Fluid Mechanics, Heat Transfer, Thermodynamics Design Project. Production of Allyl Chloride

Similar documents
Fluid Mechanics, Heat Transfer, and Thermodynamics Design Project. Production of Acrylic Acid

Fluid Mechanics, Heat Transfer, and Thermodynamics. Design Project. Production of Acetone

Fluid Mechanics, Heat Transfer, and Thermodynamics Fall Design Project. Production of Dimethyl Ether

Separations and Reaction Engineering Spring Design Project. Production of Acetone

Fluid Mechanics, Heat Transfer, Thermodynamics Design Project. Production of Ethylbenzene

Fluid Mechanics, Heat Transfer, Thermodynamics Design Project. Production of Styrene

Fluid Mechanics, Heat Transfer, Fluid Mechanics Design Project. Production of Ethanol

Fluid Mechanics, Heat Transfer, Thermodynamics. Design Project. Production of Ammonia

Separations and Reaction Engineering Design Project. Production of MTBE

Fluid Mechanics, Heat Transfer, and Thermodynamics Fall Design Project. Production of Drying Oil

Separation Processes and Reaction Engineering Design Project. Production of Ethylbenzene

Energy Balances and Numerical Methods Design Project. Production of Cumene

Fluid Mechanics, Heat Transfer, Thermodynamics Design Project. Production of Phthalic Anhydride

Separations and Reactors. Acrylic Acid Production via the Catalytic Partial Oxidation of Propylene

Fluid Mechanics, Heat Transfer, Thermodynamics Design Project. Production of Formalin

Energy Balances and Numerical Methods Design Project. Ammonia Production

Energy Balances and Numerical Methods Spring Design Project. Production of Ethylene Oxide

Design Project Energy Balances and Numerical Methods Styrene Manufacture

Energy Balances and Numerical Methods Design Project. Production of Maleic Anhydride

Energy Balances and Numerical Methods Design Project. Production of Methyl Tertiary-Butyl Ether

Material Balances Design Project Manufacture of Diethyl Ether

Problems at the Cumene Production Facility, Unit 800

ChE 455 Fall 2001 Major 1. Ethylene Oxide Production

MTBE Production. Process Description. Possibility of Changing Process Feed Conditions

Material Balances. Design Project. Production of Phthalic Anhydride from o-xylene

Reactors and Separations Design Project. Phthalic Anhydride Production

Increasing the Production of 3-Chloro-1-Propene (Allyl Chloride) in Unit 600

APPENDIX. Design Projects

Example SPC-2: Effect of Increasing Column P on a C3 splitter

Furnace. 1. (10 points) mol/s 53.5% H2O CO2

- 2 - SME Q1. (a) Briefly explain how the following methods used in a gas-turbine power plant increase the thermal efficiency:

Faculty of Engineering 2 nd year 2016 Mechanical Engineering Dep. Final-exam (code: M 1222)

Problems in chapter 9 CB Thermodynamics

CHAPTER 1 BASIC CONCEPTS

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET

HYSYS WORKBOOK By: Eng. Ahmed Deyab Fares.

Exercise 5. Simulation of HDA plant in UniSim

AREN 2110: Thermodynamics Spring 2010 Homework 7: Due Friday, March 12, 6 PM

Improvement of distillation column efficiency by integration with organic Rankine power generation cycle. Introduction

ECONOMIC OPTIMIZATION OF AN ETHYLBENZENE PROCESS. by Erin Leigh Dyer. Oxford May 2015

Eng Thermodynamics I - Examples 1

Corn to Ethanol Plant

CONTROL VOLUME ANALYSIS USING ENERGY. By Ertanto Vetra

The project goal is to design a process capable of converting methane, obtained from remote

Eng Thermodynamics I - Examples 1

Eng Thermodynamics I: Sample Final Exam Questions 1

Chapters 5, 6, and 7. Use T 0 = 20 C and p 0 = 100 kpa and constant specific heats unless otherwise noted. Note also that 1 bar = 100 kpa.

Module 05 Lecture 35 : Low temperature process design Key words: Refrigeration system

Introduction to Distillation. Binous - Introd. to Distillation

Exercise 5. Simulation of HDA plant in UniSim

UNIVERSITY OF TORONTO FACULTY OF APPLIED SCIENCE AND ENGINEERING FINAL EXAMINATION, DECEMBER 2008 MIE 411H1 F - THERMAL ENERGY CONVERSION

Taravosh Jam Design & Engineering Co.

