DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Similar documents
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

Environment protection measures / technology

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

J-11011/45/2009- IA II (I)

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

Environmental Clearance Compliance Half Yearly Report

COMPLIANCE STATUS REPORT

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

Environmental Clearance Compliance Half Yearly Report

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Environmental Clearance Compliance Half Yearly Report

Calcom Cement India Limited

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

Janki Corp. Ltd., Six Monthly Compliance Report

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Six Monthly Compliance Status Report

Cement Manufacturing Company Ltd. Page 1

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA

Environmental Clearance Compliance Half Yearly Report

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Telefax: 011: Dated:10 th May, 2013

Mangalam Cement Ltd. (Unit-II) Stack No.

Telefax: 011: Dated: 8 th March, 2013

Monitoring the Implementation of Environmental Safeguards

Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power.

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance Status Report

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited

Mill Expansion Cum Augmentation Project Compliance

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata

Mangalam Cement Ltd.(Unit I)

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

Environmental Clearance Compliance Half Yearly Report


(Period April 2017 ~ Sept. 2017)

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE

(A) Specific Conditions

Compliance Report of EC : Compliance Status

Mangalam Cement Ltd.

Name of the Project:- J&K Mineral Development Corporation Limited.

J-11011/371/2016-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (Impact Assessment Division)

F. No. J-11011j51j2016-IA.II (I) Telefax:

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

Mangalam Cement Ltd. Clearance Letter No. :- F NO. J / 30/ IA II (I), dtd 17/07/2007

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

NATCO PHARMA LIMITED CHEMICAL DIVISION

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

FORM-V (See Rule - 14) Part-A

Ref: Online proposal no. IA/AP/IND2/57973/2016 dated 6th September, 2017

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

Hind Energy & Coal Beneficiation (India) Ltd.

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Rajasthan State Pollution Control Board

(E.C. Letter No. F.No.J-11011/107/2013-IA II (I) Dated ) (For the Period 1 st October 17 to 30 th March 18)

SIX MONTHLY COMPLIANCE REPORT OF BORHAT-TITLAGARH AREA

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

A. SPECIFIC CONDITION COMPLIANCE

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

Sr.No Condition Status A. SPECIFIC CONDITIONS:

qqfq(ui qci CA' ~< Government of India Ministry of Environment & Forests (IA Division)

Compliance Status Report of Environmental Clearance No. J 11011/257/2008 IA II (I) dated 23/11/2010

J-11011/15/ IA II (I)

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

State Level Environment Impact Assessment Authority

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Rajasthan State Pollution Control Board

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory

Hind Energy & Coal Beneficiation (India) Ltd.

J.K. Cement WORKS, NIMBAHERA (RAJ)

; Fax No. :

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd.

THE RAMCO CEMENTS LIMITED

F. No. J-11011/28/2007- IA II (I)

Transcription:

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA, II(I), dated 15.02.2008 Duration October 2016 to March 2017 Sl. No. Condition Present Status A i. SPECIFIC CONDITIONS: Natural gas shall be used as fuel as well as feed stock. No naphtha shall be used after de-bottlenecking. ii. On-line stack monitoring facilities for all the stacks and sufficient air pollution control methods to various process units to control CO 2, NH 3, Urea dust emissions etc. shall be provided. The gaseous emissions (SO 2, NO x, NH 3, Urea dust) and particulate matter from various process units shall conform to the standards prescribed by the concerned authorities from time to time and maintained below 100 mg/nm 3. Regular monitoring reports for all the relevant parameters shall be submitted to the Regional Office at Bangalore, CPCB and iii. Total NO x emissions after expansion shall not be increased over and above the existing NO x emission levels. NO x burners shall be provided to control NO x emissions. w.e.f. 11.08.09, Natural Gas is being used as Feedstock & Fuel. As per the directives of CPCB, online stack monitoring for CFG Plant Stack has been commissioned. De-dusting system has been incorporated in the prilling tower top to reduce dust emissions. The emissions from all stacks are within the stipulated limits. CDR unit of 450 MTPD capacity has been installed to recover Carbon Dioxide from the flue gases of Ammonia plant which led to reduction of substantial amount of Carbon Dioxide being emitted into the atmosphere which is a small step towards reducing NFCL s carbon footprint. Monitoring reports for all the relevant parameters are being submitted to the Regional Office at Bangalore, CPCB and NO X emissions have not increased after expansion. Low NO X burners were installed in primary reformer to limit the NOx emissions at the inception stage itself. iv. The secondary fugitive emissions shall The secondary fugitive emissions are be controlled and monitored as CPCB controlled and monitored as per CPCB guidelines and reports submitted to the guidelines and reports are submitted to Regional Office at Bangalore, CPCB the Regional Office at Bangalore, CPCB and De-dusting system shall and be provided to urea prill tower to De-dusting system has been provided at control urea dust. Urea Prill tower to control urea dust. v. Total water requirement from Godavari Total water requirement and effluent Page 1 of 6

