I-395 Reconstruction. Project Advisory Group Meeting A1. PRESENTATION November 15, 2011

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

TAMPA BAY NEXT MAJOR PROJECTS UPDATE

AIR QUALITY TECHNICAL MEMORANDUM

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

FTBA 2018 Construction Conference Major Projects Update

I-64 Capacity Improvements Segment III RFQ Information Meeting

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

Highway Construction Program

Pensacola Bay Bridge Replacement Design Build. Industry Forum. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer

The Gateway Expressway FTBA Conference. February 2-3, 2017

MDX PROCUREMENT/CONTRACT NO.: RFP MDX WORK PROGRAM NO.:

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

Conceptual Design Report

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Florida Department of Transportation

I-64 Capacity Improvements Segment I Financial Plan Annual Update

Northeast Bridge Preservation Partnership Meeting

IMPROVING I 81 IN MARYLAND

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

I-65/I-70 North Split Project

CLA /10.54, PID Project Description:

Design-Build Selmon West Extension

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

Florida Department of Transportation

Florida Department of Transportation

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

Exposition Light Rail Transit Project

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

USE OF HIGH PERFORMANCE STEEL IN TEXAS BRIDGES

PUBLIC INFORMATION MEETING June 24, 2015

2009 Louisiana Transportation Conference February 9, 2009 Session 9. LA DOTD s Design-Build Procurement For the I-12 Widening Project

Pattullo Bridge Replacement Project. Cost Report

Overview of Prior Studies

I-65/I-70 North Split Project. Alternatives Screening Report CAC Meeting October 9, 2018

PAVEMENT DESIGN MEMORANDUM

Air Quality Analysis Technical Memorandum

Florida Department of Transportation

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

LOCATION HYDRAULIC REPORT

Air Quality Analysis Technical Memorandum

Request for Proposal Golden Glades Multimodal Transportation Facility July 31, 2017 Table of Contents I. Introduction A. Design-Build Responsibi

INTERCHANGE MODIFICATION REPORT

SCOPE OF SERVICES INTERSTATE 195 CORRIDOR PLANNING STUDY FROM INTERSTATE 95/NW 12 TH AVENUE TO ALTON ROAD

Highway Construction Program

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016

Lehigh Valley Transportation Study

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

The Main Street Bridge - Supporting Transportation Systems

PRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

Oklahoma Department of Transportation Environmental Programs Division Office Fax

NOTICE TO DESIGN PROFESSIONALS / CONTRACTORS REQUEST FOR LETTERS OF INTEREST S.R. 408/ S.R. 417 INTERCHANGE IMPROVEMENTS PHASE 2 PROJECT NO.

Project Location. Pensacola Bay Bridge Replacement Design Build 03/02/16. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

I-4 Ultimate Social Media

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

MEMORANDUM: INITIAL CONCEPTS SUMMARY

Minnesota Statewide Freight Bottlenecks

I-74 Final Design Request For Proposal

Transportation Update

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

GDOT s Design-Build Program Past, Present and Future

Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report. APPENDIX E Interchange Concepts Considered

Shadow Lake Woods HOA

ANNUAL INSPECTION REPORT 2017 TABLE OF CONTENTS

Zoo Interchange Reconstruction

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

2018 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

University Region FY 2023 Final Scoping Package

Final Air Quality Report

1.4 Analysis of Alignment Alternatives

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No.

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

FDOT PROJECT INFORMATION APPLICATION FORM

Final Recommendations Identification of Improvements, Strategies, and Solutions

Transportation Connectivity, Accessibility and Economic Opportunity Study

Community Advisory Committee Meeting No. 2. June 22, 2006

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting

2018 FTBA CONSTRUCTION CONFERENCE February 8-9, 2018 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

LOCATION HYDRAULICS REPORT. SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida

Any discussions or marketing activities related to this specific project.

