Minnesota State Permitting Process for Large Wind Energy Conversion Systems

Similar documents
Minnesota Energy Facility Permitting

MURRAY COUNTY WIND ENERGY ORDINANCE

ORDINANCE NO. Commercial WECS: A WECS of equal to or greater than 15 kw in total name plate generating capacity.

CUP APPLICATION WIND ENERGY CONVERSION SYSTEMS (WECS) Commercial or Non-Commercial

Wind Turbine Zoning for CERTs

BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION

Attached are comments and recommendations of Department of Commerce, Energy Environmental Review and Analysis (EERA) staff in the above matter.

SECTION 12 WINDPOWER MANAGEMENT ADOPTED: FEBRUARY 15, 2005 TABLE OF CONTENTS SUBDIVISIONS... PAGE

SECTION SPECIAL REQUIREMENTS FOR WIND ENERGY CONVERSION SYSTEM

Attached are comments and recommendations of Department of Commerce, Energy Environmental Review and Analysis (EERA) staff in the above matter.

TURBINE AND TRANSMISSION NEIGHBORS?

SECTION 25: WIND ENERGY CONVERSION SYSTEMS (WECS)

Article 18 Wind Energy Conversion System Regulations

Humboldt County Ordinance #68 Commercial/Utility Grade Wind Energy Conversion Systems (WECS) PURPOSE DEFINITIONS

SECTION 25: RENEWABLE ENERGY ORDINANCE

Commercial WECS: A WECS of equal to or greater than [100/40] kw in name plate generating capacity. Wind Energy Conversion System Ordinance

DRAFT SITE PERMIT. For LARGE WIND ENERGY CONVERSION SYSTEM COTTONWOOD COUNTY ISSUED TO SUMMIT WIND, LLC EQB DOCKET NO.

September 16, EQB Board Members. George Edwin Johnson EQB Staff

Wind Energy ARTICLE XL - WIND ENERGY AN ORDINANCE REGULATING THE DEVELOPMENT OF WIND ENERGY SYSTEMS

Chapter 750 WIND POWER GENERATION FACILITIES

Wind Energy Conversion System Ordinance of Otter Tail County Effective February 15, 2011

Public Utilities Commission Site Permit Application for a Large Wind Energy Conversion System

Zoning Regulations for Large and Small Wind that are Working

CHIPPEWA COUNTY LAND AND RELATED RESOURCE MANAGEMENT ORDINANCE SECTION 16 SOLAR POWER MANAGEMENT TABLE OF CONTENTS SUBDIVISION 1.

2.04 Applicability. This ordinance applies to all unincorporated lands within the boundaries of Henry County.

ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: December 19, 2007

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

INTRODUCTION. Understand Your Goals. Large WECS, Small WECS. Model Wind Energy Standards. Model Wind Energy Ordinance

Solar Energy as a Community Resource. Fritz Ebinger Clean Energy Resource Teams (CERTs) MN Association of Townships November 16, 2018

Appendix O FEIS ID #270. O-644 CapX Hampton-Rochester-La Crosse 345kV and 161kV Transmission Lines Project: Final Environmental Impact Statement

Benton County Wind Farm LLC. Loraine L. Seyfried Administrative Law Judge Indiana Utility Regulatory Commission

CARLTON COUNTY RENEWABLE ENERGY ORDINANCE #32

STATE OF MINNESOTA ENVIRONMENTAL QUALITY BOARD

Wind Energy Ordinances

STATE OF MINNESOTA BEFORE THE PUBLIC UTILITIES COMMISSION

Nance County Zoning Regulations for Wind Energy Conversion Systems

CITY OF TONKA BAY COUNTY OF HENNEPIN STATE OF MINNESOTA ORDINANCE NO

BULL MOOSE 115 KV PROJECT

MINNESOTA LOCAL GOVERNMENT WIND TOOLKIT

Clustering: The grouping of wind turbines positioned or occurring closely together around a particular dwelling.

Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red.

TOWNSHIP OF WEYMOUTH ATLANTIC COUNTY NEW JERSEY ORDINANCE NO

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND

Minnesota Public Utilities Commission Site Permit Application for a Large Wind Energy Conversion System

Ohio Power Siting Board. Staff Investigation Report and Recommendation

List of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview...

STATE OF MINNESOTA BEFORE THE PUBLIC UTILITIES COMMISSION

BEFORE THE OHIO POWER SITING BOARD

Article 57 WIND GENERATION AND WIRELESS COMMUNICATION TOWERS

Section 2202 Applicability. This regulation applies to all lands within the boundaries of Austintown Township, Mahoning County, State of Ohio.