River and effluent generation shall not exceed 25,100 m 3 /day (including 5,560 m 3 /day for the expansion project) and 550 m 3 /day respectively. No effluent shall be generated from the fertilizer plant and entire quantity of treated wastewater shall be recycled and reused in the process, dust suppression and green belt development. `ZERO effluent discharge will be maintained. vi. Prior permission for he drawl of water from the Godavari River shall be obtained from the concerned department. vii. Regular monitoring of ground water by installing peizometric wells around the guard pond and sludge disposal site shall be periodically monitored and reports submitted to Ministry s Regional Office at Bangalore, CPCB and viii. The solid waste i.e. ETP sludge shall be used for green belt development. Waste oil shall be sold to the authorized recyclers / re-processors. ix. As proposed, green belt shall be developed in 789 acres (70%) out of total 1,127 acres and existing plantation shall be properly maintained to mitigate the effects of fugitive emissions all around the plant as per the Central Pollution Control Board guidelines. x. Permission from the National Board of Wildlife / Chief Wildlife Warden shall be obtained regarding impact of the proposed expansion on the Coringa Mangroves sanctuary located nearby and recommendations, if any shall be implemented in a time bound manner. xi. The company shall implement all the recommendations made in the Charter on Corporate Responsibility for Environmental Protection (CREP) for Fertilizer Industries. generation in NFCL complex are as follows: The treated liquid effluent is utilized for irrigation of green belt and its sustenance. NFCL is a Zero Effluent discharge plant as no effluent is discharged outside the boundary limits of the complex. Final treated effluent discharged to green belt conforms to the prescribed regulatory standards Permission for the drawl of water from the Godavari River has been obtained. Groundwater quality in the surrounding areas is monitored on a monthly basis and reports are submitted to RO and ZO ETP sludge is not generated in the complex. Waste oil is disposed to authorized recyclers/re-processors. Green Belt is maintained in 789 acres of land to mitigate the effects of fugitive emissions all around the plant as per the Central Pollution Control Board guidelines. As per the Environment Clearance letter accorded by MoEF, Application was submitted to the Chief Wildlife Warden, Hyderabad on 22.02.08 and 08.08.12 All the recommendations made in the Charter on Corporate Responsibility for Environmental Protection (CREP) for Fertilizer Industries have been implemented. Page 2 of 6

B. GENERAL CONDITIONS: i. The project authorities shall strictly adhere to the stipulations made by the Andhra Pradesh Pollution Control Board (APPCB). ii. No further expansion or modifications in the plant shall be carried out without prior approval of the Ministry of Environment and Forests. In case of deviations or alterations in the project proposal from those submitted to this Ministry for clearance, a fresh reference shall be made to the Ministry to assess the adequacy of conditions imposed and to add additional environmental protection measures required, if any. iii. The gaseous emissions (SO 2, NO x, NH 3, Urea dust) and particulate matter from various process units shall conform to the standards prescribed by the concerned authorities from time to time. At no time, the emission levels shall go beyond the stipulated standards. In the event of failure of pollution control system(s) adopted by the unit, the respective unit shall not be restarted until the control measures are rectified to achieve the desired efficiency. iv. Ambient air quality monitoring stations shall be set up in the downwind direction as well as where maximum ground level concentrations are anticipated in consultation with the APPCB and data submitted to the Ministry s Regional Office at Bangalore six monthly and APPCB quarterly along with statistical analysis. v. Fugitive emissions including NH 3, Urea dust concentrations in the work zone environment, product, raw material storage area shall be controlled and monitored. The emissions shall conform to the limits imposed by The stipulations made by the Andhra Pradesh Pollution Control Board (APPCB) are adhered to strictly. No expansion or modification has been carried out in the plan without approval of the concerned authorities. All the emissions are maintained well below the prescribed limits as specified by the concerned authorities. Ambient Air Monitoring stations have been installed for continuous monitoring of ambient air. The locations of the ambient air monitoring stations were in consultation with Reports are submitted on a six monthly basis to the Ministry s Regional Office at Bangalore and on a monthly basis to Fugitive emissions of NH 3, Urea dust and CO are monitored in the work zone environment, product and raw material storage area and these are well below the stipulated standards. Page 3 of 6