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

SR 836 / I-395 and SR 5 / US 1 / Biscayne Boulevard Tunnel Concept Evaluation FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 6

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

S.P TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

Value Engineering For Transportation Improvements. I-4 from 1 Mile East of State Road 434 to Volusia County Line

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013

Nancy Daubenberger, MnDOT Assistant Commissioner Engineering Services

Transcription:

I-395 Reconstruction MDX SR 83611 Improvements I-95 Concrete Pavement Reconstruction FTBA Conference February 10, 2016

Presentation Outline Project Overview I-395 Reconstruction MDX SR 83611 I-95 Pavement Reconstruction Procurement Activities Schedule/Upcoming Events

BISCAYNE BLVD Project Location SR 836/I-395 system 83611 I-395 Port Tunnel (Completed May 2014)

Four Major Project Segments Department Project FPID 251688-1-52-01: I-395 Reconstruction FPID 429300-1-52-01: I-95 Pavement Reconstruction FPID 423126-2-52-01: SR 836 WB Connector MDX Project FPID 423126-1-52-01: NW 17 th St to Midtown

I-395 Record of Decision Commitments (July 2010) Minimum 19 of roadway vertical clearance west of FEC Minimum 25 of roadway vertical clearance east of FEC Minimum 200 of distance between the I-395 westbound bridge and the Adrienne Arsht Center for the Performing Arts (AACPA) Minimum 225 of span length between columns Provide a signature span design Provide aesthetics enhancements (landscape) to help maximize the total integration of the project with the adjacent community Reconnect NW 2 nd Avenue

I-395 Signature Bridge Requirements Minimum apex above street level = 245 Minimum length of bridge = 650 Minimum suspended span length = 500 Visual consistency between approach and main span Signature Bridge shall span Biscayne Blvd. Final bridge to look as one no duplicity, i.e. twin arches

I395 Signature Bridge Requirements

I-395 Template - Looking NB Along Biscayne, Night View - Wishbone

I-395 Template - Looking NB Along Biscayne, Night View Lotus

I-395 - Transition View - Wishbone

I-395 South Bound Biscayne

I-395 Aerial View

I-395 Metromover CABLE STAYED STRUCTURE Supports the existing cap of the pier to be removed Provides FDOT minimum vertical clearance of 16.5 for the new alignment Constructed within the Right-of-Way and aerial easements Memorandum of Agreement The Metromover will have limited nighttime closures between the hours of 1:00 AM to 4:00 AM

I-395 Aesthetics Aesthetic Steering Committee Project Advisory Group (PAG) Visual quality concepts and recommendations Iconic Inviting Usable

I-395 Aesthetic Components

I-395 Streetscape Zone A Zone 1 Zone 2 Zone 3

I-395 Streetscape Zone A

I-395 Streetscape - Zone 1

I-395 Streetscape - Zone 1

I-395 Streetscape - Zone 2

I-395 Streetscape - Zone 2

I-395 Streetscape - Zone 3

I-395 Streetscape - Zone 3

I-395 Streetscape - Zone 3

MDX 83611 Project From the NW 17th Ave Interchange to the SR 836/ I-95/ I-395 Interchange (Midtown Interchange) or approximately 1.4 miles Urban Principal Arterial Expressway

MDX 83611 Scope Add capacity to SR 836 (1 additional lane in each direction) to improve mobility and safety (11 bridges to be improved) Meet all project commitments approved by FHWA during PD&E phase Eliminate existing weaving across eastbound SR 836 by creating an elevated separate eastbound CD road to connect NW 12th Avenue interchange with I-395 eastbound, I-95 northbound and I-95 southbound (6 new bridges for this new elevated section) Eliminate existing weaving across westbound SR 836 by creating an elevated separate westbound CD road to connect I-95 southbound movement with SR 836 westbound and new exit at NW North River Drive (3 new bridges for this new elevated section)

MDX 83611 Scope Cont. Construct new fender system to protect SR 836 columns over Miami River Replace isolated sections of bridge structures with deficient load ratings Add two new tolling facilities for NW 14 th Street Exit and at NW North River Drive Exit Modify 5 parking facilities

836 WB Connector Portion of new WB Connector only Doesn t include exit ramp to NW 14 th Street

MDX 83611 - Scope

MDX SR 83611 - Aesthetics

I-95 Project Update

I-95 Pavement Reconstruction FPID 429300-2-32-01 NW 8th Street to NW 29th Street 1.6 miles Project consists of replacement of all Rigid Pavement on I-95 mainline and associated entrance and exit ramps.

