Country Analysis Paper. < Lao PDR>

Similar documents
Presented by: Ministry of Natural Resources and Environment, Lao PDR

ESC Promotion by MONRE/PCD together with LPP/LPPE in Lao PDR

Second Meeting of the Regional 3R Forum in Asia Kuala Lumpur, Malaysia Solid Waste Management in Lao PDR. 6 October, 2010

Country Analysis Paper. < Cambodia>

March 1, 2014 Pollution Control Department (PCD) Ministry of Natural Resources and Environment (MONRE), Lao PDR

Introduction of LPP/LPPE and ESC_GL

Integrated on Solid Waste Management in Krong Kampot, Kampot province

Outline of the subject (2 weeks)

Country Analysis Paper. < Bhutan>

Country Analysis Paper. < People s Republic of China>

Mrs. Singkham KHONGSAVANH Vice Governor, Vientiane Province, Lao PDR

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE SERVICES 1

Country Analysis Paper. < Indonesia >

Phares P. Parayno 1 and N.D. Trang 2

Solid Waste Management in Thailand: Policy and Implementation

Trade Logistics and the 2030 Agenda for Sustainable Development

MAPPING NEEDS AND ACTIVITIES ON WASTE MANAGEMENT IN VIETNAM

LAO BUSINESS FORUM BRIEF

(in-country training workshop )

Municipal Solid Waste Management Policy in Thailand. Pollution Control Department (PCD) Ministry of Natural Resources and Environment Thailand

Technology for Waste Management/Infrastructure Chiang Mai (Thailand)

Country Report. (Draft) < Indonesia>

Introduction of solid waste management and climate change

JICA s Cooperation for the 3Rs JICA. 30/10/2006 Global Environment Department. Implementation of 3R s program in a school, Malaysia

Vietnam. local actions to address of marine litter. Enabling Sustainable Communities

SOLID WASTE IN DA NANG CITY

Strategy on Freight Transport and Logistics Development in Lao PDR

Challenges and future prospects in the sustainable management of waste in the Republic of Moldova

Performance Indicators in the 3Rs and Resource Efficiency -Overview of Session Background and 3R Policy Indicator Factsheets-

Launch of CCAC MSWI Asian Component

Example 2. Development of Waste Management Strategy and Action Plan of Phnom Penh City, Cambodia. Key Challenges and Policy Responses

Development and Promotion of National 3R Strategy: Cambodia, Philippines and Thailand

NAMA in the Waste Sector: Waste to Resources for Cities in Vietnam

Nationally Appropriate Mitigation Action (NAMA) programme in the Waste Sector: Waste to Resources for Cities in Vietnam

INTEGRATED SOLID WASTE MANAGEMENT TOWARDS GREEN ECONOMY IN VIETNAM

POLICIES AND PRACTICES FOR PLASTIC WASTE MANAGEMENT IN THAILAND

Municipal Solid Waste Management Practices and Challenges in Cambodia

Country Report. (Draft) < Malaysia >

Country Analysis Paper. < Maldives>

Waste Statistics 2017

City Report. (Draft) < Dhaka South>

ASSESSMENT OF THE SOLID WASTE MANAGEMENT SYSTEM OF BAHIR DAR TOWN AND THE GAPS ISWM PLAN IDENTIFIED FOR THE DEVELOPMENT OF AN.

Japan s efforts of country-country cooperation and CCAC as a new framework of international cooperation

Ensure availability and sustainable management of water and sanitation for all

Low Carbon Activities in Hai Phong City based on City-to-City Collaboration

Integrated Waste Management in Chiang Mai Province

NATIONAL STANDARDS TECHNICAL SPECIFICATION FOR RIVER WORKS IN LAO PDR

Working for Better Water Quality The State of Water Quality Management in WEPA Partner Countries

LAO PEOPLE S DEMOCRATIC REPUBLIC

Country Report on Waste management in Sri Lanka Status, Achievements and Challenges

SOLID WASTE TREATMENT TECHNOLOGY

Solid Waste Management

Urban Organic Waste Management Option for Climate Change Mitigation in Developing Asia Countries: A case study on composting

Country Report - Lao PDR

City Report. (Draft) < Kuala Lumpur>

City Report. (Draft) < Dhaka South, Bangladesh >

INTEGRATING THE INFORMAL SECTOR INTO WASTE- TO-RESOURCE INITIATIVES IN KAMPOT, CAMBODIA

Drought conditions and management strategies in Lao PDR.