Publication Date: October 17, 2011 Next Publication: October 31, 2011 Submittal Deadline: October 24, 2011 Submit to

EXECUTIVE SUMMARY. Supplemental Environmental Impact Statement Jericho Rise Wind Farm

ORDINANCE BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF NORTH MYRTLE BEACH, SOUTH CAROLINA, IN COUNCIL DULY ASSEMBLED, THAT:

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

Wind Energy Facility Siting and Permitting in South Dakota

CITY OF DELANO COUNTY OF WRIGHT STATE OF MINNESOTA ORDINANCE NO.

DRAINAGE REPAIR POLICY FOR COUNTY DRAINAGE SYSTEMS. Drainage System No.

TOWNSHIP OF STURGIS ST. JOSEPH COUNTY MICHIGAN ORDINANCE NO ADOPTED: October 1, EFFECTIVE: October 22, 2018

1.0 INTRODUCTION 1.1 SUMMARY OF SEQRA PROCESS

WIND ENERGY CONVERSION SYSTEMS

3.0 UNAVOIDABLE ADVERSE IMPACTS. 3.1 General Mitigation Measures

Proposed UNION COUNTY ORDINANCE # 73

HEIGHT, TOTAL SYSTEM: The height above grade of the system, including the generating unit and the highest vertical extension of any blades or rotors.

TELECOMMUNICATIONS AGENDA

Wind Development: Benefits and Constraints

Dispersed Renewable Generation Transmission Study by Mike Michaud Matrix Energy Solutions June 27, 2008

U.S. DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE SERVICE OKLAHOMA ECOLOGICAL SERVICES FIELD OFFICE

Cassadaga Wind Project Exhibit 6. Wind Power Facilities

# Central States Tower/ Verizon Wireless Special Use Permit & Zoning Variation Project Review for Planning and Zoning Commission

Minnesota Public Utilities Commission

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

Possible Impacts of Low Frequency Wind. Rita B. Messing, Ph.D. Carl Herbrandson, Ph.D. Risk Assessment Course, Feb. 2011

MEETING DATE: ADOPTED ON EARTH DAY: APRIL 22, 2008 AGENDA ITEM COMMENTARY

IT IS HEREBY ENACTED AND ORDAINED by Paradise Township, York County, Pennsylvania as follows:

Developing a Wind Farm. Bill Whitlock, June 26, 2008 Bloomington, IL

TABLE OF CONTENTS PAGE SECTION

REPORT TO THE MINNESOTA LEGISLATURE

Grant County Wind: Revised Decommissioning Plan

17. Commercial WECS S P X X X X X X X X B C

COUNTY OF CARVER PUBLIC SERVICES DIVISION Department of Land Management

ORDINANCE NO

Greengate Power Corporation

APPLICATION TO THE MINNESOTA PUBLIC UTILITIES COMMISSION

SEWRPC Model Zoning Ordinance ZONING REGULATIONS FOR WIND ENERGY SYSTEMS

MCLEOD COUNTY JOINT DRAINAGE SYSTEM POLICY AND GUEIDELINES FOR REPAIR

CHAPTER 725. Solar Farms.

NOTICE OF EIS PREPARATION

8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

Agricultural/Rural Riparian Buffer Analysis

Publication Date: December 18, 2006 Next Publication: January 1, 2007 Vol. 30, No. 26 Submittal Deadline: December 22, 2006

Wind Power Development on Port of Corpus Christi Authority Property

ORDINANCE NO. THE LENT TOWNSHIP BOARD OF SUPERVISORS ORDAINS: The following language is hereby added to the Lent Township Zoning Ordinance:

BILL NO. B ORDINANCE NO TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

2

TABLE OF CONTENTS STANDARDS FOR NON COMMERCIAL ENERGY FACILITIES, COMMERCIAL ENERGY FACILITIES & RELATED USES. (Amended 4/12) SECTION TITLE PAGE

POLLUTION CONTROL AGENCY An Inventory of Its Environmental Quality Review Files

POWER PLANT SITING ADVISORY TASK FORCE ON WIND POWER IN MINNESOTA

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

Overview of Proposed Amendments to NR 151

In May of 2011, Council completed a three year project to develop regulations for largescale wind turbines in the County.

Transcription:

Minnesota State Permitting Process for Large Wind Energy Conversion Systems Deborah Pile, supervisor Energy Facility Permitting Office of Energy Security Minnesota Department of Commerce

Minnesota Energy Facility Permitting Large Wind Energy Conversion Systems Large Electric Power Generating Plants High Voltage Transmission Lines Pipelines

Minnesota Program Began in 1995 Wind Siting Act Minnesota Statute 216F The siting of Large Wind Energy Conversion Systems (LWECS) projects of 5 MW or more is to be made in an orderly manner compatible with environmental preservation, sustainable development, and the efficient use of resources (Minn. Stat. 216F.03). Local government may regulate projects less than 25 MW in combined nameplate capacity. Less than 5 MW is a Small Wind Energy Conversion Systems. Between 5 MW and 25 MW if assume authority to regulate LWECS via Minn. Stat. 216F.08.