I-95 Pavement Reconstruction Cont. Replace Mainline rigid pavement and asphalt shoulder with full depth rigid pavement across full width of mainline Address drainage maintenance issues Address associated bridge rail retrofits and approach slab upgrades / repairs All work to be done during nighttime

Procurement Activities Procurement Process Proposal Evaluation Criteria and Weighting Schedule

Design Build RFP Procedure Four Step Procurement Process Phase 1 Short Listing Phase 2 Aesthetic Signature Bridge Submission Pass/Fail Phase 3 Technical Proposal: Technical and Aesthetic Volumes Submissions Phase 4 Price Proposal and Financial Proposal Submittals

Project Selection Committee Project Selection Gerry O Reilly, PE FDOT District 4 Secretary Debora Rivera, PE FDOT District 6 Director of Transportation Operations Javier Rodriguez, PE MDX Executive Director

Phase 1 Short List Letter of Response Approach to Project Design and Construction Experience in the last 15 years on similar projects Photos of previous completed projects/structures Do Not include digital images or sketches of proposed bridge or streetscape No Points

Review Committee Technical Mario Cabrera, PE FDOT Rudy Garcia, PE FDOT David Amato, PE FDOT Omar Meitin, PE FDOT Juan Toledo, PE MDX Aesthetic The Honorable Audrey Edmonson Commissioner District 3 Brian Blanchard, PE M. John Richard Albert Parjus Alyce Robertson

Phase 2 Aesthetic Signature Bridge Submission Aesthetic Signature Bridge Proposals Maximum of 3 Options per Team Each ARC member will independently pass or fail each option For an option to be passed it must receive 4 out of 5 passes from the ARC members. (3 out of 5) Public Meeting to announce passing teams Must receive passing on at least 1 bridge

Phase 3 Technical Proposal Technical Proposal Volume 1 Technical All Four Projects Two Volumes Preliminary Component Plans and Specification Approved Alternative Technical Concept (ATC) Volume 2 Aesthetic Aesthetic Master Plan Approved Aesthetic Project Technical Enhancement (APTE)

Phase 4 Price Proposal Submittal Separate Price Proposals Department Project FDOT Contract through three separate cash availability schedules JPA MDX Project Maximum Contract Time = 1825 Days (5 Years)

Adjectival Scoring System ADJECTIVE RATING Excellent Very Good Good Fair Poor DESCRIPTION The Proposal significantly exceeds stated requirements/objectives in a beneficial way, providing advantages, benefits or added value to the Total Project, and provides a consistently outstanding level of quality. The Proposal exceeds the stated requirements/objectives in a beneficial way, providing advantages, benefits or added value to the Total Project, and offers a significantly better than acceptable quality. The Proposal comfortably meets the stated requirements/objectives, provides some advantages, benefits or added value to the Total Project and offers a generally better than acceptable quality. The Proposer has demonstrated an approach which is considered to marginally meet stated requirements/objectives and meets a minimum level of quality. The Proposer has demonstrated an approach which contains significant weaknesses/deficiencies and/or unacceptable quality.

Proposal Evaluation Criteria and Weighting Understanding and Approach (Up to 15 pts) MDX Aesthetics (Up to 1 pt) Team Staffing and Experience (Up to 5 pts) Maintainability (Up to 5 pts) Technical Volume 1 Criteria Up to 60 Points Value Added (Up to 4 pts) Innovative Aspects (Up to 10 pts) Construction Methods (Up to 10 pts) Maintenance of Traffic (Up to 10 pts)

Proposal Evaluation Criteria and Weighting Signature Span (Up to 10 pts) APTEs (Up to 10 pts) Aesthetic Volume 2 Criteria Up to 30 Points Mainline and Connector Ramps (Up to 2 pts) Lighting (Up to 2 pts) Streetscape (Up to 6 pts)

Proposal Evaluation Criteria and Weighting Technical Volume 1 Up to 60 points total Aesthetic Volume 2 Up to 30 points total APTEs Up to 10 points total Proposed Contract Time Up to 5 points Price Proposal Up to 5 points Department will convert the adjectival scores to numerical scores using numerical equivalents.

Procurement Schedule Advertisement Date February 8, 2016 Letter of Response March 7, 2016 Short Listing April 18, 2016 Final Aesthetic Signature Bridge June 20, 2016 Public Meeting to Pass/Fail August 19, 2016 Technical Proposal Due December 5, 2016 Price Proposal Due February 15, 2017 Anticipated Award Date March 16, 2017 Anticipated Execution Date March 30, 2017