Appendix 8.5 Equipment Summary & Specification Sheets

PROCESS DESIGN AND OPTIMIZATION: ANALYSIS OF AN ETHYLBENZENE PRODUCTION PLANT. by Butler VanVeckhoven

EXTRA CREDIT OPPORTUNITY: Due end of day, Thursday, Dec. 14

R13. II B. Tech I Semester Regular/Supplementary Examinations, Oct/Nov THERMODYNAMICS (Com. to ME, AE, AME) Time: 3 hours Max.

Thermodynamic Data. CO (g, 0 C, 1 atm) CO (g,100 C, 1 atm):

Thermodynamics: Homework A Set 6 Jennifer West (2004)

a. The power required to drive the compressor; b. The inlet and output pipe cross-sectional area. [Ans: kw, m 2 ] [3.34, R. K.

Written Exam 02 March Problems - Time: 2 hours PLEASE NOTICE

HW-1: Due Tuesday 13 Jun 2017 by 2:00:00 pm EDT to Your Division s GradeScope Site

OPTIMIZATION: A PERSPECTIVE ON IMPROVING AN ETHYLBENZENE PRODUCTION DESIGN. by Derrick Cochrane Marchant

Attachment 18. Undergraduate Teaching Laboratory Facilities

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant

Chapter 10. Flowsheet Analysis for Pollution Prevention. by Kirsten Sinclair Rosselot and David T. Allen

PI Heat and Thermodynamics - Course PI 25 CRITERION TEST. of each of the following a. it

ERT 318/4 UNIT OPERATIONS SEMESTER 1 (2013/2014)

UNIVERSITY OF TORONTO FA CUL TY OF APPLIED SCIENCE AND ENGINEERING . DEPARTMENT OF CHEMICAL ENGINEERING AND APPLIED CHEMISTRY

Spring 2010 ENCH446 Project 1

O 2 n-site Oxygen Production

A Process Trouble-Shooting Problem. Joseph A. Shaeiwitz, Richard Turton West Virginia University. Problem Statement

Chemical Engineering Plant Design 1

PROCESS OPERABILITY Why Operability?

Practice Final Exam (A) Six problems. (Open-book, HW solutions, and notes) (Plus /minus 10 % error acceptable for all numerical answers)

Chapter 5: Thermodynamic Processes and Cycles

Raymond A. Adomaitis. March 7, 2012

Optimization of Single and Multiple Unit Chemical Processes: A. case study on the optimization of a styrene plant design

Chapter 10 POWER CYCLES. Department of Mechanical Engineering

Enhancement of LNG Propane Cycle through Waste Heat Powered Absorption Cooling

Enthalpy Calculations. Change in enthalpy can occur because of change in temperature, change in phase, or mixing of solutions and reactions.

ProSimPlus Library (Standard version + rate base option)

R13 SET - 1 '' ''' '' ' '''' Code No: RT31035

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

2. The data at inlet and exit of the turbine, running under steady flow, is given below.

Review Questions for the FE Examination

Table of Contents. iii. vi Tables. Figures. viii Foreword. ix Acknowledgments

Chapter 10. In Chap. 9 we discussed gas power cycles for which the VAPOR AND COMBINED POWER CYCLES. Objectives

Analysis of the applicability of adsorption oxygen generators in the field of industry and power engineering

Chapter 10. In Chap. 9 we discussed gas power cycles for which the VAPOR AND COMBINED POWER CYCLES. Objectives

C. heating turbine exhaust steam above its saturation temperature. D. cooling turbine exhaust steam below its saturation temperature.

Supercritical Water Coal Conversion with Aquifer-Based Sequestration of CO 2

CALCIUM LOOPING PROCESS FOR CLEAN FOSSIL FUEL CONVERSION. Shwetha Ramkumar, Robert M. Statnick, Liang-Shih Fan. Daniel P. Connell

CHEMICAL PROCESS OPTIMIZATION FOR DUMMIES. By Troy Mannino. Oxford. May 2015

Qualitative Phase Behavior and Vapor Liquid Equilibrium Core

Lecture No.3. The Ideal Reheat Rankine Cycle

Chapter 8. Vapor Power Systems

Thermodynamic Analysis of Combined Power and Cooling Cycle Using Process Heat from a Passout Turbine as a Heating Source

OPTIMIZATION OF PARAMETERS FOR HEAT RECOVERY STEAM GENERATOR (HRSG) IN COMBINED CYCLE PLANTS

.1 All equipment, controls and accessories to be compatible with system design, and matched to the steam boiler(s) by the boiler Manufacturer.