Waste Management in Thailand

Solid Waste Management: The Case of Bangkok. Department of Environment Bangkok Metropolitan Administration

Integrated Solid Waste Management Wuxi New District, PRC

EXECUTIVE SUMMARY RISK ANALYSIS (VOLUME 1)

Preparatory Meeting for the Inaugural Meeting of the Regional 3R Forum in Asia. June 28-29, 2009 Tokyo, Japan

PROMOTING DECENTRALIZED AND INTEGRATED RESOURCE RECOVERY CENTERS

City Report. (Draft) < Rayong, Thailand>

NAMA on Circular Economy Solid Waste Management Approach for Urban Areas in Kenya

Country Report. (Draft) < Solomon Islands>

Greenhouse Gas Emission from Municipal Solid Waste in Phnom Penh, Cambodia

Overview of Municipal Solid Waste Management in Thailand. Pollution Control Department Ministry of Natural Resources and Environment, Thailand

ASEAN German Technical Cooperation Programme Cities, Environment and Transport

Circular Economy Challenges in MENA.

Lao People Democratic Republic

Dethoudom, S. *, Nualchawee, K., Kanchanasuthum, S. and Soytong, P.

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION

Towards Region wide Connectivity in the Greater Mekong Sub Region (GMS)

The Polish National Waste Management Plan 2014

It was presented to the Minister of the Environment, Kingdom of Cambodia on May 5, 2000 Phnom Penh, Cambodia

Solid Waste Management City Profile

Sabaidee Welcome to Lao PDR

STATUS ON DRY PORTS DEVELOPMENT IN LAO PDR

Ex-ante Project Evaluation

Industrial Development Strategies for Lao PDR

Exploring Areas of Learning and Cooperation on Forest Tenure Reform of Asia

Solid Waste Management

Vietnam - Waste Sector NAMA: Waste to Resources for Cities

SOLID WASTE MANAGEMENT PROGRAM of QUEZON CITY

Flood Management and Mitigation measures

Country Report. (Draft) < Republic of Kazakhstan >

CONCLUDING REPORT. Roadmap toward Effective flood Hazard Mapping in. Lao PDR. By: Mr. Anousone SISA-AD. Lao PDR

Progress on Work on 3R Policy Indicators in ERIA Working Group

URENCO s Environmental Business on 3R in Hanoi City

Transportation Infrastructure Development in CLMV Countries

Executive Brief for NAMA Consultation Workshop

Solid Waste Management in Least Developed Asian Countries A Comparative Analysis

Solid Waste Management in Cambodia

Pacific, 4-6 th March , India Bangkok, Thailand

SOLID WASTE MANAGEMENT AND 3R IN VIETNAM

3 rd Asia Automobile Institute Summit 3-4 December 2014 Bangkok, Thailand

City Report. (Draft) < Rajkot, Gujarat, India>

Country Report. (Draft) < Afghanistan>

Transcription:

Fourth Regional 3R Forum in Asia 3Rs in the Context of Rio+20 Outcomes The Future We Want Ha Noi, Viet Nam, 18-20 March 2013 Country Analysis Paper (Draft) < Lao PDR> ------------------------------------- This country analysis paper was prepared by Lao PDR as an input for the Fourth Regional 3R Forum in Asia. The views expressed herein do not necessarily reflect the views of the United Nations.

Fourth Regional 3R Forum in Asia 18-20 March 2013, Ha Noi, Viet Nam Venue: Calidas Landmark 72 Royal Residence Hanoi Hotel Theme: 3Rs in the Context of Rio+20 Outcomes The Future We Want Brief Country Analysis Paper Lao PDR Jointly Prepared by: Ministry of Public Works and Transport and Ministry of Natural Resources and Environment

