Implementing Surveillance Tools and Processes to Improve Performance and Identify Possible Opportunities in Mature CO 2 Floods

Similar documents
Update of Lost Soldier/Wertz Floods Living in a Constrained CO 2 Environment

Effects of Enhanced Oil Recovery on Production Engineers, Elm Coulee Field, Bakken Reservoir, Richland County, Montana

INJECTION CONFORMANCE IN CO 2 FLOODS

SACROC CO 2 Flood Project Challenges: Past, Present, and Future

Moving from Secondary to Tertiary Recovery Stages. 9 TH ANNUAL WYOMING EORCO2 CONFERENCE JULY 14-16, 2015 Casper, WY By Jim Mack MTech Ventures LLC

Hearing How An Operator Monitored Individual Producing Well Pump Intake Pressures To Maximize The Areal Sweet In A CO2 Flooding Operation In The

Timber Creek Field Study for Improving Waterflooding

EORI 6 th Annual CO 2 Conference. Improving Conformance in CO 2 Floods with Polymer Gel Treatments. Michael Lantz TIORCO

Monell Unit CO 2 Flood

Optimal Tertiary Recovery Strategies for Mature Wells. More Oil, Naturally. Daan Veeningen

Experiences in the Salt Creek Field CO2 Flood

Delay P&A Through Improvement in Oil Cut for Mature Offshore Facilities

Applicability of Gravity-Stable CO2 Injection in Mature Tensleep Reservoirs with Large TZ/ROZs

Case Study of Polymer Flooding a Heavy Oil in the Tambaredjo Field, Suriname 2008 till now

CONTENTS. Goal Zero Safety Culture...2. Unlock Your Reservoir...4

Rejuvenating A Mature EOR Asset: Miscible CO 2 Flooding at SACROC. Mark Linroth Kinder Morgan CO 2 Company, LP December 7 th, 2012

Monell CO 2 EOR Unit. Grant Caldwell. December 6 th, Presented at the Annual CO 2 & ROZ Conference, Midland, Texas; Dec 6, 2018

Wyoming CO 2 Status and Developments. Glen Murrell

Murphy Oil Company LTD.

SOUTH CASPER CREEK: Steamflood Pilot Implementation

Navigating through the Challenges of NSPS OOOOa

The Potential For Secondary Recovery Projects in Wyoming

EOR in the US, Success of Gas Injection

CO 2 EOR Operational Considerations Case Study

Managing a CO 2 Development in a Privately Funded Environment: The GLSAU Project

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project Middle Bakken East Manson, Manitoba

Performance Optimization of Water Alternating CO 2 Flooding in Tight Oil Formations

Turning around the Tern

Practical Workflows for Reservoir Management and Production Enhancement in Fields under Waterflooding

Field Demonstration of CO 2 Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas

Waterflood Monitoring and Management. On-Line Monitoring. Waterflood Monitoring and Management. Waterflood Systems

PRODUCTION WELL WATER SHUT-OFF TREATMENT IN A HIGHLY FRACTURED SANDSTONE RESERVOIR

Historic IOR/EOR practices in the Minnelusa

Thermal Recovery Status and Development Prospect for Heavy Oil in China

Connectivity Analysis; Understanding Waterflood Behavior, Connectivity for EOR Analysis. Richard Baker September-2012 Jackson Hole Wyoming

EORI Screening & Scoping tools for Wyoming Oil Fields

Feasibility of CO 2 Flooding Higher Viscosity Oils, Field Results, and Screening. Presented by: Richard Baker, December 7, 2012

SIMULATION OF POLYMER FLOODING APPLIED FOR OIL FIELD IN PHITSANULOK BASIN

POWERWAVE - WATERFLOOD Case History, ALBERTA, CANADA. Les Garner & John Warren

EOR and IOR in Wyoming

CO 2 EOR - What s Working, What s Under Evaluation An Existing Technology Overview

January 8, 2010 SUBJECT. Middle Bakken Formation / Three Forks Formation. Daly Bakken Three Forks Pool (01 62B) Daly Field, Manitoba

This is Reservoir Engineering COPYRIGHT. By the end of this lesson, you will be able to:

MAXIMIZING OIL RECOVERY EFFICIENCY AND SEQUESTRATION OF CO 2 WITH GAME CHANGER CO 2 -EOR TECHNOLOGY

COPYRIGHT. Development of a Gas Condensate Reservoir. The Anschutz Ranch East Field: Case Study

Considerations for Chemical Flooding

For contact information, please visit our website:

EOR: The Economic Alternative for CCS Denbury Resources Inc. Gasification Technology Conference October 2007