TransPacific Energy Advantage: Case Studies

Transcription:

Fluid Mechanics, Heat Transfer, Thermodynamics Design Project Production of Allyl Chloride We are investigating the feasibility of constructing a new, grass-roots, 20,000 metric tons/year, allyl chloride production facility. The plant is to be built in La Nueva Cantina, Mexico based on the designs of our existing plants in Beaumont, TX and Mobile, AL. The Mexico site is favored because of its proximity to one of our propylene plants and local chlorine suppliers. As part of the feasibility study, we would like you to investigate some of the details of the reaction and refrigeration sections of the proposed plant. Allyl Chloride Production Reactions The reactions are given below. The primary reaction is: The secondary reactions are: C H + Cl C H Cl + HCl 3 6 2 3 5 allyl chloride C H + Cl C H Cl + HCl 3 6 2 3 5 2 chloropropene C H + 2Cl C H Cl + 2HCl 3 6 2 3 4 2 dichloropropene C H + 3Cl 3C + 6HCl 3 6 2 carbon For the purposes of this preliminary evaluation, it is assumed that the reactions occur in a fluidized bed. The fluidized material is sand which scavenges any carbon formed. The sand is regenerated by recovering it with a cyclone and burning the carbon off with air in a combustion reaction. It may be assumed that the carbon formation is negligible compared to the other two reactions. The fluidized bed operates at 510 C and is fed at the same temperature. This temperature should not be exceeded because it promotes carbon formation in the 4 th reaction. At 510 C, it may be assumed that 85% of the limiting reactant reacts in the primary reaction, 3%

2 reacts to form 2-chloropropene, and 12% reacts to form dichloropropene. A minimum of 100% excess propylene is required. Reaction Section The PFD for the reaction section is given in Figure 1. The reactants are stored in tanks which are not shown. There are two tanks for each reactant, each holding a one-day supply, one in a filling mode and the other in a feeding mode. The reactants are stored at ambient temperature (which may be assumed to be 25 C) as a vapor/liquid equilibrium mixture, and the feeds to the process are liquids. The feed to the reactor must be at 8 bar and the crude allyl chloride product must be at least 5 bar. The pressure drops across process units are given in Table 1. It may be assumed that pressure drops in pipes beyond Stream 6 are negligible. Table 1: Pressure Drops across Process Units in Feed Section Unit P (bar) Fired Heater 0.75 Mixing Point 0.40 Reactor 0.50 E-602 0.35 E-603 0.35 The reactor feed must be at 510 C. Heat generated in the reactor is removed by Dowtherm A, and high-pressure steam is made in E-601. Medium-pressure steam is made in E-602, and Stream 8 should be at 200 C. Since both high-pressure and medium-pressure steam can be used elsewhere in the plant, credit may be taken for its generation. In E-603, the crude allyl chloride product is cooled to 50 C, the required temperature. Stream 8 must contain the required production rate of allyl chloride (plus impurities which will be separated in the separation section). Refrigeration Section In the separation section, which will be studied in more detail later, refrigeration is required in one heat exchanger and in three distillation column condensers. Propylene is used as the refrigerant. The propylene refrigeration cycle is illustrated in Figure 2. In E-604, the crude allyl chloride product is cooled to from 50 C to -50 C at approximately 2 bar. In E-606, a mixture of HCl and propylene is condensed at -57 C and 1.4 bar (Q = -1940 MJ/h). In E-611, 0.8 kmol/h of propylene is condensed at -40 C and 1.5 bar. In E-613, 19 kmol/h of 2-chloropropene is condensed at 30 C and 1.4 bar. For the vessel, V-607, which is a vapor-liquid separator, it should be sized for a 10 minute liquid residence time under the assumption that it contains one-half liquid.