1 General Information Lao People's Democratic Republic (Lao PDR), is a landlocked country in Southeast Asia, bordered by Burma and People's Republic of China to the northwest, Vietnam to the east, Cambodia to the south and Thailand to the west. Lao People's Democratic Republic is comprised largely of mountains, highlands and plateaus. Despite the assumption that the country is quite small because of its population, the actual land size is equivalent to Great Britain. About 75 percent of the country is mountainous, and the remaining 25 percent is lowlands adjacent to the Mekong River, which runs for 1,800 kilometers along and within the western border. According to the three previous population censuses, the population of Lao PDR increased by about one million in every 10 years; in 1985 Laos had about 3.5 million inhabitants, in 1995 about 4.5 million habitants and in 2005 about 5.6 million. With a growth rate of 2% in the population (women between the reproductive ages have 4-5 children), it is estimated that the population of Lao PDR will be 6.9 million by 2015. Waste generation has been increased significantly in urban centres of Lao PDR, and only about 45-50 percent has been collected. From 2000 to 2008, Vientiane has more than doubled its waste generation and collection. The waste in Lao PDR consists of approximately 30 per cent organic material; 30 per cent plastic; 15 per cent paper; and 25 per cent glass, cans and other metals (STEA and Worldbank 2005). The annual waste generation in 2004 was 270 000 tons. Domestic waste accounts for most of the waste generated. The average urban waste production in Lao PDR is 0.75 kg per capita per day. Vientiane and the four secondary towns account for 0.8 1.4 kg per capita per day (Table 7.2). Hazardous and toxic wastes such as batteries, old paint cans, aerosols and other refuse are also mixed with this waste. The comparatively low content of organic material in municipal solid waste is mainly due to the agricultural lifestyle, even in urban areas, where a large proportion of food waste is recycled as animal feed. According to surveys in 57 urban areas, only Vientiane City and the four secondary towns of Luangprabang, Thakhek, Savannakhet and Pakse use landfills for solid waste disposal. However, the disposal areas are small and have no leachate collection and monitoring wells. Elsewhere, open dumping and burning are common practices for waste disposal in Lao PDR. Hazardous and infectious wastes are often disposed in the same areas and manner as municipal waste. There is inadequate solid waste management in the secondary cities of Lao PDR. It is clear that the landfills were not monitored if they had cause groundwater quality problems, as leachate contains a wide variety of contaminants and hazardous chemicals. During raining season, Surface water run-off from the landfills could also cause waste sediment loads in receiving water bodies (rivers, lakes). 2 Major initiatives and achievements in the areas of 3R policies, programmes, and institutional measures; Waste management has only recently developed in Lao PDR and there is no appropriate legal framework for it yet. The National Assembly approved a draft law regarding national hygiene, health care, and protection on 6 May 2001. This law defines the main responsibilities for waste management and provides a framework for more detailed regulations. But the implementation has been problematic due to lack of resources. 1

The main government body responsible for waste management is the Ministry of Public Works and Transport (MPWT) The main agency responsible for the environment is the Ministry of Natural Resources and Environment (MONRE). While this ministry, as focal point, is involved in the preparation of environmental laws and regulations, it is not directly involved in waste management like in many other countries. The responsible agency for waste collection and disposal is the local authorities. In Vientiane Capital, it is the Vientiane Cleansing Unit (formally known as the Sanitation and Environment Agency) under the Vientiane Urban Development Administration Authority. For the other cities, the provincial administration and the district office of Public Works and Transport are the key responsible agencies. The legislative basis for solid waste management in each city is by provincial decree. The provincial decree allocates the responsible agency or committee, defines the general scope of work, and sets the fees to be collected from private households, government offices and commercial enterprises. The provincial decree forms the most effective management tool for supervision and for public co-operation. While these regulations provide a broad legal framework for waste management, there are still many gaps that need to be filled. In particular, rules to support community and private sector involvement have to be set up. The local authorities have also not yet taken serious steps to introduce recycling. The Government has yet to formulate any wider vision on integrated waste management. An integrated waste management strategy would allow the government to introduce preventive measures targeting all producers of waste, including waste minimization, waste reuse, and recycling. The role of the Ministry of Natural Resources and Environment (MONRE) should be strengthened and clarified. The concept and implications of the 3Rs (reduction, reuse, and recycling) should be promoted, especially through awareness raising and public participation activities. The regulations and measures should be implemented and enforced properly. Finally, the element of monitoring and evaluation of the management practices should be followed up. 3 Major initiatives and achievements in promoting 3R technologies and infrastructure development 3.1 Kaysone Phomvihanh Solid Waste Management The rapid growth of the town center and sub-urban areas in Kaysone Phomvihane has created considerable demands for essential urban environment infrastructure. The collection, transport and disposal of solid waste have become the perennial concerns of the local residents given the inadequacy of the existing solid waste management system, with only some 40-50 % of the solid waste being collected and with unacceptable operation of the existing dumpsite. A recycling system exists currently, primarily based on informal collection in the city of the most valuable fractions, selling them to junkyards and dealers. A private recycling contractor is operating a simple MRF at the disposal site. The percentage recycled, however is assumable low; in the range of 5-10 % of the total waste stream. The current fees are 16 USD/year for each serviced household and varying fees for commercial customers. No system exists for hazardous waste (HW). Consequently, an improved overall solid waste management system covering whole Kaysone Phomvihane is required, including: 2

