment avoidance, minimization and mitigation options within industry and line agencies. http://www.mrcmekong.org/about-mrc/programmes/initiative-onsustainablehydropower/guidelines-for-hydropower-environmental-impact-mitigationandrisk-management-in-the-lower-mekong-mainstream-and-tributariesish0306/.

MRC Sustainability Assessment Tool for HP in Basin wide context (RSAT) Most common and key issues requiring particular attention during planning and management in order to achieve sustainable hydropower development in a basin wide context No. Topic 1 Topic 2 Topic 3 Topic 4 Topic 5 Topic 6 Topic 7 Topic 8 Topic 9 Topic 10 Topic Institutional capacity Options assessment, siting and design Economic contribution of hydropower Equitable sharing of hydropower costs and benefits Social issues and stakeholder consultation Environmental management and ecosystem integrity Flows and reservoir management Erosion, sediment transport and geomorphological impacts Management of fisheries resources Dam and community safety

Preliminary Design Guidance (2009) 1. Navigation 2. Fish passage 3. Sediment management and river morphology 4. Water quality and aquatic ecosystems 5. Safety of dams 1. Xayaburi HPP 2. Don Sahong HHP 3. Pak Beng HPP 12

Outcomes of the initiative

Contribution of MRC ISH Outputs to the Hydropower Planning Cycle Construction & Operations (EMP, SMP, RMP) ISH0306 Risks and Mitigation aluation &Evaluation RSAT RSAT Project Selection and Approval Process Ecologically Sensitive Sub-Basins ISH0306 Risks and Mitigation Electricity demand market assessment resource assessment Information for HP Planning and Management RSAT Data base of power options, Other Sector inputs Screening Analysis Economic Analysis SEA, CIA ISH0306 Risks and Mitigation Power Development Plan ISH0306 Risks and Mitigation Refinement of Hydropower Project Portfolio (ESIA, cascades, multipurpose use) Multi purpose Valuation RSAT Valuation and Evaluation ISH01 Ecologically Sensitive Sub-Basins Ecologically Sensitive Sub- Basins

Addressing MRC Member Countries Concerns During the PNPCA and design review process for Xayaburi HP project: Concerns of potential impacts on Mekong Delta area, water flow, fish migration, sediment flow, and navigation have been considered by GOL; Additional works to address all concerns have been addressed by GOL Accepted additional works, has resulted in more than USD200 million absorbed by XPCL. Interpreted from the Technical Workshop on Xayaburi HPP Requisites for Concession Agreement: Requirements of MRC-1995 Agreement Donchan Palace Hotel, Ministry of Energy and Mines, Vientiane, 15 July 2015

Major Lessons Learnt For other Large Basins with international boundaries implications: Planning Cooperation Operation

Developers and Planners Experience w/ PDG To use lessons learned and recommendations for PDG update: PDG content should be updated with simple, practical, accurate with specific terms where necessary for better risks management and clear guidance Formalised communication exchange between MRC and Developers before the start of a PNPCA process to assure correct understanding and high quality MRC Technical Review Report Consistent design and operation for all dams in the Mekong cascades PDG should also include a follow up monitoring/inspection during construction and operation phases Coordination mechanisms among concerned parties should be established to assure safe operation of a proposed dam Coordination of design should be built in the PPA Power Purchasing Agreement (PPA) should be amendable to include additional provisions resulting from the PNPCA process.

Thank you