4

5 Assignment Your assignment consists of four mini-designs. 1. Optimization of the Power Cycle. (ChE 111 and 142) You are to determine the optimum topology (equipment sequencing) and optimum conditions for the refrigeration loop. The objective function is the Equivalent Annual Operating Cost (EAOC) of refrigeration ($/y). The EAOC is defined as: EAOC = CAP A P i n,, + operating costs for refrigeration loop (1) where CAP = the installed cost of equipment in the refrigeration loop and ( 1+ ) n ( i) A P i n i i,, = n [ 1+ 1] (2) where i = 0.15 (15% rate of return) and n = 10 (ten year plant life). 2. Optimization of the Feed Section. (ChE 110 and 142) Refer to Figure 1. You are to determine the optimum pipe sizes for Streams 1-6. Equivalent pipe lengths can be determined from the attached plot plan (Figure 3). Pipe runs are at 4 m elevation off the ground, and you should add 90 elbows as necessary. The objective function is the EAOC (see Eq. (1)) for the piping and pumps (do not include tank costs), where CAP includes the cost of pipes and pumps and operating costs include the electricity to run the pumps. You are also to size and cost the feed tanks (1 day of liquid storage required - 2 tanks required for each reactant, one for filling and one for feeding - assume 70% full with liquid) and determine the conditions for propylene and chlorine storage. Both reactants are to be stored as vapor/liquid mixtures and are to be fed to the process as liquids. Specify the elevation of each tank. We have a supply of a feed pumps used in our other plants which we would like to use in this plant, and pump and NPSH curves for these pumps are attached (Figures 4 and 5) We would like the flexibility for 35% scale-up in the future. 3. Optimization of the Dowtherm A Loop. (ChE 110 and 111) The heat exchanger and pump should be optimized together. CAP should include the cost of the pump and of the heat exchanger. Operating costs should include the cost of pumping and the cost or credit for the heat removal medium in the heat exchanger. We also have a supply of the pump used in our other plants which we would like to use in this plant, and the pump curve is attached (Figure 6). The loop operates above 10 bar, at which pressure the Dowtherm A is not volatile below 400 C. The pump and pipes should be sized to allow for 35% scale-up in the future. Equivalent pipe lengths should be determined from the attached

7 12 Pressure Head Across Pump (m of liquid) 10 8 6 4 2 0 0.0 0.5 1.0 1.5 2.0 2.5 Flowrate (m 3 /h) Figure 4: Pump Curve for Feed Pump 14 12 NPSH R (ft of liquid) 10 8 6 4 2 0 0 1 2 3 4 Flowrate (m 3 /h) Figure 5: NPSH Curve for Feed Pump

8 35 Pressure Rise Across Pump (psi) 30 25 20 15 10 5 0 0 50 100 150 200 250 300 Flow of Dowtherm A (gal/min) Figure 6: Pump Curve for the Dowtherm A Pump

9 plot plan (Figure 7). Pipe runs are at 4 m elevation off the ground, and you should add 90 elbows as necessary. 4. Determination of Break-even Price for Crude Allyl Chloride. A Chemcad simulation for your best case should be presented. The break-even price (BEP) for crude allyl chloride product should be calculated. The best case is defined as the optimum case for mini-designs 1-3, above, plus any other changes to the process that you recommend. The break-even price for crude allyl chloride product is calculated as follows: CAP A P i n,, + cost of reactants + operating costs - byproduct revenue BEP = kg allyl chloride in crude product (3) where CAP is the installed capital cost for the entire reaction section. Neglect the cost of pipes in this analysis.

10

11 Cost Data Raw Materials Benzene (highest purity) Propylene (polymer grade) see Chemical Marketing Reporter see Chemical Marketing Reporter Utility Costs Low Pressure Steam (446 kpa saturated) Medium Pressure Steam (1135 kpa saturated) High Pressure Steam (4237 kpa saturated) Natural Gas (446 kpa, 25 C) Fuel Gas (446 kpa, 25 C) Electricity $3.00/1000 kg $6.50/1000 kg $8.00/1000 kg $3.00/10 6 kj $2.75/10 6 kj $0.08/kW h Boiler Feed Water (at 549 kpa, 90 C) $300.00/1000 m 3 Cooling Water $20.00/1000 m 3 available at 516 kpa and 30 C return pressure 308 kpa return temperature is no more than 15 C above the inlet temperature Refrigerated Water $200.00/1000 m 3 available at 516 kpa and 10 C return pressure 308 kpa return temperature is no higher than 20 C Waste Treatment $1/kg organic waste

