KANMANTOO COPPER MINE PRIMARY TO OXIDE HAYDEN ARBON IIIII MINE GEOLOGIST BEN ALEXANDER IIIII METALLURGICAL SUPERINTENDENT 5 DECEMBER 2014

Similar documents
KANMANTOO COPPER MINE: STRATEGY AND OPPORTUNITY SA GOVERNMENT COPPER SUMMIT GREG HALL IIIII CEO & MANAGING DIRECTOR 6 MAY 2015

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

For personal use only KANMANTOO MINE: MINING WITHIN OUR COMMUNITY GREG HALL IIIII CEO & MANAGING DIRECTOR 13 APRIL 2015

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

For personal use only

KANMANTOO PUMPED HYDRO STEVE McCLARE IIIII CEO & MANAGING DIRECTOR PUMPED HYDRO ENERGY STORAGE CONFERENCE SYDNEY MARCH 2018

Aeon Metals Limited HIGHLIGHTS

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Hidden Valley PNG s Newest Mine Briefing for Analysts

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

ELEMENTOS. For personal use only. Asia Tin Summit 2017 Progressing the Development of the Cleveland Project. (ASX:ELT) September 2017

ELEMENTOS LTD ASX:ELT summary

For personal use only

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate

KANMANTOO BROWNFIELDS EXPORATION DRILLING RESULTS

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

For personal use only

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 JUNE 2016

ANNUAL GENERAL MEETING. 26 November 2010

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

FEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT. Highlights

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT

CONTRACT AWARDED FOR TESTWORK AND PURCHASE OF FIRST NATIVE COPPER SHIPMENT NATIVE COPPER IN HIGH DEMAND IN CHINA

March 2017 Quarterly Report Presentation and Webcast 27 April 2017

Updated Investor Presentation

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington

Investor Update. January 2014 ASX : ENR

For personal use only

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

ASX ANNOUNCEMENT 15 August 2011

ASX ANNOUNCEMENT 18 January 2011

Grange Resources Australia s leading magnetite producer

Bald Hill Delivers Excellent Metallurgical Test Work Results

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

September 2018 Quarterly Report Presentation and Webcast 25 October 2018

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

A Tiger in the Congo. Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo

For personal use only

For personal use only

For personal use only

Pre Feasibility Study Advances the Taronga Tin Project

HAVILAH. the land where gold comes. Acknowledgement to PIRSA-BHEI for image

For personal use only. Mining the Territory. Korab Resources Limited NT RESOURCES WEEK ASX: KOR. Andrej K. Karpinski Executive Chairman

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

Large copper resource inventory Low sovereign risk South Australia Clear development strategy. Havilah s Copper Strategy August 2017

Great Western Scoping Study Update & Onsite Gold Processing

Developing High Grade Projects in Mexico

For personal use only

Carbine Tungsten Limited Mt Carbine Tungsten Project

Australia s leading magnetite producer

SAVANNAH RESOURCES PLC AIM: SAV. Savannah Resources Plc. Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining RNS 06 February 2017

SECOND QUARTER REPORT 15 JULY 2014

Arrium Mining. Continued Mining Success in the Face of Lower Iron Ore Prices. 11 th SAEMC 5 December 2014

Bryah Secures Option over Historic Manganese Mine

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details

NIUMINCO GROUP LIMITED PNG MINING & PETROLEUM INVESTMENT CONFERENCE DECEMBER 2014

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 DECEMBER 2017

March 2015 Quarterly Report

SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015

AGM - Lorena Gold Project

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

For personal use only

Azure Minerals Ltd ASX Code:

Panda Hill Niobium Project. January 2014

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

For personal use only

Pilbara Gold Project, Western Australia Open Pit Development Opportunity Scoping Study nearing completion. ASX Code : DEG May 2017 Andy Beckwith

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

2018 Resources and Reserves

Quebrada Blanca Phase 2. April 2012

Brett Fletcher Executive General Manager PNG & Indonesian Operations

ASX : BLK. Australian gold producer with exceptional growth opportunity

For personal use only

For personal use only

Quarterly Report 30 June 2011

ASX ANNOUNCEMENT 12 MAY 2016

CAPITAL DOWN AT TALA HAMZA

FIRST GOLD ORE DISPATCHED FROM ULYSSES

Geology and mineral resources of the Kylylahti Mine

For personal use only

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

Fortuna provides update on the Lindero gold Project in Argentina

NIUMINCO GROUP LIMITED

For personal use only

Flotation and Leaching at Anglo Asian Mining s Gedabek Gold and Copper Mine in Azerbaijan. A.J. Monhemius, F. Hedjazi & H.