New Methods and Technologies in Petroleum Geology, Drilling and reservoir Engineering. June Krynica, Poland

Role of Enhanced Oil Recovery in Carbon Sequestration The Weyburn Monitoring Project, a case study

A CO 2 Midstream Overview

Reservoir Simulation & Forecasting Course Outline

The Science and a Case History of CO 2 Conformance Through the Use of Complex Nano Fluids

Digital Oilfield A Template based Approach. Meyer Bengio Vice President Petroleum Engineering Schlumberger Information Solutions

Oxy CO 2 EOR Project Discussion Draft MRV Plan

Weyburn Unit Extending The Horizon

Reducing uncertainty in fracture modeling using dynamic data: McElroy field case

12 Reservoir technolgy August Classification: Internal

Enhanced Oil Recovery Institute IOR/EOR Conference Jackson, Wyoming September 10 & 11, 2012

EVALUATION OF WATER AND GAS INJECTION IN A CARBONATE RESERVOIR

Analogs in Resource Assessment and Beyond

Modeling and Monitoring Associated CO 2 Storage at the Bell Creek Field

RDS Aberdeen. Thursday, May-05-11

ENHANCED OIL RECOVERY PLANNING FOR THE LUCKEY DITCH FIELD

BELL CREEK TEST SITE BASELINE MVA INITIATED

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation

Reservoir Development Plans

Carbon Dioxide White Paper Prepared for the Wyoming Joint Minerals, Business and Economic Development Interim Committee October 4, 2006

Oil Recovery Enhancement: Approaches, Methods, Project Design and Current Status, Application to Egyptian Oil Fields

60%+ CO 2 -EOR TECHNOLOGY

A QRI white paper. Quantum Reservoir Impact

The Effect of Different Carbon Dioxide Injection Modes on Oil Recovery

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation

Detailed Reservoir Modeling and Simulation YES. Delay... Business-As-Usual or Different EOR Technology. (i) (ii) (iii) (iv) (v) (vi)

CO 2 -Enhanced Oil Recovery, Applying a Mature Technology in Kentucky

Production Performance Optimisation

CO 2 Foam for Enhanced Oil Recovery and CO 2 Storage

SPE Copyright 2006, Society of Petroleum Engineers

of Reservoir Temperature as a Favorable Factor for Application of In Situ Combustion

Digital Montana Tech. Montana Tech Library. Charles Ohalekwu Montana Tech. Spring 2017

Feasibility of Gas Drive in Fang-48 Fault Block Oil Reservoir

COPYRIGHT. Reservoir Drive Mechanisms Review. Spectrum of Reservoir Energies. Reservoir Management Core. PetroSkills, LLC. All rights reserved.

EOR Economics Research E O R I TA B M E E T I N G J A N

Optimizing Production: Integrated Field Surveillance & Cost Efficient Analytical Tool Approach (DEJ Event 29 th Sept, 2015)

Mature Fields: Key Factors for Successful EOR Projects*

A Global Perspective for IOR and Primary in Unconventional Tight Oil and Gas Reservoirs. Richard Baker May-13

Steam Injection. Dr. Helmy Sayyouh Petroleum Engineering Cairo University

Representing EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

8. Storage options with EOR

For personal use only Operations Update

Resource Royalty Ltd. Land Leasing & Drilling Opportunity- Central Alberta Mannville and Duvernay Oil Plays November 2017

OIL AND GAS DOCKET NO

INJECTION OF NATURAL GAS INTO RESERVOIRS: A FEASIBLE SOLUTION TO GAS FLARING IN NIGERIA

Cenovus EnCAID approval #10440J Performance presentation

POLYMER FLOODING Dr. Helmy Sayyouh Petroleum Engineering Cairo University

The SPE Foundation through member donations and a contribution from Offshore Europe

CO 2 TRANSPORTATION AND EOR The Genesis of the Carbon Highway

Annual Performance Presentation

An Update on the Saskatchewan CO2 Floods (Weyburn+Midale) and Storage Monitoring Activities

Building an Enhanced Oil Recovery Culture to Maximise Asset Value. Marco Rotondi Stavanger, 28 th April 2015

Transcription:

Implementing Surveillance Tools and Processes to Improve Performance and Identify Possible Opportunities in Mature CO 2 Floods Juan J. Nevarez Exploitation Engineer

Agenda Field History Geologic Setting Reservoir Data Production History Reservoir Surveillance Process & Activity Reservoir level review Pattern level review Well level review Production Surveillance Process WAG management reports Well testing reports Impact of Reservoir & Production Surveillance Cambrian downspacing Field performance