Extended and improved receptacle and collection equipment and operation Improved and extended recycling through an improved materials recovery facility (MRF) and a pilot composting plant New sanitary landfill area with all environmental measures and with adequate operation Separate system for reception, storage and disposal of hazardous waste 3.2 Laos Pilot Program for Narrowing the Development Gap towards ASEAN Integration-Environmental Management Component (LPPE) The purpose of this program is the enhanced promotion of environmentally sustainable cities (ESC) in Lao PDR based on the ASEAN Initiative on Environmentally Sustainable Cities (AIESC). The expected outputs are: Output 1: The guidelines on ESC (ESC_GL) are formulated based on the National Environmental Strategy 2020 and related strategies and action plans. Output 2: As part of urban environmental management (UEM), solid waste management (SWM) in the three pilot cities (Vientiane Capital, Luang Prabang and Xaiyabury) is improved based on the Guidelines on ESC. Output 3: Community-based UEM on SWM is promoted in the three pilot cities Promotion of Environmentally Sustainable Cities (ESC) under LPPE Some activities for output 2 in Vientiane Capital include: 3Rs Promotion at Generation Sources: On-site composting by compost barrel Recyclable wastes separation Reduction of plastic shopping bags by using the Eco-bags Collection System Improvement: Establishment of discharge rules for collection system improvement, i.e. day, time, place, container, etc. Elimination of non-collection households in the target villages. Final Disposal System Improvement Improvement of HCWM Institutional System Improvement Preparation of proposals for decrees, regulations and rules necessary for SWM improvement Preparation of proposals for financial system improvement necessary for SWM improvement 3

4 List examples of specific policy initiatives or measures in dealing with new emerging waste streams such as - e-waste, plastics in coastal-marine environment, chemicals and hazardous wastes 4.1 For municipal solid waste A draft decree from 2009 exists on SWM, but this has not been officially approved yet. This has overall guidelines and requirements for all the SWM components, including hazardous and medical waste. This has been available and reviewed, and the requirements taken into consideration. There is an existing decree on Disposal site management (No 520 / TCPC, dated 23 Feb 2007), regulating site selection and design of disposal sites. 4.2 For medical/infectious waste Decree on Waste Management from Health Care Facilities (No 1706 /MOH, 2/7/2004). Article 8: Separation into 3 fractions: Infectious, Sharp and General Waste. Article 9: Collection & Storage Article 10: Handling & Internal Transfer Article 12-13 : Communal Storage & Duration Article 14-21: Disposal of different Items Decree on Sanitation of Public Area ( No 1705/MOH, 20/7/2004 ) Article 3: All people organizations have the responsibility to keep the public place clean and order. Article 4: There re two kind of public place Open air place: Public Park, stadium, tourist area, parking, fuel station, festival area. Public building: Museum, entertain hall, cultural hall, airport terminal, market, port, conference hall and others. Article 12: Department of Hygiene / Disease Prevention is the responsible for publishing the regulation and information for nationwide. Manage, monitor and supervise the implementation of this decree. Coordinate with all institutions concerned. Organize meeting and workshop for evaluation and planning. Summarize and report the situation to the government. Article 15: Measure taken for the violations and fine start from educate until 5.000.000 kips. In severe case would be send to tribunal court. 5 List specific policy initiatives or strategies for promotion of 3Rs in industry and business sectors, including small and medium size enterprises (SMEs); Presently, Lao PDR does not specific policy and strategy for promotion of 3Rs technologies in small and medium size enterprises, The country does not have a waste management strategy and with limited involvement of private sectors and government resources, international organizations are actively assisting in managing the waste crisis. National policy and rules are not adequately harmonized with the needs and capabilities of the local governments and industries. 4

Integrated waste management using 3R concepts into policy and strategy is one of priorities of environmental protection work contributing to pollution control toward sustainable development in Lao PDR. 5