For personal use only

Sierra Metals Exploration Update Call

The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR. Authors: A Hoyle, D Bennett, and P Walker

Focused on delivery of high-value metals critical to energy revolution. Annual General Meeting 20 November 2018

MORANBAH NORTH MINE. Analyst & Investor Site Visit Australia 28 October 2011

DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD

AN EXCITING PLAYER IN AUSTRALIAN BASE METALS. Annual General Meeting 21 st October 2016

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

Horseshoe Metals Limited (HOR)

Transcription:

KANMANTOO COPPER MINE PRIMARY TO OXIDE HAYDEN ARBON IIIII MINE GEOLOGIST BEN ALEXANDER IIIII METALLURGICAL SUPERINTENDENT 5 DECEMBER 2014

KANMANTOO COPPER MINE AND LEASE AREAS 100%-owned by Hillgrove 55km from Adelaide, South Australia Mining Lease is within 500km 2 exploration license, and relatively unexplored Exploration Area EL4401 Organic growth potential considered high Kitticoola Prospect Project enjoys infrastructure advantages Close to power (National Grid) Recycled water pipeline 3km from main highway 90km to export port Kanmantoo Copper Mine Wheal Ellen Attractive employment costs compared to remote fly-in/fly-out mine operations Quality of life attracts mature, experienced workforce with low turnover 2

KANMANTOO COPPER MINE SUMMARY OF OPERATION Historic copper mining area from 1840 s BH South developed and operated open pit mine and plant from 1971 to 1976 HGO acquired leases in 2004, resource development 2005-08, feasibility and construction 2009-11, initial production December 2011 Current production +20,000t copper in concentrates, from processing of 3Mt ore @ ~0.8% Cu minor gold and silver Current workforce of ~200 and 50 contractors Strong community focus and engagement 3

KANMANTOO MINE OREBODY AND SITE LAYOUT Cross section through main Kanmantoo orebody with interim Kavanagh pit and final Giant pit (above) Plan view of all Kanmantoo pits (right) 4 Note: Giant will include Kavanagh, Spitfire, Falcon, Lean, Matthew and Valentine

KANMANTOO GEOLOGY Geological Context Located in Adelaide Fold Belt Early Cambrian Kanmantoo Group Metasediments Deposit hosted in the Tapanappa Formation longest formation in the Kanmantoo Group Several deformation stages related to Delamerian orogeny Same metasediment formation host as Bremer Cu-Au deposit as well as Aclare, Wheal Ellen, Angas Pb-Zn+/-Ag Figure Adapted from Toteff (1999) 5

KANMANTOO GEOLOGY Lithology Regionally hosted in Biotite Schist (BS) Mineralisation hosted in a 6km wide Fe rich pelite (GABS) Staurolite with minor Muscovite also present Main zone mineralisation hosted in chlorite alteration (BGCS) Deposit Fe-rich; Na/Ca-poor Magnetite in particularly Fe enriched pods 6

KANMANTOO GEOLOGY Mineralisation Most likely epigenetic, though a SEDEX system is still argued Fe-rich fluid metasomatism Mineralisation usually hosted in stockwork vein selvages or podiform lenses Hosted commonly in quartz veins, but also magnetite/chlorite rich fluid intrusions Likely to be multiple generations precipitated/reactivated during rotational stress field 7

KANMANTOO GEOLOGY Mineralogy - Oxides Oxides encountered at shallow depths are predominately the Cucarbonate malachite Azurite is also common in higher grade areas Atacamite, Cu in magnesium oxides, and Cu sulphates are minor occurrences 8

KANMANTOO GEOLOGY Mineralogy - Primary Most common Cu-bearing sulphide mineral is chalcopyrite Others include chalcocite, covellite and rare bornite Pyrite is mostly ubiquitous, transitioning to pyrrhotite at depth Rare galena and sphalerite along with bismuth Cp Silver and gold (usually in native form) are accessory minerals Py Ch/Cv *Cp-Chalcopyrite, Ch-Chalcocite, Cv-Covellite, Py-Pyrite, Gn-Gangue 9

OXIDE / TRANSITIONAL PROCESSING INTRODUCTION Started processing primary sulphide copper (chalcopyrite) ore November 2011 Low cost capital throughput improvement projects have resulted in accelerated processing rates (2.4 to 3.2 Mtpa) 1.2 Mt of high grade copper oxide / transitional ore (sulphide/oxide blend) stockpiled available for treatment to enhance cash flow during the cut back of Kavanagh and Spitfire pits Options considered for treatment of copper oxide / transitional material Acid heap leaching and CPS flotation Based on highest NPV, lowest capital and operational costs it was decided that Controlled Potential Sulphidisation (CPS) Flotation would be used for the treatment of oxide / transitional ore Modification of the existing plant currently underway, including extra float cell, conditioning tanks, reagent area to allow for the successful treatment of oxide and transitional ore 10