Discovery: 1916 by Bair Oil Company 269 well in 1 st Frontier Formation Lost Soldier No. 1 IP = 200 bopd. Earliest production from shallow horizons Frontier, Muddy, Lakota, Morrison and Sundance Development 1930 s: Lost Soldier Tensleep discovered Well IP = at 2,435 bopd 1936: Wertz Field discovered 1947: Madison discovered 1975 Acquired by Amoco 1999 Acquired by Merit Energy Company Unitization Wertz: 1937 Lost Soldier 1962 Secondary & Tertiary Floods Waterfloods initiated in the mid/late 1970 s CO 2 Floods initiated in the late 1980 s

Location: Great Divide Basin Northwestern edge of the Rawlins Uplift Structure: Faulted anitclines Eight Producing Horizons (youngest to oldest) Frontier Muddy Lakota Sundance Tensleep (CO 2 ) Darwin (CO 2 ) Madison (CO 2 ) Flathead (CO 2 ) TENSLEEP STRUCTURE MAP Wertz ABC Unit Fields: Lost Soldier: 250 wellbores 500 mmbbl OOIP Wertz: 164 wellbores 250 mmbbl OOIP Lost Soldier Unit

Average Formation Average Air Perm Current Res Press Oil Grav Formation Lithology Depth Thickness Porosity md Spacing psi API Tensleep SS 5,000 535 9.9% 31.0 10-20 2,800 35 Darwin SS 5,500 65 13.0% 36.0 20-30 2,650 35 Madison LS/DOL 5,565 340 9.0% 2.5 20-30 2,650 35 Cambrian SS 7,000 200 10.5% 30.0 30-40 3,700 35 Tensleep SS 6,200 425 10.9% 20.0 10-20 3,500 35 Darwin SS 6,625 75 13.1% 36.0 20-30 3,300 35 Madison LS/DOL 6,700 400 8.7% 2.5 20-30 3,300 35 General Statistics 158 active producers 174 active injectors Facilities 9 production satellites 14 injection satellites Lost Soldier Main Battery (In 1995 Amoco Production Company combined production facilities) Injection plant No.1 (6 positive displacement pumps each with a 40,000 bwpd capacity) Bairoil CO 2 Recycle Plant 5 Compressors 150 MMCFPD Capacity (200 2200 psi)

Bairoil Faces Significant Challenges in Mid 2008 Reservoir Issues Production is on decline WAG cycle management Reservoir surveillance Production Issues High GOR ratios limiting production in some wells Well testing frequency CO 2 Facilities Issues Limited capacity in CO 2 recycling plant Preventive maintenance completed but downtime still exists

Reservoir Level Workflow Develop geologic model for all WAG CO 2 flooded reservoirs Develop updated OOIP for all reservoirs including new well data Utilize StreamSim s 3D streamline simulator model for two key reservoirs Performance Plots in all reservoirs to identify flood maturity and efficiency Production/Injection % Recovery vs HCPVSI CO 2 efficiency and maturity CO 2 retention and utility factors Review Pressure data over time where available

Pattern Level Workflow Used StreamSim s 3D streamline simulator to develop well allocation factors and injection efficiencies Used Geologic Model to develop updated OOIP at the pattern level Linked Landmark DSS Software to Bairoil SCADA system via Procount and Merit Databases Daily Production/Injection Data is automatically loaded Develop performance plots at pattern level to identify flood maturity and efficiency % Recovery vs HCPVSI CO 2 retention and utility factors Injection/Withdrawal Bubble Maps

Production/Injection Bubble Map Movie

Putting Reservoir/Production Surveillance into Practice Collected and reviewed all historical injection profiles, last profiles had been done in 2000 Develop a plan to conduct injection survey on all active injectors All active injectors were completed within 7 months Utilized OOIP, Pattern performance and injection surveys data to develop new WAG setpoints and cycles volumes based on pattern maturity and efficiency Developed an inventory of recommendations to improve underperforming patterns Conformance Work Squeeze jobs, Selective Injection Coil Tubing Work

Conformance Candidates

Injection /Production Surveillance Tools Merit has a robust SCADA system that provides production well testing, injection volumes and pressure data System provided daily reports that were utilized by field personnel to manage daily operations Identified a need to develop Exception Based Reports that identified patterns and wells that needed attention Well Testing Report Identified production drops & testing issues Injection Report Identified WAG switching candidates and metering issues Directly link to Reservoir Surveillance Tools

Impact of Reservoir & Production Surveillance Helped identified downspacing opportunities in Cambrian flood Development of WAG Management Tool at the pattern level Identified and executed several conformance modification projects Develop surveillance tools that can be utilized in other Merit s CO 2 WAG floods Arrested production decline in all reservoirs

Thank You