vi The project authorities shall strictly comply with the rules and regulations under Manufacture, Storage and impact of Hazardous Chemicals Rules, 1989 as amended in October 1994 and January 2000. Authorization from the APPCB shall be obtained for collection, treatment, storage and disposal of hazardous wastes. vi. The project authorities must strictly comply with the rules and regulations with regard to handling and disposal of hazardous wastes in accordance with the Hazardous Wastes (Management and Handling) Rules, 2003. Authorization from the A.P. Pollution Control Board must be obtained for collections / treatment / storage / disposal of hazardous wastes. viii. The overall noise levels in and around the plant area shall be kept well within the standards (85 dba) by providing noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation. The ambient noise levels shall conform to the standards prescribed under Environment (Protection) Act, Rules, 1989 viz. DBA (day time) and 70 dba (night time) ix. Occupational health surveillance of the workers shall be done on a regular basis and records maintained as per the Factories Act. x. The company shall undertake ecodevelopmental measures including community welfare measures in the project area for the overall improvement of the environment. xi. The company shall adopt suitable surface as well as roof top rain water harvesting measures to harvest the run Being Complied. Hazardous Waste Handling authorization was obtained for collection, treatment, storage and disposal of hazardous wastes from the Being Complied. Hazardous Waste Handling authorization was obtained for collection, treatment, storage and disposal of hazardous wastes from the Noise control measures like acoustic hoods, silencers, enclosures etc. have been provided on all sources of noise generation in the plant. Monitoring of noise levels in the plant is done on regular basis and the values are below the stipulated limits. Medical examination is conducted at Occupational Health Center for all the personnel and records are maintained as specified in the Factories Act. As a part of eco developmental measures, a green Belt has been developed in an area of 789 acres of land. Community welfare measures are undertaken for people in and around the plant area for the overall improvement of the environment as a part of CSR Activities. The company has adopted surface as well as roof top rain water harvesting measures to harvest the run off water for Page 4 of 6

off water for recharge of ground water. Methods shall also be adopted for the conservation of water through and recycling and reusing the treated wastewater. xii. The project proponent shall also comply with all the environmental protection measures and safeguards recommended in the EIA report. xiii. A separate Environmental Management Cell equipped with full-fledged laboratory facilities shall be set up to carry out the Environmental Management and Monitoring functions. xiv. Adequate funds shall be earmarked for environmental pollution control measures respectively shall be utilized to implement the conditions stipulated by the Ministry of Environment and Forests as well as the State Government and an implementation schedule shall be submitted to Ministry s `Regional Office at Bangalore for implementing all the conditions stipulated herein. The funds so provided shall not be diverted for any other purpose. xv. The implementation of the project visà-vis environmental action plans shall be monitored by Ministry s Regional Office at Bangalore / APPCB / CPCB. A six monthly compliance status report shall be submitted to monitoring agencies. xvi. The project proponent shall inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the APPCB and may also be seen at Website of the Ministry at http://envfor.nic.in. This shall be advertised within seven days from the date of issue of the clearance letter, at least in two local newspapers that are widely circulated in the region of recharge of ground water. All the environmental protection measures and safeguards recommended in the EIA report are being complied with. A separate Environment Management Dept with a full-fledged laboratory has been setup to carry out the Environmental Management and Monitoring functions. Adequate funds are earmarked for environmental pollution control measures and it is ensured that these funds are not diverted for any other purposes. The compliance status is communicated to APPCB/CPCB through monthly, quarterly, six monthly and annual reports. The said information was shared by means of advertisements in two newspapers viz. Andhra Prabha and The Financial Express on 23.02.08. Xerox copies of the advertisements were sent to APPCB, EE, Kakinada vide letter dated 29.02.08. Page 5 of 6

which one shall be in the vernacular language of the locality concerned and a copy of the same shall be forwarded to the Ministry s Regional Office at Bhopal. xvii. The project authorities shall inform the Regional Office as well as the Ministry, the data of financial closure and final approval of the project by the concerned authorities and the date of start of the project. _ Page 6 of 6