PRIMARY TO OXIDE PRIMARY ORE Primary copper sulphide ore is coarse grained chalcopyrite with fast flotation kinetics (P80-212um) Kanmantoo Mineral Resource (Feb 13) 31.30Mt @ 0.78% Copper, 0.20 g/t Gold, 2.11 g/t Ag Ore beneficiation via two stage crushing, SAG milling, standard flotation with regrind, dewatering Previously used processing facility (Lennard Shelf Xstrata, Teck) Float feed density very high 50% solids, Recovery ~ 92%, 24% Copper Concentrate 11

PRIMARY TO OXIDE OXIDE / TRANSITION ORE Extensive metallurgical testwork undertaken 4 in-depth studies completed Operational parameters and modified process flow sheet developed Comminution - Oxide ore less competent, exhibits slight rheology difference Flotation Controlled Potential Sulphidisation (CPS) 4 stages Metallurgical performance optimized by increasing flotation circuit retention time enabling lower pulp density (40%) Cost savings by owners team approach utilizing suppliers and local CPS expertise (Kwan Wong KYSPY) Thickening and Filtration tests indicate host rock similarities between ore types leads to acceptable settling rates and filter moistures no upgrade to thickeners ore filters is currently foreseen 12

WHAT IS CONTROLLED POTENTIAL SULPHIDISATION (CPS)? Sulphidise the copper oxide mineral surface (provide a copper sulphide layer) Sodium Hydrosulphide (NaHS) employed as sulphidising agent Process involves a sulphidising or conditioning stage followed by collector addition and flotation Sulphidisation is critical Too much or too little NaHS = poor metallurgical response No CPS on oxide minerals = poor floats, poor recovery Controlling the pulp potential utilising Eh ORP probes (correlated to an Es set point of -600mV) cascaded to NaHS addition to conditioning tanks CPS much more effective than un-metered additions of sulphidising agent (utilised by Kanmantoo Mines limited 1970 s 1.12% Cu @ 62.2% recovery) Metallurgical test work to date: Oxide Ore : 70-75% Recovery, low to mid 30 s % Oxide Concentrate grade employing 4 stage of CPS conditioning and 5 flotation stages no cleaning Transitional Ore : Process flow design completed, cleaning tests to be completed, will involve a sulphide prefloat followed by three stages of CPS conditioning and floats. Test work still to be finalised, expected 65-70% recovery 13

OXIDE PROCESS FLOW DESIGN Config 65 oxide (2) FLOAT FEED ROUGHER 0 OK100TC ROUGHER 1 / SCAV 1 2 SCAVENGER 1 2 SCAVENGER 4 7 SCAVENGER 8 12 TANK 1 TANK 2 TANK 3 TANK 4 CLEANER 1 4 CLEANER 5 10 FINAL TAIL TANK 5 FINAL CONCENTRATE 14

TRANSITIONAL PROCESS FLOW DESIGN Config 65 oxide (2) FLOAT FEED ROUGHER 0 OK100TC ROUGHER 1 / SCAV 1 2 SCAVENGER 1 2 SCAVENGER 4 7 SCAVENGER 8 12 TANK 1 TANK 2 TANK 3 TANK 4 CLEANER 1 4 CLEANER 5 10 FINAL TAIL TANK 5 FINAL CONCENTRATE 15

PROCESSING PLANT

KEY CONTACTS For further information please contact: Greg Hall, CEO and Managing Director Suite 1709 Australia Square Level 17, 264 George Street Sydney NSW 2000 E: info@hillgroveresources.com.au T: 61 2 8247 9300 17