12 Equipment Costs (Purchased) Piping $/m = 5.0 (diameter, in) Valves $100 (flow diameter, in) 0.8 for control valve with orifice plate, double the price Pumps $630 (power, kw) 0.4 Heat Exchangers $1030 (area, m 2 ) 0.6 Compressors $770 (power, kw) 0.96 + 400 (power, kw) 0.6 Turbine $2.18 10 5 (power output, MW) 0.6 assume 65% efficiency Fired Heater $635 (duty, kw) 0.8 assume 80% thermal efficiency assume can be designed to use any organic compound as a fuel Vessels $[1.67(0.959 + 0.041P - 8.3 10-6 P 2 )] 10 z z = (3.17 + 0.2D + 0.5 log 10 L + 0.21 log 10 L 2 ) D = diameter, m 0.3 m < D < 4.0 m L = height, m 3 < L/D < 20 P = absolute pressure, bar Reactor assume to be $750,000 Storage Tank $1000V 0.6 V = volume, m 3 It may be assumed that pipes and valves are included in the equipment cost factors. Location of key valves should be specified on the PFD.

13 Equipment Cost Factors Pressure < 10 atm, 0.0 does not apply to turbines, compressors, vessels, (absolute) 10-20 atm, 0.6 packing, trays, or catalyst, since their cost equations 20-40 atm, 3.0 include pressure effects 40-50 atm, 5.0 50-100 atm, 10 Carbon Steel 0.0 Stainless Steel 4.0 Total Installed Cost = Purchased Cost (4 + material factor + pressure factor) Heat Exchangers For heat exchangers that do not have to be designed in detail, use the following approximations for heat transfer coefficients to allow you to determine the heat transfer area: situation h (W/m 2 C) condensing steam 6000 condensing organic 1000 boiling water 7500 boiling organic 1000 flowing liquid 600 flowing gas 60

14 Other Information You should assume that a year equals 8000 hours. This is about 330 days, which allows for periodic shutdown and maintenance. Unless specifically stated in class, the information in this document is valid for this project only. Any information in the sophomore projects not specifically stated in this document is not valid for this project. Deliverables Each group must deliver a report written using a word processor. The written project report is due by 11:00 a.m. Friday, November 21, 1997. Late projects will receive a minimum of a one letter grade deduction. The report should be clear and concise. For the correct formatting information, refer to the document entitled Written Design Reports. Any report not containing a labeled PFD and a stream table, each in the appropriate format, will be considered unacceptable. PFDs from CHEMCAD are generally unsuitable unless you modify them significantly. When presenting results for different cases, graphs are superior to tables. For the optimal case, the report appendix should contain details of calculations that are easy to follow. There should be separate appendices for each mini-design. These may be hand written if done so neatly. Calculations that cannot be easily followed will lose credit. Since this project involves four mini-designs, it is suggested that the report be organized as follows. There should be a general abstract and introduction. Then, there should be a results section followed by a discussion section for each mini-design. General conclusion and recommendation sections should follow. At a minimum, there should be an appendix for each mini-design. With this organization, there is no need for a separate section for each class, as suggested in the document entitled Written Design Reports. Each group will give an oral report in which the results of this project will be presented in a concise manner. The oral report should be between 15-20 minutes, and each group member must speak. A 5-10 minute question-and-answer session will follow. Refer to the document entitled Oral Reports for instructions. The oral presentations will be Monday and Tuesday, December 1 and December 2, 1997 from 11:00 a.m. to 1:00 p.m. each day. Attendance is required of all students during their classmates presentations (this means in the room, not in the hall or the computer room). Failure to attend any of the above required sessions will result in a decrease of one-letter grade (per occurrence) from your project grade in ChE 110, 111, and ChE 142.

15 Groups You may do this projects in a group of three or four. Since there are 23 students doing the project, there will be seven groups. Five groups will have three members and two groups will have five members. Revisions As with any open-ended problem (i.e., a problem with no single correct answer), the problem statement above is deliberately vague. The possibility exists that, as you work on this problem, your questions will require revisions and/or clarifications of the problem statement. You should be aware that these revisions/clarifications may be forthcoming.