Wind Permitting Trends In Minnesota > 1,800 MW (>1,400 turbines) in Minnesota today, plus 600 turbines permitted but not built. Projects increasing in number and size 12+ projects in PUC process 1,300+ MW, 800+ turbines 12+ additional projects expected in next year for another 1,000+ MW Concentrated in southern Minnesota, but expanding across state Drivers MISO deadlines, Grants, Transmission, Wind Resources, Renewable Requirements

Total Number of Megawatts by Year For Wind Power Projects in MN State Process 2005-2010 2500 2000 1500 1000 500 2005 2006 2007 2008 2009 2010 0

Wind Development in Minnesota

Public Utilities Commission Wind Permitting Provides consistent process and standards statewide Up to 6 month process Alternate form of Environmental Review not required to prepare an EIS, EA, or EAW for Minnesota Public notice, participation, comments Site permits issued for up to 30 years and may be amended

PUC Permitting Process Minnesota Rules 7854

County Delegation (Minnesota Statutes Chapter 216F) County Delegation Program Overview PUC General permit standards for wind developed Standards apply to projects < 25 MW, variance allowed Counties may be more restrictive by ordinance Technical assistance to counties How to Assume Authority Adopt standards by ordinance and pass resolution Written notice to PUC Clarified Project Size Definition Established project sized determination procedure Applications to counties must include the determination

LWECS Permitting Requirements General Permit Standards Minn. Stat. 216F.08 directed PUC to adopt standards for projects less than 25 MW PUC Order, January 11, 2008 (Docket #: 07-1102) Establishes minimum standards. Setbacks Size Determination Permittee Responsibilities Studies/Surveys/Plans Reporting Pre-Construction Meeting

County LWECS Permitting Approach Amend existing ordinances to: Incorporate General Permit Standards Adopt more restrictive standards, such as: Larger setbacks Setbacks from additional features Exclusion areas Can be different for commercial, non-commercial sized turbines Current Counties with Delegation: Lyon Freeborn Murray Lincoln Stearns Meeker

PUC General Permit Setbacks Issue Wind Access Buffer (setback from lands not in permittee s control) Homes Noise Standard Public Roads Wetlands PUC General Permit Setback Minimums 3 RD (760 985 ft) on east-west axis 5 RD (1280 1640 ft) on north-south (RD = rotor diameter = 78 100 m) 500 feet + distance to meet state noise standard. 750 1500 ft typically required to meet state noise standard. (Minnesota Rules Chapter 7030). 250 ft from edge of public road ROW. No turbines in wetlands and no setback; but Wind Access Buffer setback applies to public lands.

Additional Standards Include Native prairie, biological and archeological surveys. Public road permits required and repair construction related damages. NPDES storm water permit for construction projects. Utility scale, monopole design turbines, not prototypes. Off white or white in color. Lighting and safety marking limited to FAA requirements. Conditions for crop damage and restoration; drain tile avoidance, repair. Preconstruction emergency plan. Tower identification and as-built GIS data submitted to PUC. TV signal strength study (baseline) and preconstruction microwave beam path analysis. Decommissioning plan. Special Conditions.

PUC Permit Prevails PUC's permits preempt local planning and zoning LWECS permit is the only site approval required. Local governments encouraged to comment during the state permitting process PUC must apply county standards for LWECS unless PUC finds good cause to not apply those setbacks.

Docket Records Define Conditions General Permit Standards Docket Health Effects Docket Natural Resource, including Avian and Bat Impacts Individual Project Dockets If PUC's state permitting authority is to be used to establish conditions, the record for these conditions must be developed within PUC's process.

PUC Permits the Box

Exclusion Areas Defined in Process

Details Come Through Compliance

Other Permits Wetland and Water Impacts Section 404 (COE), WCA (SWCD), PWI (DNR) License to cross public waters (DNR) Turbine Location and Lighting Proposed Construction or Alteration (FAA) Sediment Control NPDES storm water permit for construction projects Transportation and Road Permits State, County, Township oversize/overweight, driveway access, utility crossing. Other Project Specific Permits Additional permitting maybe be required for the interconnection, O&M building, and other project components.

Local Review of Associated Facilities Associated Facilities Transmission lines, substations, O&M building Local Review for Transmission Lines Minn. Stat. 216E.05, Minn. Rule 7850.5300 HVTL between 100 and 200 kv Substations with a voltage designed 100 kv Other facilities Within 10 days of notifying local government, applicant must notify PUC Local government can request PUC to assume jurisdiction within 60 days. Requires Environmental Review with scoping

For Further Information on Minnesota s Permitting Process for Large Wind Energy Conversion Systems see: http://energyfacilities.puc.state.mn.us/ wind.html Deborah Pile, supervisor Energy Facility Permitting Office of Energy Security Minnesota Department of Commerce