COMPETENT PERSON STATEMENTS ABOUT HILLGROVE Hillgrove is an Australian mining company listed on the Australian Securities Exchange (ASX: HGO) focused on the operation of the Kanmantoo Copper Mine in South Australia, and with exploration projects on its Indonesian tenements. The Kanmantoo Copper Mine is located less than 55km from Adelaide in South Australia. With construction completed in late 2011, Kanmantoo is an open-cut mine with a throughput of 3.0Mtpa, to produce approximately 100,000 dry metric tonnes of copper concentrate per annum, containing approximately 20,000t copper and associated gold and silver per annum over the current life of mine. Kanmantoo Global Mineral Resource Estimate at End February 2013 In Situ Resource Long Term Stockpiles Note: In Situ Resource >0.20% Cu, Long Term Stockpiles >0.15% Cu. JORC 2012 Tonnage Cu Au Ag Classification (Mt) (%) (g/t) (g/t) Kanmantoo Global Ore Reserve Estimate at End February 2013 In Situ Reserve Measured 2.63 0.88 0.10 1.95 Indicated 21.77 0.82 0.23 2.21 Inferred 5.0 0.67 0.13 1.79 29.46 0.80 0.20 2.11 Measured 1.39 0.46 N/A N/A Indicated 0.50 0.18 N/A N/A 1.89 0.39 - - Total 31.30 0.78 0.20 2.11 JORC 2012 Tonnage Cu Au Ag Classification (Mt) (%) (g/t) (g/t) Proven 2.5 0.77 0.08 1.7 Probable 18.2 0.72 0.20 2.0 20.7 0.73 0.18 1.9 Long Term Stockpiles Proven 1.4 0.46 N/A N/A 1.4 0.46 - - Total 22.1 0.71 0.18 1.9 Note: In Situ Reserve >0.20% Cu. Long Term Stockpiles >0.15% Cu. Competent Person's Statement The information in this release that relates to Mineral Resources is based upon information compiled by Mrs Michaela Wright, who is a Member of The Australasian Institute of Mining and Metallurgy. Mrs Wright is a full time employee of Hillgrove Resources Limited and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mrs Wright has consented to the inclusion in the release of the matters based on their information in the form and context in which it appears. The information in this release that relates to Ore Reserves is based upon information compiled by Mr Steven McClare, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr McClare is a full time employee of Hillgrove Resources Limited and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr McClare has consented to the inclusion in the release of the matters based on their information in the form and context in which it appears. 18

DISCLAIMER IMPORTANT NOTICE No representation or warranty is or will be made by any person (including Hillgrove Resources Limited ACN 004 297 116 ( Hillgrove, HGO, or the Company ) and its officers, directors, employees, advisers and agents) in relation to the accuracy or completeness of all or part of this document (the Document ), or the accuracy, likelihood of achievement or reasonableness of any forecasts, prospects or returns contained in, or implied by, this Document or any part of it. This Document includes information derived from third party sources that has not been independently verified. This Document contains certain forward looking statements with respect to the financial condition, results of operations and business of Hillgrove and certain plans and objectives of the management of Hillgrove. Forward looking statements can generally be identified by the use of words such as project, foresee, plan, expect, aim, intend, anticipate, believe, estimate, may, should, will or similar expressions. Indications of, and guidance on, production targets, targeted output, mine development or timelines, exploration or expansion timelines, infrastructure alternatives and financial position and performance are also forward looking statements. Any forecast or other forward looking statement contained in this Document involves known and unknown risks and uncertainties and may involve significant elements of subjective judgment and assumptions as to future events which may or may not be correct. Such forward looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of the Hillgrove, and may cause actual results to differ materially from those expressed or implied in such statements. There can be no assurance that actual outcomes will not differ materially from these statements. Various factors may cause actual results or performance to differ materially. These include without limitation the following: risks specific to Hillgrove s operations; credit risk; levels of supply and demand and market prices; legislation or regulations throughout the world that affect Hillgrove's business; insurance expenses; the risk of an adverse decision or other outcome relating to governmental investigations; class actions or other claims; growth in costs and expenses; and risk of adverse or unanticipated market, financial or political developments (including without limitation in relation to commodity markets). You are cautioned not to place undue reliance on forward looking statements. These forward looking statements are based on information available to us as of the date of this Document. Except as required by law or regulation (including the ASX Listing Rules) we undertake no obligation to update these forward looking statements. This Document is provided for informational purposes only and is subject to change without notice. Subject to any obligations under applicable laws, regulations or securities exchange listing rules, Hillgrove disclaims any obligation or undertaking to release any updates or revisions to this Document to reflect any change in expectations or assumptions. Nothing in this Document should be interpreted to mean that future earnings per share of Hillgrove will necessarily match or exceed its historical published earnings per share, or that there has been no change in the affairs of Hillgrove since the date of this Document. Nothing contained in this Document constitutes investment, legal, tax or other advice. The information in this Document does not take into account the investment objectives, financial situation or particular needs of any recipient. Before making an investment decision, each recipient of this Document should make its own assessment and take independent professional advice in relation to this Document and any action taken on the basis of this Document. All currency referred to is Australian Dollars (AUD) unless otherwise indicated. Hillgrove has moved from a 31 January to 31 December year end, so current references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Sep and Q4 Oct-Dec (CY14). In 2015 Q1 and Q2 will be Jan-Mar and Apr-Jun. 19 19